|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20210J1751999-07-30030 July 1999 Marked-up TS Pages for Proposed Changes Re Upper Temp Limit for UHS ML20209B7411999-06-30030 June 1999 Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T Batteries ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20204H9781999-03-23023 March 1999 Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood Stations ML20204H4291999-03-22022 March 1999 Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20198N3471998-12-29029 December 1998 Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable Values ML20198K5841998-12-23023 December 1998 Revised Tech Spec Pages 3/4 3-53,3/4 3-53a,6-27 & 6-27a,for Rv LI Sys ML20198A0811998-12-14014 December 1998 Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant Sys ML20196G6611998-11-30030 November 1998 Proposed Rev to Improved Tech Specs Section 3.1 ML20196B4101998-11-25025 November 1998 Proposed Tech Specs Facilitating Replacement of 125 Vdc At&T Batteries with New 125 Vdc C&D Batteries While in Mode 1-4 ML20155J2051998-11-0505 November 1998 Proposed TS Converting to Its,Rev R ML20155J0041998-10-30030 October 1998 Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria ML20154S5011998-10-18018 October 1998 Proposed Rev N to Improved TS Section 3.7 ML20154M5281998-10-15015 October 1998 Revisions K,O & P of 961213 ITS Submittal ML20154A8881998-10-0202 October 1998 Proposed Rev L to Improved Tech Specs Section 3.8 Closeout ML20153G4331998-09-25025 September 1998 Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package ML20153C0351998-08-31031 August 1998 Revs to ODCM for Plant,Including Rev 2 to Chapters 10 & 11, Rev 4 to Chapter 12 and Rev 3 to App F ML20238F8221998-08-25025 August 1998 Rev 2 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan ML20236Y5481998-08-0303 August 1998 Rev 1 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan ML20236W5851998-07-31031 July 1998 Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs ML20237B6391998-07-30030 July 1998 Proposed Rev H to Section 3.5 of Improved Tech Specs ML20237E9971998-07-21021 July 1998 Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout ML20237B7021998-07-0909 July 1998 Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal ML20236H6531998-07-0202 July 1998 Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0 ML20248M1491998-06-0101 June 1998 Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs ML20248C5511998-05-29029 May 1998 Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power Accident ML20216C1011998-03-26026 March 1998 Revs to ODCM for Braidwood,Including Rev 1.9 to Chapter 10 & Rev 3 to Chapter 12 ML20217B2681998-02-14014 February 1998 Proposed Rev D to ITS ML20217C3011998-01-31031 January 1998 Rev 0 to Inservice Testing Program Plan Pumps & Valves Braidwood Nuclear Generating Station,Units 1 & 2 ML20198L8131998-01-14014 January 1998 Proposed Tech Specs Pages Revising TS 3.4.8, Specific Activity, Figure 3.4-1,Table 4.4-4 & TS Bases 3.4.8 ML20198L8811998-01-14014 January 1998 Proposed Tech Specs Pages,Revising TS Section 3/4.8.2 & Bases,To Allow Replacement of 125 Volt Dc At&T Batteries W/New Charter Power Sys,Inc (C&D) Batteries ML20216H4321997-12-31031 December 1997 Revs to OCDM for Braidwood,Including Rev 1.8 to Chapter 10, Rev 1.9 to Chapter 11,rev 2 to Chapter 12 & Rev 2 to App F ML20198C3181997-12-30030 December 1997 Proposed Tech Specs 3.7.1.3 Re Condensate Storage Tank ML20203M5921997-12-17017 December 1997 Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS Submittal ML20203D0361997-12-0909 December 1997 Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot Conditions ML20199A4751997-11-0707 November 1997 Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20217K4461997-10-21021 October 1997 Proposed Tech