REV. 54 LOSS OF RH COOLING UNIT 1 1Bw0A PRI-10 r k'}/ -
A. BIRE01E This procedure provides actions required to restore RH System cooling in the event RH System cooling is lost during Modes 4 or 5 or 6.
! B. SYMPTOMS OAJNIRY_CONDITIQHS
- 1. The following annunciators may cause entry into this procedure:
l o RH PUMP TRIP - alarm o RH PUMP 1A(B) DSCH PRESS HIGH - elarm o RH PUMP 1A(B) DSCH PRESS LOW - alarm o RH PUMP 1A(B) CC FLOW LOW - alarm o RH HX CC WTR FLOW HIGH LOW - alarm o RCS SYSTEM COLD PRESS HIGH - alarm o RCS PRESS HIGH AT LOW TEMP - alarm o CC PUMP TRIP - alarm p- o CC SURGE TANK LEVEL HIGH LOW - alarm i o CC PUMP DSCH PRESS LOW - alarm
- 2. Tne following symptoms may cause entry into this procedure: l o Oscillating RH pump amps.
o Fluctuating RH Pump dsch pressure.
! o Excessive N3 Pump noise or-vibration.
Fluctuating Letdown Flow when on RH Letdown.
o o Decreasing Reactor vessel level o Increasing RCS temperature. l o Increasing RH system temperature.
- 3. This procedure.may be entered from: !
o 1BwFR-C.3, RESPONSE'TO SATURATED CORE COOLING, Step 1.
o Inability to reduce RCS temperature while shutdown.
o Loss of RH' System while operating in Modes 4, 5, or 6.
APPROVED 1
SEP 7 $89 ;
O ==
9109170298 91o91o
[DR ADOCK 05000456 PDR Page 1 of 61 (0192Q/0018Q/082889) i
REV. 54 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10 O
LJ STEP ACT10N/ EXPECTED RE5 GNEE ' OETFONSE NOT OST A AED HOTE
- With this procedure in effect, *
- notify the Station Director who will *
- evaluate for GSEP conditions per *
- BwZP 200-1, BRWD EMERGENCY ACTION *
- LEVELS.
- =*******
1 CHECK RH S1SIEM OPERATION:
- a. Verify lA or 1B RH a. GO TO Step 2.
pump run light - LI.T
- b. Verify operating RH pump b. Attempt to stabilize RH parameters - STAHLE system operation as follows:
,cw
- RH letdown flow
- Reduce RH pump flow.
()
- RH pump amps
- Increase RCS level by increasing charging flow
- RH disch pressure and/or reducing letdown flow.
- RH disch flow IE RH pump parameters do
- Reactor Vessel level not stabilize, t
THEN trip the affected RH
- RH pump noise / vibration pump and GO TO Step 3.
l L
1 l
l Step continued on next page APPROVED
- SEP 7 1989 v)
(
A?.^UfE Page 2 of 61 (0192Q/0018Q/082889)
REV. 54 LOSS OF RH COOLING UNIT 1 IBWOA i PRI-10 l STEP ACTION / EXPECTED RES GN5E PEiFONSE NOT OSTtuhED-i I
Step 1 (continued) ;
i c . Verify RCS temperature - c. Verify sufficient flow l SIABLE_0R_ DECREASING through-RH HX,- )
- 1) Verify proper operation .
of RH flow control- i valves: l o 1RH606/618 -!
o 1RH607/619 i i
adversely affecting RH !
HX operation, !
THEN GO TO 1Bw0A PRI-6,
(
5 COMPONENT COOLING i
MALFUNCTION,while !
continuing witt this .
procedure-at Step 2. -[
- i
- d. RETURN TO procedure and step !
in effect- ,
t I
L
?
[
t t
APPROVED i i
SEP '7 1989 i O == i Page 3 of 61 ;
l (0192Q/0018Q/082889)
r REV. 54 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10 p
STEP ACTION / EXPECTED RE3?ON5E ,
FE EFONSE NOT OSTeoNED 4 2 YERIFY POWEIL10XLESf_ BUSES:
- Bus 141 bus alive light - LII direction, while continuing
- Bus 142 bus alive light - LII with this procedure.
3 CHECK RH SlSIEM STATUS:
- a. RH hot leg suction valves - a. Manually open RH suction ,
QEEH valves as required: I o 1RH8701A and B o 1RH8701A and B o 1RH8702A and B o 1RH8702A and B l 1
- b. RH System - IHIACI b. Isolate any leak.
- At SE discretion, check for leak:
l 4 CHECK RCS CONQ1Il0NS:
i
LESS THAN 360 PSIG less than lh0_ESIG:
l
- 1PI- 403 o Solid Plant - Throttle !
- 1PI- 405 letdown and charging as i necessary to reduce RCS l pressure. I o Pzr Bubble - Manually initiate pressurizer spray to reduce RCS pressure.
(-
l '
o 1RY455B l o 1RY455C l o 1CV8145 II either pressure l instrument has failed,
! THEH GO TO ATTACHMENT B APPROVED (page 31).
() 5tep continued on next page SEP 7 1989 DR AlOWOOO oN SITE ACVIEW l
Page 4 of 61 (0192Q/0018Q/082889)
r REV. 54 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10
,3 4
'LJ PEiFONSE NOT OST Ait;ED
~
STEP ACTION / EXPECTED RESPON5E i
t Stop 4 (continued)
- b. RCS level: b. GO TO Attachment A (page 11). ;
o RVLIS - AT_LEAST_1B .
Plenum Region '
-OR-o Tygon level indication -
GREATER _THA! LOR E0HAL ID 393'62 ,
-OR" o 1L1-R7046, REACT VSL '
LVL - GBEATER__THAN OR lQUlk_ID_193'62 g rN
\_] t 1
b a
APPROVED n SEP 7 1989 ,
DR AIDWOoD ON.s;TE asver w i
Page 5 of 61 (0192Q/0018Q/082889)
REV. 54 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10 q ,
b 5TEP ACTION / EXPECTED REE;0N5E EiFON$E NOT OEiTmt.ED ,
5 CHECK _RfLS1SlftLSIALUS:
a, RH hot leg suction valves - a. Manually open RH suction QEEN valves as required:
o 1RH8701A and B o 1RH8701A and B o 1RH8702A and B o 1RH8702A and B
- b. RH System - IHTACT b. Isolate any leak.
- At SE discretion, check for leaks ,
t CAUTION -
Starting redundant RH train prior to '
determining the cause of the failure of the first train may cause a -
( failure of the redundant RH train.
6 ESIABLISH RCS CODLIRG WITH IE redundant RH train is HOT ;
REDUNDANT RH TRAIN: available, THEN attempt to restart the RH ,
- a. Establish RCS cooling per train previously in service.
Bw0P RH-6, PLACING THE RH SYSTEM IN SEUTDOWN COOLING IE neither RH train can be restored. :
THEN continue attempts to restore either RH train, and GO TO Step 8.
7 CHECKlCS_CDRDlILoh5:
- a. Verify RCS temperature - a. GO TO Step 8.'
SlAHLE__Q1LDECEFAS.IEG
ATTACHMENT A (page 11),
- c. RETURN To procedure and step APPROVED .
effect
- SEP 7 G89 ;
l'O N M 5 fa .
Page 6 of 61 (0192Q/0018Q/082889)
REV. 54 LOSS OF RH COOLING UNIT 1 1Bw0A PRI-10
,en (j __
STEP ACTION / EXPECTED RE5?ON5E PEiFONSE NOT OST AiNED 8
{0 g g IEMEIS_I.0_RESIORL ,
a, lE at anytime an RH train becomes >
available, THEM:
- 1) Immediately align the RH train ,
for RCS cooling per Bw0P RH-6, PLACING THE RH SYSTEM IN ;
SHUT DOWNC00 LING ,
- 2) RETURN TO Step 7 of this i procedure .
Thh ChD
- a. Refer to Table A (page 8) to
(~S
(_) determine applicable cooling method: ,
o Bleed and Feed Using Excess >
Letdown through Loop Drains and Normal Charging -
AIIACHMENT C (page 32) ,
o Steaming Intact /Non-isolated SGs AITACHMENT D (page 37) o Bleed and Feed Using Pzr PORVs and Normal Charging -
AIIACHMEHI_E (page 44) , ,
o Refuel Cavity to Fuel Pool Cooling -
AIIACHMEHI_E (page 49) .
o SI Pump Hot Leg Injection -
AIIACHMENT G (page 53) o Accumulator Injection -
AIIACEMEHI_1L(page 57) APPROVED
. o Inventory Addition via RWST - ggp 7 ;ggg .
AIIACEMEHI.l (page 60) eSO.T!?Nw j
-END-Page 7 of 61 ,
(0192Q/0018Q/082889)
REY. 54 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10 0
TABLE _A_(page_LoLil DETERMIRAT10lLOLEEEECI1YE _RC LC 00LI NGlET110RS COOLING iMODE 4 110DE_5 MODE _1 METHOD RCS isI w/hotI NORMAL REFUEL i HEAD' RCS is w/ hot adverse) side ' Configu FLOODED OFF adverse side vent ration vent C
Y p p , ,/
ATTACHMENT \
ATTACHMENT \
D
~'N
\
/,/ \ '*
K f' p
,/
'x \
p N
/
O ATTACHMENT
/ /' /
"\2/
/x/
s /\
^TT^ ""*"I o ,E y p( \
'{ '
ATTA HMENT ,-
, 'N ,/ 'N N 's . ' '
N j'
/\ N \ / 'N _ / ,/_
'N / N / 'N / N
's \
~
' "N / 'N / / 'x / /
ATTACHMENT N'N / N. x/ s - N
\ , 'N s ,
'N,[ 's. f/
g 'x / N
- 1. SI pump hot leg injection must be initiated as the primary means of RCS cooling and inventory control. Other methods may be used in conjunction with ATTACMENT G but not in place of it.
