k REV. 55 LOSS OF RH COOLING UNIT 1 1BWOA r PR!-10 O
V i
A. EUREQSI ,
This procedure provides actions required to restore RH System cooling in the event RH System cooling is lost during Modes 4, 5, l or 6.
B. SIMEIQMS._.0lLINIRL101mlIl0115
- 1. The follouing annunciators may cause entry into this procedure:
o RH PUMP TRIP - alarm ;
o RH PUMP 1A(B) DSCH PRESS HIGH - alarm o RH PUMP 1A(B) DSCH PRESS LOW - alarm o RH PUMP 1A(B) CC FLOW LOW - alarm ,
o RH HX CC WTR FLOW HIGH LOW - alarm o RCS SYSTEM COLD PRESS HIGH - alarm o RCS PRESS HIGH AT LOW TEMP - alarm o CC PUMP TRIP - alarm o CC SURGE TANK LEVEL HIGH LOW - alarm >
o CC PUMP DSCH PRESS LOW - alarm b(~N o REACTOR VESSEL LEVEL LOW - alarm t
- 2. The following symptoms may cause entry into this procedure:
o Oscillating Rd pump amps.
o Fluctuating RH Pump dsch pressure.
.o Excessive RH Pump noise or vibration, o Fluctuating Letdown Flow when on RH Letdown.
o Decreasing Reactor vessel level ,
o Increasing RCS temperature.
o Increasing RH system temperature.
- 3. This procedure may be entered from:
o 1BwFR-C.3, RESPONSE TO SATURATED CORE COOLING, Step 1.
o Inability to reduce RCS temperature while shutdown.
o Loss of RH System while operating in Modes 4, 5, or 6.
i 1
APPROVED l APR 5 1990
( .l EEL *?.?.
Q,, - - - --
l 9109170299 910910 POR ADOCK 05000456
! G PDR l Page 1 of 62 l .
0197Q/0018Q/011990) .
REV. 55 LOSS OF RH COOLING UNIT 1 1BWOA I PR!-30 0 .
STEP ACTION / EXPECTED RES GN5E PEIFONSE NOT OBT A4NED ..
CAUIIDH Changes in RCS pressure could teruit in inaccuracies in RCS level readings.
I CAUTIOH Any dilution of the RCS should be stopped until RER Flow has been re-established.
.s
- ROIE
( With this procedure in effect,
- notify the Station Director who will *
- evaluate for GSEP conditions per *
- Bw2P 200-1, BRWD EMERGENCY ACTION *
- LEVELS.
1 CHEG RH SYSTEM OPERATION:
- a. Verify 1A or 1B RH a. GO TO Step 2.
pump run light - LII Step continued on next page APPROVED APR 5 1990 pmanowooo asvaw O i Page 2 of 62 (0192Q/0018Q/011990)
REY.155- -LOSS,0F RH-COOLING-UNIT 1 1BWOA
, PRI-10 1 STEP - ACTION / EXPECTED RESPON5E REIFONSE NOT OBTAiNED i t
l t
Step.1_(continued)
- b. Verify operating RH pump b. Attempt to stabilize RH >
parameters - SIAHLE: system operation as ,
follows: ;
- 'IGI-letdown flow. l
- - Reduce RH pump flow. j
- RH pump amps
- Increase RCS level by . i increasing charging flow !
RH disch presJure
- - and/or reducing letdown !
flow. .
- RH disch flow l IE RH pump parameters do l
- Reactor Vessel level not stabill:e, ;
THEN trip the affected RH- ;
- RH pump noise / vibration pump and GO-TO Step 3. -}
c LVerify RCS temperature - c. Verify sufficient flow [
SIABLE OR DECEEASllln through RH RX.
- 3) Verify. proper-operation. J
_ of RH flow control ;
valtos: !
o 1RH606/618 o 1RH607/619
.UE CC. system is adversely affecting RH l HX operation,
'UIEN GO~TO l 1Bw0A PRI-6.- !
COMPONENT COOLING i
-MALFUNCTION,while continuing with this ;
procedure at Step 2. [
t
- d. RETURN TO procedure and step . APPROVED ' ;
in effect i APR 5 1990 ;
O == i i
Page 3 of 62
.(0192Q/0018Q/011990) ;
e if
REV. SS LOSS OF RH COOLING UNIT 1 1BWOA s PRI-10 k-STEP ACTION /EEPECTED RESPON5E PE!FONSE NOT 06TaitiED 2 YERlf.Y POWER TO 4KV ESF BUSES:
- Bus 141 bus alive light - LII direction, while continuing
- Bus 142 bus alive light - LII with this procedure.
3 CHECK RH SYSTEM STATUS:
- a. RH hot leg suction valves - a. Manually open RH suction QEEH: valves as required:
o 1RH8701A and B o 1RH8701A and B o 1RH8702A and B o 1RH8702A and B
- b. RH Syste:u - INTACT: b. Isolate any leak.
- At SE discretion, check for leaks
-)
'l 4 CBECT RCS CONDITIONS:
- iPI- 403 o Solid Plant - Throttle
- 1PI- 405 letdown and charging as necessary to reduce RCS pressure.
o Pzr Bubble - Manually initiate pressurizer spray to reduce RCS pressure:
o 1RY455B o 1RY455C l
o 1CV8145 II either pressure instrument has failed, l IHEH GO TO ATTACHMENT B
- (page 32).
APPROVED l
[ ,r S Step continued on next page APR 5 1990 ll$$Evi?w Page 4 of 62 (0192Q/0018Q/011990)
f REV,-55 LOSS OF RH-COOLING UNIT-1 1BWOA- ';
"/~ PRI-10 -
1 ( >) !
5TEP ACTION / EXPECTED RE5?ON5E :RE5FONSE NOT OBTAiNED j i
I Step 4 (continued) !
- b. RCS level: b. GO TO Attachment A (page 12). l$
o RVLIS AT LEASI_21%
Plenum Region
?
-OR- !
o lLI-RYO46. RV HL' LEVEL - }
r GREATER _JHAN OR EOUAL TO 393'6" .
i
-OR- '
i o Tygon-level indication - ,
GEEAIEE THAN OR_ EQUAL TO 393'6" '
5 CHECK RH-SYSIEM STAIUS: -
- a. 101 hot _ leg _ suction valves -- a. Manually open RH suction f QEEH: valves as required: -
E o' 1RH8701A and B o 1RH8701A and-B 1 o: 1RH8702A and B o 1RH8702A and B
[
b.,RH-System - INTACT: b.. Isolate any leak. ,
- At SE~ discretion, check for :
leaks {
i !
l !
L I i
t APPROVED y
, APR 5 1990 i O maAicwooo
- aa v= w
- i. ;
l :
e Page 5 of-62 l (0192Q/0018Q/011990) {
REY. 55 LOSS 0F'RH COOL 1NG UNIT 1 1BWOA x PRI (
STEP ACTION / EXPECTED RESPON5E RESPONSE NOT OST AiNED CMlTLoli Starting redundant RH train prior to
-determining'the cause of the failure of the first train-may.cause a fallure of the redundant-RH-train.
aa e .
Heli attempt to restart the RH
- a. Establish RCS cooling per train previously in service.
Bw0P RH-6, PLACING THE RH SYSTEM IN-SHUTDOWN COOLING II neither RH train-can be restored, H Eli continue attempts.to restore either RH train, and 7 -CHECK _RCS_CONDITJ0NS:
- a. Verify RCS temperature - a. GO TO Step 8.
STABLE OR DECREASING
- c. RETURN T0 procedure and step
-. ] in effect 8 CONTINt1E ATTEMPTS TO RESTORE RH COOLIN3:
- a. At-SE discretion -evacuate all
_ personnel from Unit 1 containment Step continued on-next page APPROVED APR-'5 1990 Page 6 of 62 (0192Q/0018Q/011990) m_ . . _ . _ . ._ _ ., _., . .
