MONTHYEARML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 ML20198Q7181997-10-24024 October 1997 Rev 5 to ER-ME-067, Evaluation of Thermo-Lag Fire Barrier Systems ML20137D3601997-03-20020 March 1997 Engineering Self-Assessment Rept ML20129F6991996-10-25025 October 1996 Justification for SPC 1986 LBLOCA Evaluation Model W/Interim Adjustment for Non-Physical Behavior ML20100F2761996-02-13013 February 1996 Rev 0 of Engineering Rept, Resolution of NRC GL 95-07 'Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves.' ML20116M4021996-02-0101 February 1996 Commitment Matl Change Evaluation Rept 0001 for 941101- 960201 ML20095K5411995-12-18018 December 1995 Nonproprietary Small Break LOCA Analysis Methodology ML20094P7971995-11-22022 November 1995 Rev 0 to CPSES Risk-Based IST Program Risk Ranking Determination Study ML20094P7821995-11-22022 November 1995 CPSES Risk-Based IST Program Risk Ranking Determination Study Summary Rept ML20094P4231995-09-29029 September 1995 Pyrolysis Gas Chromatography Analysis of 10 Thermo-Lag Fire Barrier Samples ML20085N2911995-06-21021 June 1995 Individual Plant Exam of External Events for Severe Accident Vulnerabilities TXX-9432, Rev 0 to CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity1994-12-0909 December 1994 Rev 0 to CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity ML20097A3821994-08-19019 August 1994 Individual Plant Exam of External Events,Seismic,Cpses ML20069M8761994-06-10010 June 1994 Engineering Rept Evaluation of Unit 1 & Unit 2 Thermo-Lag Configurations ML20064M6081994-03-21021 March 1994 Engineering Rept Evaluation of Thermo-Lag Fire Barrier Sys ML20059F5431993-10-0505 October 1993 Engineering Rept, Evaluation of Fir Endurance Test Results Related to Cable Functionality in 1-1/2 & 2 Inch Conduits ML18010B0841993-05-0505 May 1993 NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. ML20127K8121993-01-19019 January 1993 Rev 0,to Evaluation of Unit 2 Thermo-Lag Configurations ML20126G2121992-12-23023 December 1992 Rev 2 to ER-ME-067, Evaluation of Thermo-Lag Fire Barrier Systems ML20126C0421992-12-18018 December 1992 Suppl 6 to Human Factors Control Room Design Review of Comanche Peak Steam Electric Station ML20126A3621992-12-15015 December 1992 Rev 3 to Receipt,Dispensing,Quality & Insp Requirements for Thermo-Lag Fire Barrier Matls ML18010A9521992-11-30030 November 1992 NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. ML20116C9511992-10-27027 October 1992 Individual Plant Exam Submittal:Comanche Peak Steam Electric Station Vol II:Back-End Analysis ML20115D2241992-09-29029 September 1992 Rev 1 to HI-92880, Criticality SE of Comanche Peak Fuel Storage Facilities W/Fuel of 5% Enrichment ML20127C8291992-09-0808 September 1992 Rev 1 to Interim Engineering Rept, Evaluation of Thermo-Lag Fire Barrier Sys ML20114B8051992-09-0101 September 1992 Suppl 5 to Human Factors Control Room Design Review of Comanche Peak Steam Electric Station ML20114C6101992-08-31031 August 1992 Individual Plant Exam Comanche Peak Steam Electric Station Vol 1:Front-End Analysis ML20105A7821992-08-14014 August 1992 Engineering Rept on Thermo-Lag 330-1 Fireproofing Coating Thicknesses Required for 1 & 2 Hour Fire Ratings for Various Structural Steel Members Used by Texas Utils Svcs,Inc ML20105A8471992-08-0606 August 1992 Rev 0 to Comanche Peak Steam Electric Station Unit 2 Engineering Bwip Check Valve 2AF-0083 Failure Investigation ML20116C9621992-07-16016 