Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20210J1751999-07-30030 July 1999 Marked-up TS Pages for Proposed Changes Re Upper Temp Limit for UHS ML20209B7411999-06-30030 June 1999 Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T Batteries ML20204H9781999-03-23023 March 1999 Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood Stations ML20204H4291999-03-22022 March 1999 Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20198N2041998-12-29029 December 1998 Revised Tech Specs Change,Page 3/4 3-54,providing Early Implementation of Containment Floor Drain Sump Water Level Instrumentation Requirements ML20198N3471998-12-29029 December 1998 Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable Values ML20198K5841998-12-23023 December 1998 Revised Tech Spec Pages 3/4 3-53,3/4 3-53a,6-27 & 6-27a,for Rv LI Sys ML20198A0811998-12-14014 December 1998 Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant Sys ML20196G6611998-11-30030 November 1998 Proposed Rev to Improved Tech Specs Section 3.1 ML20196B4101998-11-25025 November 1998 Proposed Tech Specs Facilitating Replacement of 125 Vdc At&T Batteries with New 125 Vdc C&D Batteries While in Mode 1-4 ML20155J2051998-11-0505 November 1998 Proposed TS Converting to Its,Rev R ML20155J0041998-10-30030 October 1998 Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria ML20154S5011998-10-18018 October 1998 Proposed Rev N to Improved TS Section 3.7 ML20154M5281998-10-15015 October 1998 Revisions K,O & P of 961213 ITS Submittal ML20154A8881998-10-0202 October 1998 Proposed Rev L to Improved Tech Specs Section 3.8 Closeout ML20153G4331998-09-25025 September 1998 Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package ML20236W5851998-07-31031 July 1998 Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs ML20237B6391998-07-30030 July 1998 Proposed Rev H to Section 3.5 of Improved Tech Specs ML20237E9971998-07-21021 July 1998 Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout ML20237B7021998-07-0909 July 1998 Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal ML20236H6531998-07-0202 July 1998 Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0 ML20248M1491998-06-0101 June 1998 Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs ML20248C5511998-05-29029 May 1998 Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power Accident ML20216D9431998-04-0909 April 1998 Modified Proposed TS Pages Re 980324 Request for Amends to Licenses NPF-37 & NPF-66 ML20217E1891998-03-24024 March 1998 Proposed Tech Specs Surveillance Sections & Bases Allowing Util to Defer 10CFR50,App J,Type a Testing of Byron Unit 2 Containment Until Next Refuel Outage in 1999 ML20217B2681998-02-14014 February 1998 Proposed Rev D to ITS ML20198L8811998-01-14014 January 1998 Proposed Tech Specs Pages,Revising TS Section 3/4.8.2 & Bases,To Allow Replacement of 125 Volt Dc At&T Batteries W/New Charter Power Sys,Inc (C&D) Batteries ML20198L8131998-01-14014 January 1998 Proposed Tech Specs Pages Revising TS 3.4.8, Specific Activity, Figure 3.4-1,Table 4.4-4 & TS Bases 3.4.8 ML20198C3181997-12-30030 December 1997 Proposed Tech Specs 3.7.1.3 Re Condensate Storage Tank ML20203M5921997-12-17017 December 1997 Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS Submittal ML20203D0361997-12-0909 December 1997 Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot Conditions ML20199A4751997-11-0707 November 1997 Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20217K4461997-10-21021 October 1997 Proposed Tech Specs Re Boron Credit in SFP ML20202F4561997-10-10010 October 1997 Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation Sys ML20211D9421997-09-24024 September 1997 Proposed Tech Specs Revising Allowable Time Interval for Performing Turbine Throttle Valve & Turbine Valve SRs Requirements from Monthly to Quarterly ML20216G8541997-09-0808 September 1997 Proposed Tech Specs Change to TS 4.5.2.b & Associated Bases Bringing Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in ML20216F1351997-09-0202 September 1997 Proposed Tech Specs 3.4.8 Re Specific Activity