- 2. May be used as a cooling method if the boot seal is inflated and refueling cavity is being filled.
- 3. hone of the following existo RCS is intact (no opening) or at least one RCS loop has both hot and cold leg isolation valves open or hot side vent less than required per Figure 1BWOA PRI-10-2 (page 10) APPROVED O SEP 7 1989 oYEO21w Page 8 of 61 l (0192Q/0018Q/082889) l
REV. 54 LOSS OF RH COOLING UNIT 1. 1BWOA PRI-10
- ,n\
()
0 0 TRCS = 100 F TRCS = 140 F 20.0 18.0 ---
/
16.0 7
'/
-/
c 14.0 f
$. 12.0 g 7 i % /
O m ',,-
r 10.0 ,
a '-
y ^
- B0 ,
a C 6.0 4.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 200.0 Time After Shutdown ihrs)
FIGURE IBw0A PRI 10-1 SEP 719M (7 Time to Reach Saturation Following a
(_) Loss of RER at Mid-Loop g,yggw,900 (0192Q/0018Q/0828891
I
-REV. 54 LOSS OF RH COOLING UNIT 1 1BWOA-- l PRI-10 .
t
'l r
TRCS = 100 F 0
-TRCS = 140 0F 30.5 2 SAFETIES ,- .
30.0 -
-- i
/' / '
i
' f' !
25.0 -
s 'e g, / '
20.0 '
y 18.3 3 S AFET,ES //
O y
_s is o I
/
l :
l- it! . - Im. nan :
I- >. W , W ICD l ._$i 10.0 f PZR M ANWAY--
j7 8.5 j' j 5.0 . f
/ i i
l l 0.0 L 0.0 100.0 200.0 '300,0 400.0 500.0 600.0 -700.0 800.0.-' 900.0 ;
p :TW.E AFTER SHUIDOWN IHRSl' ,
1! '
i e APPROVED i FIGURE 1Bw0A PRI l'0-2 i SEP 7 N83 i Vent Path Requried to Prevent
( RCS Pressurization n uiow oco oa me nutw t
I i
Page 10 of 61 ,
(0192Q/0018Q/082889). i
REV. 54 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10 f')
%J STFP ACTION / EXPECTED RE5;Ofot WEEFONSE NOT OST>whED I ,
.AITACHMEHI_A_ Rage _L.oll01 RH RLC0VERY WHILE AT REDUCED IHYEHIORLCONDITIONS D'
1 Eg:g PUMP $_Sii0U1.D
- a. RH pump - ANI.RUHNING a. Go To Step 2.
- b. RCS level: b. Stop the RH Pumps and Go TO Step 2.
o RVLIS plenum region - f GREATER _THAILORlQUAL
- 10_.173
-OR-o 1LI-046,-REACT VSL LVL - [
GREATER _THAILOR_. EQUAL
/m
%.j) ID_212L3" .
t
-0It -
o Tygon level indication
- GREATER THALLOAlQUAL to 393'6"
- c. RH Flou - LESS_THAN 3000 gpm c. Reduce RH Flow to less than or equal to 3000 gpm.
- d. RH pumps - HQT_CAYlIATING d. II the RH Pumps continue to cavitate with adequate RCS
- level, ,
l THEN stop the RH Pumps and !
00 TO Step 2. t I e. RETURN TO procedure and step in e.ffect l
l APPROVED SEP 7 Sag (o) cidNU8f, Page 11 of 61 (0192Q/0018Q/082889)
REV. S4 LOSS OF RH COOLING UNIT 1 IBWOA PRI-10 3
(V STEP ACTION / EXPECTED RES GN5E FEIFONSE NOT 06Tn4NED AUACHMENLA_LFage_LoL202 RH RECOVERY WHILE AT REDUCED
_ IHVEHTORLCONDITIONS
- a. Verify /Close letdown orifice isol valves:
- 1CV8149A
- 1CV8149B
- 1CV8149C
- b. Verify /Close RH to CV Ltdwn Flow Cont Vlv:
- ICV 128
_( c. Verify /Close RC Loop Drn Vivs:
- 1RC8037A
- 1RC8037B
- 1RC8037C
- 1RC8037D 3 DETERMINE _IIME TO RCS B0lLlRG:
- a. Time to core saturation - a. Go To step 4. Observe LESS THAN 5 MIRUIES per CAUTION prior to Step 4.
FIGURE 1Bw0A PRI 10-1
- b. GO To step 13 l
l l
l l
APPROVED SEP 7 GD (9 S7d0EiO 7
%/
i l
l Page 12 of 61 (0192Q/0018Q/082889)
REV, 54 LOSS OF RH COOLING UNIT 1 IBWOA PRI-10 ry .
O PEiFONSE NOT OSTn,NED STEP ACTION / EXPECTED RE5:0N5E b
ATTACHMENT _A_LEage_1_r L 202 RH RECOVERY WHILE AT REDUCED IHYERIORLCONDlILONS CAUIl0B Personnel working in containment ,
should be warned prior to refilling the RCS to avoid inadvertent '
contamination of personnel working near RCS openings.
i 4 CliECK_RCS_LEYEL: :
- a. RCS level - a. Go TO Step 9. !
o RVLIS plenum region - LESS THAN_. 3 77.
[}
-OR-o 1LI-046, REACT VSL LVL -
LESS_ THALL 111' fi" j
-OR- ,
o Tygon level indication -
LESS TH/dL331'(2" Step continued on next page ;
APPROVED SEP ? G83 d'M S R ?. .
(J~N, .
?
i Page 13 of 61 (0192Q/0018Q/082889)
1 REV, 54: LOSS OF-RH-COOLING-UNIT 1 1Bw0A- -
PRI-10:
O STEP ACTION / EXPECTED RES ON56 PE1FONSE NOT OSTmNED iTTACHMEHI A_.IEage 4_of_ZQJ RH RECOVERY WHILE AT REDUCED ;
LEYERIORLC.01QlILO11S
' Step 4 (continued)
- b. RCS level - b. GO To step 8.
o RVLIS plenum region - LESS l THAN;277. ;
-OR-o- 1LI-046, REACT VSL LVL - !
LESS THAN_332' !
-0R- !
i o; Tygon level indication - LESS ;
IHAN 392' 5
gKgigg]) EVENT
' - resistance;- LESS THAN leg opening. .I i -ItEQUIRED'per FIGUAE THEH, refill the RCS per j 1 Sit 0A ERLlD-2 the following: ;
-1) Align at least one SI Pp for Hot Leg ;
injectlon.- ;
1
- 2) Start the aligned SI Pp.
- 3) WHEN RCS leve11is-gre.ater 1 than~393'6",- -I IEEN stop-theLSI-Pp. 4
' 4) G0'To step 9. !
APPROVED f SEP 7 1989 i O == _.
l h
Page 14.of 61 E (0192Q/0018Q/082889) .;
w . - . _ ~ - - - -. . _ . _ _ _ . . . __ .._.--e
REV, 54 LOSS Of' RH COOLING UNIT 1 1BWOA PR I- 10 I <
L, } _
STEP ACTION / EXPECTED RE5;0 NEE .'fE?FONSE NOT OST AiNED AIIACHMERT_&_Raati oL10.).
RH RECOVERY WHILE AT REDUCED l INM H10RY_CONDITIO!1S a a la 1 ,
IHLH makeup to the RCS using
- a. Open RWST to CENT CHG one ol' the f ollowing:
pump suction valves:
o Attachtent I, RWST GRAVITY
- 1CV112D FILL (page 60)
- ICV 112E
-OR-
- 1CV112B
- 1CVll2C -OR-
,m\ c. Increase charging Flow o Attachment H. ACCUdULATOR
(
' to maximum by throttling INJECTION (page 57) open ICV 121 and ICV 182 7 ED.10_S1EP_3 l
r i
APPROVED SEP 7 989 nnruosaco 1
(}
g O N 6tT8 ncviggy J i ,
1 Page 15 of 61 r
, (0192Q/0018Q/082889)
REV. S4 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10 '
() .
STEP ACTION / EXPECTED REE?CNEE '
PEEFONSE NOT OBT44f.ED ATTACHMENLtL(Fage_h_oL201 RH RECOVERY WHILE AT REDUCED IINENTORLCONDITIONE 8
g g 1A_fENI E
a, One Cent Chg Pp - a. Start a Cent Chg Pp IIL1EF211rE per Bwo'PCV-1, STARTUP OF THE CV SYSTEM.
IE a Cent Chg Pp can NOT r be started, THEN makeup to the RCS .
using one of the following: ,
o Attachment I, RWST GRAVITY FILL (page 60) gs -OR-g o Attachment G, SI PUMP HO'I LEG INJECTION (page 53)
-OR-o Attachment H, ACCUMULATOF INJECTION (page 57) :
- b. Increase RCS level to -
GREATER _THML391L6". by throttling open 1CV121 ;
i and ICV 182
- c. Throttle 1CV121 to
Page 16 of 61 (0192Q/0018Q/082889)
REV. 5tt LOSS OF RH COOLING UNIT 1 1BWOA PRI-10 ACTI0tuEXPECTED PE5?GN5E } PEIFONSE NOT OSTiuNED
_ STEP ATTACliMENT__A_fPage_1_oll01 RH RECOVERY WHILE AT REDUCED-IINENIQRLCQNDlnONS ,
L E01E .