Specs Re Boron Credit in SFP ML20198P1601997-10-20020 October 1997 Rev 1.5 to Odcm,Chapter 12 ML20202F4561997-10-10010 October 1997 Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation Sys ML20211D9421997-09-24024 September 1997 Proposed Tech Specs Revising Allowable Time Interval for Performing Turbine Throttle Valve & Turbine Valve SRs Requirements from Monthly to Quarterly ML20216H7011997-09-10010 September 1997 Revised Procedures,Including Rev 2 to Bwzp 2000-18, Post- Accident Sampling Sys (Primary Responsibility - Chemistry Director) & Rev 2 to Bwzp 2000-18A1, PASS Sample Collection Procedures ML20216G8541997-09-0808 September 1997 Proposed Tech Specs Change to TS 4.5.2.b & Associated Bases Bringing Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in ML20216F1351997-09-0202 September 1997 Proposed Tech Specs 3.4.8 Re Specific Activity ML20148P7721997-06-30030 June 1997 Proposed Tech Specs,Revising TS 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Permanently Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of Subcriticality ML20141F3081997-06-24024 June 1997 Proposed Tech Specs,Changing TS for ECCS Venting ML20141B7781997-06-17017 June 1997 Proposed Tech Specs Revising TS Sections 3/4.6.1.6,4.6.1.2, 6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a, Which Requires Utils to Update Existing Containment Vessel Structural Integrity Programs ML20148J3231997-06-0909 June 1997 Proposed TS Reflecting Latest Rev of Waste Gas Decay Tank Rupture Accident Dose Calculation ML20141K8991997-05-24024 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves ML20141K8931997-05-23023 May 1997 Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b.1 for Unit 1 as It Relates to Requirement to Vent ECCS Pump Casings & Discharge Piping High Points Outside Containment ML20141K3381997-05-23023 May 1997 Proposed Tech Specs Requesting Enforcement Discretion from Compliance W/Ts 4.5.2.b.1 Requirements of Venting of Emergency Core Cooling Sys Pump Casings & Discharge Piping High Points Outside of Containment 1999-07-30
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20153C0351998-08-31031 August 1998 Revs to ODCM for Plant,Including Rev 2 to Chapters 10 & 11, Rev 4 to Chapter 12 and Rev 3 to App F ML20238F8221998-08-25025 August 1998 Rev 2 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan ML20236Y5481998-08-0303 August 1998 Rev 1 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan ML20216C1011998-03-26026 March 1998 Revs to ODCM for Braidwood,Including Rev 1.9 to Chapter 10 & Rev 3 to Chapter 12 ML20217C3011998-01-31031 January 1998 Rev 0 to Inservice Testing Program Plan Pumps & Valves Braidwood Nuclear Generating Station,Units 1 & 2 ML20216H4321997-12-31031 December 1997 Revs to OCDM for Braidwood,Including Rev 1.8 to Chapter 10, Rev 1.9 to Chapter 11,rev 2 to Chapter 12 & Rev 2 to App F ML20198P1601997-10-20020 October 1997 Rev 1.5 to Odcm,Chapter 12 ML20216H7011997-09-10010 September 1997 Revised Procedures,Including Rev 2 to Bwzp 2000-18, Post- Accident Sampling Sys (Primary Responsibility - Chemistry Director) & Rev 2 to Bwzp 2000-18A1, PASS Sample Collection Procedures ML20137A4961996-12-31031 December 1996 Rev 2 to Odcm,Braidwood Annex,Chapter 12 & App F ML20116F3811996-06-30030 June 1996 Rev 1.9 to ODCM, Chapters 11,12 & App F ML20134N3051996-03-25025 March 1996 Rev 1 to 10CFR50.59 Se ML20095A9071995-10-31031 October 1995 Rev 1.8 to Odcm ML20129B7051995-09-22022 September 1995 Rev 0 to Byron/Braidwood Units 1 & 2 SG Eddy Current Analysis Guidelines ML20092B1051995-09-0202 September 1995 Rev 0 to SG Structural Insp Plan in Support of Braidwood 1 & Byron 1 3.0 Volt Ipc ML20091M8641995-08-25025 August 1995 Verification Analysis for Computer Program ML20082L5451995-04-18018 April 1995 Rev 3 to ISI Plan for Braidwood