MONTHYEARML20210J1751999-07-30030 July 1999 Marked-up TS Pages for Proposed Changes Re Upper Temp Limit for UHS ML20209B7411999-06-30030 June 1999 Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T Batteries ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20204H9781999-03-23023 March 1999 Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood Stations ML20204H4291999-03-22022 March 1999 Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20198N3471998-12-29029 December 1998 Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable Values ML20198K5841998-12-23023 December 1998 Revised Tech Spec Pages 3/4 3-53,3/4 3-53a,6-27 & 6-27a,for Rv LI Sys ML20198A0811998-12-14014 December 1998 Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant Sys ML20196G6611998-11-30030 November 1998 Proposed Rev to Improved Tech Specs Section 3.1 ML20196B4101998-11-25025 November 1998 Proposed Tech Specs Facilitating Replacement of 125 Vdc At&T Batteries with New 125 Vdc C&D Batteries While in Mode 1-4 ML20155J2051998-11-0505 November 1998 Proposed TS Converting to Its,Rev R ML20155J0041998-10-30030 October 1998 Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria ML20154S5011998-10-18018 October 1998 Proposed Rev N to Improved TS Section 3.7 ML20154M5281998-10-15015 October 1998 Revisions K,O & P of 961213 ITS Submittal ML20154A8881998-10-0202 October 1998 Proposed Rev L to Improved Tech Specs Section 3.8 Closeout ML20153G4331998-09-25025 September 1998 Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package ML20153C0351998-08-31031 August 1998 Revs to ODCM for Plant,Including Rev 2 to Chapters 10 & 11, Rev 4 to Chapter 12 and Rev 3 to App F ML20238F8221998-08-25025 August 1998 Rev 2 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan ML20236Y5481998-08-0303 August 1998 Rev 1 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan ML20236W5851998-07-31031 July 1998 Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs ML20237B6391998-07-30030 July 1998 Proposed Rev H to Section 3.5 of Improved Tech Specs ML20237E9971998-07-21021 July 1998 Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout ML20237B7021998-07-0909 July 1998 Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal ML20236H6531998-07-0202 July 1998 Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0 ML20248M1491998-06-0101 June 1998 Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs ML20248C5511998-05-29029 May 1998 Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power Accident ML20216C1011998-03-26026 March 1998 Revs to ODCM for Braidwood,Including Rev 1.9 to Chapter 10 & Rev 3 to Chapter 12 ML20217B2681998-02-14014 February 1998 Proposed Rev D to ITS ML20217C3011998-01-31031 January 1998 Rev 0 to Inservice Testing Program Plan Pumps & Valves Braidwood Nuclear Generating Station,Units 1 & 2 ML20198L8131998-01-14014 January 1998 Proposed Tech Specs Pages Revising TS 3.4.8, Specific Activity, Figure 3.4-1,Table 4.4-4 & TS Bases 3.4.8 ML20198L8811998-01-14014 January 1998 Proposed Tech Specs Pages,Revising TS Section 3/4.8.2 & Bases,To Allow Replacement of 125 Volt Dc At&T Batteries W/New Charter Power Sys,Inc (C&D) Batteries ML20216H4321997-12-31031 December 1997 Revs to OCDM for Braidwood,Including Rev 1.8 to Chapter 10, Rev 1.9 to Chapter 11,rev 2 to Chapter 12 & Rev 2 to App F ML20198C3181997-12-30030 December 1997 Proposed Tech Specs 3.7.1.3 Re Condensate Storage Tank ML20203M5921997-12-17017 December 1997 Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS Submittal ML20203D0361997-12-0909 December 1997 Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot Conditions ML20199A4751997-11-0707 November 1997 Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20217K4461997-10-21021 October 1997 Proposed Tech Specs Re Boron Credit in SFP ML20198P1601997-10-20020 October 1997 Rev 1.5 to Odcm,Chapter 12 ML20202F4561997-10-10010 October 1997 Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation Sys ML20211D9421997-09-24024 September 1997 Proposed Tech Specs Revising Allowable Time Interval for Performing Turbine Throttle Valve & Turbine Valve SRs Requirements from Monthly to Quarterly ML20216H7011997-09-10010 September 1997 Revised Procedures,Including Rev 2 to Bwzp 