Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated ML20092L6251995-09-22022 September 1995 Informs of Change to Pbaps,Units 2 & 3 TS Bases,Figure 1.1-1.Change Allows PBAPS Units 2 & 3 to Maximize Generation Throughout Entire Fuel Cycle ML20092A2071995-09-0101 September 1995 Application for Amend to License DPR-56,consisting of Change Request 95-07,deleting License Condition 2.C ML20092B9361995-08-28028 August 1995 Rev E to TS Change Request (Tscr) 93-16 to Licenses DPR-44 & DPR-56 Re Implementation of Improved Ts.Rev E to Tscr 93-16 Redesignates Change Control Mechanism from 10CFR50.59,as Indicated Previously,To 10CFR50.54(a) for Six Listed Items ML20086Q4271995-07-21021 July 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing Overall Conversion of Current PBAPS TS to Improved TS as Contained in NUREG-1433, Std Ts,Ge Plants,BWR/4 ML20083Q7341995-05-16016 May 1995 Rev a to Tscr 93-16 Re Conversion to Improved TSs as Contained in NUREG-1433 ML20083K8581995-05-0909 May 1995 Application for Amend to Licenses DPR-44 & DPR-56,consisting of Change Request 93-16 Re Conversion of Current PBAPS TS to Improved TS ML20082M3191995-04-12012 April 1995 Suppl 2 to License Change Request 94-08,supporting Mod P00068-3,which Upgrades Major Components of TIP Sys to Correct Typo.Revised TS Page 186 Encl ML20087H0411995-04-10010 April 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Requests 94-11,94-12 & 94-13,relocating Certain Review & Audit Requirements to Plant UFSAR ML20082B2121995-03-23023 March 1995 Revised Page 4 to TS Change Request 90-03 ML20082B0491995-03-22022 March 1995 License Change Request 95-04 to Licenses DPR-44 & DPR-56, Reducing Local Leak Rate Test Hold Time Duration from One H to 20 Minutes ML20081H1261995-03-16016 March 1995 Application for Amends to Licenses DPR-44 & DPR-56 Re Requirements for SRMs While in Refueling Condition ML20080H0401995-02-10010 February 1995 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Errors Made During Past TS Changes ML20078A0531995-01-17017 January 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing to Change Source Range Monitor to Range Neutron Monotors & Delete Intermediate Range Monitors ML20077S6191995-01-13013 January 1995 License Change Request 94-07 to Licenses DPR-44 & DPR-56, Revising Allowed Time Between Signal Calibrs of LPRM from Every 6 Wks (Approx 1,000 EFPH) to Every 2,000 Megawatt Days Per Std Ton ML20077S4691995-01-13013 January 1995 License Change Request 94-08 to Licenses DPR-44 & DPR-56, Revising TS Tables 3.7.1 & 3.7.4 to Reflect Reduction in Number of Primary Containment Power Operated Outboard Valves for TIP Probes,Per PBAPS Mod P00068 ML20078L7541994-11-21021 November 1994 TS Change Request 94-14 to License DPR-56,re One Time Schedular Exemption from 10CFR50,App J,Section III.D.1(a) Concerning 10CFR50,App J Type a Test Intervals ML20078K7601994-11-17017 November 1994 License Change Request 93-13 to Licenses DPR-44 & DPR-56, Revising TS to Support Mods 5384 & 5386,upgrading Main Stack & Vent Stack Radiation Monitoring Sys 1999-09-27
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217K9761999-10-14014 October 1999 Amend 234 to License DPR-56,changing TS in Response to 990301 Application & Suppls ,1001 & 06,to Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Monitoring Sys ML20217B4261999-10-0505 October 1999 Amend 233 to License DPR-56,changing Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Repts ML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20216H6891999-09-24024 September 1999 Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively, Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by TSs SR 3.9.1.1 ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20211D5471999-08-23023 August 1999 Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Correct Typo & Editorial Errors Introduced in TSs by Previous Amends ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205K7371999-04-0707 April 1999 Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively, Consisting of Changes to TS SRs Re Secondary Containment Doors in Response to 980204 Application,As Revised by ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20155C6011998-10-26026 October 1998 Amend 226 to License DPR-44,revising TSs for Safety Limit MCPR from Current Value of 1.11 to 1.10 for Two Recirculation Loop Operation & from 1.13 to 1.12 for Single Recirculation Loop Operation ML20154H4691998-10-0505 October 1998 Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Permit Incorporation of EOC-RPT Sys at Plant,Units 2 & 3 ML20154J2261998-10-0505 October 1998 Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20154G6551998-10-0101 October 1998 Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively, Revising Plant,Units 2 & 3 TSs to Exclude MSIV Leakage from Total Type B & Type C Local Leak Rate Test Results ML20153B9581998-09-14014 September 1998 Amend 9 to License DPR-12,adding Requirements for Control of Effluents & Annual Reporting Per 10CFR50.36a ML20238F2611998-08-24024 August 1998 Amend 222 to License DPR-44,revising Pbaps,Unit 2 TSs to Support Mod P00271,which Would Replace SRMs & IRMs W/Wrnms, During Forthcoming Outage 2R12,scheduled for Early Oct 1998 ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20212G8261997-10-24024 October 1997 Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively, Changing TSs to Eliminate Inconsistency Between ECCS Operability Requirements & Autostart & Protective Trip Bypass of EDGs on ECCS Initiation Signal ML20217J5571997-10-0909 October 1997 Amend 225 to License DPR-56,revising MCPR Safety Limit in Section 2.1 of TSs from 1.07 to 1.11 for Two Recirculation Loops in Operation ML20217D8101997-09-30030 September 1997 Amend 224 to License DPR-56,revises TS to Support PBAPS Mod P00271,which Would Replace Source Range & Intermediate Range Monitors W/Wide Range Neutron Monitoring System ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20216G5321997-09-0404 September 1997 Amends 220 & 223 to Licenses DPR-44 & DPR-56,respectively, Revising TS to Extend Replacement Frequency for Inflatable Seat Seals for Primary Containment Purge & Vent Valves to 96 Months ML20217M7961997-08-19019 August 1997 Amends 219 & 222 to Licenses DPR-44 & DPR-56,respectively, Extending APRM Flow Bias Instrumentation Surveillance Interval from 18 Months to 24 Months ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20135B3851997-02-19019 February 1997 Amends 218 & 221 to Licenses DPR-44 & DPR-56,respectively, Changing Min Allowable Charging Water Header Pressure from Value 955 Psig to Value of 940 Psig in TS 3.10.8 ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated 1999-09-27
[Table view] |
Text
_ _ _ _ _
Et; tion Support DepIrtment 10 CFR 50.90 v
PECO NUCLEAR nce c-A Unit of PECO Energy wa7N1NN59 July 10,1998 Docket No. 50-277 License No. DPR-44 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station, Unit 2 License Change Application ECR 98-01403
Dear Sir:
PECO Energy Company (PECO Energy) hereby submits License Change Application ECR 98-01403, in accordance with 10 CFR 50.90, requesting a change to the Peach Bottom Atomic Power Station (PBAPS), Unit 2 Facility Operating License. This proposed change will revise Technical Specifications (TS) Section 2.0, " Safety Limits" and Section 5.6.5 (" Core Operating Limits Report"). These Sections will be revised to incorporate revised Safety Limit Minimum Critical Power Ratios (SLMCPRs) due to the use of cycle-specific analysis performed by General Electric Nuclear Energy (GENE) for PBAPS, Unit 2, Cycle 13.
Information supporting this request is contained in Attachment 1 to this letter, I and the marked up pages showing the proposed changes to the PBAPS, Unit 2 I TS are contained in Attachment 2. Attachment 3 (letter from S. B. Shelton (GENE) to K. W. Hunt (PECO Energy)," Peach Bottom Unit 2 Cycle 13 Safety Limit MCPR," dated June 10,1998) specifies the new SLMCPRs for PBAPS, Unit 2. Attachment 3 contains information proprietary to General Electric.
General Electric requests that the document be withheld from public disclosure in .
accordance with 10 CFR 2.790(a)(4). An affidavit supporting this request is I contained in Attachment 3. Attachment 4 contains a non-proprietary version.
We request that the amendment to the PBAPS, Unit 2 TS be approved by September 28,1998, and be made effective prior to the restart from the upcoming PBAPS, Unit 2 refueling outage.
- i 9807210353 980710 PDR ADOCK 05000277 P PDR r C-I .
L,G trk '
pop l w ,
(\ s 1 t.J[
e
, July 10,1998 Page 2 If you have any questions, please do not hesitate to contact us.
Very truly yours, h Garrett D. E ards Director- Licensing
Enclosures:
Affidavit, Attachment 1, Attachment 2, Attachment 3, Attachment 4 cc: H. J. Miller, Administrator, Region I, USNRC A. C. McMutray, USNRC Senior Resident inspector, PBAPG ,
R. R. Janati, Commonwealth of Pennsylvania '
l
e 4
. COMMONWEALTH OF PENNSYLVANIA:
- ss.