Nuclear Generating Station Units 1 & 2 1st Insp Interval ML20082C9481995-03-14014 March 1995 Rev 7 to IST Program Plan for Pumps & Valves ML20083N8701994-07-31031 July 1994 Rev 7 to Byron & Braidwood Stations Units 1 & 2 Eddy Current Analyis Guidelines ML20063F8961994-01-31031 January 1994 Rev 1.0 to Chapters 10,11,12 & App F to Odcm,Braidwood Station ML20064N3281993-12-20020 December 1993 Rev 0 to Operating Parameter Uncertainties for Byron/ Braidwood Revised Thermal Design Procedure ML20056C7441993-06-30030 June 1993 Rev 0.M to ODCM Chapters 10,11 & 12 for Braidwood Station ML20046C7941993-06-25025 June 1993 Idns Map Monitoring Point Id for Braidwood Station, Tables H & I ML20062N7851993-03-0101 March 1993 Rev 4.1 to Procedure Bwhp 4006-008, Repairing, Determinating,Terminating,Splicing,Taping,Cable Jacket Repair & Application of Ray Chem Kit on Cable ML20127D0691992-12-30030 December 1992 Corporate Emergency Response Organization Required Reading Package 92-11 ML20101M2191992-06-25025 June 1992 Rev 5 to Inservice Testing Program Plan for Pumps Braidwood Station Units 1 & 2 ML20098D7431992-05-31031 May 1992 Rev 0.G to ODCM Chapter 11,pages 11.i,11-5,11-6,11-7 & 11-7, Figure 11-3 ML20092F2251992-02-0606 February 1992 Rev O.F to Chapter 11,Pages 11-i,11-7 & 11-17 of ODCM ML20092J4091992-02-0303 February 1992 Rev 25 to Block Index Procedure Bwzp 600-3A1,App a, Federal Agency Emergency Support Phone List ML20058E8761991-11-18018 November 1991 Rev 56 to AOP Bwoa PRI-10, Loss of Rh Cooling Unit 1 ML20082S8031991-09-0707 September 1991 Rev 55 to 1BWOA PRI-10, Loss of Residual Heat Cooling,Unit 1 ML20082S8001991-09-0707 September 1991 Rev 54 to 1BWOA PRI-10, Loss of Residual Heat Cooling,Unit 1 ML20082B2431991-07-0303 July 1991 Plant Procedure Manual Update Notification,Including Rev 20 to Block Index Procedure (Bip) Bwzp 600-1,Rev 22 to Bip Bwzp 600-1A3 & Rev 23 to Bips Bwzp 600-3 & Bwzp 600-3A1 Through Bwzp 600-3A8 ML20077G3631991-06-19019 June 1991 Rev 0.D to Odcm ML20091C8421991-04-30030 April 1991 Rev O.A to Odcm,Consisting of Pages Inadvertently Omitted from Previous Distribution ML20076D8331991-04-25025 April 1991 Rev 0.A to Odcm ML20066D9121990-12-0505 December 1990 Rev 2 to BWAP-1205-3TI, Odcm ML20246H6241989-08-28028 August 1989 Rev 0 to Special Procedure SPP-89-9, Control Room Boundary In-Leakage Test ML20245L7651989-08-0707 August 1989 Rev 0 to Offsite Dose Calculation Manual ML20247M7921989-07-31031 July 1989 Rev 6 to PWR Operations Guideline Number 12 Simulator Testing Program. Simulator Transient Test Review Data Encl ML20247M9151989-07-27027 July 1989 Procedure Generation Package ML20062N7961989-07-14014 July 1989 Rev 0 to Procedure Bwhp 4006-008A32,Attachment AF, Straight Splices of Power Cables 600 Volts or Less ML20062N7941989-07-14014 July 1989 Rev 0 to Procedure Bwhp 4006-008A31,Attachment Ae, Terminations of Power Cables 600 Volts or Less ML20062N7881989-07-14014 July 1989 Rev 0 to Procedure Bwhp 4006-008A29,Attachment AC, Straight Splice for Multiconductor Control & Instrument Cable ML20062N7921989-07-14014 July 1989 Rev 0 to Procedure Bwhp 4006-008A30,Attachment AD, Typical Pigtail Splices for Motor Connections of 600 Volts or Less, Control & Instrument Cable ML20247N0421989-06-19019 June 1989 Rev 5 to SS-1, Braidwood Simulator Steady State Performance Test ML20247M7861989-05-26026 May 1989 Rev 0 to SV-1, Braidwood Simulator Surveillance Testing ML20247M7581989-05-26026 May 1989 Rev 0 to Test NO-1, Braidwood Simulator Normal Operations Testing ML20247M7801989-04-0404 April 1989 Rev 0 to ST-1 Re Simulators safety-related Valves Stroke W/ Acceptable Time Period Required by ANSI/ANS-3.5-1985 ML20247M8011989-02-0101 February 1989 Rev 1 to 1BWEP-0, Reactor Trip or Safety Injection Unit 1 1999-04-30
[Table view] |
Text
- _ _ _ _ - .