REV, 55 LOSS OF RH COOLING UNIT 1 IBw0A PRI-10 p
L) <
STEP ACTION / EXPECTED RESP 0fGE PE?FONSE NOT OCTmhED Step 8 (continued)
- b. Continue with this procedure at step 9 IE at anytime an RH train becomes available, IllEti:
- 1) Immediately align the RH train for RCS cooling per Bw0P RH-6, PLACING THE RH SYSTEM IN SHUTDOWN COOLING
,_.s a. Refer to Table A (page 8) to ,
( ) determine applicable
's l cooling method:
o Bleed and Feed Using Excess Letdown through Loop Drains and Normal Charging -
l ATTACHMENT C (page 33) o Steaming Intact /Non-isolated l SGs - ATECEtiEtiI_D (page 38) o Bleed and Feed Using Pzr PORVs ,
and Normal Charging -
l ATTACHMENT E (page 45) o Refuel Cavity to Fuel Pool Cooling -
l ATTACHMENT F (page 50)
- o SI Pump Hot Leg Injection -
I AIIACHMENT G (page 54) o Accumulator Injection -
l ATTACHMENT H (page 58) APPROVED o Inventory Addition via EWST - APR 5 1990 ,
f xl ATTACHMENT I (page 61)
-END-samowoop l
l Page 7 of 62 (0192Q/0018Q/011990)
REV, 55 LOSS OF RH COOLING UNIT 1 IBWOA t 's PRI-10 L) 9 T! ALE _Al page 1 of_11 DETyJ,MINATION_ Qf_EEEECTIVE _ PCE_CHOLIH(i_MEIliODS t
~-
i l MODE MODE I MODE COOLING 4 5 6 METHOD NORMAL w/ hot RCS is REFUEL HEAD w/ hot RCS is Configu side adverse 4 FLOODED OFF side adverse 4 ration vent 3 vent 3 ATTACHMENT C yes yes yes yes yes yes yes yes (cage 33) _
ATTACHMENT D yes yes N/A yes N/A N/A N/A yes
_1page 38)
ATTACHMENT
- E yes yes N/A yec N/A N/A N/A yes (eage 45) ,
(O,)
ATTACHMENT 2 F N/A N/A N/A N/A yes yes N/A N/A
_ipage 50)
ATTACHMENT 1 _1 G yes yes yes yes yes yes yes yes (page 54)
ATTACHMENT H yes yes yes yes yes yes yes yes (page 58)
ATTACHMENT I N/A yes yes yes yes yes yes yes (page 61)
- 1. SI pump hot leg injection must be initiated as the primary means of RCS cooling and inventory control. Other methods may be used in conjunction with ATTALMENT G but not in place of it.
- 2. May be used as a cooling method if the boot seal is inflated and refueling cavity is being filled.
- 3. Refer to FIGURE IBw0A PRI-10-2 (page 10) for an acceptable hot side vent path. ,
- 4. The RCS is ADVERSE if ALL of the following exist:
-, a. The RCS is EDI intact (any openings) AND l An acceptable RCS hot side vent path is HQI establisted AND
\ 'l~
b.
- c. ALL RCS loops are blocked (3oop stops closed or hot leg nozzle dams are installed) APP RCP/ E D APR 5 1990 Page 8 of 62 anuowuvu (01929/0018Q/011990)
r t .
REV.2 55 LOSS-0F-RH COOLING UNIT 1- 1BWOA- :
PRI-10 D) x <
l i
e I
--t
, i 0 0 TRCS =.100 F' .,_
TRCS = 140 F [
20.0 = ;
.la.0- i
/
- 16.0 / :
[ /
/ l 8 o14.0-u -d ;
gn: / t C a "12.0 / 1 gg f
- 4 .. / \
1 3- . -
~'
c " 10 < 0
. e1 ;
&y ,,- -r' l ae z a 0-
- t
. l' }
'g:t e- -
. 6~ 0-i
- '4.0: ;
40.0 60.0 -80.0 100.0 120.0 140.0' ;160.0 '180.0 200.0- !
Time After Shutdown (hrs)~ )
zi
-APPROVED !
t FIGURE IBw0A,PRI 10-1 APR 5 '1990 !
Time to Reach Saturation Following a ,ajpggoyg ;
Loss of RHR-at Mid-Loop j i
-i i
i Page 9-of 62 i
( 0192Q/00180/011990)
REV. 55 LOSS OF RH COOLING UNIT 1 1Bw0A PRI-10
(\
0 0 Tges = 100 F -- TRCS ** 1(0 F 35.0 i
0.5 l ~ ~
2 SAFETIES / ~~~
00 -
I ,// -
NOT '
ACCEPTASLE -
25.0 -
s //
26
//
d
' 3 SAFETIES ' _ _____ ___
h 8.3 ___,,,_,,
s.<15.0 e
= : / '
g ,
- ACCEPTABLE z
E 10.0
- 8. s 0"j' "I"
- E^"*F- ---- --- ---- ----- - - - -
)
5.0 -- /
0.0 -
0.0 100.0 200.0 300.0 400.0 500.0 600.0 700.0 800.0 900.0 TIHE AFTER SHUIDOWN (HRS)
APPROVED TIGURE IBw0A PRI 10-2 APR 5 1999 Vent Path Required to Prevent
(]
V RCS Pressurir.ation anatowovo
- '5 85= w (0192Q/0018Q/011990)
REV. 55 LOSS OF RH COOLING UNIT 1 3Bw0A
-m; PRI-10
.J _
w
- ~ . . . ,~...
w N W e @ F E E
. % 3 JE.%) = =
500 ,
. . i , 1 , 4 ,- ,
4 , ,
7 I
! 1
! i3 i I
( i l i l i_ 1 I
\ i l i ! ! l
\ i ' i ! I i ,
3
\ l I 3 ' I 8
! i ! 3
\ ! 3 * ! ' ! i
\ , , .
400 \i i i i i i > > ,
i\ i t
_1
! \ i! i i O I \ l !_ i 3
% ! !I I I i i ! I g i !I i i b,. \ i i ! ! I e 3 v 300- \
1 . .
~
.5 . 1!
f.. W I1
. I (V) H q
\ '
i E
q ;
e -- s x
i 20g [
3 ' m
, 1 6
3 ,i ,- x, <
_ . i .
o -
x 4 3 .
i a x , <
u.
1
- x .
x x ,
100- '
s, m :
4 i
, ~ 1
~, e 1
l ?
I i i e 3 I 10 100 1000 10000 l
TIME (Minutes) l APPROVED FIGUPI 1Bw0A PRI 10-3 APR 5 1990 Required Charging Flow anuowovo
,3 y3 nurn nauw
) Time From Shutdown Page 11 of 62 (0192Q/0018Q/011090)
. . _ ~ - _ . - . _. _
-r
~
i j
REV.J55L LOSS OF RH COOLING UNIT 1 1Bw0A PRI-10 (
O _ _
i
-STEP ACTION / EXPECTED RESPONSE RESFONSE NOT OBTAiNED :
I ATIACH!iEET_.A_.QAge 1 of 20) !
RH R'4COVERY WHILE AT REDUCED i
_ILEENIORI.10EDl.IIONS l 1 C iECK-I :
RH PUMPS SHOULD !
BE STOE)E2: l
- a. RH pump 'ANY RUNNING a. Go To Step 2. !
- b. RCS level: b. Stop the RH Pumps and ,
Go To Step 2, !
o RVLIS plenum region - !
-GREATER THAN OR EOUAL !
TC 377. !
t
-OR- ,
o ILI-RYO46, RV HL-LEVEL - ;
GEEAIER THAN OR FOUAL TO 3 9 3
- 6 ',',
[
-OR- f
-t o Tygon level indication - j GREATER THAN OR EOUAL !
to 393'6" -[
- c. RH. Flow - LESS THAN 3000 gpm- -c.-Reduce RH Flow-to less than !
or equal to 3000 gpm, _!!
- d. RH pumps - HOT CAVITATING d. II the RH Pumps-continue to [
cavitate with adequate RCS- i s level, l IHEN stop the RH Pumps and i GO TO Step 2. l
.e._ RETURN TO procedure and !
step in effect i
- e l .. k l APPROVED i L i APR 5 -1990- !
r SRAADWOOD 'L
~ ~ ~ '
O L !