~--
- The time to-boiling in the RCS should** ,
- be taken into consideration when
- determining how much time should be *
- spent venting the RH system prior *
- to taking additional actions starting *
- at Step 10.
- NQTI
- If adequate time to completely vent *
./c _* the RH system is not available, air *
- can-be swept out of the-RH lines by *
- filling the RCS to 393'6" and- *
- running _an.RH pump at a flowrate * '
l i _
- greater than 3000 gpm, *
'10 VEN" AFFEC_TED RH II the affected RH train can
.IRALN_USING_ RWSTL HOI be vented using the RWST THEH:
-a,-MaintainLRCS. level-while venting RH System 1. Close.RH Pump 1A/B Suction from RWST.Isol Viv:
o ISI8812A o = ISI8812B >
APPRoygg
+
Step continued on next page SEP 7 1939 J
fO SRAtOWOOD DN sitt agysgg Page 17 of 61 (0192Q/0018Q/082889)
f I
REV. 54.- LOSS OF RH COOLING UNIT 1 1Bw0A PRI-10 ,
O -
STEP ACTION / EXPECTED RE5?ON5E ' PETFONSE NOT OSTa>NED j,-
t i
ATTACHMENT _A.(Eage 8 of_202 l RH RECOVERY WHILE AT REDUCED l INVENIOR1_CONDITIQHS i
)
Step.10-(continued)
- b. Align the affected RH train 2. Open RH Hot Leg .
for venting: Suction Viv:
- 1) RH Hot Leg-Suction Valves - 'o 1RH8701A and-B i CLOSED: o_ 1RH8702A and B 1 o 1RH8701A and B 3. Open RH to Cold Legs ,
o- 1RH8702A and B 1A&D/1B&C.: !
I ISI8809A I
-2) RH to Cold Legs 1A&D/1B&C - o CLOSED: o ISI8809B t o ISI8809A 4. Close RH HX 1A/B Disch I O o ISI8809B 3)-RH-Pump 1A/B-Suction o Xtie Viv:
1RH8716A I from RWST Isol Valve - o 1RH8716B QEIH: i
- 5. Open lA/B RH HX FCV: !
o 15I8812A .
o 1SI8812B o 1RH606-o 1RH607 :
- c. Vent RH train-suction piping _
._using high point vent valves: 6. Close 1A/_B RH Ex Bypass _ i FCV: ;
o- 1RH028A (374 +6' U12 AB) I o- 1RH028B (374 +6' X12 AB) o .1RH618 l o 1RH619 l
.t
-j I
APPROVED Step continu6d'on next page SEP 7 G83 ;
Wf AIDWOOO r' ON site ALviEW f
\
I v
Page 18 of 61 ,
(0192Q/0018Q/082889)
i l
REVL S4 LOSS OF RH COOLING UNIT 1 IBWOA l PRI-10 n\si STEP ACTION / EXPECTED RESPOfGE RETFONSE NOT 06TmhED ATIACHMEHI_A_Hagt9_st.201 RH RECOVERY WHILE AT REDUCED INVEHIQRY CONDll1Q1]S
- Step 10 (continued)
- d. Vent RH train discharge piping 7. Vent RH train suction piping using high point vent valves: using high point vent valves:
o 1RH026A (357+12' S15 AB) o 1RH028A (374+6' U12 AB) o 1RH026B (357+12' V15 AB) o 1RH028B (374+6' X12 AB)
- e. Re-align the affected RH train: 8. Vent RH train discharge piping using high point
- 1) RH Pump 1A/B Suction from vent valves:
RWST Isol Valve - CLQSID:
/'N. o 1RH026A (357+12' S15 AB)
(_) o 1SI8812A o 1RH026B-(357+12' V15 AB) .
o ISI6812B
- 9. Start the affected pump at c
- 2) RH Hot Leg Suction Valves - high flow rate and monitor CLQSID: reactor vessel level.
When RH pump amps and disch o 1RH8701A and B pressure are stable, reduce o 1RH8702A and B RH flow.
- 3) RH to Cold Leg 1A&D/lB&C 10. Shutdown the RH Pump and OEEH: align per SE direction, o 1SI8809A 11.Go To Step 11.
o' 1SI8809B APPROVED SEP 7GJ9 ih oY$$$?Nw
(_/
Page 14 of 61
- (0192Q/0018Q/082889)
REV. 54 LOSS OF RH COOLING UNIT 1 1BwCA >
PRI-10 O'.
STEP _
ACTION / EXPECTED RE5?GN5E PE!FCNSE NOT JSTa NED l i
ATTACHMENT _AJEage_10_of_201 RH RECOVERY WHILE AT REDUCED INVENIOR1_ CONDITIONS _ _
t CAUTION Starting an RH pump may result in r an RCS level decrease due to shrink or void collapse, ,
11 RES10REllLELOW: ,
- a. RCS level - GREATE1LTHAM_331' 6" a. Continue with this ,
procedure, '
WHEN RCS level is greater then 393'6",
~ THEN perform Steps lib through 11j.
(
?
- b. Align the RH system:
- 1. RH Hot Leg Suction valves -
OEEN:
o 1RH8701A and B o 1RH8702A and B :
- 2. RH Pump Suct From RWST Isol Viv - CLOSED:
o ISI8812A o ISI8812B
o 1SI8809A o 1SI8809B APPROVED l Step continued on next page SEP 7 N39 '
\
- g 3 gga 1
(J l i l
Page 20 of 61 ,
(0192Q/0018Q/082889)
REV. 54 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10 0 5TEP ACTION / EXPECTED RES ONE.E PE EFONSE NOT 06Taif 4ED ATIACHMENT_A_ Rage _lLnL201 RH RECOVERY WHILE AT REDUCED INVENIORY_CONDITLONS Step 11 (continued)
- d. Verify /Close RH Dsch Flow path flow control vlvs:
- RH HX Flow control viv:
o 1RH606 o 1RH607
- RH HX Bypass Flow control viv:
o 1RH618 o 1RH619
- e. Start one RH pump:
o A RH pump o B RH pump
- f. Maintain RCS level -
GREATER THAN 393 ' 6'!
Step continued on next page APPROVED SEP 7 1933 O == tva-l l
Page 21 of 61 (0192Q/0018Q/082889)
- . - . - . . - . . - . - . - ~ _ - . . - - - - . - . . -. .- -
REY. 54 LOSS OF RH COOLING UNIT 1- ~ 1BWOA'-
-PRI-10 STEP- ACTION / EXPECTED RES?ON5E FE5FONSE NOT OST AiNED :
ATIACHMENT A Gage _12_of_2Q1 RH RECOVERY WHILE AT REDUCED UEEHIORLCDHDIILONS P
Step'11 (continued)
- g. Gradually increase RH flowrate to-desired flowrate ,
.h. Verify RH Flow - RESTORED h. Start trending core exit +
TC's and Go To Stop 12 OBSERVE NOTE prior.-to
- Step-12.
- i. Verify RCS temperature - i. Increase cooling flow thru LESS THAN 140'E the inservice RH HX and continue cooling the RCS. RETURN TO Step lig.
Lj.. RETURN TO procedure and step in-effect APPRO_vED SEP 7 G89
- BR AtOWOOO ON.stTE REVI8#
Page 22 of 61 (0192Q/0018Q/082889)
REY. 54 LOSS OF RH' COOLING UNIT 1 IBWOA PRI-10 ,
D J
STEP ACTION / EXPECTED PEi?ON5E PEiFCNSE NOT OST AiNED ATTACHMENT _A_IPage_13_of_201 .
RH RECOVERY WHILE AT REDUCED ,
__ INVENT.0RLCONDITIONS :
HQIE
- To maintain RCS pressure low enough * ,
- for gravity Feed, at least two SG's *
- must be refilled and utilized. *
- 12 ER$LN _SECONDAR1 '
LD._BE T 21N'ED:
ATLIS !
- a. RCS-hot side vent path a. Go To Step 13.
resistance - LESS_THAH f3 REQUIRED per Figure
( i 1Bw0A PRI 10-2
\_/ ,
- b. SG - ALLEASL.TR0_AVAILABLE b. Restore at least two Steam Generators to service while continuing ,
with this procedure at ,
Step 13. [
- c. Go To Attachment D.
STEAMING INTACT /NON- i ISOLATED SG(s) (page 37) i APPROVED SEP 7 989 A".Snfe. ;
(~')
s- i i
Page 23 of 61 (0192Q/0018Q/082889)
5 REY. 54 LOSS-0F-RH COOLING UNIT 1 1Bw0A- 4 PRI-10 ;
.O
-STEP- ACTION / EXPECTED RES?ON5E '
PEiFONSE NOT OBT AiNED ATIACIIMENT_A_ Rag _e 14 of_20_1 RH RECOVERY WHILE AT-REDUCED IHy%NIORY_CDHD1IIQHS ,
13 EYACUAIE ALL PEBS N EL -
FROM UNIT CON fAI s MENT:
- a. Announce over-.the plant page system for all unnecessary
- personnel to evacuate Unit 1 containment
- b. Actuate Unit 1 Containment i Evacuation Alarm; 1.)_ Select SR' channel to provide Containment Evacuation alarm:
o SR channel 31'
-OR-
- o' SR' channel 32
- 2) Verify Audio Count Rate 2) Place Audio Count Rate Channel-selector switch in Channel Selector switch position for SR channel in position for SR HQI' selected in Step 1.b.1 _ channel HQI selected in above- Step-13.b.l.