urs
( i,, c (j. ,1. . e . w. , C. t aitL gig,t J. , , ,{o r n t. u u t h i l J 't
- u. s. o. um o kY '"Ini" N fi i t. .. i e ii s ~I~i>/
. s ,o t a i . <c Hay 14, 1992 eus,
-Attached are the recent revisions of the Offsite Dose Calculation Manual (00CM) Braidwood Station Annex Chapter 11.
Please complete the following manual update:
Remove Insert
, e Braidwood Station Annex
. Chapter 11, p.~11-1, 11-5, 11-6 Chapter 11, p. 11-1, 11 5, 11-6 Ti-7,'11-17, Revision 0.F 11-7, 11-17, Revision 0.G December, 1991- Hay,1992 Please sign and date this control-sheet. Return to:
COMMONWEALTH EDISON COMPANY c/o' Document Control - Emergency Preparedness _
72 Hest Adams --Room 1237E Chicago, IL 60690 (312) 294-8665
-Your signature indicates you have verified that your control copy-is
. correct.
Signature Date 9205290322 920531 PDR ADOCK 05000456 1 F PDR {
ZEMER700[4T21 Ih i
BRAIDH000 REVISION 0.G BRAIDH000 ANNEX INDEX I
,o A P_A_GE REVISION
( ')
'~
CHAPTER 11 11-1 0.G 11-11 0.A 11-111 0.A ll-iv 0.A 11-1 0 11-2 0 11-3 0 11-4 0 11-5 0.G 11-6 0.G 11-7 0.G 11-8 0 11-9 0.A 11-10 0.A 11-11 0 11-12 0.A 11-13 0 11-14 0 11-15 0 11-16 0 11-17 0.G O
L)
O v 11-1
\ .
BRAIDH000 REVISION 0.G HAY 1992 Table 11-1 (Cont'd)
Exposure Pathway Sampling or Type and Frequenc.
and/or Samole Samolina or Monitorina Locationsa Collection Freauency of Analysis L
- 2. Direct Radiation. 80-209-1, -4.8 mi S .(7.7 km J)
(Cont'd) 80-209-2, 4.8 mi S (7.7 km J)
BD-210-1, 4.9 mi SSH (7.9 km K)
BD-210-2, 4.9 mi SSH (7.9 km K)
BD-211-1, 4.8 mi SH (7.7 km L) 80-211-2, 4.8 mi SH (7.7 km L)
BD-212-1, 4.7 mi HSH (7.6 km H) 80-212-2, 4.7 21 HSH (7.6 km H)
BD-213-1, 4.5 mi H (7.2 km N)
B0-213-2, 4.5 ml H (7.2 km N)
BD-214-1, 4.3 mi HNH -(6.9 km P)
BD-214 -2, 4.3 ml HNH (6.9 km P)
BD-215-i, 4.5 mi NH (7.2 km Q) 80-215-2, 4.5 mi NH (7.2 km Q)
BD-216-1, 4.4 mi'NNH (7.1 km R)
B0-216-2, 4.4 mi NNH (7.1 km R)
Lake - 1, 1.0 mi E (1.6 km E)
Lake - 2, 1,4 mi 5 (2.2 km J)
- c. Special Intere11 Quarterly Gamma dose quarterly on each TLD.