COUNTY OF CHESTER :
J. B. Cotton, being first duly swom, deposes and says:
That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the attached License Change Application ECR 98-01403,' for Peach Bottom Facility Operating License DPR-44, and knows the contents thereof; and that
- the statements and matters set forth therein are true and correct to the best of his knowledge,information and belief.
,M , -
[
Vice President Subscribed and swom to before me this /0 M day of 1998.
4 Y-
/
/ Notary Public gualAL SEAL carol A. WALTON. Notary Putes j?? en L
l
t
+
l ATTACHMENT 1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 -
Docket No. 50-277 License No. OPR-44 LICENSE CHANGE APPLICATION-ECR 98-01403
" Revision of SLMCPRs" Supporting information - 4 Pages l
1
Docket No. 50-278 i License No. DPR-56 Introduction PECO Energy Company, Licensee under Facility Operating License DPR-44 for the Peach Bottom Atomic Power Station (PBAPS), Unit 2, requests that the Technical Specifications (TS) contained in Appendix A to the Operating License be amended to revise TS 2.1.1.2 and TS 5.6.5.b.1 to reflect changes in the Safety Limit Minimum Critical Power Ratios (SLMCPRs) due to the use of cycle-specific analysis performed by showing the proposed changes a(re contained in Attachment 2.
from S. B. Shelton (GENE) to K. W. Hunt (PECO Energy), " Peach Bottom Unit 2 Cycle 13 Safety Limit MCPR," dated June 10,1998) specifies the new SLMCPRs for PBAPS, Unit 2, Cycle 13. This License Change A description of the proposed TS changes, a safetypplication assessmentprovides of the proposed a discussion TS and changes, information supporting a finding of No Significant Hazards Consideration and informa'.:on supporting an Environmental Assessment.
Discussion and Description of the Proposed Chanae The proposed changes involve: 1) revising the SLMCPRs contained in TS 2.1.1.2,2) revising the footnote associated with TS 2.1.1.2 to reflect the use of cycle-specific SLMCPRs for Cycle 13, and 3) adding a footnote to TS 5.6.5.b.1.
The calculations of the cycle-specific, two-loop and single-loop operation SLMCPR values for PBAPS, Unit 2, Cycle 13, are based upon USNRC-approved methodology described in " General Electric Standard Application for Reactor Fuel," NEDE-24011-P-A-13, and U.S. Supplement, NEDE-24011-P-A-13-US, August,1996, and the ;
" Proposed Amendment 25 to GE Licensing Topical Report NEDE-24011-P-A (GESTAR 1 II) on Cycle Specific Safety Limit MCPR." Proposed Amendment 25 was submitted by )
GENE to the U. S. Nuclear Regulatory Commission (USNRC) on December 13,1996. ;
Revision 13 of GESTAR 11 requires that the SLMCPR be reconfirmed each cycle. This reconfirmation was performed using the procedures contained in the proposed Amendment 25 to GESTAR which include utilization of cycle-specific parameters such as: 1) the actual core loading (GE11 and GE13 fuel),2) conservative variations of and 4) the full cycle exposure rang)e. projected control blade pattems,3 the ac The SLMCPR is selected such that 99.9% of the rods in the core are expected to avoid transition boiling. The results of the GENE analysis for PBAPS, Unit 2 Cycle 13 show a MCPR Safety Limit of 1.10 for two-loop operation and 1.12 for single-loop operation.
Additional information regarding the 1.10 and 1.12 cycle-specific SLMCPR for PBAPS, Unit 2 Cycle 13 is discussed in the Attachment 3 letter. ,
Due to the use of the proposed Amendment 25, the current footnote to TS 2.1.1.2 is being updated to ensure that the SLMCPR value is reconfirmed for the cycle l subsequent to PBAPS, Unit 2, Cycle 13. The current footnote applies to PBAPS, Unit 2, Cycle 12. This footnote was originally added to TS 2.1.1.2 to ensure that the TS clearly articulated that the TS values are applicable only to PBAPS, Unit 2, Cycle 12.