- 3) Place selected SR channel Level
- Trip Switch to - BYPASS:
- Check SR TRIP BYPASSED.
alarm LII-4): Bypass BDPS on selected SR ~
channel':
a) Place BDPS TEST / NORMAL toggle switch on card NM107 in IESI position:
APPROVED
- - Check BDPS BYPASSED alarm - LII. 7 GS9 SEP
_: Step' continued on next page enuowoco CH 63TE RE41EN Page 24 of 61 (0192Q/0018Q/082889)
- - ~ . . - , . - .-
REV. 54 LOSS OF RH COOLING UNIT 1 1Bw0A '
PRI-10 T',
\v)
STEP ACTION / EXPECTED RE3?ON5E PETFCNSE NOT OSTmNED ATTACHMEHLA_ Rage _U_oL201 i RH RECOVERY WHILE AT REDUCED IHEERIORLCONDITIONS i
Step 13 (continued)
- 5) Rotate selected SR channel t Level Adjust potentiometer fully counter clockwise l l
- 6) Place selected SR channel operations selector switch to - LEVEL _ADUSI position
- At SR dre.wer, check l CHANNEL ON TEST light - LII i 7) Rotate selected SR channel Level Adjust potentiometer
. t clockwise until HIGH FLUX AT ;
SHUTDOWN alarm - LII
- 8) Continue procedure at Step 2, After at least 3 minutes, deenergize the containment Evacuation Alarm by placing the HIGH FLUX AT SHUTDOWN switch to - BLOCK
.c. Monitor containment conditions:
- 1) Notify Rad Protection Dept to I monitor containment conditions '
and provide guidance on i
protective clothing and equipment during containment closure
- 2) Notify Rad Protection Dept to provide additional guidance should l RCS boiling point be reached before containment closure is completed APPROVED -
I SEP 7 1989 oSUSN70vTw
(
5 Page 25 of 61 ;
(0192Q/0018Q/082889)
o
- REV. 541 -LOSS 0F-RH-COOLING UNIT-1 1BWOA . !
PRI-10 i
O 1 I
STEP- ACTION / EXPECTED RE5?ON5E RETFONSE NOT OSThiNED i
ATTACHMERLA_.1P_ age _16_oL2DJ .
RH RECOVERY-WHILE AT REDUCED ItNENTDRY_C0lfDIT10Hs ,
t i
14- LN1IIALE CONTAWMENT CLOSSJJRE:
- a. Close Unit.1 Containment: l
-- i j
. 1-) Use 1Bw05 XPC-W1. CNMT BLDG P NETRATIONS WEEKLY SURV, j as a. guide j
?
2)-Provide at least one barrier i between containment atmosphere i and areas outside containment !
15 -VERIFY iCffs RUNtlMG_W t
. LOW SPEED: ;
- IVP01CA
- IVP01CB-
- - IVP01CC -[
- IVP01CD !
16 CHECK RCS-LEVEL:
- a. RCS-level - LEEE a..Go To step 21. [
THAN.393'6" :
- b. RCS level - LESS b. GO To step 20. !
THAN 331L j f
i APPROVED !
i
?
SEP :71989 DRAIOWO
~ ~ " "OO O "
1 i
i i
Page 26 of 61 i
.(0192Q/0018Q/082889)- i
I i
t REV. 54 LOSS OF RH COOLING UNIT 1 1BWOA l PRI-10 ,
O 5TEP ACTION / EXPECTED RE9?CNSE FEiFONSE NOT OBTa>NED ATTACllMEliT_A_IPage.lLoL 20.1 !
Ril RECOVERY Wi!ILE AT RUDUCED IINEHIDRLCONDITIONS _._ l Il
- REQUIRED _ser_EIEURE._ TilEN retill the RCS per IBH0A_ERL10 2 the following: ,
- 1) Align at least one SI [
pump for llot Leg Injection.
- 2) Start the aligned SI Pp.
- 3) When RCS level is greater than 393'6",-
h*. TIIEN stop the SI Pp.
- 4) GO-TO Step 21.
i f
6 s
APPROVED [
SEP 7 589 l 0 l?n?L'2?x t
Page 27 of 61 l (0192Q/0018Q/082889) ;
a .....,____._._...___..______.m,_,
REV. 54 LOSS OF RH COOLING UNIT 1 IBWOA PRl-10 O
()
STEP ACTION / EXPECTED PEE;ON5E PE R ONSE NOT 06Tmf.ED
\
ATTACllMEliT_ A_(Page_18.ot 20).
Rif RECOVERY WilILE AT REDUCED
_.. _ ..IlWENTORLC0!1DIT10!iS_._
18 ALIG i i iI Jr a Cent Charging Pp is not 1QJ1E[(I .._RL5 !liARGING._PE available.
TiiEl{ makeup to the RCS using a . Open ~ ' T to CENT CliG one of the following:
pump i ion valves:
o Attachment I, RWST GRAVITY
- 1CV112D TILL (page 60)
- 1CV112E
-OR-
- b. Close VCT to CEllT Cl!G
- pump suction valves: o Attachment G SI PUMP 110T LEG I!iJECTION (page $3)
- ICV 112B r
- ICV 112C -OR-O c. Increase charging Flow ( Attachment H. ACCUMULATOR V to maximum by throttling INJECTION (page 57) open 1CV121 and ICV 182 19 00_T.03IER.21 9
APPROVED SEP 7 1989 oil?siNN'Nw bi~
Page 28 of 61 (0192Q/0018Q/082889)
REV. 54 LOSS OF RH COOLING UNIT 1 1Bw0A PRl-10 f
b}
i bTEP ACTION /EXFECTED REE OfdE PEiF ON$E NOT OST f.ED ATTACHMEHT_A_iPage l t ot 20)
R11 RECOVERY WiiILE AT REDUCED
_ I!WENTORLCONDITIONS _ ,
t g fp
- a. One Cent Chg Pp - a. Start a Cent Chg Pp '
I!LSERVICE per Bw0P CV-1, STARTUP OF T11E CV SYSTEM.
If a Cent Chg Pp can HQI be started.
THEH makeup to the RCS using one of the following:
o Attachment I, RWST l GRAVITY FILL (page 60) r
-OR-o Attachment G, SI PUMP HOT LEG I!iJECTI0li (page 53)
-OR-o Attachment II, ACCUMULATOR INJECTION (page 57) ,
- b. Increase RCS level to -
GREATER _THAIL33326" by throttling open 1CV121 and 1CV182
- c. RCS level - GREAIEILTHAIL3SJ_3" c. RETURN TO Step 20a,
- d. Throttle 1CV121 to maintain desired RCS level ;
APPROVED see 7 '982 O afdfWE l
(0192Q/0018Q/082889)
l 4
REV. 54 LOSS OF RH COOLING UNIT 1 IBWOA PRl-10
(/
STEP ACTION / EXPECTED RE!;ON5E FE!FCNSE NOT %T. f ED ATTACllMEliT_A_(Pate_2Lof _20)
RH RECOVERY WillLE AT REDUCED
__ I!(VE!!TORLC0!iDIT10liS. _
21 RES10RE_RfLC00 LING:
- a. RH Flow - RESTORED a Restore RCS cooling
- 1) Perform one of the following:
o ATTACllMENT C BLEED AND FEED USI!1G EXCESS LETDOWN Ti!ROUGli LOOP DRAINS AND NORMAL CIIARGI!1G (page 32)
-OR-
/ o ATTACHMENT G. SI PUMP
!!CT LEG INJECTION (page 53)
-OR-o ATTAC!IMENT H.
ACCUMULATOR INJECTION (page 57)
- 2) RETURN TO Step 10.
_l E
-END-APPROVED SEP 7 G89 o?S?2?3h Page 30 of 61 (0192Q/0018Q/082889)
REV, 54 ># W, ' '
LOSS OF RH CC 1BWOA PRI-10
.,.......,_w-.+~
STEP ACTION / EXPECTED EEF:OfiiE [ PE ELONSE NOT OBTmf.ED ATTACHMENT _ D_ I Pa ge. .L.cf _1).
LOCALLY _DPENING_RH 110I_LE0_SVCTIO!LVALVES 1 LOCALLL0EEfLRiLSVCIl0NJALYES: l
- a. IE 1PI-405 failed, a. IE valves can NOT be opened THEH open the following valves: electrically due to failed motor,
- 1RH8701A (MCC131X2, Cub B1) THEH turn breaker OEF and ,
- 1RH8702A (MCC131X2, Cub B4) locally open with handwheel as necessary:
THEH open the following valves: o 1RH8701A (377' R7 P68) o 1RH8701B (377' R11 IMB)
- 1RH8701B (HCC132X2, Cub B3) o 1RH8702A (377' R4 P75) ;
- 1RH8702B (MCC132X2, Cub B1) o 1RH8702B (377' R3 IMB) ;
- 1) Turn breaker DEE and open 1) At SE discretion, vent cubicle door RH trains using high ,
(~s' point vent valves.
\m J 2) Install jumper between points 2 and 3 on terminal board i at front of cubicle
- 3) Override breaker / door ;
interlock and turn breaker OH
- 4) WHEN 'M' contactor drops out.
THEN turn breaker Ort and remove jumper
- 5) Check valve position by visual ins) etion or by computer point
- 6) At SE discretion, vent RH trains using high point vent valves
- b. RETURN TO 13w0A PRI-10, Step 4
- END -
APPROVED SEP 7 G93 o A?A'n,%
V Page 31 of 61 (0192Q/0018Q/082889)
REV. 54 LOSS OF RN COOLING UNIT 1 IBWOA PRI-10 i O STEP ACTION / EXPECTED RE9:0NSE PEiFONSE NOT OBTAiNED i
ATTACHMERLC_(Page_LoLil BLEED AND FEED USING EXCESS LETDOWN THRU LOOP
_ RRAlliSl_liORMALJHAR0lliG
- HQIE * -
-* This ATTACHMENT establishes-a drain
- 7ath to the RCDT-, This letdown may *
- 3e sent to either-the HUTS or RWST *
- via the RCDT. Charging is also *'
- - established, which may use either *
- --VCT or RWST suction. Evaluate
- plant conditions to determine which
- combination to use. Consider RWST
- 1
- 1evel. PWST levels BAT levels, *
- and HUT capacity.
