MONTHYEARML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements CY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors CY-99-111, Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update1999-09-0202 September 1999 Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update ML20211E8051999-08-20020 August 1999 Forwards Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted.Completion of Corrective Actions for Spent Fuel Bldg Ventilation Issues Adequate ML20210J6021999-08-0202 August 1999 Informs That Info Re Orise Technical Survey Assistance to NRC at CT Yankee Is to Include Copies of Listed Documents CY-99-048, Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls1999-07-29029 July 1999 Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors1999-07-20020 July 1999 Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors ML20210C1491999-07-0101 July 1999 Responds to ,Which Responded to NRC Ltr & NOV & Informs That Engagement in Any Similar Wrongdoing in Future May Result in More Significant Enforcement Action. No Further Action Will Be Taken at This Time ML20209C3911999-06-30030 June 1999 Forwards TS Page 6-3 for Haddam Neck Plant ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195F9011999-06-0909 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/98-06 on 990226. Util Did Not Agree with Disposition of Issue Cited as Severity Level IV Violation.Violation Will Be Noncited ML20195H3591999-06-0202 June 1999 Responds to NRC Re Violations Noted in Insp of License DPR-61.Corrective Actions:Disciplinary Actions Were Taken by Util Against Jm Foley & Individual & Departmental Emphasis Is Placed on New HP Stds & Expectations ML20207E9031999-06-0202 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Mt Masnik Will Be Section Chief for Haddam Neck.Organization Chart Encl ML20207B9301999-05-25025 May 1999 Responds to 990114 Correspondence Re Changes to Plant Defueled Physical Security Plan Rev 1 Submitted Under 10CFR50.54(p).Implementation of Changes Subj to Insp to Confirm Changes Have Not Decreased Security Plan ML20207G1761999-05-21021 May 1999 Forwards Insp Rept 50-213/99-01 on 980119-990419 & Closure of CAL 1-97-010.No Violations Noted.Conduct of Activities Associated with Control of Radiological Work at Haddam Neck Generally Characterized as Careful & Thorough ML20206R7221999-05-12012 May 1999 Refers to Investigation 1-97-031 on 970616-0718 & Forwards Nov.Investigation Found That Recipient Deliberately Did Not Follow Radiation Protection Procedures,Falsified Documents & Provided Incomplete & Inaccurate Info to NRC ML20206R8051999-05-12012 May 1999 Responds to 3 Investigations,Repts 1-97-031,008 & 1-98-008 Between 970314 & 980722 as Well as Insp Conducted Between 980720 & 1102.Forwards Synopsis of 3rd OI Investigation ML20206R7021999-05-12012 May 1999 Refers to Investigation 1-97-008 Conducted by Region I & Forwards Notice of Violation.Investigation Found That Recipient Deliberately Attempted to Conceal Release of Contaminated Video Equipment ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders CY-99-057, Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose1999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose ML20206C8631999-04-28028 April 1999 Forwards Amend 194 to License DPR-61 & Safety Evaluation. Amend Authorizes Relocation of Requirements Related to Seismic Monitoring Instrumentation from TSs to Technical Requirements Manual ML20206A6871999-04-22022 April 1999 Informs of Completion of Review of Re Nepco in Capacity as Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee Atomic Power Co ML20210V5221999-04-0808 April 1999 Discusses Continued Performance of Technical Assistance Activities for NRC & Environ Survey & Site Assessment Program (Essap) Survey Assistance at Cy IR 05000213/19960121999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl ML20205J7931999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl CY-99-042, Provides Info on Status of Decommissioning Funding for Haddam Neck Plant1999-03-31031 March 1999 Provides Info on Status of Decommissioning Funding for Haddam Neck Plant CY-99-024, Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted1999-03-29029 