In_dicators Two TLDs at each of ti.e airborne pathway indicator locations specified in Part 1 of this table.
11-5
m .p ~ -
(N ') ( l \ l' ^
BRA 1 .000 EEVIsluj 0.G MAY 1992 Table 11-1 (Cont'd)
Exposure Pathway Sampling or Type and Frequency.
and/or Samole Samolina or Monitorina locationsa Collection Frecuency of Analysis
- 2. Direct Radiation Controls 8 (Cont'd)
Two TLDs at each of the airborne Gamma dose quarterly pathway control locations on each TLD.
specified in Part 1 of this table.
- 3. Waterbornee
- a. Public Water 8D-22 Hilmington, 5.0 mi NNE (8.0 km B) Heekly Gross beta and gamma isotopic analyses monthly composite.
Tritium analysis on quarterly composite.
- b. Surface BC-07, Kankakee River upstream of Heekly Gamma isotopic discharge, 5.4 mi E (8.4 km E) analysis on monthly composite from each 80-10, Kank6kee River downstream of location. Tritium discharge, 5.0 mi ENE (8.0 km D) analysis on quarterly composite from each BD-25, Kankakee River upstream of discharge, location.
9.6 mi E (15.4 km E)
- c. Ground / Hell 80-13, Braidwood City Hall Hell, Biweekly f Gross beta and gamma 1.7 mi NNE (2.7 km B) isotopic analysis on monthly composite.
Tritium analysis on quarterly composite.
I-131 analysis biweekly when the dose calculated for consumption is greater than 1 mrem /yr.
11-6
! l l
~#
BR 000 REki$ ION 0.G '
MAY 1992 .
e
- 3. iaterborne (Cont'd) .
- d. Coolina Water 8D-08, Intake Pipe No. 3, 5.0 mi E (8.0 km E) Heekly Gross beta analysis BD-09, Discharge Pipe No. 4, 5.0 mi E (8.0 km E)
- e. Shoreline 80-10. Kankakee River dcwnstream of Semiannually Gamma isotopic Sediments discharge, 5.0 mi ENE (8.0 km D) analysis on each sample.
- 4. Inaestione
- a. Hilk Indicators Semimonthly: May to October Gamma isotopic and Monthly: November to April I-131 analysis on each 80-17 Halpin's Dairy, 5.5 mi SSH sample.
(8.8 km K) 80-26 Gaddis Farm, 11.0 mi ESE (17.6 km F)
BD-27, Prussner Farm, 11.0 mi S (17.7 km J)
Controls BD-18, Biros Farm, 10.5 mi H (16.9 km N)
- b. Fish BD-07, Kankakee River upstream of discharge, Three times a year (spring, Gamma isotopic 5.4 mi E (8.7 km E) summ2r, and fall) enalysis on edible portions.
80-10, Kankakee River downstream of discharge, 5.0 mi ENE (8.0 km D)
- c. Veaetables 80-14, Pinnick Farm, 1.8 mi N (2.9 km A) Annually Gamma isotopic BD-15, Girot Farm, 1.4 mi N (2.2 km A) analysis on edible BD-16, Clai Farm, 3.3 mi ENE (5.5 km D) portions.
11-7
f .-
BWDM REVISION 0.G NAY 1992 o , , .
/ Al +
/
\c,.
Kankakee l u
River BraldWOOO .-
, 3 , .3 it 113 o'r
... 1 .
8 Lec. tion 1.,
+ - as.....
N .25 !
j eBraldwood i, . . . . .. a
/ / Station ee 23 /t ,
i g y Braceville
.. sv County Line Rd.
Gardner _
Essex Asce Ad l i
]
South Wilmiroton !
26 Scate Q
.'. f f i ,
w-
. . . u. . . . .
- y ; 4,.
0FFSITE DOSE CALCULATION MANUAL BRAIDWOOO STATION FIGURE 113 INGESTION AND WATERBORNE EXPOSURE l PATHWAY SAMPLE LOCATIONS T
o I'-ses 11-17
-