This issue was discussed in the USNRC Safety Evaluation dated September 27,1996, for PBAPS, Unit 2, Cycle 12.
i 1 i
Docket No. 50-278 License No. DPR-56 Additionally, TS 5.6.5.b provides the analytical methods used to determine the core operating limits. TS 5.6.5.b.1 references the latest approved General Electric Standard Application for Reactor Fuel identified in the Core Operating Limits Report. Due to the use of the proposed Amendment 25, and the use of a proposed R-factor calculation methodology ("R-Factor Calculation Method for GE11, GE12, ano GE13 Fuel,"
NEDC-32505P, Revision 1, June 1997), which has not yet been approved for generic use by the USNRC, a footnote is being added on page 5.0-21 to TS 5.6.5.b.1 which states that for Cycle 13, specific documents will be approved in the USNRC Safety Evaluation that support the License Amendment to revise the SLMCPRs. This footnote was also added to the PBAPS, Unit 3 TS as discussed in the USNRC Safety Evaluation dated October 9,1997, for PBAPS, Unit 3, Cycle 12.
Safety Assessment The proposed TS changes will revise TS 2.1.1.2 and TS 5.6.5.b.1 to reflect the changes in the SLMCPRs due to the cycle-specific analysis performed by GENE for PBAPS, Unit 2, Cycle 13. The new SLMCPRs are calculated using USNRC-approved methodology described in " General Electric Standard Application for Reactor Fuel,"
NEDE-24011-P-A-13, and U.S. Supplement, NEDE-24011-P-A-13-US, August,1996, and the " Proposed Amendment 25 to GE Licensing Topical Report NEDE-24011-P-A (GESTAR 11) on Cycle Specific Safety Limit MCPR." Amendment 25 was submitted by GENE to the USNRC on December 13,1996. The SLMCPRs are set high enough to ensure that greater than 99.9% of all fuel rods in the core avoid transition boiling if the limit is not violated. The MCPRs are calculated to include cycle-specific parameters which include: 1) the actual core loading (GE11 and GE13 fuel),2) conservative variations of projected control blade pattems,3 the actual bundle parameters (e.g.,
local peaking), and 4) the full cycle expocure ra)nge. The new SLMCPRs at PB Unit 2, Cycle 13 are 1.10 (two-loop operation) and 1.12 (single-loop operation).
The footnote associated with TS 2.1.1.2 is being revised to ensure that the SLMCPR value is reconfirmed for the cycle subsequent to PBAPS, Unit 2, Cycle 13. Additionally, a footnote is being added to TS 5.6.5.b.1 due to the use of the proposed Amendment 25, and the use of a proposed R-factor calculation methodology ("R-Factor Calculation Method for GE11, GE12, and GE13 Fuel," NEDC-32505P, Revision 1, June 1997),
which has not yet been approved for generic use by the USNRC.
Information Supportina a Findina of No Significant Hazards Consideration We have concluded that the proposed changes to the PBAPS, Unit 2 TS, which will revise TS 2.1.1.2 and TS 5.6.5.b.1, do not involve a Significant Hazards Consideration.
in support of this determination, an evaluation of each of the three (3) standards set forth in 10 CFR 50.92 is provided below.
- 1. The proposed TS chanaes do not involve a significant increase in the probability or consequences of an accident previousiv evaluated.
The derivation of the cycle-specific SLMCPRs for incorporation into the TS, and I
its use to determine cycte-specific thermal limits, have been performed using the i methodology discussed in " General Electric Standard Application for Reactor l Fuel," NEDE-24011-P-A-13, and U.S. Supplement, NEDE-24011-P-A-13-US, l~
l August,1996, and the " Proposed Amendment 25 to GE Licensing Topical Report NEDE-24011-P-A (GESTAR ll) on Cycle Specific Safety Limit MCPR."
Amendment 25 was submitted by GENE to the U. S. Nuclear Regulatory 2
Docket No. 50-278 License No. DPR-56 Commission (USNRC) on December 13,1996. This change in SLMCPRs
.cannot increase the probability or severity of an accident.
The basis of the SLMCPR calculation is to ensure that greater than 99.9% of all fuel rods in the core avoid transition boiling if the limit is not violated. The new SLMCPRs preserve the existing margin to transition boiling and fuel damage in the event of a postulated accident. The fuellicensing acceptance criteria for the SLMCPR calculation apply to PBAPS, Unit 2, Cycle 13 in the same manner as they have applied prevously. The probability of fuel damage is not increased.
Therefore, the proposed TS changes do not involve an increase in the probability or consequences of an accident previously evaluated.