March 1999 Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee B17697, Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w)1999-03-12012 March 1999 Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w) CY-99-032, Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring1999-03-0909 March 1999 Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring ML20207B6641999-02-26026 February 1999 Forwards Insp Rept 50-213/98-06 on 981103-990118 & Notice of Violation Re Locked High Radiation Area Doors That Were Found Unlocked by Staff.Security Program Was Also Inspected ML20204C6901999-02-22022 February 1999 Informs That Public Citizen Waives Copyright for 5th Edition of Nuclear Lemon So NRC May Reproduce for Purpose of Contributing to NRC Recommended Improvements to Oversight Process for Nuclear Power Reactors ML20203H9621999-02-17017 February 1999 Responds to to Dk Rathbun Which Forwarded Number of Questions from Constituent Re Spent Fuel Decommissioned Nuclear plants.NUREG-1628, Staff Responses to Frequently Asked Questions Re Decommissioning of NPPs Encl.W/O Encl CY-99-005, Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS1999-01-29029 January 1999 Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS CY-99-023, Provides Summary of Understandings Reached During 990108 Meeting Between Util & CT Dept of Environ Protection Re Dike Area Rainwater Reporting Protocol1999-01-28028 January 1999 Provides Summary of Understandings Reached During 990108 Meeting Between Util & CT Dept of Environ Protection Re Dike Area Rainwater Reporting Protocol ML20203H9711999-01-21021 January 1999 Requests Response to Concerns Raised by Constitutent M Marucci Re Spent Fuel at Decommissioned Nuclear Plants CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl1999-01-18018 January 1999 Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl CY-99-010, Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl1999-01-14014 January 1999 Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl CY-99-009, Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.7901999-01-14014 January 1999 Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.790 ML20206R6051999-01-11011 January 1999 Ack Receipt of Submiting Sf Mgt Plan.Staff Has Reviewed Plan & Notes Plan to Store Sf in SFP Until DOE Takes Physical Possession of Fuel DD-98-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-98-12 Has Expired.Decision Became Final Agency Action on 981211. with Certificate of Svc.Served on 9812221998-12-22022 December 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-98-12 Has Expired.Decision Became Final Agency Action on 981211. with Certificate of Svc.Served on 981222 CY-98-142, Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included1998-12-22022 December 1998 Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included ML20198R1321998-12-21021 December 1998 Forwards Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted.Insp Completes Review of Licensee Actions Described in ,In Response to NOV & Proposed Imposition of Civil Penalties ML20198K8651998-12-21021 December 1998 Ack Receipt of ,Requesting Corrected Pages to Be Issued for License Amend 193,issued on 980630.Informs That Inconsistencies Found When Comparing Corrected Pages Submitted on 981030 & License Amend Application CY-98-201, Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs1998-12-0303 December 1998 Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs IR 05000213/19980041998-11-27027 November 1998 Forwards Special Insp Rept 50-213/98-04 of Licensee Performance During Reactor Coolant Sys Chemical Decontamination ML20195J3571998-11-19019 November 1998 Forwards Exemption from Certain Requirements of 10CFR50.54(w) & 10CFR140.Exemption Submitted in Response to 971007 Application & Suppls & 1218,requesting Reduction in Amount of Insurance Required for Facility 1999-09-20