Page 12 of 62 j (0192Q/0018Q/011990) r
? [
{
i
, REV. 55 LOSS OF. RH COOLING UNIT 1 IBWOA PRI-10 STEP ACTION / EXPECTED RES;0N5E PESPONSE NOT OBTAiflED AITACEMENT A_ Qage-.2 of 2Al RH RECOVERY WHILE AT REDUCED INVENTORY CDNDITIONS 2 ISOL AT E - LETDOWN AND KNOWN
-DRAI V )ATHS:-
- a. Verify /Close letdown orifice isol valves:
- 1CV8149A
- - ICV 8149B
- 1CV8149C b, Verify /Close RH to CV Ltdwn Flow Cont Viv:
- 1CV128
- c. Verify /Close.RC Loop Drn Vivs:
- 1RC8037A
- 1RC8037B-l.
- 1RC8037C e'- 1RC8037D-
, 3 DETERMINE TIME TO'RCS BOILING:
! a. Time to core saturation - a.- Go To Step 4 Observe LESS THAN 5 MIIBJIES per' CAUTION-prior-to Step 4. 5 I
FIGURE IBw0A PRI 10-1, !
! (page 9) ;
- b. GO..TO' Step 13 ;
}
t i
APPROVED }
APR 5 1990' l.
ftsview O ,
~!
i l
Page 13 of 62 :
(0192Q/0018Q/011990) .l
REV. 55 . LOSS OF RH COOLING UNIT 1 IBWOA PRI-10 STEP- ACTION / EXPECTED RES?ON5E RE5FONSE NOT OSTAiNED AIIACEMENT A (Page 3 of_201 RH RECOVERY WHILE AT REDUCED INVENTORY CONDITIONS CAUTION Personnel working in containment should be warned prior-to. refilling
-the RCS to avoid inadvertent-contamination-of' personnel working near RCS openings.
4 CHECK RCS LEVEL:-
- a. RCS level: a. GO TO Step 9.
o RVLIS plenum region - LESS O THAN 377.
-OR-o ILI-RYO46, RV HL LEVEL -
LESS THAN 393'6"
-0R-4 o' Tygon level indication -
. LESS THAN 393'6"-
Step continued on next page i - APPROVED
, APR 5 1990 h
d Page 14 of 62 (0192Q/0018Q/011990)
'.REV. 55 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10 i O ACTION / EXPECTED RESPON5E RESPONSE NOT OBT AiNED l
STEP ;
AIIACHMENT A (Page 4 of 201-RH RECOVERY WHILE.AT REDUCED INVENTORY CONDITIONS Step 4 (continued)
- b. RCS level: b. Go TO Step s.
o .RVLIS plenum region - LESI THAN 277.
-OR-
.o I o ILI-RYO46 RV HL LEVEL -
-LESS THAN 392'
-OR-o Tygon level indication - LESS THAN 392'
(]
5 CHECK RCS HOT SIDE VENT PATH-R ESISTANCE:
.l resistance ACCEPTABLE leg opening, per FIGURE 1Bw0A PRI 10-2 THEH, refill the RCS per
- l .ipage 10)- the.following:
- 1) Align at-least one.
SI Pp for Hot Leg injection.
- 2) Start the aligned SI Pp.
- 3) WHEN RCS level is .
greater than 393'6" .
- THEH stop the SI Pp.
- 4) GO To Step 9.
APPROVED APR 5 1990 STSv?w Page 15.of 62 (0192Q/0018Q/011990)
REV. 55 LOSS OF-RH COOLING UNIT 1 1BWOA PRI-10 O
STEP ACTION / EXPECTED RESPONSE ,
RESPONSE NOT OST AiNED.
ATIACHMENT A-(Page_5_of E RH RECOVERY WHILE AT REDUCED INVENTORY CONDITI0liS 6 AllG'LC ENT. CHARGING PP -IE a CENT CHARGING Pp is not TO R EFI _ _ RCS: available, IEEH makeup to the RCS using
- a. Open RWST to CENT CHG one of_the following:
pump suction valves: .
o Attachment I, RWST GRAVITY l
- 1CV112D FILL (page 61) l!
i
- ICV 112E
-OR- !
- b. Close VCT to CENT CHG
-pump suction valves: o Attachment G. SI PUMP HOT -
LEG INJECTION (page 54) l! !
- ICVll2B s
- : ICV 112C -OR-
- c. Increase charging flow o Attachment H,_ ACCUMULATOR 1
to maximum by throttling- INJECTION'(page'58) l- t open.1CV121 and 1CV182 }
- d. RCS. level - GREATER THAN d. Maintain maximum charging 393'6"- flow-until RCS level is greater than 393'6",
l 7 GOTTO STEP 9' !
l
[
t
- i
?
r APPROVED:
t APR 5 1990 >
< O == !!
f
)
l :
i Page 16 of 62 (0192Q/0018Q/011990) i
?
t REV. 55 LOSS OF RH COOLING UNIT 1 1BWOA- !
PRI-10 i O :
STEP ACTION / EXPECTED RES?ON5E RESPONSE NOT OST AiNED ;
I t
AT_TACHMEET A-(Pare 6 of 101 .[
RH RECOVERY WHILE'AT REDUCED _!
INVENTORY CONDITIONS ;
8 -8EFILL 3CS VIA CENT !
CHARGIN-3 PP: .i a.-One Cent Chg Pp - a. Start a Cent Chg Pp IN SERVICE per Bw0P CV-1, STARTUP OF j THE CV SYSTEM. !
IE a Cent Chg Pp can HQI !
be started. i THEH makeup to the RCS :
using one of the following: j t
i o Attachment I. RWST GRAVITY FILL (page 61) llr
-OR-o Attachment G, SI PUMP !
HOT LEG IN.h ; TION - t (page 54) l --
l '
1
- l. -OR- ,
o Attachment H, ;
ACCUMULATOR INJEh_ .ON (page 58) l!j b.' Increase RCS level to - !
GREATER THAN 393'6" by ;
throttling open 1CV121 i and ICV 182--
l t
-c. Throttle 1CV121 to -i maintain desired RCS level !
t i
9 JPENTIFY A4D ISOLATE ANY L- -RCS LEAKAG E APPROVED ;
I- I L APR 5 1990 ii t
l BRAIDWOOD '
Ibe etTE R5 m W
_f ,
)
i l- I Page 17 of 62 l (0192Q/0018Q/011990) !
l
REV. 55 LOSS OF RH COOLING UNIT 1 1Bw0A r 's PRI-10 C) .
STEP ACTION / EXPECTED RES?ON5E PEEFONSE NOT 06T AifiED AT.TAcliMENT A (Eage. 7. .oL201 RH RECOVERY WHILE AT REDUCED INVENTORY CONDITIDNS Il0.TE The time to boiling in the RCS should**
be taken into consideration when
- determining how much time should be *
- spent venting the RH system prior *
- to taking additional actions starting *
- at Step 10, *
- t;*********
- NOTE *
- If adequate time to completely vent *
()\
\_
- the RH system is not available, air *
- can be swept out of the RH lines by *
- filling the RCS to 394'4" and *
- running an RH pump at a flowrate *
- greater than 3000 gpm.
- 10 VEN' A:FECTE] RH If the affected RH train can T.1ALN JSING RWST: EQI be vented using the RWST THEN:
o 1SI8812A o 1SI8812B APPROVED Step continued on next page APR 5 1990
-m ll$$EUv$w l
I (0192Q/0018Q/011990)
i
- REV. 55 1BWOA: 4
. LOSS OF RH COOLING UNIT 1 PRI-10 4
-STEP- ACTION / EXPECTED RES?DNSE RESPONSE NOT OBTAiNED-I r
ATTACHMENT A_ Rage 8 of 20) l RH RECOVERX WHILE AT REDUCED -!
INVEllIQEY CONDITIONS __ )
I Step 10 (continued) i i
- b. Align the affected RH train 2. Open RH Hot Leg !
for venting: Suction Viv: l
- 1) :RH Hot Leg Suction Valves - o 1RH8701A and B [
CLOSED:- o 1RH8702A and B !
t o 1RH8701A and'B- 3. Open RH to Cold Legs j
.o 1RH8702A'and B 1A&D/lB&C: !
- 2) RH to Cold' Legs lA&D/1B&C - o 1SI8809A !