In addition to the change to the SLMCPR, the footnote to TS 2.1.1.2 is being revised, and a footnote is being added to TS 5.6.5.b.1. The revision to the footnote associated with TS 2.1.1.2 will ensure that the SLMCPR :;alue is reconfirmed for the cycle subsequent to PBAPS, Unit 2, Cycle 13, and the footnote to TS 5.6.5.b.1 is being added due to the use of the proposed Amendment 25 and the use of a proposed R-factor calculation methodology
("R-Factor Calculation Method for GE11, GE12, and GE13 Fuel,"
NEDC-32505P, Revision 1, June 1997), which has not yet been approved for generic use by the USNRC. The revision to the footnote associated with TS 2.1.1.2 and the addition of the footnote to TS 5.6.5.b.1 are administrative changes that do not involve an increase in the probability or consequences of an
. accident previously evaluated.
- 2. The orooosed TS chanaes do not create the possibility of a new or different kind of accident from any accident oreviousiv evaluated.
The SLMCPR is a TS numerical value, designed to ensure that transition boiling does not occur in 99.9% of all fuel rods in the core during the limiting postulated accident. It cannot create the possibility of any new type of accident. The new l SLMCPRs are calculated using methodology discussed in " General Electric Standard Application for Reactor Fuel," NEDE-24011-P-A-13, and U.S.
Supplement, NEDE-24011-P-A-13-US, August,1996, and the " Proposed Amendment 25 to GE Licensing Topical Report NEDE-24011-P-A (GESTAR 11) on Cycle Specific Safety Limit MCPR." Amendment 25 was submitted by GENE to the USNRC on Decembe.- 13,1996. Therefore, the revision to the SLMCPR t
will not create the possibility of a new or different kind of accident from any accident previously evaluated.
Additionally, this proposed change will revise the footnote to TS 2.1.1.2, and add i a footnote to TS 5.6.5.b.1. The revision to the footnote associated with TS
- 2.1.1.2, and the addition of the footnote to TS 5.6.5.b.1, are administrative changes that do not create the possibility of a new or different kind of accident
- from any previously evaluated.
- 3. The proposed TS chanoes do not involve a significant reduction in a maroin of safety.
There is no significant reduction in the margin of safety previously approved by the USNRO as a result of the proposed change to the SLMCPR, and the proposed change that will revise the footnote to TS 2.1.1.2, and add a footnote to TS 5.6.5.b.1. The new SLMCPRs are calculated using methodology 3
Docket No. 50-278 License No. DPR-56
' discussed in " General Electric Standard Application for Reactor Fuel," NEDE-
- 24011-P-A-13, and U.S. Supplement, NEDE-24011-P-A-13-US, August,1996, and the " Proposed Amendment 25 to GE Licensing Topical Report NEDE-
. 24011-P-A (GESTAR 11) on Cycle Specific Safety Limit MCPR." Amendment 25 was submitted by GENE to the USNRC on December 13,1996. The fuel licensing acceptance criteria for the calculation of the SLMCPR applv to PBAPS, Unit 2 Cycle 13 in the same manner as they have applied previously'. The SLMCPRs ensure that greater than 99.9% of all fuel rods in the core will avoid transition boiling if the limit is not violated, thereby preserving the fuel cladding integrity. Therefore, the proposed TS changes will not significantly reduce the margin of safety previously approved by the USNRC.
Additionally, the proposed change that will revise the footnote to TS 2.1.1.2, and add a footnote to TS 5.6.5.b.1 is an administrative change that will not significantly reduce the margin of safety previously approved by the USNRC.
Information Suooortina an Environmental Assessment An environmental assessment is not required for the proposed changes since the proposed changes conform to the criteria for " actions eligible for categorical exclusion" as specified in 10 CFR 51.22(c)(9). The proposed changes will have no impact on the environment. The proposed changes do not involve a significant hazards consideration as discussed in the preceding section. The proposed changes do not involve a significant change in the types or significant increase in the amounts of any effluents that may be released offsite.- In addition, the proposed changes do not involve a significant increase in individual or cumulative occupational radiation exposure.
Conclusion The Plant Operations Review Committee and the Nuclear Review Board have reviewed this proposed change to the PBAPS, Unit 2 TS and have concluded that it does not involve an unreviewed safety question, and will not endanger the health and safety of the public.
I I
4 L -
~
ATTACHMENT 2 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 I
Docket No. 50-277 l License No. DPR-44 i
( TECHNICAL SPECIFICATIONS CHANGES I Attached Pages i
! Unit 2 L
( TS Page 2.0-1 TS Page 5.0-21 i
i l
, J s
i
. _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . . . _ _ _ . _ _ _ ._ _ _ _ _ _ _ _ _ _ _