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARCY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam CY-99-111, Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update1999-09-0202 September 1999 Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update CY-99-048, Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls1999-07-29029 July 1999 Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors1999-07-20020 July 1999 Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors ML20209C3911999-06-30030 June 1999 Forwards TS Page 6-3 for Haddam Neck Plant ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195H3591999-06-0202 June 1999 Responds to NRC Re Violations Noted in Insp of License DPR-61.Corrective Actions:Disciplinary Actions Were Taken by Util Against Jm Foley & Individual & Departmental Emphasis Is Placed on New HP Stds & Expectations CY-99-057, Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose1999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20210V5221999-04-0808 April 1999 Discusses Continued Performance of Technical Assistance Activities for NRC & Environ Survey & Site Assessment Program (Essap) Survey Assistance at Cy CY-99-042, Provides Info on Status of Decommissioning Funding for Haddam Neck Plant1999-03-31031 March 1999 Provides Info on Status of Decommissioning Funding for Haddam Neck Plant ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee CY-99-024, Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted1999-03-29029 March 1999 Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted B17697, Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w)1999-03-12012 March 1999 Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w) CY-99-032, Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring1999-03-0909 March 1999 Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring ML20204C6901999-02-22022 February 1999 Informs That Public Citizen Waives Copyright for 5th Edition of Nuclear Lemon So NRC May Reproduce for Purpose of Contributing to NRC Recommended Improvements to Oversight Process for Nuclear Power Reactors CY-99-005, Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS1999-01-29029 January 1999 Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS ML20203H9711999-01-21021 January 1999 Requests Response to Concerns Raised by Constitutent M Marucci Re Spent Fuel at Decommissioned Nuclear Plants CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl1999-01-18018 January 1999 Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl CY-99-009, Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.7901999-01-14014 January 1999 Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.790 CY-99-010, Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl1999-01-14014 January 1999 Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl CY-98-142, Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included1998-12-22022 December 1998 Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included CY-98-201, Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs1998-12-0303 December 1998 Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs CY-98-191, Provides Notification That Util Implemented Defueled Emergency Plan for HNP on 981001.Util Completed Annual Exercise Required by Subj Plan & 10CFR50.471998-11-0505 November 1998 Provides Notification That Util Implemented Defueled Emergency Plan for HNP on 981001.Util Completed Annual Exercise Required by Subj Plan & 10CFR50.47 CY-98-140, Provides Commitment to Maintain Water Chemistry Requirements in HNP Technical Requirements Manual1998-11-0202 November 1998 Provides Commitment to Maintain Water Chemistry Requirements in HNP Technical Requirements Manual CY-98-183, Forwards Revised License Amend 193 TS Pages to Correct Amend Number on Pages Not Changed by Amend 193.No Commitments Contained within Ltr1998-10-30030 October 1998 Forwards Revised License Amend 193 TS Pages to Correct Amend Number on Pages Not Changed by Amend 193.No Commitments Contained within Ltr CY-98-199, Forwards Listing of Corrections Made & Revised Pages for Proposed License Amend 193.Ltr Also Transmits Repaginated Pages for TS Index & Section 1,per Request of NRC Project Manager1998-10-30030 October 1998 Forwards Listing of Corrections Made & Revised Pages for Proposed License Amend 193.Ltr Also Transmits Repaginated Pages for TS Index & Section 1,per Request of NRC Project Manager CY-98-062, Updates Info of Historical Nature in