CLQSID: o ISI8809B i g-w o ISI8809A 4. Close RH HX 1A/B Disch !
gj o- ISIS 809B Xtie Viv: f I
- 3) RH Pump 1A/B Suction o 1RH8716A from RWST Isol Valve - o 1RH8716B OPEN:
- 5. Open lA/B 10I HX FCV: ;
o ISI8812A i o ISI8812B o 1RH606 :
- o 1RH607 -!
- c. Vent RH-train suction piping [
using high point vent valves: 6. Close-1A/B RH Ex Bypass- -!
FCV: -l o 1RH028A-(379' CWA P68) ;
o 1RH028B-(379' CWA P75) o 1RH618 ;
o 1RH619- ,
t i
APPROVED Step continued on next page ;
o APR5 1990 i L
O !
( Page 19 of 62 [
(0192Q/0018Q/011990) i
REV. 55 LOSS OF RH COOLING UNIT 1 1Bw0A PRI-10
[vD STEP ACTION / EXPECTED RES?ONSE REIFONSE NOT OST AiNED ,
AI.TACEMEl[I A (Pate. 9 of._211 RH RECOVERY WHILE AT REDUCED INVElRQRY_C01{DITIONS Step 10 (continued)
- d. Vent RH train discharge piping 7. Vent RH train suction using high point vent valves: piping using high point vent valves:
o 1RH026A o 1RH028A (357' S16 1A RH HX RM) (379' CWA P68) l o 1RH026B o 1RH028B (357' V16 1B RH HX RM) (379' CWA P75) l
- e. Re-align the affected RH train: 8. Vent RH train discharge piping using high point
- 1) RH Pump 1A/B Suction from vent valves:
RWST Isol Valve - CLQSID:
(~N o 1RH026A
\s-) o 1SI8812A (357' S16 1A RH HX RM) l o 1SI8812B o 1RH026B (357' V16 1B RH HX RM)
- 2) RH Hot Leg Suction Valves -
CLQSED: 9. Start the affected pump at a high flow rate and o 1RH8701A and B monitor reactor vessel o 1RH8702A and B level.
When RH pump amps ano
- 3) RH to Cold Leg 1ALD/lB&C - disch pressure are stable, QEEH: reduce RH flow, o 1SI8809A 10. Shutdown the RH Pump and o 1SI8809B align per SE direction, ll.G0 TO Step 11.
APPROVED APR 5 1990 O
Page 20 of 62 (0192Q/0018Q/011990) i
.- . . . . . - . .. ._ . - . -. ._ - - .~.. . -
-REY.-55 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10
=
STEP ACTION / EXPECTED RES?ONSE RESFONSE NOT OSTAiNED -
AITACHMENT A (Eag,e 10 of 201 RH RECCVERY WHILE AT REDUCED INVENTORY CONDITIONS CAUTIOH Starting an RH pump may result in an RCS level decrease due to shrink or void collapse.
- 11. RESTORE RH FLOW:
- a. RCS level - GEEATIR THAN 393'6" a. Continue with this procedure at step 12, l WHEH RCS level is greater than 393'6", __
l THEN perform Steps lib through lij.
() b. Align the RB system:
- 1) RH Hot Leg Suction valves - 1) Align valves as necessary QEEN: per ATTACHMENT B, i Step la, (page 32) while <
c 1RH8701A and B continuing with this o 1RH8702A and B ATTACHMENT.
R2)lME Pump Suct From RWST 2) Locally; align valves as Isol Viv - CLOSED: necessary:
1 SIB 812A (343' V13 o 1 SIB 812A o o 1SI8812B 1A CS PP RM asove grating) o 1SI8812B (343' X14 1E RH PP RM above grating)
' APPROVED Step continued on next_page Aea s isso O : = w.s Page 21 of 62 (0192Q/0018Q/011990) ,
REV 55 LOSS OF RH C0OLING UNIT 1 1BWOA l P"s!-10 O
STEP ACTION / EXPECTED RE5:0N5E l PE FCriSE NOT OBT AifiED ATTAC1111E11T_A._IPace_iL9L202 RH RECOVERY WHILE AT REDUCED II(VIliTORLC01(DIT10liS Step lib (continued)
- 3) RH to Cold Leg 1AlD/1Bl.C 3) Locally align valves as
- DEEll: necessary:
o 1 SIB 809A o 1518809A o ISIS 809B (387' CWA P50) o ISI8809B (387' CWA PSI)
o A RH IiX o B RH HX
- d. Verify /Close RH Dsch Flow path flow control vivs:
- RH HX Flow control viv:
o 1RH606 o 1RH607
- RH HX Bypass Flow control viv:
o 1RH618 o 1RH619
- e. Start one RH pump:
o A RH pump o B RH pump
- f. Maintain RCS level -
GREATER _T11 AIL 393 ' 6" APPROVED Step continued on next page APR5 1990
[M07s"v7w Page 22 of 62 (0192Q/0018Q/011990)
t t
REY.--55 LOSS OF RH COOLING UNIT 1 IBWOA PRI-10 l O !
I l
STEP ACTION / EXPECTED RESPON5E REIFONSE NOT OST AiNED -
ATTACHMENT RH RECOVERY WHIL_A_Rakt_12 AT REDUCEb oL20)
_ ,lHYENIORY CONDITIONS l
Step 11 (continued)
.g. Gradually increase RH flow to desited flowrate
- h. Verify RH Flow - EESE RED h. Start trending core exit TC's, and GO TO Step 12.
Observe NOTE prict to lt Step 12. l t
i
- 1. Verify RCS temperature - 1. Increase cooling flow thru l LESS THAN 140'F the inservice RH HX -i and continue cooling the !
RCS. RETURN TO Step lig. j
- j. RETURN TO procedure and k step in effect l APPROVED APR 5 1990 O
Page 23 of 62 (0192Q/0018Q/011990).
REV. 55 LOSS OF Rii COOLING UNIT 1 1BWOA PRI-10 STEP ACTION / EXPECTED RES;0N5E PE?FONSE NOT OSTa NED ATTAClitiEliT_A_(PageJLcL20) -
Ril RECOVERY WHILE AT REDUCED
_IWEHIORLCOUD1IlfliS r
. ********************************w*t**e*,4
- liOJE
- i
- To maintain RCS pressure low enough *
- for gravity Feed, at least two SG's * ,
^
- must be refilled and utilized. *
[
- a. RCS pressure - GEEATER a. GO TO Step 13.
IIIAtLOR_. EQUAL _IQ_103.SIG I
(N b. SG - AT_LEASI_TWQ_AYA11ABLE b. Restore at least two Steam Generators to service while continuing with this procedure at Step 13,
- c. GO TO Attachment D.
STEAMI!iG I!TTACT/lioll-l ISOLATED SG(s) (page 38)
! APPROVED APR 5 1990
((AiUsY[w L) -
l Page 24 of 62 i (0192Q/0018Q/011990) l
I I
REV. 55 LOSS OF RH COOLING UNIT 1 IBWOA PRI-10 p) v STEP ACTION / EXPECTED RES DN5E REIFONSE NOT OSTaiNED ,
ATTACEMElfLA_ Rage _1Lof_202 RI! RECOVERY WiiILE AT REDUCED IllERIDAI_CfHDlI19115 I:
- a. Announce over the plant page system for all unnecessary personnel to evacuate Unit 1 containment
- b. Actuate Unit 1 Containment Evacuation Alarm:
- 1) Select SR channel to provide Containment Evacuation alarm:
e o SR channel 31
( -OR-o SR channel 32
- 2) Verify Audio Count Rate 2) Place Audio Count Rate Channel selector switch in Channel Selector switch position for SR channel in position for SR l HOI selected in Step 13.b.1 channel RQI selected in above Step 13.b.1.