- 1- CliECLRCDT PUMP S:
AVAILABLE GO TO another ATTACHMENT for RCS cooling.
II no other c_ooling method is l available, THEN consider opening drain on RCDT and continue with .
this procedure, i i.
2 CHECL.CENLCEG_Euti23: ,
- a. At least one-CENT CHG pump - a. GO T0 another Attachment
'AYAILABLE for RCS cooling, ,
f l
9' ii APPROVED 4-SEP 7 G89
- bO
t
F Page 32 of 61 (0192Q/0018Q/082889) l
___________._._____________.m..._, . . . . _ _ _ , _ . _ . . . _ . , _ , _ , , , _ _ , _ _ _ , .
REV 54 LOSS OF RH COOLING UNIT 1 1Bw0A PRl-10 G
i l v
5TEP ACTION / EXPECTED PES;OfGE PE T E CfGE f10T OST.uf.ED ATTACHMEHT_C_(Face _2_.oL51 BLEED AND FEED USII1G EXCESS LETDOW!( THRU LOOP DRAINS 1N01UE._CHARGIHG 3
ggALIGttplSCitARGE 0E_RCDI o U-1 RCDT Pump to Recycle HUT's Isol Viv - DEEH:
- 1AB8551 (401' V14 AD 10' below grating)
-OR-o U-1 RCDT pump to RWST Isol viv - DEEH:
- 1RE9171 (385' V9 AB)
V 4 ESIABLI.SILDRallLEAIH T0_RCDI:
a Excess Ltdwn Hx's Common Outlet Hdr Isol - CLOSED:
- 1CV123
- b. RC Loop Drn Viv - DEEU:
- 1RC8037A
- 1RC8037B
- 1RC8037C
- 1RC8037D
IKRQT.TLED:
- ICV 8350 (377' R12 RXB1)
APPRoyc0 SEP 7 1933
- o?L$NNw Page 33 of 61 (0192Q/0018Q/082889)
l REV. 54 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10 i 5TEP ACTION / EXPECTED PEi;0NSE PEiFCNSE NOT OSTo.hED ATTACliMENT _C_(Page_3_ of_5)
BLEED AND FEED USIliG EXCESS LETDOW!1 TilRU LOOP
._ D RAlli S_.L H O RMALC l! ARG I liG_. __. -
5 VERIELRCDLEUMPS_IfLAUIO:
- 1A RCDT pump
- IB RCDT pump 6 CBECK.YCLMAKEVP_C.0NIROLSYSIEM:
- a. Mode selector switch - AUTOMATIC a. Verify RWST level greater than 67, and perform the following:
,
- 1CV112D
- 1CV112E
- 2) Close VCT Outlet 1801 valves:
- 1CV112B
- 1CV112C
- 3) GO TO Step 7
- b. Set boric acid and makeup water flow controller potentiometers - GREATER _TilAN RCS_HORQ1LCORCENTRAT10li
- c. Control switch - SIARI
! APPROVED SEP 7 ;2 l
( c?N$$?h%
l Page 34 of 61 l (0192Q/0018Q/082889)
i
< REY. S4 LOSS OF RH COOLING UNIT 1 1BWOA I PR I -10 O ACTION / EXPECTED PE5;ON5E l PEicCN5E NOT 06Tmt.EE.
STEP ATTACliMEHT_ C... Ira ce>_ of _ 5 }
BLEED AllD FEED USIIIG EXCESS LSTDOW11 TilRU LOOP
_ . . Dl%11(S_L110RMAL_CllARGIllG_
7 YERlfl_GiAPRGluG_S1SIEtLSJAIDS:
- a. CENT CllG Pumps Miniflow Isol Valves - OPEli:
- 1CV8110
- ICV 8111
- 1CV8114
- 1CV8116
- b. Charging Line Cnmt Isol Valves - OPEll:
- 1Cv8105
- 1CV8106
- c. Start a CENT CilG pump
- e. Equalize charging and letdown flow APPROVED SEP 7 E39 O awn =
Page 35 of 61 (0192Q/0018Q/082889)
REY. 54 LOSS OF RH COOLING UNIT 1 II3WOA PRI-10
/^')
LJ 5TEP ACTION / EXPECTED REi;0f.5E l c Ei'sCNSE NOT OSTa,f.ED A T T A C H M E N T _.C ..( E a g e.. L o L S )
BLEED AND FEED USI!1G EXCESS LETDOWii THRU LOOP
._ DRAINS..L!!ORMA LCHARGING_ _ . _
li .
- a. Check RCS temperature - a. GO T0 another STABLE _0R_ DECREASING ATTACHMEllT for
. A 1
-a. IE at anytime an RH train becomes available, THEll:
- 1) Immediately align the RH Train for RCS cooling per Bw0P PJi-6 PLACING THE I- RH SYSTEM IN SHUTDOWN b COOLING
- 3) RETURN TO 1Bw0A PRI-10, Step 7
- END -
i APPROVED I
, SEP 7 G3 :
t l2M?2N?.
L Page 36 of 61 l- (0192Q/0018Q/082889)
REV 54 LOSS OF RH C00l.ING UNIT 1 IBw0A PRl-10 m
STEP ACTION /EXPEC'ED REE;0 FEE PE4CNSE NOT OSTmt [D ATTACHMEllT A.(Page.Lof _D STEAMING _IliTACTlNON: ISOLATED _. 50(SJ 1 ESIABL LStLRC S_ COOLING _US IN(LSGISl :
- b. Check Two SGs - AVAILAllLE:
- 1) Associated loop stop 1) IF ALL SGs are isolated valves - OPEli T}iEN try to unisolate at least one SG.
IE no SG can be made available TIIEN GO TO another ATTACilMEt4T for RCS Cooling.
O O
- 2) Aval3able vent path: 2) Establish a vent path for at least one SG, o Associated PORV's IE no SG can be made o Steam Dumps available, THEN GO TO another ATTACllMEliT for RCS Cooling.
- 3) 11 arrow range levels - 3) Feed SGs using AF GREATER _THA!L47, System, Maintain level greater than 4% narrow range.
THEN GO To Step 2.
l Step continued on next page APPROVED SEP 7 N3 A'aOEi?-
Page 37 of 61 (0192Q/0018Q/082889)
REV. S4 LOSS OF RH COOLING UNIT 1 1Bw0A PRI-10 O)
L.
STEP ACTION / EXPECTED PEE OfGE PEiF0fME NOT OBTa f.ED ATTAC!! MENT D_(Page_ Z _oLL) l S TEAMlHG_I HIACTIH0lb l S 0 LATED _ S G C S )
Step 1 (continued) i
- c. Dump steam to condenser from c. Manually or locally dump i available SGs: steam from available SG(s) using SG PORV(s). ,
- 1) Chech condenser available
- 2) Place MS header pressure controller in MANUAL and reduce demai.4 signal to zero
- 3) Place steam dump mode selector switch in STEAM PRESSURE mode
- 4) Manually adjust MS header
[. pressure controller demand ;
to initiate cooldown .
- d. Check RCS temperature:
- 1) RCS temperature - STAHLE 1) II steam flow from at least OR._ DECREASING two available SGs is verified Locally, IllDJ continue with this attachment If NOT verified, THEN GO To at.other ATTACIIMENT for RCS ,
- 2) Continue heat removal by steaming SGs and feeding !
with AF System ,
- 3) II at anytime an RH train beccmes available, THEH immediately align it for RCS cooling per Bw0P RH-6, '
PLACING THE RH SYSTEM IN SHUTDOWN ,
- P E R O V L D COOLING
- 4) RETURN TO 1Bw0A PRI-10, Step 7 SEP 7 CJ3 EDE25Su Page 38 of 61 (0192Q/0018Q/082889)
REV. 54 LOSS OF RH COOLING UNIT 1 113WOA PRI-10 (mv) ACTION /EXPEC'ED REE;0N5E STEP F EIL ONSE f10T OBTa.f.ED ATTACliMENT_D_(Page.. 3_of_D S TEAMIIlG_I NT ACTIlioll-I S O LATED _ S 0 ( S2 CAUTION If offsite power is lost after SI reset, then manual action may be required to restart safeguards equipment.
2 CHECK.lEERWATER_110mLON:
- a. FEEDWATER ISOLATION alarm - LIT a. Go TO Step 3.
- b. Reset SI. if necessary: b. Reset SI per 1Bw0A PRI-5, CONTROL ROOM (g) INACCESSIBILITY, v ATTACHMENT E.
- 1) Depress both SI reset pushbuttons
- 2) Verify SI ACTUATED PERMISSIVE LIGHT _ HOLLI.T
- 3) Verify AUTO SI BLOCKED permissive light - LII
- 4) Ver4i fy all automatic SI 4) Deenergia:e F.'idwater signals - CLEARED Isolation Aux Relays by removing fuses FU-24 and FU-27 at Aux Safeguard Relay Cabinets 1PA27J and IPA 28J. GO TO Step 2e.
- 5) CLOSE AND TRIE OPIH 5) II reactor trip breakers reactor trip breakers will NO.T CLQSE, APPROVED DIEN litt lead on TB506-5 in IPA 09J ar.d IPA 1CJ to clear P-4 signal.