2000-18, Post- Accident Sampling Sys (Primary Responsibility - Chemistry Director) & Rev 2 to Bwzp 2000-18A1, PASS Sample Collection Procedures ML20216G8541997-09-0808 September 1997 Proposed Tech Specs Change to TS 4.5.2.b & Associated Bases Bringing Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in ML20216F1351997-09-0202 September 1997 Proposed Tech Specs 3.4.8 Re Specific Activity ML20148P7721997-06-30030 June 1997 Proposed Tech Specs,Revising TS 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Permanently Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of Subcriticality ML20141F3081997-06-24024 June 1997 Proposed Tech Specs,Changing TS for ECCS Venting ML20141B7781997-06-17017 June 1997 Proposed Tech Specs Revising TS Sections 3/4.6.1.6,4.6.1.2, 6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a, Which Requires Utils to Update Existing Containment Vessel Structural Integrity Programs ML20148J3231997-06-0909 June 1997 Proposed TS Reflecting Latest Rev of Waste Gas Decay Tank Rupture Accident Dose Calculation ML20141K8991997-05-24024 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves ML20141K8931997-05-23023 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b.1 for Unit 1 as It Relates to Requirement to Vent ECCS Pump Casings & Discharge Piping High Points Outside Containment ML20141K3381997-05-23023 May 1997 Proposed Tech Specs Requesting Enforcement Discretion from Compliance W/Ts 4.5.2.b.1 Requirements of Venting of Emergency Core Cooling Sys Pump Casings & Discharge Piping High Points Outside of Containment 1999-07-30
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20153C0351998-08-31031 August 1998 Revs to ODCM for Plant,Including Rev 2 to Chapters 10 & 11, Rev 4 to Chapter 12 and Rev 3 to App F ML20238F8221998-08-25025 August 1998 Rev 2 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan ML20236Y5481998-08-0303 August 1998 Rev 1 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan ML20216C1011998-03-26026 March 1998 Revs to ODCM for Braidwood,Including Rev 1.9 to Chapter 10 & Rev 3 to Chapter 12 ML20217C3011998-01-31031 January 1998 Rev 0 to Inservice Testing Program Plan Pumps & Valves Braidwood Nuclear Generating Station,Units 1 & 2 ML20216H4321997-12-31031 December 1997 Revs to OCDM for Braidwood,Including Rev 1.8 to Chapter 10, Rev 1.9 to Chapter 11,rev 2 to Chapter 12 & Rev 2 to App F ML20198P1601997-10-20020 October 1997 Rev 1.5 to Odcm,Chapter 12 ML20216H7011997-09-10010 September 1997 Revised Procedures,Including Rev 2 to Bwzp 2000-18, Post- Accident Sampling Sys (Primary Responsibility - Chemistry Director) & Rev 2 to Bwzp 2000-18A1, PASS Sample Collection Procedures ML20137A4961996-12-31031 December 1996 Rev 2 to Odcm,Braidwood Annex,Chapter 12 & App F ML20116F3811996-06-30030 June 1996 Rev 1.9 to ODCM, Chapters 11,12 & App F ML20134N3051996-03-25025 March 1996 Rev 1 to 10CFR50.59 Se ML20095A9071995-10-31031 October 1995 Rev 1.8 to Odcm ML20129B7051995-09-22022 September 1995 Rev 0 to Byron/Braidwood Units 1 & 2 SG Eddy Current Analysis Guidelines ML20092B1051995-09-0202 September 1995 Rev 0 to SG Structural Insp Plan in Support of Braidwood 1 & Byron 1 3.0 Volt Ipc ML20091M8641995-08-25025 August 1995 Verification Analysis for Computer Program ML20082L5451995-04-18018 April 1995 Rev 3 to ISI Plan for Braidwood Nuclear Generating Station Units 1 & 2 1st Insp Interval ML20082C9481995-03-14014 March 1995 Rev 7 to IST Program Plan for Pumps & Valves ML20083N8701994-07-31031 July 1994 Rev 7 to Byron & Braidwood Stations Units 1 & 2 Eddy Current Analyis Guidelines ML20063F8961994-01-31031 January 1994 Rev 1.0 to Chapters 10,11,12 & App F to Odcm,Braidwood Station ML20064N3281993-12-20020 December 1993 Rev 0 to Operating Parameter Uncertainties for Byron/ Braidwood Revised Thermal Design Procedure ML20056C7441993-06-30030 June 1993 Rev 0.M to ODCM Chapters 10,11 & 12 for Braidwood Station ML20046C7941993-06-25025 June 1993 Idns Map Monitoring Point Id for Braidwood Station, Tables H & I ML20062N7851993-03-0101 March 1993 Rev 4.1 to Procedure Bwhp 4006-008, Repairing, Determinating,Terminating,Splicing,Taping,Cable Jacket Repair & Application of Ray Chem Kit on Cable ML20127D0691992-12-30030 December 1992 