- 3) Place selected SR channel Level Trip Switch to
- h1RASS:
- Chech SR TRIP BYPASSED alarm - LII
- 4) Bypass BDPS on selected SR channel:
a) Place BDPS TEST / NORMAL toggle switch on card
!TM107 in IESI position: APPROVED e Check BDPS BYPASSED APR 5 1990 alarm - LII agogo, Step continued on next page Page 25 of 62
- (0192Q/0018Q/011990)
- -. _ ~ . , - . .-
REV. 55 LOSS OF RH C00Li,NG UNIT 1 IBWOA r~N PRI-10 U
STEP ACTION / EXPECTED RE5:0N5E l PEiFONSE NOT 06TtuhED ATTAClltiEliT_.A_lP. age._li. oL101 RH RECOVERY WHILE AT REDUCED
____IlNIliTORLCONDITIONS
- 5) Rotate selected SR channel Level Adjust potentiometer fully counter clockwise
- 6) Place selected SR channel operations selector switch to - LEVEL _ADlDSI position
- At SR drawer, chech CHANNEL ON TEST light - LII
- 7) Rotate selected SR channel Level Adjust potentiometer clockwise until HIGH FLUX AT SHUTDOWN alarm - LIT
(}
\_- i l 8) Continue procedure at Step 13c, After at least 3 minutes, de-energir.e the containment Evacuation Alarm by placing the HIGH FLUX AT SEUTDOWN switch to - ELQCK
- c. Monitor containment conditions:
- 1) Notify Rad Protection Dept to monitor containment conditions and provide guidance on protective clothing and equip-ment during containment closure
- 2) Notify Rhd Protection Dept to provide additional guidance should RCS boiling point be reached before containment closure is completed APPROVf D APR 5 1990 EN="vYa w Page 26 of 62 (0192Q/0018Q/OllOJ0)
, . . - _ ~ _ _
REV. 55 LOSS OF RH COOLING UNIT 1 1Bw0A PRl-10 O -
STEP ACTION / EXPECTED RES?ON5E REEFON5E NOT 06T Aif;ED ATTAClitiEliT_A_ Race _lk_oL201 RH RECOVERY WilILE AT REDUCED IliyEl{IORLC01{D1TIQ1{S 14 1RlllAIE CONTAllMENI_ CLOSURE:
- a. Close Unit 1 Containment:
- 1) Use 1Bw05 XPC-W1. CNMT BLDG PENETRATION WEEKLY SURV.
as a guide
- 2) Provide at least one barrier between containment atmosphere and areas outside containment 15 gig S_RUMW1G._lR
- IVP01CA
- IVP01CB
- IVP01CC
- IVP01CD 16 CBECK RCS LEVEL:
- a. RCS level - LESS a. GO TO Step 21.
TRAN 393'6"
- b. RCS level - LESS b. GO TO Step 20.
T11 AIL 1921 APPROVED APR 5 1990 A"!4%?4 Page 27 of 62 (0192Q/0018Q/011990)
REV. 55 LOSS OF RH COOLING UNIT 1 IBw07 PRI-10 STEP ACTION / EXPECTED RES GN5E FEIFONSE NOT 06T AifiED ATTACliMINT_.A_(Page_1LoL202 RH RECOVERY WHILE AT REDUCED 11ME!IIORY_C0HDITI.0HS R 3 C
- a. RCS Hot side vent path a. If the RCS has a cold resistance - AC UPIAELE Icg opening, par __IIGURE_.lBROA_IRL1D.-2 TIILH refill the RCS per Lpage 10) the following:
- 1) Align at least one SI pump for Hot Leg Injection.
- 2) Start the aligned SI Pp.
D V
- 3) WHEH RCS level is greater than 333S ",
IHEN stop the SI Pp.
- 4) Go 10 Step 21. ;
l i
r l
l s
l l APPROVED !
(
APR 5 1990 ;
M Evin I e
a- t l
Page 26 of 62 :
(0192Q/0018Q/011990)
- . - _ . . - _. . _ _ _ _ . _ . . . ~
REV, 55 LOSS OF RH COOLING UNIT 1 IBWOA "ai-10 O_
STEP ACTION / EXPECTED RESrGN5E FE?FONSE NOT CSTmNED ATIACIIMENT_A_LFace_1B_of_201 RH RECOVERY WHILE AT REDUCED IINEtIIORLC0HDIIIO11S 18 II a Cent Charging Pp is not
&lGJ CT11 pARG1NG_EE IV_Edl a NLa available.
THEli mahoup to the RCS using
- a. Open RWST to CENT CHG one of the following:
pump suction valves: Attachment I, RWST GRAVITY
. 1CV112D L (page 61) l
. 1CV112E
-OR-
- 1CV112B
- 1CV112C -OR-
- c. Increase charging Flov o Attachmeat H. ACCUMULATOR to maximum by throttling INJECTION (page 58) l open 1CV121 and ICV 182 i
d . RCS level - GEA'AEILIHAll d. Maintain maximum charging f jll%" flow until RCS level is greater than 313'.h".
19 GD_10._SIEE_21 l -
f-APPROV ED APR5 1990
- =ta
'O
- - - =_ .
' f f (0192Q/001BQ/011990)
L m. , a .
REV, 55 LOSS OF RH COOLING UNIT 1 IBw0A
- PRI-10 l STEP ACTION / EXPECTED RE5 0N5E PE9FONSE NOT bhTmNED ATTAC!IMElrLA_.(Page_1.9_.0L201 Rif RECOVERY W111LE AT REDUCED llNEliTORI_ CONDITIONS 2
EMhl%V " :
- a. One Cent Chg Pp - a. Start a Cent Chg Pp :
IILSERY1CE per liw0P CV-1, STARTUP ,
OF Ti!E CV SYSTEM. ,
IE a Cent Chg Pp can NQI be staited.
THEN makeup to the RCS using one of the following:
9 Attachment I, RWST .
GRAVITY TILL (page 61) l'.
(3 ..OR -
(
o Ate:chment G, 51 PUMP ,
.40T LEG I!UECTIO!(
(page 54) l' 0 Attachment !!,
ACCUMULATOR I!UECTION (page 58) l
- b. Increase RC5 level to -
GREATIILTHAN 393 ' 6" by thrott3ing open 1CV121 c,nd ICV 182 l c. RCS level - GREAIEILTIIAIL332Lh" c. RETURN TO Step 20a. '
I
APR 5 1990 l
l 0 MSEv7w ;
[ V - - -
- i Page 30 of 62 (0192Q/001SQ/011990) l
REV. 55 LOSS OF RH COOLING UNIT 1 1BWOA q
v PRI-10 STEP ACTION / EXPECTED RESPON5E FE?FONSE NOT OBTmf;ED ATIACliMEliTAIPage_2D_cfJ01 RH RECOVERY VMILE AT REDUCED
__110ZEliERLC011DIT10liS t
21 RES10RLEH C00LitG: r
- a. RH Flow - RESIORED a. Restore RCS cooling:
- 1) Perform one of the following: ;
o ATTACHMENT C, BLEED AND FEED USING EXCESS LETDOWN THROUGH LOOP I
DRAINS AND NORMAL CHARGING (page 33) l'
-OR-()
O o ATTACHMENT G, SI PUMP HOT LEG INJECTION (page 54)
-OR-o ATTACEMENT H.
ACCUMULATOR INJECTION (page 58)
- 2) RETURN TO Step 10.
- b. RCS temperature - LESS b. Continue cooling with RH, IRAN 140'F RETURN TO Step 21a.
h!bkkFhk ,
-EliD-APPROVED l APR 5 1990 O 3li?%*?& ;
V l >
Page 31 of 62 (0192Q/0018Q/011990) l
RdV. 55 LOSS OF RH C00'ING UNIT 1 IBWOA t PRI-10 f O !
I STEP ACTION / EXPECTED RE5 0N5E REEFON5E NOT OST Aif.ED ATTAC11tiENT B_(Page_ Loll)
~
f LOCALLLDEElf1HG_RIL110LLEG_5MCIIDILVALVES ;
i 1 LOCALLLDEEtLRtLSVC110tLYALYES: i I
- a. IE IPI-405 failed, a. II valves can HOI be opened THIH open the following valves: electrically due to failed !
motor,
- 1RH8701A (MCC131X2, Cub B1) THEN turn breaker OFE and j
- 1RH8702A (MCC131X2, Cub B4) locally open with handwheel ;
as necessary: ;
-THEN open the following valves o 1RH8701A (377' R7 P68) !
o 1RH8701B (377' R11 IMB) :
- 1RE8701B (NCC132X2, Cub B3) o 1RH8702A (377' R4 P75) i
- 1RH8702B (MCC132X2, Cub B1) o 1RH8702B (377' R3 IMB) [
t
point vent valves. ;
- 2) Install jumper between points t 2 and 3 on terminal board e at front of cubicle [
- 3) Override breaker / door interloch and turn breaker-DH .j
- 4) WHEN 'M' contactor drops out, !