ML20217H6071997-08-0707 August 1997 Proposed Tech Specs Pages,Revising Bases for Proposed Improved TS SR 3.8.6.1 & 3.8.6.3,to Indicate That Correction for Level Is Not Required When Battery Charging Current Is Less than 2 Amps for Gould & Less than 3 Amps for C&D ML20148P7721997-06-30030 June 1997 Proposed Tech Specs,Revising TS 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Permanently Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of Subcriticality ML20141F3081997-06-24024 June 1997 Proposed Tech Specs,Changing TS for ECCS Venting ML20141B7781997-06-17017 June 1997 Proposed Tech Specs Revising TS Sections 3/4.6.1.6,4.6.1.2, 6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a, Which Requires Utils to Update Existing Containment Vessel Structural Integrity Programs ML20148J3231997-06-0909 June 1997 Proposed TS Reflecting Latest Rev of Waste Gas Decay Tank Rupture Accident Dose Calculation ML20140D0081997-05-31031 May 1997 Proposed Tech Specs,Revising TS Surveillance Requirement Re ECCS Pump Casings & Discharge Piping High Points Outside of Containment ML20141K8991997-05-24024 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves ML20148D6861997-05-23023 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b.1 for Unit 1 as It Relates to Requirement to Vent ECCS Pump Casings & Discharge Piping High Points Outside Containment ML20141K8931997-05-23023 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b.1 for Unit 1 as It Relates to Requirement to Vent ECCS Pump Casings & Discharge Piping High Points Outside Containment ML20141K3381997-05-23023 May 1997 Proposed Tech Specs Requesting Enforcement Discretion from Compliance W/Ts 4.5.2.b.1 Requirements of Venting of Emergency Core Cooling Sys Pump Casings & Discharge Piping High Points Outside of Containment ML20141K0011997-05-21021 May 1997 Proposed Tech Specs Relocating Reactor Vessel Surveillance Program Capsule Withdrawal Schedules IAW GL 91-01 ML20148B6151997-05-0606 May 1997 Proposed Tech Specs,Revising TS 3/4.7.5, Ultimate Heat Sink & Associated Bases to Support SG Replacement & Incorporate Recent UHS Design Evaluations ML20196G0501997-04-25025 April 1997 Proposed Tech Specs Revising Primary Containment & Reactor Coolant Sys Volume Associated W/Unit 1 Steam Generator Replacement 1999-07-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20210J1751999-07-30030 July 1999 Marked-up TS Pages for Proposed Changes Re Upper Temp Limit for UHS ML20209B7411999-06-30030 June 1999 Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T Batteries ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20204H9781999-03-23023 March 1999 Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood Stations ML20204H4291999-03-22022 March 1999 Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20202G9361999-01-30030 January 1999 Rev 1.4 to Chapter 10, Radioactive Effluent Treatment & Monitoring, Rev 1.6 to Chapter 11, Radiological Environ Program & Rev 1.6 to Chapter 12, Radioactive Effluent Technical Standards (Rets), for Odcm,Byron Annex ML20198N2041998-12-29029 December 1998 Revised Tech Specs Change,Page 3/4 3-54,providing Early Implementation of Containment Floor Drain Sump Water Level Instrumentation Requirements ML20198N3471998-12-29029 December 1998 Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable Values ML20198K5841998-12-23023 December 1998 Revised Tech Spec Pages 3/4 3-53,3/4 3-53a,6-27 & 6-27a,for Rv LI Sys ML20198A0811998-12-14014 December 1998 Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant Sys ML20196G6611998-11-30030 November 1998 Proposed Rev to Improved Tech Specs Section 3.1 ML20196B4101998-11-25025 November 1998 Proposed Tech Specs Facilitating Replacement of 125 Vdc At&T Batteries with New 125 Vdc C&D Batteries While in Mode 1-4 ML20155J2051998-11-0505 November 1998 Proposed TS Converting to Its,Rev R ML20155J0041998-10-30030 October 1998 Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria ML20154S5011998-10-18018 October 1998 Proposed Rev N to Improved TS Section 3.7 ML20154M5281998-10-15015 October 1998 Revisions K,O & P