Response to Both NRC Historical Review Rept & NRC Insp Rept 50-213/97-11 Open Items1998-10-28028 October 1998 Updates Info of Historical Nature in Response to Both NRC Historical Review Rept & NRC Insp Rept 50-213/97-11 Open Items CY-98-154, Forwards Sf Mgt Plan for Haddam Neck Plant.Plan Submits Info on Mgt & Funding for Program to Safely Store Sf Following Permanent Cessation of Power Operations Until Title Is Transferred to DOE1998-10-28028 October 1998 Forwards Sf Mgt Plan for Haddam Neck Plant.Plan Submits Info on Mgt & Funding for Program to Safely Store Sf Following Permanent Cessation of Power Operations Until Title Is Transferred to DOE CY-98-129, Provides Supplemental Info to 980629 Response to 2.206 Petition Questions on Spent Fuel Cooling Methods.Util Pending Commitment Made within Ltr Stated1998-10-14014 October 1998 Provides Supplemental Info to 980629 Response to 2.206 Petition Questions on Spent Fuel Cooling Methods.Util Pending Commitment Made within Ltr Stated CY-98-186, Provides Notification of Organizational Changes Which Affect Cyap.Organization Chart,Biographical Profile of K Heider & Revised Distribution List for NRC Correspondence,Encl1998-10-0202 October 1998 Provides Notification of Organizational Changes Which Affect Cyap.Organization Chart,Biographical Profile of K Heider & Revised Distribution List for NRC Correspondence,Encl CY-98-153, Forwards Final Response to NRC 961009 RAI Re Configuration Mgt Project at Plant.No New Commitments Made within Ltr or Attachment1998-09-30030 September 1998 Forwards Final Response to NRC 961009 RAI Re Configuration Mgt Project at Plant.No New Commitments Made within Ltr or Attachment CY-98-157, Responds to NRC Request That Cyap Submit Proposed License Amend to Include Fuel Storage Pool Water Chemistry Program within Haddam Neck Plant Ts.Cyap Considers That Amend Is Not Necessary for Listed Reasons.Procedure Encl1998-09-28028 September 1998 Responds to NRC Request That Cyap Submit Proposed License Amend to Include Fuel Storage Pool Water Chemistry Program within Haddam Neck Plant Ts.Cyap Considers That Amend Is Not Necessary for Listed Reasons.Procedure Encl B17440, Corrects Errors in Ltrs & 980225 Re semi-annual Fitness for Duty Performance Data for Jan-June 1998 & July-Dec 19971998-09-24024 September 1998 Corrects Errors in Ltrs & 980225 Re semi-annual Fitness for Duty Performance Data for Jan-June 1998 & July-Dec 1997 CY-98-151, Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct1998-09-21021 September 1998 Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct ML20153G3891998-09-14014 September 1998 Informs That Union of Concerned Scientists Fully Supports Citizens Awareness Network Petition Filed Pursuant to 10CFR2.206,seeking to Revoke or Suspend License for Haddam Neck Nuclear Plant ML20154J9861998-09-11011 September 1998 Forwards for Service Upon Lj Callan,Jc Hoyle & Commission, Request for NRC to Revoke Connecticut Yankee Atomic Power Co License to Operate Haddam Neck Reactor Pursuant to 10CFR2.206 ML20154J9991998-09-11011 September 1998 Requests NRC Take Immediate Action to Revoke Util License to Operate Haddam Neck Nuclear Power Station Pursuant to 10CFR2.206 B17420, Forwards Semiannual fitness-for-duty Performance Data for Jan-June 1998,per 10CFR26.71(d)1998-08-31031 August 1998 Forwards Semiannual fitness-for-duty Performance Data for Jan-June 1998,per 10CFR26.71(d) CY-98-107, Forwards Decommissioning Cost Study for Connecticut Yankee Nuclear Power Plant. Adjustments to Cost Estimate Will Be Made as Necessary as Detailed Work Planning Progresses & Elements of Cost Estimate Periodically Reviewed & Updated1998-08-25025 August 1998 Forwards Decommissioning Cost Study for Connecticut Yankee Nuclear Power Plant. Adjustments to Cost Estimate Will Be Made as Necessary as Detailed Work Planning Progresses & Elements of Cost Estimate Periodically Reviewed & Updated B17384, Submits fitness-for-duty Program Rept for Investigations Re Unsatisfactory Performance Test Results,Per 10CFR26,App a, Subpart B,Section 2.8(e)(4).No New Commitments Are Contained in Ltr1998-08-20020 August 1998 Submits fitness-for-duty Program Rept for Investigations