THEN turn breaker OEI and ,
remove jumper ,
- 5) Check valve position by visual !
inspection or by computer point j
- 6) At SE discretion, vent RH trains !
! using high point vent valves- l
- - i
- b. RETURN TO IBw0A PRI-10, Step _4 i
- END -
APPROVED ;
APR5 1990 f
- = % ;
O i
f V i l i Page 32 of 62 :
'(0192Q/0018Q/011990) ;
- 1
.a .. ; ._ a_ . . .. ; _ _a_._ -
_,,-.__..__.-..,._,,__.]
REY. 55 LOSS OF RH COOLING UNIT 1 IBWOA PRl-10 7-~3 V
STEP ACTION / EXPECTED RE5:0N5E FEicCNSE NOT OSTmNED l ATTACHMENT _C_IEagelof_M BLEED AND FEED USING EXCESS LETDOWN THRU LOOP DRAIHS 1 HORMAL_CHARG1HG. .
HOTE
- This ATTACHMENT establishes a drain * !
- path to the RCDT. This letdown may
- l
- be sent to either the HUTS or RWST *
- via the RCDT. Charging is also *
- established, which may use either
- l ;
l
- plant conditions to determine which
- l
- combination to use. Consider RWST *
- 1evel, PWST levels, BAT levels,
- l
- and HUT capacity.
- l
() 1 CHECK _RCS_IEMPERAIURE:
- a. RCS temperature - LESS_THAH a. GO TO another ATTACHMENT 2101I for RCS cooling per TABLE A (page 8). ,
i 2 CHECLRCILT PUMPS:
^
l a..At least one RCDT pump - a. Resture an RCDT pump or AVAILABLE Go T0 another ATTACHKENT ;
for RCS cooling per TABLE A (page 8).
II no other cooling method is t I available.
l THEN perform the following:
- valve:
ICV 8350 (377' R12 RCDT Valve Aisle) -
- 2) Evacuate personnel from ccntainment, l
(q
_j Step continued on next par,ED APPROV e !
APR5 1990 ,
BRAIDWUVW Page 33 of 62 me+n5M"**
(0192Q/0018Q/011990) i
s- .. . ._ um.v I
REV. 55 LOSS OF RH COOLING UNIT 1 1BWOA
--==_.: __-
STEP ACT10fuEEFEdlED REB 20fGE RE?F0fiSE NOT OSTAifiED i
ATTACMEliT C. Gage._2._of_n BLEED AND TEED USING EXCESS LETDOWN THRU LOOP
__._DRAlliS_f=JiORMALCHARG11fG Step 2a (continued) !
- 3) At the Radwaste Pnl, ,
ORE 01J._open RCDT Drain i valvet !
- 1RE9163 I i
- 4) Verify that a CENT CHG Pp l is available prior to establishing a RCS drain !
path.
- 5) Verify that the Excess [
LTDWN HXs Common Outlet !
HDR 18o1 Valve is closed: j
- 1CV123 l
- 6) Open the following RCS i Loop Drain Valves:
- 1RC8037A $
- 1RC8037B +
- 1RC8037C
- 1RC8037D 7)-GO T0 step 7 of this ATTACHMENT. ,
I 3 GECK CENT CHG PUMPS: j
- a. At-least one CENT CBG pump - a. GO'TO another Attachment [
AVAILABLE for RCS cooling per i TABLE A_(page 8). ,!
-I APPROVED _}
APR 5 1990 !
l Q O' U?#w E !
I i
Page 34 of 62 l (0192Q/0018Q/011990) i
-f
REY. 55 LOSS OF RH COOLING UNIT 1 1BWOA PRI-10
[
Qx . - - -
STEP ACTION /f PECTED RE5;CN5E PEEFONSE NOT OST5 NED l
'TTACHMERT_C_ If ace _ 3_rLi} ;
BLEED AND /EED USING EXCESS LETDOW!{ THRU LOOP ,
DRAlliS_Ll!0Rlh_CHARGRtG !
l 4 ggL1DfLDJ5CliARGL0f_RCDJ
^
o U-1 RCDT Pump to Recycle HUT's Isol Viv - 0FEl{: ,
- 1AB8551 (401' V14 10' l
below grating)
-OR- ,
o U-1 RCDT pump to RWST Isol Viv - 02I11: i-1RE9171 (403' CWA From Pil)
- 1518936 (364' V15 CWA ;
C along wall)
I 5 ESIABLLSILDRAllLPA11LIOJ1CDl:
- a. Excess Ltdun Ex's Common Outlet Hdr Isol - CLOSED:
- 1CV123
- b. RC Loop Drn Viv - 0 Fili:
- 1RC8037A [
- 1RC8037B
- 1RC8037C
- 1RC8037D
IHRO.IILED:
- 1CV8350 (377' R12 RCDT Valve Aisle) APPROVED :
, APR 5 1990 O ""*
l Page 35 of 62 (0192Q/0018Q/011990) l . _
REV. 55 LOSS OF RH COOLING UNIT 1 IBWOA PRl-10
(~~]
m)
STEP ACTION / EXPECTED PE5?ON5E PEIFCNSE NOT 06T4 NED ATTACIIMENLC _ Wage._4_of_D BLEED AND FEED USING EXCESS LETDOWN THRU LOOP
.11M111S_JLR01W1_CMEG1HG_
l 6 YEEIFY RCDT PUHP_S_J1LAU10:
- 1A RCDT pump l
- a. Mode selector switch - AUTOMTIC a. Verify RWST level greater than b7 and perform the following:
I
- 1) Open RWST to CENT CllG Pumps Suction valves:
- 1CV112D
- 1CV112E
- 2) Close VCT Outlet 1801 valves:
- ICV 112B
- 1CV112C
- 3) GO TO Step 8, l:
b, Set boric acid and makeup water flow controller potentiometers - GREATER _THAN >
RCS._3.0A0lLCONCEliTMT10N
- c. Control switch - START I 8 YERTFY CHARGlRG_S1SJf!LSIMS:
- a. CENT CHG Pumps Mini
- low Isol valves - OPEN:
- 1CV8110 APPROVED ,
- ICV 0111 APR 5 1990
- 1Cv8114
- 1CV8116 uuowuvo '
e s na u w
{
( Step continued on next page i
l
! Page 36 of 62 l (0192Q/0018Q/011990) l >
REV, 55 LOSS OF RH COOLING UNIT 1 IBWOA PRI-10 1 STEP ACTION / EXPECTED RES?ONSE PEIFONSE NOT 00TAiNED ATIACEMENT_C_ Rage._i_of_51
-BLEED AND FEED USING EXCESS LETDOWN TH M LOOP DRAINS _ LliORMAL_ CHARGING Step 8 (continued)
- b. Charging Line Cnmt Isol Valves - QEEN:
- 1CV8105
- 1CV8106
- c. Start a CENT CHG pump
- d. Monitor RWST level.
IE RWST Level EMPTY alarm energizes-
-THEN trip Cent Chg Pump AND isolate the drain path O
- e. Equalize charging and letdown flow N 4
-a. Check RCS temperature - a. Go TO another ATTACIMENT S.IABLE OR DECREASING for RCS cooling per TABLE A (page 8).
I R
a.~II at anytime an RH
-train becomes'available.
THEE:
- 1) Immediately all'gn the RH Train for RCS cooling per Bw0P RH-6 PLACING THE RH SYSTEM IN SHUTDOWN COOLING APPROVED
- 2) Return CV, AB, RE and RC Systems. APR5 1990 to normal lineup per SE direction l , ,o.ono w ovow O 3) RETURN TO-1Bw0A'PRI-10, Step 7
- END -
Page 37 of 62 (0192Q/0018Q/011990)
REV. 55 LOSS OF RH COOLING UNIT 1 IBWOA .