of 961213 ITS Submittal ML20154A8881998-10-0202 October 1998 Proposed Rev L to Improved Tech Specs Section 3.8 Closeout ML20153G4331998-09-25025 September 1998 Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package ML20153C0351998-08-31031 August 1998 Revs to ODCM for Plant,Including Rev 2 to Chapters 10 & 11, Rev 4 to Chapter 12 and Rev 3 to App F ML20238F8221998-08-25025 August 1998 Rev 2 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan ML20236Y5481998-08-0303 August 1998 Rev 1 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan ML20236W5851998-07-31031 July 1998 Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs ML20237B6391998-07-30030 July 1998 Proposed Rev H to Section 3.5 of Improved Tech Specs ML20237E9971998-07-21021 July 1998 Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout ML20237B7021998-07-0909 July 1998 Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal ML20236H6531998-07-0202 July 1998 Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0 ML20248M1491998-06-0101 June 1998 Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs ML20248K7361998-05-31031 May 1998 Commonwealth Edison Bnps Unit 1 Cycle 9 Startup Rept ML20248C5511998-05-29029 May 1998 Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power Accident ML20217Q8521998-05-0101 May 1998 Rev 9 to Bzp 310-2, Nuclear Accident Reporting Sys Form (Primary Responsibility - Station Director). W/Notes & Comments ML20216D9431998-04-0909 April 1998 Modified Proposed TS Pages Re 980324 Request for Amends to Licenses NPF-37 & NPF-66 ML20216C1011998-03-26026 March 1998 Revs to ODCM for Braidwood,Including Rev 1.9 to Chapter 10 & Rev 3 to Chapter 12 ML20217E1891998-03-24024 March 1998 Proposed Tech Specs Surveillance Sections & Bases Allowing Util to Defer 10CFR50,App J,Type a Testing of Byron Unit 2 Containment Until Next Refuel Outage in 1999 ML20217B2681998-02-14014 February 1998 Proposed Rev D to ITS ML20217C3011998-01-31031 January 1998 Rev 0 to Inservice Testing Program Plan Pumps & Valves Braidwood Nuclear Generating Station,Units 1 & 2 ML20198L8131998-01-14014 January 1998 Proposed Tech Specs Pages Revising TS 3.4.8, Specific Activity, Figure 3.4-1,Table 4.4-4 & TS Bases 3.4.8 ML20198L8811998-01-14014 January 1998 Proposed Tech Specs Pages,Revising TS Section 3/4.8.2 & Bases,To Allow Replacement of 125 Volt Dc At&T Batteries W/New Charter Power Sys,Inc (C&D) Batteries ML20216H4321997-12-31031 December 1997 Revs to OCDM for Braidwood,Including Rev 1.8 to Chapter 10, Rev 1.9 to Chapter 11,rev 2 to Chapter 12 & Rev 2 to App F ML20199J7581997-12-31031 December 1997 Rev 1 to IST Plan Pumps & Valves Byron Nuclear Generating Station,Units 1 & 2 ML20198C3181997-12-30030 December 1997 Proposed Tech Specs 3.7.1.3 Re Condensate Storage Tank ML20203M5921997-12-17017 December 1997 Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS Submittal ML20203D0361997-12-0909 December 1997 Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot Conditions ML20199A4751997-11-0707 November 1997 Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20216H8241997-10-31031 October 1997 Revs to OCDM for Byron Station,Including Rev 1.3 to Chapter 10,rev 1.5 to Chapters 11 & 12 & Rev 1.3 to App F ML20198M2621997-10-31031 October 1997 Revs to Offsite Dose Calculation Manual,Consisting of Rev 1.5 to Chapter 11 & Rev 1.5 to Chapter 12 ML20217K4461997-10-21021 October 1997 Proposed Tech Specs Re Boron Credit in SFP ML20198P1601997-10-20020 October 1997 Rev 1.5 to Odcm,Chapter 12 ML20202F4561997-10-10010 October 1997 Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation Sys ML20211D9421997-09-24024 September 1997 Proposed Tech Specs Revising Allowable Time Interval for Performing Turbine Throttle Valve & Turbine Valve SRs Requirements from Monthly to Quarterly ML20216H7011997-09-10010 September 1997 Revised Procedures,Including Rev 2 to Bwzp 2000-18, Post- Accident Sampling Sys (Primary Responsibility - Chemistry Director) & Rev 2 to Bwzp 2000-18A1, PASS Sample Collection Procedures 1999-07-30
[Table view] |
Text
.. .. - . - - - _ - ._. .