7 (G) Step centinued on next page enuowneo cuas nuw Page 39 of 61 (0192Q/0018Q/082889)
REV. 54 LOSS OF RH C00LlilG UtJIT 1 1Bw0A PRl-10 r C)
O .
5TEP ACT10ruEXPECTED PEE;0fGE l PEiVfdE NOT ODTmf.ED ATTACHMENT._D_lPage_4_of 12 SIEAMlHG_lHTACTil10th150 LATED _ S G LSI Step 2 (continued)
- c. Peset feedwater isol ,
- d. Reset feedwater isol aux relays l
CAUTIDH :
l Slowly initiate feedwater flow to steam generators to limit Jevere water hammer to it.thct SGs,
()
v j
IL412sF29113sidd? ,
- a. Verify Condensate System in operation: ;
- 1) At least two CD/CB pump run lights - LII
- b. Place FW reg valves in MAINAL ,
and reduce demand to :cro
- c. Place FW reg byp valves in MANUAL and reduce demand to zero APPROVED Step continued on next page SEP 7 '033 d?SE%ih l
[V ---
? age 40 of 61 (0192Q/0018QiO82889)
i REV. 54 LOSS OF RH COOLING UNIT 1 IBWOA l PRI-10 ;
r'~N Lj !
STEP ACT10fuEXPECTED PEi:C!GE l PETFO!J$E NOT OBTmfjED l r
f ATTACHMEliTA(Pagelofill !
> SIEAMIHG_IliTACT LliO11-I S OLATED_. S GIU t i
Step 3 (continued)- j d, Start the-startup feedwater d. Establish condensate flow !
pump to the Steam Generators by t performing the following: !
-1) The following interlocks must 1) Verify at least one TW be met to start the startup Pp discharge valve is i feedwater pump open:
- Suetion'isol valve - OEEli: o- 1FW002A i
o 1FWOO2B
- 1CB133 o 1FWOO2C !
o 1FWO58 !
- Discharge isol valve - OPEli: ;
L
- 1FWO59
- Recirc control valve switch in DEEli position: -
- 1FWO76 !
i e Recirc 1001 valve - QEEN: ;
- - 1W058 l
- e. Manually open FW tempering i
' isolation-valves: l o 1FWO35A ;
o 1FWO35B :
o IFWO35C ,
1' o 1FWO35D 4 APPROVED e i
SEP 7G ;
Step continued cn r. ext page m,n g eo :
mwu maa
+
1
.., i
=- _ __ _ _ _ _ _ _
Page 41 of di f
'(0192Q/0018Q/082809) .i
- , . .- - . . . . -.- ..-.n_._._._-.-__ - . . ,....:
REY. 54 LOSS OF RH COOLING UNIT 1 IBw0A PRI-10
(
ACT10tdEXPECTED REE;GNiE FEirON$E NOT OST A4t;Et*
l STEP ATTACHitEllLD_IEage.._b_of_D SIEAtilllG_IliTACT/ NON- LEOLATED_$GLS 1 Step 3 (continued)
- f. Control flow with TW tempering f. GO TO another Attachment flow control valves: for RCS cooling.
o irWO34A o IrWO34B o 1FWO34C o 1rWO34D 4 GlECK_SD LEVELS:
- a. Narrow range level in at a. IE feed flow to at least least two available SGc - two avsilable SGs is GREATIR_THAtt4% verif1ed, IIIE!I maintain flow to Os restore narrow range level
( to greater than 4J.
IE IiQT verified.
InEtt Go TO another ATTACllMENT for RCS cooling.
, a. Chech RCS Temperature - a. GO To another ATTACHMENT SIABLE_0LQLCREAElliG for RCS cooling.
Appaoveo SEP 7 1931
, oI.*SE$$&
, =
Page 42 of 61 (0192Q/0018Q/082889)
L __
.. _ _ _ . _ _. .. _ . _ . _ _ _....m . - . _ .
REV. 54 LOSS OF RH C00Lil4G Uf11T 1 3DwoA PRl-10
/^\ _
V -
ACTION / EXPECTED REE;CfGE REIF0fdE NOT OSTa f.ED
, STEP i ATTACHMENLDJ Page_Lof._D SIEAMING_.1HTACIIH0!i-1 S O LATED _E GI S 2 6
{0 g g IIEMEIS_IO_RES10RE
- a. IE at anytime an RH train becomes available. -
TilElu. >
- 1) Immediately align the RH train for RCS cooling per Ew0P RH-6 PLACING THE RH SYSTEM IN 3HUTDOWN COOLING
- 3) RETURN TO 1Bw0A PRI-10, Step 7
-END- ,
APPROVED SEP 7 Q3 oi"$EIES.
(%
u)
Page 43 of 61 (0192Q/0018Q/082889)
LOSS OF RH COOLING UNIT 1 i REV. 54 1BWOA PRI-10 i O STEP ACTION / EXPECTED RES CN5E PEiFON$E NOT OSTAitiED i
l 1'
ATTAc11 MENT _ ElPAGE_LOEJl BLEED AND TEED USING PZR PORV(S) AtID i HORMALCl!ARGIMG_ _ - - ,
1 RESEl_SLlEJECESSMX: Redet SI per 1Bw0A !
PRI S. CONTROL ROOM :
- a. Depress both Si reset INACCESSIBILITY. i pushbuttons ATTACHMENT E. i
- b. Verify SI ACTUATED permissive !
light - HQT_LLT l
- c. Vexify AUTO SI BLOCKED !
permissive light - LII :
2 IA11u1GLI__lSQLaI10lLIE i
, a.-Reset Cnmt Isol Phase A a. Reset per 1BwCA PRI-5. !
CONTROL ROOM f 1NACCESSIBILITY. [
ATTACHMENT E. j
- b. Reset Cnnt Isol ?hase B b. Recet per 1Bw0A PRI-5. f CONTROL ROOM !
INACCESSIBILITY. !
ATTACHMENT E. ;
- c. Reset Cnmt Ventilation Isol l t
'd. Reret SI recirc sump and !
CENT CHG pumps miniflow i isol valves: ;
- 1518811A [
- 1SI8811B }
- ICV 8110 .i
- ICV 8111 i step continued on next page ,
~
cumweco 0 v24tlL 9;% tn N .
t i
i L
Page 44 of 61 f
.(0192Q/0018Q/082889) _
c
REV. 54 LOSS OF RH COOLING UN1T 1 IBWOA PRI-10
\ ..
STEP ACTION / EXPECTED REE;0NE.E PEiFONSE NOT OSTmf.ED ATTACIIMENLE.lPage_2_ oLS)
BLEED AND FEED USIllG PZR PORV(S) AND '
310FJiAL._Cl!ARGIl!G . _ _ . . :
Step 2 (continued)
- e. Reset SI CEllT CHG pumps <
miniflow isol valves:
- 1CV8114
- 1CV8116 ,
- f. Check SAC run lights - AHLLLT f. Start one SAC per Ew0P SA-1, STARTUP AND OPERATION OF STATI0h
- g. Open instrument air Cnmt AIR COMPRESSORS.
isol valves:
- 11A065
,-s\
(q)
- IIA 066
- h. Open fire protection Cnmt isol valve:
- 1FP010 APPROVED 1 CEP 'llua
(} .-.
s?B?2?2?a l- Page 45 of 61 (0192Q/0018Q/082889)
REV. 54 LOSS OF RH COOLING llNIT 1 18w0A PRI-10 O ACTION /EXFECTED RE5:0N5E 5TEP. DE^FONSE NOT OST A<fJED l
-I
-I ATTACRMENT E (Paae_.LoL5.). t BLEED AND FEED USING PZR PORV(S) AND l NORMAL _CilARG.IHG !
l 3 YERIELRCS_f.EED PATH:
l
- a. Check pump status: a. Manually start pumps. j
- - CENT CHG pumps - AT_.LEASI I OHE_RUENING ;
'I b.. Check ECCS valve alignment: b. IE a feed path can NOT be ,
established l
- 1) RWST to CENT CHG pumps THEN GO To another i suction valves - QEEN: ATTACHMENT for !
- 1CV112D RCS cooling. i
- LICV112E !
j
- 2) VCT outlet isol valves - CLOSED: 1 i.
O +
ICV 112B 1CV112C
- 3) Charging line Cnmt isol !
valves - QEEN: ;
- 1CV8105 :
- 1CV8106 [
i
- 4) CENT CHG' pumps to cold legs !
injection isol valves - CLO.SID:- !
- 1SI8801A :
- 1SI8801B- {.
4 ESTABLISH RCS BLEED PATH: j 1
- a. Verify power to PZR PORV a. II. either-PORV is NOT l isol valves - AVAILABLE: -available, t IRIN GO T0 another -
- - 1RYB000A ATTACHMENT for-RCS-cooling. . !
- 1RY8000B ;
- b. Op'en both PZR PORVs: APPROVED I
- . 1RY455A ggp 7 g33 j
- 1RY456 t awowooo ca s.ng nrviEW l
]L i
Page 46 of 61 j
-(0192Q/0018Q/082889) j
._._,__..__._.,___.___________,_?
i REV. 54 LOSS OF RH COOLING UNIT 1 IBw0A PRl-10 O STEP ACTION / EXPECTED RESPON5E RE?FONSE NOT OSTmNED ATIACEMEHT l_ Rate 4 of_51 BLEED AND FIED_ USING..PZR PORV(S) AND E0RMAL CHARGlliG S MAINTAIN RCS HEaLREMOYAL: l-
- a. Operate CENT CHG pumps as a. IE minimum flow required necessary to establish minimum can R0.I be obtained via flow required as determined from normal-charging, Figure below IHEH open CENT CHG pumps to cold leg injection icol valves:
- 1 SIB 801A
- -1SI8801B 500 , - t x_ .._. .1 s
- p
._y li: -
' ' ' i 1
i; 400- 4 1 1
.. . . _3
-p . ,
s- _.
a . . . . > -:
3- . .__ y ..