Re Unsatisfactory Performance Test Results,Per 10CFR26,App a, Subpart B,Section 2.8(e)(4).No New Commitments Are Contained in Ltr CY-98-141, Requests Postponement of Defueled Emergency Plan Exercise Until 980923.Ltr Contains No New Commitments1998-08-13013 August 1998 Requests Postponement of Defueled Emergency Plan Exercise Until 980923.Ltr Contains No New Commitments CY-98-145, Provides Remediation Plans for Offsite Location 9621.Work Associated W/Location 9621 Scheduled to Begin on 9808171998-08-13013 August 1998 Provides Remediation Plans for Offsite Location 9621.Work Associated W/Location 9621 Scheduled to Begin on 980817 CY-98-132, Provides NRC W/Addl Info on Plant Defueled Emergency Plan. Util Stores Resin Liners Inside Area Protected by Vehicle Barriers1998-07-31031 July 1998 Provides NRC W/Addl Info on Plant Defueled Emergency Plan. Util Stores Resin Liners Inside Area Protected by Vehicle Barriers CY-98-127, Provides Clarifying Info Re Spent Fuel Pool make-up Capability at Hnp.Conclusions Reached by NRC Staff in SER Contained in Issuance of License Amend 193 Not Impacted & & Remain Valid1998-07-30030 July 1998 Provides Clarifying Info Re Spent Fuel Pool make-up Capability at Hnp.Conclusions Reached by NRC Staff in SER Contained in Issuance of License Amend 193 Not Impacted & & Remain Valid CY-98-118, Informs NRC Staff That Rev 38 to Plant Emergency Plan Has Been Implemented1998-07-21021 July 1998 Informs NRC Staff That Rev 38 to Plant Emergency Plan Has Been Implemented CY-98-121, Responds to NRC Request for Addl Info on Recent Operational Events at Plant.Corrective Actions That Have Been Taken, Discussed1998-07-16016 July 1998 Responds to NRC Request for Addl Info on Recent Operational Events at Plant.Corrective Actions That Have Been Taken, Discussed ML20151Z0221998-07-10010 July 1998 Informs That R Bassilakis & Gejdenson Share Same Concerns Re Recent Incidents at Connecticut Yankee Reactor in Haddam Neck,Ct & Hope That NRC Address Concerns Promptly ML20236P0971998-07-0909 July 1998 Inquires About Truth of Cyap Having No Shift Compliment of Licensed Operators at Haddam Neck Reactor ML20239A0651998-07-0707 July 1998 Discusses 980620 Inadvertent Radwaste Discharge from Plant Reactor.Team of NRC Inspectors,Completely Independent of Region I,Requested to Investigate Region I Ability to Regulate Effectively 1999-09-02
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. l l
CONNECTICUT YANKEE ATOMIC POWER COMPANY )
l B E R L I N, CONNECTICUT P o BOX 270 HARTFORD, CONNECTICUT 06141-0270 TELEPHONE 203 4 65-5000 June 25, 1986 Docket No. 50-213 A05804 Mr. Stewart D. Ebneter, Director Division of Reactor Safety United States Nuclear Regulatory Commission Region 1 631 Park Avenu2 King of Prussia, Pennsylvania 19406 Re f erences : (1) S. D. Ebneter letter to J. F. Opeka, dated May 22, 1986, transmitting Inspection No. 50-213/86-08.
(2) J. F. Opeka letter to C. I. Grimes dated March 12, 1986.
(3) W. G. Counsil letter to D. M. Crutchfield, dated January 5, 1983.
(4) D. G. Eisenhut letter to W. G. Counsil, dated April 5, 1984.
(5) W. G. Counsil letter to D. M. Crutchfield, dated August 18, 1982.
(6) D. M. Crutchfield letter to W. G. Counsil, dated December 13, 1982.
Gentlemen:
Haddam Neck Plant Response to I&E Inspection No. 50-213/86-08 Pursuant to the provisions of Section 2.201 (" Notice of Violation")
and Appendix C (Enforcement Policy) of the NRC's Rules of Practice (10 CFR 2), this report is submitted in reply to Reference (1), which informed Connecticut Yankee Atomic Power Company (CYAPCO) of vio-lations which were identified during a routine inspection at the Haddam Neck Plant from March 10-14, 1986. An extension of the response time from June 21, 1986 to June 25, 1986 was granted by Region I via telephone conversation on June 20, 1986.
O D
II DOC O TE O1
r-Alleged Violation:
Technical Specification 4.4.II. A states, " leak detection tests of the following components shall be performed locally at a pressure of not less than 40 psig, using halogen gas detection, soap bubbles, pressure decay or other methods of equivalent sensitivity... isolation valves on lines penetrating containment."