ATTACHMENT B-1 9707020230 970624 PDR ADOCK 05000455 P
PDR (P:\97byltrs\970152. doc)
maamaecnawanwouomog - - - --- - - - - - - - --
~
SURVEILLANCE REQUIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE:
'a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the following valves are in the indicated positions with power to the valve operators !
removed: l Valve Number Valve Function Valve Position MOV SI8806 Suction to the SI Open 1 Pumps MOV SI8835 SI Pump Discharge Open*
To RCS Cold Legs MOV SI8813 SI' Pump Recirculation Open To The RWST MOV SI8809A RHR Pump Discharge to Open*
RCS Cold Legs MOV SI88098 RHR Pump Discharge to Open*
RCS Cold Legs MOV SIB 840 RHR Pump Discharge to Closed RCS Hot Legs MOV SI8802A SI Pump Discharge to Closed RCS Hot Legs MOV SI8802B SI Pump Discharge to Closed RCS Hot Legs g -
l
/ hMC- Io ld/C AN ddd
- b. At least once per 31 days by:
SI S dams only ) i
- 1) Venting the ECCS pump asingshnd-ds p g g pointjf vent outside of containmen and yafve3
- 2) Verifying that each valve (manual, power-operated, or d
automatic) in the flow path that is not locked, sealed, or otherwisesecuredinposition,isinitscorrectpositiog I c. m By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.) is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions. This_ visual inspection .sjia11 be performed: -
g ,g
$f %6+.5n5 )
\
ua 1 2.
i n ac c.v
.f3uominve.g;in A es.c+hese ec -+1on of %e we-pg cyis upu sof w * ;
& d' vge. check valvc ne sh nan 3 + pov+ ion o-f 9he_. l Pi pin 3 P #A% of Ae ,J,SIE801 A and '$ at %e asroHI l va\ve, and ne- Pi P I "3 at 4he acvem valvc if +he J3 c V y I pump is latep.p nly. y YRON - UNIT 2 3/4 5-4 b AMENDMENT NO 40--
,wemauecmaowmotana
, BASES ECCS SUBSYSTEMS (Continued) loads.
During normal operation, this exclusion would apply to the High Head Safety Injection subsystem. During shutdown cooling operation, the exclusion would apply to the single required centrifugal charging pump and operating RH pump, in addition to the ECCS piping in connunication with the operating pumps.
Because the centrifugal charging pumps are not equipped with pump casing vent valves, and the pump design and system piping configuration allow the pumps to be maintained pumps under positive pressure when in standby, manual venting of these is not required.
The surveillance requirement to ultrasonically examine selected portions of piping involves the idle CV pump discharge pi valve on the pump discharge and miniflow lines,and pingthe upstagnant to the first checkof the portion piping upstream of the ISIB801A/B adjacent to the vent valve ISIO45. This will provide added assurance that the piping is water solid.
7 p.
BYRON - UNITS 1 & 2 B 3/4 5-2a AMENDMENT N0.-9tP-
i
- i INSERT A For Unit 2, Surveillance Requirement 4.5.2.b.1 requires that the RH and Si pump casings and discharge piping high point vent valves be vented on a 31 day frequency. This venting surveillance does not apply to subsystems in communication with operating systems because the flows in these systems are sufficient to provide confidence that water hammer which could occur from voiding would not result in unacceptable dynamic loads. During shutdown cooling l operation, the exclusion would apply to the operating RH pump, in addition to the ECCS piping in communication with the operating pump.
The TS 4.5.2.b.3 surveillance requirement to ultrasonically examine selected portions of piping involves the idle CV pump discharge piping up to the first check valve on the pump discharge and miniflow lines, the stagnant portion of the piping upstream of the 2Sl8801A/B adjacent to the vent valve 2S1045, and the piping at the 2CV206 valve if the 2B CV pump is idle. This examination will provide added assurance that the piping is water solid. 1 o
l J
l l
l i
l l
4 l
l i
lI (p:\97byltrs\970152. doc) 4
1
/
ATTACHMENT B2
)
(p:\97byltrs\970152. doc)
. . _ . - . - - . - . - - . -.. - ... - -..-.-.- .~ ...