[
~~~
k 300- ==_ 's .
m
- m _. - . .
y __ . . _ ~ - N i; +-
' 'A g200- d5in > > .ij j x . -
u,
'\, I [i s 1 .
,x 1
._ xg; t ~-
..6 x !
100a ,,,,,,,,,,,,_. . . _ , , , , , , , , _
Zg
-4........_... <
.; ,- 7 i :
04 100 i
1000 I
10.000 i 10 TIME (MINUTES) APP Ro V::D REQUIRED CHARGING FLOW VS TIME TROM TRIP l
SEP 7 G3 L
\ MRMOhCCO .
Step continued on next page c:. as emw r Page 47 of 61 [
(0192Q/0018Q/082889) ;
- , _ . . _ - - . = . . . . - _ , . . . . , - .
REV. Sl4 LOSS OF RH COOLING UNIT 1 1Bw0A PRI-10 v
STEP FEiFCNSE NOT OST A,NED l ACTION / EXPECTED REE C.NLE AITAQiMERT_E_IPage_5_oL52 BLEED AND FEED USI!1G PZR PORV(S) Al4D 310RMAL_Cl!ARGlHG Step 5 (continued)
- b. Control charging flow to maintain PZR level - GREATER T11AU 47, h
7 g .IEtiPlS_ID_.EESIORE
- a. II at anytime an RH train becomes available.
THEN:
- 1) Immediately align the RH train for RCS cooling per Bw0P RH-6, PLACING THE RH SYSTEM IN SHUTD01/N COOLING
- 2) Close both PZR PGlV(s)
- 3) Return CV System lineup to normal per SE direction
- 4) RETURN TO 1Ew0A PRI-10, Step 7
-END-APPROVED p SEP 7G 0 E!S?Y2 Page 48 of 61 (0192Q/0018Q/082889)
REY. 54 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10
() /
STEP ACTION / EXPECTED ;ES GNEE REiFONSE NOT OSTmhED ATTACHMENLLIpage._LoL_4_)
RE EUIkCAYlILT 0__ EV E L _.PQ 0kC 00 LI NG
- HQIE *
- This ATTACHMENT uses the Refueling *
- Water Purification pumps with *
- suction from the refueling cavity. *
- The pumps discharge to the Spent *
- Fuel Fool and the effluent is cooled *
- by the FC trains. Cooler water from *
- the Spent Fuel Pit flows back to *
- the cavity.
- 1 CHECK _BEACIOR_YEc 5EL_HE AD_REtiOYED GO T0 another ATTACHMENT 2 CHECK _SEENT FN'L_E00L_C00 LING:
f
- a. At least one cooling train
- IILDEERATI.ON
- a. Establish one train of FC cooling.
IE a train can HQI be established.
THEN GO 10 another ,
ATTACHMENT for RCS cooling.
3 gREEVELING_WAIERlVRIEICAIJ0N
- a. LOCALLY _ SIDE Refueling Water Purification pumps:
o OA Pump (364' S12 AB) o OB Pump (364' S12 AB)
APPROVED SEP / 123 a;.'3?%
v(3 Page 49 of 61 (0192Q/0018Q/082889)
REV. 54 LOSS OF RH COOLING UNIT 1 1BWOA l PRl-10 STEP ACTION / EXPECTED RE5:0N5E REiFONSE NOT OSTMJED .i 7 ATIACliMENT_ E_(page_LoL Al i
REEUEL_C AY1TLIQ_ EVEL_ PROL300LI NG 4 IY TO FVEL100L [
- a. Check position of the following a. Open any closed component f components: IE all components will HOT -t open. :
- Fuel Pool Sluice Gate - OPIN TliEN GO TO another !
- Transfer Canal Gate ATTACHMENT for RCS Cooling, i valve 1FH001 - OPEH !
- Transfer Canal Flange - OPIH !1 5 .c
)
lM "E1G _WAIER i I e. F s 3?
1 ,. . 3 uE :,0AHIH !
- a. Locally CLOSE the following valves: !
- Unit-2 Refueling cavity.
Suction Valves - CLOSED:
- 2FC009 (377 + 11' R25 RXB2)
- 2FC010 (364 + 19' V23 AB) .
1
- Unit-2 RWST Suction Isol valve - CLOSED 1 ,
- 2FC8758.(364 + 15' V23 AB) ;
i
- b. Unit-1 RWST Suction Isol [
valve - CLOSED: B
- 1FC8758 (364 + 15' V13 AB) >
?
- c. Unit-1 Refueling Cavity Suct valves - DIEN: i
- 1FC009 (377 + 11' R7 RXB1) i
- 1FC010 (364 + 19' U12 AB) APPROVE 0 ?
SEP 7 53 I p .
Step continued on next page m,nym one.n w e. j l
f I
! Page 50 of 61 !
(0192Q/0018Q/082889) ,
~ ~
..,...,,.,-..,..,.,._,m,._......__.,__,m.,..,...,.,,,,-. - . _ . , . . , , . . . . . . , , , , . , , ,~. ,..r..,,,.., . . - , . . ~ . . , , . , , .
REV. 54 LOS5 0F RH COOLING UNIT 1 IBWOA PRI-10
(
~j
') . . - - .
STEP ACTION /' EXPECTED PEi;0N EE '
PE i P: NEE ND" OETmf ED ATTACHMEliT F _(page _3 of 4)
REFUEL CAVITL T0 EUEL P00L.C00LIliG Step 5 (continued)
- d. Cash Fill Isol viv - CLOSED:
- OFC001 (401 + 0' *il5 FHB)
- e. Demin Inlet Isol Vivs - CLOSED:
1FC013 (401' Q17 AB) 2FC013 (401' Q18 AB)
- f. Spent Fuel Pit Inlet valve - OPEll:
- OFC002A (385 + 2.6' X15 FHB) em g. OB Refueling Water Purification
/ Pump Suction Isol viv - OPEli:
~_ /
)
JFC003 (364' S12 AB) 6 LOCSLLY ARI REEUELitiG WAILRA..S"EICAL10tLPuhES:
R
- OA Pump (364' S12 AB)
- OB Pump (364' S12 AB)
[ i I
AvP w <60
'l ';lJ CEP n) me .. 'e a c . . 61 E .. c < a ./
-w .-- ,
(0192Q/0018Q/082889)
A
REV. Sti LOSS OF RH COOLING UNIT 1 1BWOA PRI-10
,t~y LJ FETFONSE NOT OSta,NED STEP ACTION / EXPECTED RE9 0N5E ATTACIMEliT._F_.Ipage_A_ot 41 RE TU E L _ C AV I TLT0_JVE L _E00 L _C 00 LI !10 R G
- a. If at anytime an Rif train becomes available, I!!EH:
- 1) Immediately align the Ril train for RCS cooling per Bw0P Ril-6 PLACIliG TIIE RH SYSTEli Ill S!!UTDOW!i C00LIllG
- 2) Return FC System lineup to normal per SE direction
- 3) RETURN TO IBw0A PRI-10, Step 7 O
- EllD -
APPL!OVLD SEP 7CD
- .^2Eif, Page 52 of 61 (0192Q/0018Q/082889)
LOSS OF RH COOLING UNIT 1 IBWOA REV. 514 PRI-10 O STEP ACTION / EXPECTED PEi;0 NEE FEiF CNSE NOT 06TmhEE-ATTACEMEHT_G_(PAGE 1.0LAl S L E U M P _ l! D I _ L E G _.I N J E C T 1 0 H HOTE
- This ATTACHMEliT uses an SI pump in *
- a hot leg injection mode. It should *
- be noted that a finite volume of *
- water exists in the RWST, and that *
- overspill from the RCS may be *
- unrvailable for injection. *
- u******wn 110TE
- Evacuate the Containment if any *
- overspill is expected to occur. *
] 1 CHECKlWSLLEYEL:
2 CHECLSLEUt1ES:
- a. SI pump - AVAILABLE a. Restore one pump in a resonable period of time or o 1A SI Pump GO TO another ATTACHMEllT o 1B SI Pump for RCS cooling.
3 YERIFY ECCS VALYE_LINEUE:
- a. SI pumps miniflow isolation valves - QEIN.
[2lki?<
Page 53 of 61 (0192Q/0018Q/082889)
LOSS OF RH COOLING UNIT 1 1BWOA REY. 514 PRI-10 m
C STEP PE?FCf 6E NOT OSTa f 4ED ACTION /EXPE}TED REE:OfGE s i
ATTACHMENT _G_(PAGE 2_of_O S LPUMP_ HOT _ LEG _ INJECTION Step 3 (continued) ,
- b. SI pumps suction valves - OPEN:
- 151-8806
- c. RCS Hot Leg injection valves -
OPEU:
- ISI-8802A
- ISI-8802B
- d. RCS Cold I.eg injection valves -
CLOSED:
- 1SI-8835 UDXE
- Use the SI Pump Injection only as *
- necessary to maintain Reactor Vessel *
- Level GREATER _THAN 393'6" and co
- limit RCS average temperature so *
- that RWST level can be conserved *
- and overspill from the RCS *
- mininized.