NRC Safety Evaluation report dated May 7,1982, supporting Amendment No. 49 to the Facility Operating License states , " Type C testing with water as a test medium...is acceptable only where the hydraulic test is used to demonstate a water seal at the penetration throughout the post accident period."
Contrary to the above, as of March 14, 1986, numerous isolation valves on lines penetrating containment were being tested using water as the test medium when the purpose of the test was not to demonstrate a water seal at the penetration. Further, this testing has not been shown to have sensitivity equivalent to the approved test methods.
This is a Severity Level IV Violation.
Response :
CYAPC0 currently tests certain penetrations using the water collection method. This method complies with that portion of Technical Specifi-cation 4.4 which permits the use of test methods other the those specifically enumerated in the Technical Specification. The intent of the Technical Specification is to assure that local leakage can be detected. The water collection method, in f act, permits not only the detection but the quantification of leakage. In contrast, the soap bubble method of leak detection does not permit the quantification of le akage. CYAPCO maintains that the method used does indeed accomplish the intent of the Technical Specification. Since the Technical Speci-fication permits the use of alternative leakage testing methods, no approval of such usage is required by the NRC Staf f prior to imple-mentation of an alternative test method. On this basis, CYAPCO maintains that local leak rate testing at the Haddam Neck Plant is conducted in accordance with the Technical Specifications.
Inspection Report No. 50-213/86-08 references an NRC Safety Evaluation Report (SER) dated May 7, 1982 to support the Notice of Violation.
That SER, supporting Amendment No. 49 to the Facility Operating License states, " Type C testing with water as a test medium...is acceptable only where the hydraulic test is used to demonstrate a water seal at the penetration throughout the test accident period."
In response to that SER, in a letter f rom W. G. Counsil to D. M.
Crutchfield dated January 5, 1983 (Reference 3), CYPACO concluded that a re-evaluation to determine the presence of a water seal would be required prior to implementation of any required modifications.
CYAPCO also concluded that there was a need to integrate any modifi-cations with the ultimate outcome of the SEP review.
~
- In a letter from D. G. Eisenhut to W. G. Counsil dated April 5,1984 (Reference 4), the Staff approved deferral of the implementation of the modifications identified in Amendment No. 49- because of the
"... interrelationship of the Appendix J, Appendix A and seismic ev aluations , and the existing penetration leak testing...". This deferral was approved pending resolution of policy and programmatic issues related to the implementation of the Integrated Safety Assessment Program (ISAP). The NRC subsequently determined that this issue would te reviewed as part of ISAP Topic 1.03, " Containment Pene trations" . That review is ongoing.
, This position is further supported by the results of an inspection conducted in July 1984 (reference Inspection Report No. 84-13).
^
During the inspection, NRC Region I personnel reviewed documents related to local leak rate testing at the Haddam Neck Plant. These documents included Technical Specification 4.4. The documents were reviewed to determine compliance with the regulatory requirements of Appendix J to 10 CFR 50, Technical Specifications, applicable industry standards and station administrative guidelines. The documents were also reviewed against a number of previously identified NRC unresolved items to determine progress made and/or compliance achieved. The inspector held discussions with the CYAPC0 personnel regarding test methods, the documentation of test results, and repair and retesting following f ailed tests.
The Region I personnel determined that documents reviewed were in general conformance with the regulatory requirements of Appendix J to 10 CFR 50 and applicable industry standards. The inspectors noted ,
that CYAPCO was performing local leak rate testing with methods and l under test conditions not approved through NRC regulations and/or technical positions , e.g. , water collection testing. The inspectors indicated they were aware this item had been identified during previous NRC inspections of local leak rate testing activities and was in the process of licensee evaluation and NRR SEP/ISAP review. The inspection report concluded that no unacceptable conditions were identified.
Pending final resolution of ISAP Topic 1.03, " Containment Pene-trations", Connecticut Yankee submitted an exemption request for schedular exemption from the requirements of 10 CFR 50, Appendix J to allow liquid collection testing (Reference 2) .