July 1992 Review of IPE Level 2 Draft Repts for Cpses ML20078H1581992-06-19019 June 1992 CPSES Thermo-Lag Barrier Applications Thermo-Lag Fire Test Conduit & J-Box Test Assemblies. Preliminary Test Results ML20095H2411992-04-13013 April 1992 Validation Efforts for Comanche Peak Steam Electric Station Unit 2 ML20094P3371992-03-26026 March 1992 Control Room Simulator 10CFR55 Certification Initial Rept TXX-9200, RHR Line Summary Rept1992-03-23023 March 1992 RHR Line Summary Rept ML20086E3861991-10-31031 October 1991 Pressurizer Surge Line Transient Justification ML20079D0481991-06-21021 June 1991 Engineering Rept, Testing & Analysis of Commercial-Grade Swing Arms in Borg-Warner Check Valves, June 1991 ML20077E0271991-05-31031 May 1991 Methodology for Reactor Core Response to Steamline Break Events ML20217C4601991-05-31031 May 1991 Reactivity Anomaly Events Methodology ML20073Q8291991-05-17017 May 1991 Small Break LOCA Analysis Methodology ML20084V1401991-03-31031 March 1991 Safety Evaluation for Operation of Comanche Peak Unit 1 W/ Positive Moderator Temp Coefficient ML20079D0571991-03-31031 March 1991 Final Rept on Analysis of Check Valve Swing Arms, Mar 1991 ML20066F4331991-01-31031 January 1991 Draft Analysis of Flow Stratification in Surge Line of Comanche Peak Reactor ML20066L0691990-12-31031 December 1990 Large Break LOCA Analysis Methodology ML20066B2391990-12-31031 December 1990 Control Rod Worth Analysis ML20067B1291990-12-24024 December 1990 Suppl 1 to TUE-1 DNB Correlation ML20062D9041990-11-12012 November 1990 Unit One Loose Parts Monitoring Sys Special Rept 1999-08-06
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
.-
l ;
1 I
' CLARIFICATION OF.IMPELL CTH DESIGN VERIFICATION CRITERIA / METHODS FOR RESOLUTION OF CYGNA AUDIT CONCERNS l
l Effect of Measuremnt Tolerances used for Collection of As-Built Data i
Prepared for:
Texas Utilities Electric Company Prepared by:
\
'Impe. .' Corporation '
0210-040/041-IM-P-009 Revision 0 Prepared by: (. ///./C A l o s_a ([f/B/
Approved by: 8[44/, J- Ar- 37 v
hbk DO K f
IM-P-009 1 l
CONCERN:
Measurement' tolerances are defined (Reference 1) for-~ use in the collection of cable tray as-built data. CYGNA has raised issues which' pertain to the lack of consideration of installation tolerances in the design calculations. i o
BACKGROUND: Measurement tolerances used for piping systems have been subjected to much greater scrutiny by the nuclear power industry than have cable tray systems. 'This is true, in part, because the dimensional accuracy used for the evaluation of pressure-retaining components is more critical. Thus, the more detailed standards available i
for piping have been referenced to address measurement '
deviations from as-built drawings.
DISCUSSION: Impell Calculation M-69 (Reference 9) has performed a i detailed review of TU Electric cable tray walkdown tolerances. The review includes a comparison of TU Electric tolerances (ReferMee 1) to (1) installation and walkdown tolerances app 14 8 by other utilities, (11)
PVRC/WRC task group publimed tolerances, and (iii) code fabrication tolerances, (References 2 through 6). The details of this comparison and pertinent comments are presented in the table attached to M-69.
A summary of the review is as follows:
Tolerances for the location of hangers with respect to cable tray layout are comparable to or more accurate than those specified in other documents referenced above.