4 .
i 4 EMERGENCY CORE COOLING SYSTEMS
' SURVEILLANCE REQUIREMENTS i
j 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE:
- a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the following valves 4
are in the indicated positions with power to the valve operators I removed:
i
- Valve Number Valve Function y,alve Position M0V SI8806 Suction to the SI Open l
Pumps MOV SI8835 SI Pump Discharge Open*
! To RCS Cold Legs MOV SI8813 SI Pump Recirculation Open To The RWST
- MOV SI8809A RHR Pump Discharge to Open*
j RCS Cold Legs j MOV SI8809B RHR Pump Discharge to Open*
RCS Cold Legs i MOV SI8840 RHR Pump Discharge to Closed i RCS Hot Legs MOV SI8802A SI Pump Discharge to Closed
. RCS Hot Legs 4 MOV SI8802B SI Pump Discharge to Cl l RCS Hot Legs CA b
- b. At least once per 31 days by:
[4 j i 1) Venting the ECCS pump as ng an discharge piping high point ved j outside of containeen , and Wtiv d
- 2) Verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwisesecuredinposition,isinitscorrectpositiog i c. By a' visual inspection which verifies that no loose debris (rags, 7
!' trash, clothing, etc.) is present in the containment which could be transported to the containment sump and cause restriction of the
{ pump suctions during LOCA conditions. This visual in et sh 11 bo performed: gg g, {g f
- va e l e w s , w w S mmosr% e s __.
heyeramm 4(wM h & cN sysh is fu.Il of aA.r- by uHfA5 H U4//
discham e_ por4,on of A talce pups /e:
y, W '
C.h e. ckcC.W. valve k s +n 9 h a n + pe)rt u n o f t m g u. Na m of-+k.a_. a Sh8fo / Abd 6 dA i
4 y ID D-l'Ne@pkwe%g Pi aypcim NI 3/4 -4b AMENDMENT NO. 83 l
-- - - - ~ ~ ~ --- --~ - - -
. _ . - . EMERGENCY CORE COOLING SYSTEMS 4
BASES
,ECCS. SUBSYSTEMS (Continued) 1 l which could result in unacceptable dynamic loadings will not occur. During normal operation, this exclusion would apply to the High Head Safety Injection subsystem. During shutdown cooling operation, the exclusion would apply to the j
j single required Centrifugal Charging pump and operating RH the ECCS piping in communication with the operating pumps.Becausepump, the in addition to centrifugal charging pumps are not equipped with pump casing vent valves, and the pump design and system piping configuration allow the pumps to be maintained under positive pressure when in standby, manual venting of these j pumps is not required.
3 f The surveillance requirement to ultrasonically examine selected portions of piping involves the idle CV pump discharge piping up to the first check valve on the pump discharge and miniflow lines, and the stagnant portion of the piping upstream of the 1518801 A/B adjacent to the vent valve ISIO45. This-1 will provide added assurance that the piping is water solid.
i i ,h D6 l
BRAIDWOOD - UNITS 1 & 2 B 3/4 5-2 a AMENDMENT NO. 83
INSERT A For Unit 2, F,urveillance Requirement 4.5.2.b.1 requires that the RH and $1 pump casings and discharge piping high point vent valves be vented on a 31 day frequency. This venting surveillance does not apply to subsystems in communication with operating systems because
, the flows in these systems are sufficient to provide confidence that water hammer which could
, occur from voiding would not result in unacceptable dynamic loads. During shutdown cooling i
operation, the exclusion would apply to the operating RH pump, in addition to the ECCS piping i in communication with the operating pump.
)
! The TS 4.5.2.b.3 surveillance requirement to ultrasonically examine selected portions of piping
! involves the idle CV pump discharge piping up to the first check valve on the pump discharge and miniflow lines, the stagnant portion of the piping upstream of the 2S18801 A/B adjacent to 4
the vent valve 2S1045, and the piping at the 2CV206 valve if the 28 CV pump is idle. This examination will provide added assurance that the piping is water solid.
i e
i f
k (p:\97byltrs\970152. doc)
, _ _ _ . _ . _ - _ _ _ _ - _ _ . _ . _ . - _ . _ - - _ . . _ ~ _ .. . . _ . _ _ _ _ . . _ . . - _ . . - . . . -
.- , Offsite Review Report Form 5 pate: . June 24,1997 i To: Station Manager (s)
Fac:htv Onsite Review No. Offsite Review No.
Braidwood 97-130 20-97-163 Byron 97-088 06-97-197 i
Description:
Supplement to Exigent Technical Specification for ECCS Venting (Byron 2 and Braidwood 2)
The reviewed document is acceptable.
t
, (29-97 lb. Bowers Date Offsite Review Group RCLL f44/77 Date R. C. Ward I 4'y/17 Date R. C. Lemke Offsite Review Group Director of Offsite Review cc: Vice President Engineering Safety Assessment Manager / SQV Director System Engineermg Supervisor Reg. Assurance Supv.