,m PRl-10 l Q) - -.
STEP ACTION / EXPECTED RESPON5E PETFONSE NOT GET AiNED ATIACIIMEllLILLEage_LoLll !
SIEAMING_IIIIACIlR0ll-I SD LATED _ S GISl ,
1 E SIABLISILRCS_C.0DLING_MSING_SG.LSl : 1
- a. Check IOS temperature - a. GO To another ATTACHMENT GREATEILTIIAIL111'I for RCS coeling per .
TABLE A (page 8). [
- b. Chech Two SGs - AVAILABLE:
- 1) Associated loop stop 1) II ALL SGs are isolated valves - DEEli IllEti try to unisolate at least one SG.
IE no SG can be made available T!iEli GO T0 another ,
ATTACHMENT for RCS Cooling
<-~ per TABLE A (page 8). l
- 2) Available vent path: 2) Establish a vent path for at least one SG, o Associated PORV's IE no SG can be made o Steam Dumps available. r IIIEli GO TO another ATTACHMENT for RCS cooling per TABLE A (page 8), l
- 3) Narrow range levels - 3) Feed SGs using AF GREATER THAN 4% System. Maintain level greater than 4% narrow range.
IE AF System liOI available, I}lEli Go TO Step 2. ;
Step continued on next page APPROVED APR 5 1990 Q O^ dees 7S
- l b - -
l l
L Page 38 of 62 (0192Q/0018Q/011990)
REV. 55 LOSS OF RH COOLING UNIT 1 IBWOA
x PRI-10 (G
STEP ACTION / EXPECTED RE5:0N5E _ PE?FONSE NOT OST Aghb -
ATTACHMENI D_ Cage _2_of_D ,
31IAMlHG__1HTACIZE0H:1101ATID_S GISl Step 1 (continued)
- c. Dump steam to condenser from c. Manually or locally dump available SGs: steam from availatie SG(s) using SG PORV(s). ,
- 1) Check condenser available
- 2) Place MS header pressure controller in MANUAL and reduce demand signal to zero
- 3) Place steam dump mode selector switch in STEAM PRESSURE mode
/~') 4) Manually adjust MS header (m,/ pressure controller demand to initiate cooldown ,
- d. Check RCS temperature:
- 1) RCS temperature - S.IABLE 1) IE steam flow from at least i QILDECREASING two available SGs is verified Locally, THEN continue with this attachment .
IE HDI verified, THEH GO T0 another ATTACHMENT for RCS cooling per TABLE A (page 8). l+
- 2) Continue heat removal by steaming SGs and feeding ,
with AF System i
- 3) II at anytime an RH train becomes available, l
THEH immediately align it for APPROVED RCS cooling per Bw0P RH-6, PLACING THE RH SYSTEM IN APR 5 1990
, SHUTDOWN COOLING O
\m/ 4) RETURN TO 1Bw0A PRI-10, Step 7
- fASNv2=
i 8
(0192Q/0018Q/011990)
REY. S5 LOSS OF RH COOLING UNIT 1 IBw0A !
PRI-10 i O !
STEP ACTION / EXPECTED RESPON5E PE5FONSE NOT OBTAifiED j ATIACEMENT D Qage_.Lof] .
SIEAMlHG_INIACILH0ll-ISDLATED_S ESl l CAUIIDH ,
If offsite power is lost after SI ,
reset, then manual action may be ;
required to restart safeguards !
equipment. !
I 2 CHECK FEEDWATER ISQLATION: !
t
- a. FEEDWATER ISOLATION alarm - LII a. GO To Step 3. l
- b. Reset SI. if necessary: b. Reset SI per IBw0A PRI-5. CONTROL ROOM INACCESSIBILITY, O~ ATTACEMENT E.
- 1) Depress both SI reset pushbuttons.
- 2) Verify SI ACTUATED PERMISSIVE LIGHT - NOT LIT
- 3) Verify AUTO SI BLOCKED permissive light - LII
- 4) Verify all automatic SI 4) Deenergize Feedwater signals - CLEARED Isolation-Aux Relays by removing fuses FU-24 and FU-27 at Aux Safeguard Relay Cabinets 1PA27J and IPA 28J. GO TO Step 2e.
[
L 5) CLOSE AND IRIE DEEN 5) IE reactor trip breakers reactor trip breakers will NOI CLOSE, THEN lift lead on TB506-5 in IPA 09J and IPA 10J to-clear P-4 Fignal.
Step continued on next page APPROVED APR E' 1440 MEMw Page 40 of 62 (0192Q/0018Q/011990)
REY. 55 LOSS OF RH COOLING UNIT 1 IBw0A PRI-10 STEP ACTION / EXPECTED RESPON5E RE?FE! SE NOT OSTaiNEt.
I ATTACllMERI_ILlPage_A._oll) !
SIEAli111G_IllTACIIH01L-1EOLATIILSGIS1 i i
Step 2 (continued) l i
- c. Reset feedwater isol i
- d. Reset feedwater isol l aux relays j:
- e. Verify feedwater isol aux relays i ACTUATED lights - RQI_LII !
f, CAUT10H Slowly initiate feedwater flow to [
steam generators to limit severe i water hammer to intact SGs. l O _ - - - ,_.
5 IE5G l
- a. Verify Condensate System in )
operation: l
- 1) At-least two CD/CB pump run '[
lights - LII t
LOW alarm - NOT LII ;
- b. Place FW reg valves in MANUAL {
and reduce demand to zero {
- c. Place-FW reg byp valves in j MANUAL and reduce demand to ;
zero APPROVED [
Step continued on next page APR5 1990 i O -
T i
Page 41 of 62 f (0192Q/0018Q/011990) i
, . . _ . - . , _ . - _ . . . _ . . . - . . . , - . _ _ . _ . . . . . . _ . _ . . _ , _ , _ . ~ . ~ . - . . _ , - . _ , . , . _ , . . , _ . - , _ . - .
REV. 55 LOSS OF RH COOLING UNIT 1 1BWOA r PRI-10 !
f STEP ACTION /EXPECJED RES?ON5E PEEFONSE NOT OSTmfiED i
ATIACEMENT_ILIEage_LoL13 !
S.TIAMING_IRTACTIHOR-110 LATED _SSLSl ,
f Step 3 (continued) [
- d. Start the startup feedwater d. Establish condensate flow !
pump: to the Steam Generators by i
-l performing the following: !
i
- 1) The fc't. lowing interlochs must 1)-Verify at least ene FW be met to start the startup Pp discharge valve is feedwater pump: open! ;
- Suction isol valve - QEEN: o 1FWOO2A !
o 1FWOO2B J-
- ICB133 o 1FWOO2C o 1FWQ58 I
- Discharge isol valve - OPEN: ,!
IE condersate flow can NOT O *
- IFWO59 Recire' control valve switch be established, nIEH GO TO another Attachment for RCS coolin);
in Of.EH position: per TABLE A (page 8). j
- 1FWO76
{
I
- Recire isol valve - DEEN:
-* 1FWO58 f
- Lube o13 preosure - GEEAIER THAN 8 ESIG
- e. Manually open FW tempering isolation valves:= !
.o 1FWO35A !
t o 1FWO35B o 1FWO35C o 1FWO35D- ,
APPROVED j Step continued on next-page APR 5_1990 _
i al4 MOW Os D i men P.svtw j O i f
Page 42 of 62 l (0192Q/0018Q/011990)
REV. 5S LOSS OF RH COOLING UNIT 1 1BWOA i PRI-10 O l STEP ACTION / EXPECTED RES 0N5E RE3F0fiSE NOT OST Aif.ED I
/
i ATIACHMENT_ILLEate_ft of._1_1 !
ETEAMIHL1HIACIIH0H-110LATEILSED l Step 3 (continued) j
- f. Control flow with FW tempering f. Go TO another Attachment !
flow control valves: for RCS cooling per l!