Corporate Emergency Response Organization Required Reading Package 92-11 ML20101M2191992-06-25025 June 1992 Rev 5 to Inservice Testing Program Plan for Pumps Braidwood Station Units 1 & 2 ML20098D7431992-05-31031 May 1992 Rev 0.G to ODCM Chapter 11,pages 11.i,11-5,11-6,11-7 & 11-7, Figure 11-3 ML20092F2251992-02-0606 February 1992 Rev O.F to Chapter 11,Pages 11-i,11-7 & 11-17 of ODCM ML20092J4091992-02-0303 February 1992 Rev 25 to Block Index Procedure Bwzp 600-3A1,App a, Federal Agency Emergency Support Phone List ML20058E8761991-11-18018 November 1991 Rev 56 to AOP Bwoa PRI-10, Loss of Rh Cooling Unit 1 ML20082S8031991-09-0707 September 1991 Rev 55 to 1BWOA PRI-10, Loss of Residual Heat Cooling,Unit 1 ML20082S8001991-09-0707 September 1991 Rev 54 to 1BWOA PRI-10, Loss of Residual Heat Cooling,Unit 1 ML20082B2431991-07-0303 July 1991 Plant Procedure Manual Update Notification,Including Rev 20 to Block Index Procedure (Bip) Bwzp 600-1,Rev 22 to Bip Bwzp 600-1A3 & Rev 23 to Bips Bwzp 600-3 & Bwzp 600-3A1 Through Bwzp 600-3A8 ML20077G3631991-06-19019 June 1991 Rev 0.D to Odcm ML20091C8421991-04-30030 April 1991 Rev O.A to Odcm,Consisting of Pages Inadvertently Omitted from Previous Distribution ML20076D8331991-04-25025 April 1991 Rev 0.A to Odcm ML20066D9121990-12-0505 December 1990 Rev 2 to BWAP-1205-3TI, Odcm ML20246H6241989-08-28028 August 1989 Rev 0 to Special Procedure SPP-89-9, Control Room Boundary In-Leakage Test ML20245L7651989-08-0707 August 1989 Rev 0 to Offsite Dose Calculation Manual ML20247M7921989-07-31031 July 1989 Rev 6 to PWR Operations Guideline Number 12 Simulator Testing Program. Simulator Transient Test Review Data Encl ML20247M9151989-07-27027 July 1989 Procedure Generation Package ML20062N7961989-07-14014 July 1989 Rev 0 to Procedure Bwhp 4006-008A32,Attachment AF, Straight Splices of Power Cables 600 Volts or Less ML20062N7941989-07-14014 July 1989 Rev 0 to Procedure Bwhp 4006-008A31,Attachment Ae, Terminations of Power Cables 600 Volts or Less ML20062N7881989-07-14014 July 1989 Rev 0 to Procedure Bwhp 4006-008A29,Attachment AC, Straight Splice for Multiconductor Control & Instrument Cable ML20062N7921989-07-14014 July 1989 Rev 0 to Procedure Bwhp 4006-008A30,Attachment AD, Typical Pigtail Splices for Motor Connections of 600 Volts or Less, Control & Instrument Cable ML20247N0421989-06-19019 June 1989 Rev 5 to SS-1, Braidwood Simulator Steady State Performance Test ML20247M7861989-05-26026 May 1989 Rev 0 to SV-1, Braidwood Simulator Surveillance Testing ML20247M7581989-05-26026 May 1989 Rev 0 to Test NO-1, Braidwood Simulator Normal Operations Testing ML20247M7801989-04-0404 April 1989 Rev 0 to ST-1 Re Simulators safety-related Valves Stroke W/ Acceptable Time Period Required by ANSI/ANS-3.5-1985 ML20247M8011989-02-0101 February 1989 Rev 1 to 1BWEP-0, Reactor Trip or Safety Injection Unit 1 1999-04-30
[Table view] |
Text
- _ . - _ - - _ - - . _ .
- s' 4 }
'I BRAIDWOOD PLAN FOR ACHIEVING AND' MAINTAINING
~+
ERROR FREE START UP AND OPERATION OF UNIT 1 APPROVAL:
M "!> f6 g , g y,,[ f c,, a(7gjg E. E. Fitzp'abrick Date D. P. Galle Date Station Manager Asst. Vice Pres, & General Manager Braidwood Station Nuclear Stations Division 4,, ed ..
11/24/86 SCOPE:
f This comprehensive plan has been developed to provide elements I
of control and operation to enhance an " error free" start-up and l operation of Braidwood Unit 1. This plan is a dynamic plan which will incorporate as necessary these and any additional elements at appropriate times during the start-up and operation of Unit 1. -
These elements will be reviewed, incorporated, revised, and terminated as necessary to assist in ensuring error free operation.
The elements of the plan are divided into four distinct categories:
- Special Reviews and Corporate Overview
- Administration Performance will be assessed as an ongoing activity by the Corporate / Station Special Review Committee.
Committee Membershij The Corporate / Station Special Review Committee will be comprised of the following persons:
- At least two corporate personnel, one of whom is either a Nuclear Station Division Vice President, or the NSD Assistant Vice President and General Manager, er the Vice President of Nuclear Operations.