- L4 SJART ONE_ SI PutiE ,
W.Y h 0 ', L D 1
- a. At th9 First indication of any cn E 7 .., g containment overspill - -
EYACUA1E_C011IAIIMENI cwacco p m..ats o wu .
t i
! V ,
I Page 54 of 61 (0192Q/0018Q/082889)
LOSS OF RH: COOLING UNIT-1 IBWOA-REV.:54" PRI-10 w .
t STEP ' ACTION / EXPECTED RES?ONEE- PE3FONSE:NOT OST AWiED -
ATIACEMERT._G_fPAGE l_cL.il SI PUMP HOT LEG _LHJECTIOH-t 6 -- tiONITOR RWST LEVEL:
-or make-up to RWST with a borated source 7: < IF SI :' 0W CH EC 1 L CA 1 BE STOPP D:
l' _ a. Check reactor vessel level:
- a. Do HOT stop SI ,
flow. RETURN TO l- .o Tygon hose.- GREAIER Step 5 of this THAN 393'6"- ATTACHMENT.-
-OR- ,
L~ o RVLIS-plenum region -
L GREATEP. THAN OR L EQUAL TO 377. i L
i I ~0R-o -lLI-RYO46..-REACT VSL LVL l -
GREATER THAN OR EOUAL
-TO 398'6" ,
- b. Check 'RCS temp r. Ature - b. Do HQI stop SI ll 51ABLE__0R DECREASING flow- . RETIJRN TO l -Step.5 of this- .
ATTACHMENT-L <
p l: c., Verify SI pumps-miniflow- 3 l: isolation valves .0 PEN:
- .1 SIB 813
- 1SI8814- APPRovgo.
- 1518920 Step continued on-next page 07 Af DWOOO O:t.5,,as ugyst w .
Page 55 of 61
.(0192Q/0018Q/082889)- l
'h
-LOSS'0F RH COOLING UNIT 1 1Bw0A REV. 54 PRI-10:
O -STEP ACTION / EXPECTED RE5;GN5E PEEFONSE NOT OBT AiNED ATIACHMEHLG_QAGE_4._of_41 SI PUMP HOT _LEGlHJ4CIlOH Step 7_(continued)
- d. Close the RCS hot leg injection _ valses-
- -ISI8802A
- 1SI8802B ,
e.-Verify SI_ pump HOT _ LEG e. Stop the running injection flow SIDEPED SI pump.
8 gg TEMPTS IQ3ESIORE
- a. II at' anytime an RH train becomes available,
- "==
.O 1) Immediately align'the RH train for RCS cooling per Bw0P RH-6, PLACING THE RH SYSTEM IN SHUTDOWN COOLING
- 3) RETURN TO 1Bw0A PHI-10, Step 7
- END -
APPROVED SEP 7 G03 E?O?%2?w Page 56 of 61 (0192Q/0018Q/082889).
LOSS OF RH-UNIT 1 - IBw0A-
' REV. S4- PRI .. >
d STEP ACTION / EXPECTED RES?ON5E' REIFONEE NOT- OSTtuf;ED -f 1
ATIACliMEHI_ILIPAGC_Lof._31 !
ACCUMULAIOR_INAECIICM l t
CAUTION _
A_ rapid high pressure' accumulator ,
injection may disarrange fuel assemblies if the upper internals are-removed.
{
CAUII.0E The minimum ambient temperature for pressurization of the-accumulator (s)
[ is-70'F.
i- ****************************************w
- ROIE
- i~
- This' ATTACHMENT utilizes accumulator *
- . injection to obtain RCS cooling. *
- Accumulator injection should be-used *
- -* only as necessary to. limit cavity *
- -spillover.--
- l' CBECK ACCUMULATOR STATUS:-
E a. One accumulator pressure - a. Attempt to restore INDICATING ON SCALE. accumulator (s) or GO To another-ATTACHMENT for RCS
-cooling.
- b. One accumulator icvel - b. Attempt to restore INDICATING ON SCALE. accumulator (s) or GO To L another ATTACHMENT for RCS cooling.
I 1: APPROVED I
F SEP 71G33 Q otM0W#u
.(0192Q/0_018Q/082889)
LOSS OF RH UNIT 1 1BwbA l
REV. 54 PRI-10 O STEP ACT10tuEXPECTED REE:0 NEE REiCON5E NOT OSTmhED ATTACHMENT.JL RAGE _2_of_J2 ACCUMULATOR. INJECTION R E[
- a. Refuel cavity level low a. Lower refuel cavity level enough to accept contents per Bw0P RE-4, FINAL DRAIN of accumulator without OF REFUEL CAVITY, TRANSFER overspill CANAL AND UPENDER AREAS.
3 YER:EX ACCUJ1ULALOR_ DISCHARGE _YALVES AVA1ABLE:
- a. At associated MCC Energize accumulator discharge valves:
- 1SI8808A (MCC 131X2A Cub A3)
- 1SI8808B (MCC 132X2A Cub A3)
+ ISI8808C (MCC 132X2A Cub A2)
O
- 1SI8808D (MCC 131X2A Cub A2) 4 INJECT ACCUMULALOR:
temperatures - GREATEILIHAN DILEQUAL TO 140
- F
- b. Inject one accumulator by b. II all accumulators manually opening its discharge injected isolation valve: IHEH GO TO another ATTACHMENT for RCS o 1SI8808A cooling.
o 1SI8808B o ISI8808C o ISIB808D APPROVED SEP 7 E33 En?%i:T?-
Page 58 of 61 (0192Q/0018Q/082889)
LOSS OF RH UNIT 1 IBw0A I REV. - 541-- PRI-10 5
=1 O STEP ACTION / EXPECTED RE5FON5E- REIFONSE NOT 06TAiNED 1
i t
'ATIACHMENT H (PAGE_3_of_3). !
ACCUMUleIOR_ INJECT 10B L N.) h a.--At First indication of any }
overspill - I'VACUATE CONTAINMENT i 6 -EVALUATE EF VENESS :
OF-COOLING + H: !
a'. Check RCS level: a. RETURN TO Step 1 i of this ATTACHMENT, 1 o- Tygon b .e - GREATEILIHAN :
QR_ EQUAL _TO_393'_6" ,
i o RVLIS plenum region .AI L ',
LEAST 377. j i
. o ILI-046 REACT VLS LVL - -
-GREATER THAN OR EQUA L j TO 393'6" ,
- b. Check-RCS temperature - b. RETURN TO Step 1 !
STABLE OR DECREASING of'this ATTACHMENT, ;
.r
- 7. . C011 UE ATTEM?"S_10 - ~'.!
RES"O ER i C00 _ L NG: - .
a, IE at. anytime an RH train.
~
_ becomes available,
- IHEH. - .
I 1)-Immediately-align the RH
-train-for RCS cooling using f
j l
p Bw0P RH-6, PLACING THE RH !
l- SYSTEM IN SHUTDOWN COOLING t I
.2) Return SI accumualtors to !
~ normal; lineup per SE direction APPROVc0
- 3) RETURN TO 1Bw0A PRI-10, Step 7 SEP 7 E3 ORAIDWOCO
- END - o"+55 acm w t 1
t
-Page 59 of 61 !
.(0192Q/0018Q/082889) !
i L
t LOSS OF RH COOLING UNIT 1. 1BWOA' !
REV. 54 PRI-10 ;
O -5TEP ACTION / EXPECTED RESPON5E PEiFONSE NOT OBTAiNED l ATIACHMENT I (EAGE 1 oL2.) i RWST_GRAYLTLEEED !
i 1 -GiECK RWST LEVEL: l
2 ESTABLISH FILL PATH FR0tLRWSI: r
- a. Verify _ containment sump !
outlet isol vivs - LLQSED: !
i
- 1SI8811A i
- ISI8811B !
t
- b. Verify RH pump suct from hot [
leg isol v1vs - CLQSED. _, .
p o .lRH8701A and B l I
d o 1RH8702A and B- t
- c. Verify.RH pump doch vivs - :
QEEH:
[
o 1RH8724A }
o 1RH8724B
- d. Verify RH HX Flow
(- control vivs - QEEH: .
o 1RH606 :
- i. o 1RH607 l
l .e. Verify RH Pp 1A/B Mini-Flow l l viva -'02EH: j o 1RH610 o -1RH611 :
A *> P R O V ; D Step continued on next page !
SEP 719a3 t OR AtOW OCO s Oh i.4TE F4cyggw -
l '.
I r
i e
Page 60 of 61 7
.(0192Q/0018Q/082889)
/
g LO. bF RH COOLING UNIT 1 1BWOA t REV. 54 PRI-10 0 5TEP ACTION / EXPECTED RE5;GN E.E PETFONSE NOT OSTait.ED l AIIACEMENLI.. RAGE _LoLZ)
RWSLGRAVIILEEED Step 2 (continued)
- f. Verify RH Ex Dsch Line Dwst Isol V1vs - DEEU:
o 1SI8809A o 1SI8809B
- g. Verify RH pump Suct from RWST Isol Vivs - QEEH:
o ISI8812A o ISI8812B 3 EYALUATE EFFECTIVEtlESS OF C.QQLIRG
. METHOD:
- b. Check RCS level - GREATEIL
4 CO MJNUE ATTEMPTS T0_RESIORE RH LODLING:
- a. II at anytime an RH train becomes available, THEN:
- 1) Immediately align the RH train for RCS cooling per Bw0P RH-6, PLACING THE RH SYSTEM IN SBUTDOWN COOLING
- 2) Return CV/SI systems to normal lineup per SE direction
- 3) RETURN TO 1Bw0A PRI-10, Step 7 ggp 7 gg
-END- ty.)g Page 61 of 61 (0192Q/0018Q/082889)