Based on the above, CYAPCO maintains that this item does not constitute a violation.
Alleged Violation:
Technical Specification 1.8 states, " Containment integrity shall exist when: ... All penetrations required to be closed during accident conditions are.. . closed by manual valves.. ."
r Technical Specification 3.11.B states, " containment integrity shall be maintained whenever the reactor coolant system is above 300 psig and 200 F..."
Contrary to the above, on January 7, March 7 and November 15, 1985, valve SA-V-413, a designated locked closed manual containment isolation valve, was opened to perform a surveillance test when containment integrity was required.
This is a Severity Level IV Violation.
Response
CYAPC0 agrees that the opening of SA-V-413, when containment integrity was required, is a violation. A Technical Specification change will be submitted by August 29, 1986 proposing to open SA-V-413 under administrative controls. SA-V-413 has been red tagged to prevent it from being opened until NRC approval is obtained.
The containment building is equipped with a continuous monitoring system (CMS). The purpose of the CMS is to provide an indication of any leaks that develop in the containment boundary during plant operation. The use of the CMS is described in the Facility Description and Safety Analysis (FDSA), Section 3.5.3 "Continous Leak Te s t " . The containment is kept at a positive pressure during plant operation. The containment weight of air is then monitored for any trends that indicate excessive leakage.
As stated in the FDSA, when the containment air pressure decreases to a prescribed limit , air is charged into containment. This practice serves two purposes: 1. A positive pressure is maintained for leakage monitoring; 2. The addition of air verifies that the instruments respond to a change. SA-V-413 must be opened to charge air into containment. The Technical Specifications do not contain a provision to open SA-V-413.
Alleged Violation:
10 CFR 50.59(b) states, in part, ".. . records shall include a written safety evaluation which provides the bases for the determination that the change, test or equipment does not involve an unreviewed safety question."
Contrary to the above, valves Ei-MOV-31 and SA-V-413 were designated as containment isolation valves for penetrations P-80 and P-62 without -
the required safety evaluation being performed to determine that no unreviewed safety questions exists as a result of the change.
This is a Severity Level IV Violation.
A
Response :
CYAPCO did not violate the 10 CFR 50.59(b) safety evaluation requirement. The basis for this position is that the containment boundaries were not changed.
The use of SA-V-413 as a containment isolation valve for P-62 dates back to preoperation design and testing. The design requirement does not specifically state that two check valves in series are required for containment isolation. SA-V-413 has always been the containment isolation valve for P-62 by design. Therefore, there was no design change .
The plant design change to add an auxiliary containment spray line f rom the fire system was approved in December 1967. The line utilizes containment penetration P-80. The line has a check valve located inside containment and a motor-operated valve (MOV-31) located outside containment. The use of MOV-31 as a containment isolation valve meets design requirements. A review of procedures showed that MOV-31 has always been tested as the conts.inment isolation valve for P-80.
Our position on this matter is further supported by correspondence on SEP Topic VI-4, " Containment Isolation System". By letter dated August 18, 1982 f rom W. G. Counsil to D. M. Crutchfield (Reference 5),
in response to an NRC request, CYAPCO provided a list of all con-tainment penetrations along with the isolation provisions for each penetration. Both SA-V-413 and MOV-31 were designated as containment isolation valves in that submittal. Furthermore, in Reference (6),
the Staff explicitly approved the isolation provisions for penetration P-80 noting that those provisions included "...a normally closed, remote manual motor operated valve (MOV 31) . ..". That safety evalu-ation also noted that the isolation provisions for penetration P-62 included two locked, closed valves outside containment, one of those being SA-V-413.
Based on the above information, CYAPC0 contends that this is not a violation.
We trust that this information satisfies your concerns. in this matter.
However, if you have any further questions or concerns, we remain available to discues them with you.
Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY
%.F h
(__,) J. F. dgbka Senior Vice President