- One Senior Manager from Byron Station (Assistant Superintendent level or higher)
- One Bargaining Group Representative from
- Operating (NSO)
Electrical Maintenance
- Instrument Maintenance
- Mechanical Maintenance '
Radiation - Chemistry
- At large (Clerical, Stores, other Operating)
- Station Manager or Production Superintendent or Service Superintendent.
- One Assistant Superintendent (Operating, Maintenance, Technical) 4036z
. 11/24/86
- Technical Staff Supervisor or Assistant Technical Staff Supervisor
- Radiation-Chemistry Supervisor or Lead Health Physicist or Lead Chemist
- Others as designated by the Stacion Manager ' -
I. SPECIAL REVIEWS AND CORPORATE OVERVIEW A. Augmented Readiness Review.
In addition to the normal Station Onsite Review for --
start-up, a Special Review, augmented by Senior Corporate
~
Management, will be conducted to assess the readiness of Unit 1 for startup. The participants in this augmented review normally will include the Vice President Nuclear Operations, Vice President Projects, Assistant Vice President and General Manager Nuclear Stations Division, and Manager of Nuclear Safety, in addition to the normal Station participants.
B. Bi-Weekly Review. "
Senior Station, NSD management, and other designated station personnel will meet on a bi-weekly . schedule as the Corporate / Station Special Review Comtittee. The purpose of this committee is to review iand svaluate past performance and authorize future activities.
Reviews will focus upon elements of the startup experience required to achieve our goal of error-free operation and will include evaluations of such items as personnel errors. ESF actuations, equipment outages (including Control Room annunciators and indicators) inhibiting future activities, and potential obstacles which could lead to undesirable or degraded situations and personnel errors.
II. SHIFT AUGMENTATION A. Senior Manager On Shift.
During critical phases of the startup, as determined by the Station Manager, a Senior Manager will provide 7 day per week, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day shif t coverage. This position will normally be filled by the Station Duty Officer (SDO) and the Duty Operating Engineer (DOE).
l 4036z '
L .
11/24/86 B. Additional License Support.
An additional SRO and NSO will augment the normal shift
' complement when deemed necessary by the Station manager.
- The function of the additional SRO is to review significant plant activities with Operations personnel, and, for critical plant activities, to ensure SRO participation for those activities . in the plant. Normally, the Unit Shift Foreman will perform those functions involving direct supervision of an Operator; if he is unavailable, the extra SRO will fulfill this role. The additional SRO will also maintain cognizance of the activities in progress in the Control Room when he is not in the plant.
- The primary function of the additional NSO will be to provide supplemental attention to activities associated with start-up of Unit 1.
C. Maintenance License Support.
The Mechanical, Electrical, and Instrument Maintenance Department will provide 5 day 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coverage, including supervision. Weekends and Holidays will be manned as necessary.
D. Shift Test Director.
The Shift Test Director position under the Station Start-Up organization will provide continuous coverage during test periods. This position will be responsible for minimizing conflict and determining priorities of start up program evolutions.
III. SHIFT OPERATIONS A. Shift Relief.
A shif t relief program consisting of selected individuals including as a minimum the Shif t Engineer, Shift Foreman, Radwaste Foreman, and Nuclear Station Operators will be instituted as follows:
- Participants will arrive approximately one hour early i
to conduct a thorough review of plant status.
l
- A meeting of these individuals will then be held to discuss reviews prior to relief. Rad / Chem Foreman and Maintenance Representative (s) will attend these meetings as appropriate.
- Shift relief will then proceed wi+.h Shift Engineer's Concurrence.
4036z
e 11/24/ %
B.- -Enhanced Shift Briefings.
Briefings of the shif t immediately following shif t relief will ' include participation by OAD, Project Start-Up, and Station Start-Up to include discussions of Unit 1 Start-Up Testing activities, OAD testing activities and Project Start-Up testing.on Unit 1 and Unit 2.
I C. Control of Construction / Contractor Activities.
Significant construction activities in Unit i remain which i must now be controlled by. the shift organization. A-review organization to review these activities including items such as room access, work requests and cutting / welding requests will pre-review, make appropriate recommendations and submit them to the shift management for approval.
IV. ADMINISTRATIVE l A. Start-Up Work Planning ,]
The start-up organization will be responsible for controlling and providing:
- Long and short term schedules.
- Meetings to coordinate completeness of mode change- !
master checklists. j
- i Training and shif t briefs on start-up activities.
- Shift Test Director .- 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coverage of a shift position responsible for minimizing conflicts and ;
setting priorities direct' support in of shift supervision.
l B. Training, j Incorporation of a start-up training program in the weekly license requalification program to review with those i operators in training the status of recently completed start-up activities and to highlight those activities which they will be directing upon return to watchstanding duties the following week.
Provide for a start-up status briefing during the shift briefing following assumption of watchstanding duties by the oncoming shift.
4036z