Tolerances for the lengths, widths, thicknesses and relative locations of cable tray hanger members and I for weld attributes are comparable to or more accurate than those specified in other documents. 'f Tolerances for the location of bolts are, in some cases, comparable to those specified in other y documents. In other cases, for expansion anchors in particular, they are somewhat more liberal.
2/4
IMJ-009 j
Industrial practice 'for the qualification of-concrete anchor bolts is to recommend a minimum ;
spacing, a' minimum embedment, and a~ minimum edge ~ j
. distance'in order to warrant that allowable loads j remain applicable to a particular installation.- '
Wherever the minimum dimensions are violated,
' allowable bolt' loads are reduced according to project-specified criteria. TU Electric tolerances will'have no impact on design consideration where a recommended dimensions are respected. . '
Impell has assessed the-impact of TV Electric I anchor bolt tolerances on design' verification i re sul ts.- Anchor bolt allowable load reductions were :l considered for minimum dimension violations of bolt spacing, bolt embedments,. and edge distances in - 1 accordance with' applicable project procedures 1 (Reference 8). The assesment indicates that !
deviations are'of the same order of magnitude as those presented in the PVRC study (Refuence 4).
The TU Electric anchor bolt tolerances 'are accordingly deemed to be acceptable, even thou'gh'-
they are somewhat more liberal than the other.
industrial standards reviewed.-
CONCLUSION: .The TU Electric tolerances applied during the collection of as-built data for cable tray design verification are adequate for design and analysis purposes. In fact, they.
are more specific in applicatien and frequently more . '
i conservative than are those developed for piping by other utilities and the PVRC task _ group.-- Thus, in agreement -
with current industrial positions, the subject tolerances should have insignificant effect on the integrity of Comanche Peak cable tray systems and supports, i
e i
i Ll 3/4
q
-IM-P-009-l l
REFERENCES:
- 1. Specification No. TNE-FVM-CS-001, Rev. 5, " Comanche Peak Steam Electric Station, Unit 1 - Field 3 Verification Method, Unit 1 Cable Tray Hanger j As-Builting and Design Adequacy Yerification-
, Program", dated July 1,1986 by Texas Utilities .]
i Generating Company, Nuclear Engineering, j
- 2. Specification No. CS-P207, Rev. 2, " Specification for Safety and Non-safety Related Pipe Support Field i Fabrication and Installation",' Southern California l Edison Company, San Onofre Nuclear Generating i Station, Unit 1, dated October 30,-1984 by Bechtel '
Power Corporation.
3 Manual of Steel Construction, Seventh Edition, dated 4/79 by the American-Institute of Steel Construction, Inc. !
i 4 " Technical Position on Piping System Installation I Tolerances", Draf t-6 (Approved by Steering Committee 1 for issuance as a WRC Bulletin), dated September 10,- ]
1985 by the Task Group on Industry Practice of the j PVRC Technical Committee on Piping Systems.. -j
- 5. Document No. ESD 223, " Installation and Inspection of Pipe Supports", Diablo Canyon Nuclear Power !
Plant, Revision dated 4/9/82 by Pullman Power Products.
i
- 6. Specification No. CS-C8, Rev.13. " Design,- (
Installation and Testing of Concrete Expansion j Anchors", Southern California Edison Co., San Onofre Nuclear Generating Station Units 2 & 3, dated 4/18/84 by Bechtel Power Corporation.
7.
)
CYGNA letter 84056.095 to W.G. Counsil from N.H.
Williams, " Review Issues List, TUGC0 Comanche Peak Steam Electric Station, Independent-Assessment Program - All Phases", dated November 26, 1985, 8 Impe11 Project Instruction PI-07, Rev. 3 "TUGCO' CPSES Unit 1 Design Verification of Base Plates, Base Angles and Embedment Plates", Job No. 0210-040, j
. dated September 16, 1986
- 9. Impe11 Calculation M-69, " Cable Tray As-built Measurement Tolerances", Rev. O.
4/4
,