TABLE A (page 8). I o 1TWO34A l o 1TWO34B [
o 1FWO34C !
o 1TWO34D. ;
4 C1EK_SG_LEYEL.S [
a4 Narrow range level in at a. IE feed flow to at 1 cast I least two available SGs - two available SGs is [
GREATEILT&MLA% verified, ;
THEH maintain flow to O restore narrow range level to greater-than A%.
l II NO verified, I THEH 0 T0 another i ATTACHhENT for RCS cooling per TABLE A (page 8). li
[
t
- b. Dump-steam to condenser from b. Manually or locally dump ,
available SGs: steam from available SG(s) ;
- 1) Check condenser available )
i
-2) Place MS header pressure ,i controller in MANUAL and i reduce demand signal to zero
- 3) Place steam dump mode i selector switch in STEAM ,
PRESSURE mode [
- 4) Manually adjust MS header AFPROVED +
pressure controller demand APR 5 1990-to initiate cooldown
$ $ $w O
I l
Page 43 of 62 (0192Q/0018Q/011990) l t
-. - - , , . _ . . , . . , . ..-. . . - . . . - . . . , - - - - . . - . . - - . . . . ~ - - , - - -
REV, 55 LOSS OF RH COOLING UNIT 1 1BWOA O PRI-10
'b STEP ACTION / EXPECTED RES;ON5E PEEFONSE NOT 06T A.NED ;
ATIACIIMENT_IL2 Age 7 of_Z2 SIEAMIRLIIITACTL11011-IS O LATED _ S GI D r
i l)
- a. Check RCS Temperature - a. GO T0 another ATTACHMENT S.TAEE__0lLDECREASlllG for RCS cooling per TABLE A (page 8). ,
- b. Continue heat removal by steaming and feeding SGs 6 f TEMPTS 10 E S10RE
- a. II at anytime an RH train !
becomes available, IHEli:
{' !
- 1) Immediately align the RH train for RCS cooling per ,
Bw0P RH-6, PLACING THE RH SYSTEM IN SHUTDOWN COOLING
- 3) RETURN TO 1Bw0A PRI-10. Step 7
-END- 7 APPROVED APR 5 1990 l
,*:l N 2 ??w
('J L
r i
l Page 44 of 62 (0192Q/0018Q/011990)
REV. 55 LOSS OF RH COOLING UNIT 1 IBWOA p PRI-10 d
STEP ACTION / EXPECTED RE9:0N5E PE?FONSE NOT OSTadjED _
ATTACII!iERTl.IPAGE_L.0L11 BLEED AND FEED USING FZR PORV(S) AND llRluihk_.CliARGlHG 1 RESET SI IF NECESSABI: Reset SI per 1Bw0A PRI-5, CONTROL ROOM
- a. Depress both SI reset INACCESSIBILITY, pushbuttons ATTACHMENT E.
- b. Verify SI ACTUATED permissive light - HQT_LLI
- c. Verify AUTO SI BLOCKED permissive light - LII 2 1 AINMENT ISOLATI0tLIE
(] a. Reset Cnst Isol Phase A a. Roset per IBw0A PRI-5, CONTROL ROOM
() INACCESSIBILITY, ATTACHMENT E.
- b. Reset Cnmt Isol Phase B b. Reset per 1Bw0A PRI-5, C0!UROL ROOM I!1ACCES SIBILITY ,
ATTACHMENT E.
- c. Reset Cnmt Ventilation 1801
- 1SI8811A
- 1SI8811B
- 1CV8110
- 1CV8111 Step continued on next page APPROVED APR 5 1990
- /EY$7ufvfw b
ag 62 (0192Q/0018Q/011990)
t I
r REY. 55 LOSS OF RH COOLING UNIT 1 IBWOA !
PRI-10 s'
STEP- ACTION / EXPECTED RESPON5E ;+0FONSE NOT OSTmNED i
ATTACEMEtiT E (P. age _.2._oLil l BLEED AND FEED USING PZR PORV(S) AND E0RMALCIIARG11tG Step 2 (continued)
- e. Reset SI CENT CHG pumps miniflow isol valves: I i
- 1CV8114 j
- ICV 8116 !
- f. Chech SAC run lighte ~ AHLLLT f. Start one SAC per l Bw0P SA-1, STARTUP AND i OPERATION OF STATION [
AIR COMPRESSORS. i I
- g. Open-instrument air Cnmt i isol valves: ;
i
- 1) IIA 065 t
- 2) IIA 066 l h.-Open fire protection Cnmt isol valve: {
- 1FP010 !
, t L !
t i
i
~!
APPROVED l APR 5 -1990 .
BR AIDWOOD Snaretts Mvestag l O l l
I Page 46 of 62 l (0192Q/0018Q/011990) !
, _ . _ . _ _ - . _ . . - _ _ _ _ . . _ _ _ _ . _ . _ . . _ _ _ _ _ _ . _ _ . - _ _ . . _ ~ . . - _ - _ _ - . _ .
REY. 55 LOSS OF RH COOLING UNIT 1 IBWOA s PRl-10 STEP ACT!ON/ EXPECTED RE5;CN5E FEiFON5E NOT OBTmfiED ATTACHMENT _E_QAge_L of_il BLEED AND FEED USI!1G PZR FORV(3) AND JiORMALCHARGING_ _
3 YERIFY RCS_f.EED EAlli:
- a. Check pump status: a. M <ually start pumps.
- CENT CHG pumps - AT_12ASI OBE_RUFHING
- b. Chech ECCS valve alignment: b. lE a feed path can HOI be established,
- 1) RWST to CENT CHG pumpo THEN GO To enother suction valves - OEEH: ATTACHMENT for RCS cooling per TABLE A (page 8). l
- 1CV112D
- 1CV112E
- 2) VCT outlet isol valves - CLQSED:
- 1CV112B
+ 1CV112C
- 3) Charging line Cnmt isol valves - OPIll:
-
- 1CV8105
- 1CVS106
- 4) CENT CHG pumps to cold legs injection isol valves - CLQSID:
- 1SIBB01A
- 1 SIB 801B l
APPROVED APR 5 1990
.=:: =
1 O
Page 47 of 62 (0192Q/0018Q/011990)
REV. 55 LOSS OF RH COOLING UNIT 1 IBWOA PRl-10 ST[ ACTION / EXPECTED REE?ON5E PE EFONSE NOT OSTmhED AIIAC11MEHTl_Eage 4 OLil B LEE D_A!!D_IIE D_U S I NGJ'Z R _EORYI sl_Al'D lt0hCIIARG.IHG La ESlaBLISH RC13LEED_fAlli:
TilEH GO To another
- 1RY8000A ATTACHMENT for RCS cooling
- 1RY8000B per TABLE A (page 8). l
- b. C;cn both PZR PORVs:
- 1RY455A
- 1RY456 5 tialtlIAltLflCS HEAT REMOVAL:
- Operate CENT CHG pu ps as
- IE minimum flow required l necessary to mainta n minimum can HQI be obtained via normal charging, flow reguired FIGURE .Bw0Aas determined PRI-10-3 (page from
- 11) TilEN oper CENT CHG puaps to cold leg injection isol valves:
- AND -
- 1SI8801A
- 1 SIB 801B
- Control charging flow to l
maintain PZR level - GREATER THAN 47,
}l _
- a. Chech RCS temperature - a. Go TO another STABLE OR DE.CEEASIHG ATTACHMENT for RCS cooling per TABLE A (page B) . l APPROVED APR 5 1990
() __
4"SunY&
Page 48 of 62 (0192Q/0018Q/011990)
REV. S5 LOSS OF RH COOLING UNIT 1 IBWOA PRI-10 (s
(, -
STEP ACTION / EXPECTED REFON5E PEIFONSE NOT OST AifiED ATIACHMEltT_E_& age _5._of_51 :
BLEED AND FEED USING PZR PORV(S) AND l
_. Il0E!BL CILEGillG 1 r
7 TEMPTS __10J1ES10RE gN l
- a. II at anytime an RH train becomes available.
TH3n:
t/ Im:pediately align the RH train for RCS cooling per Bw0P RH-6, PLACING THE RH SYSTEM IN SHUTDOWN COOLING
- 2) Close both PZR PORV(s) 3
( 3) Return CV System lineup to (
normal per SE direction
- 4) RETURN TO IBw0A PRI-10, Step 7
- -E!D-t f
l APPROVED l
! APR5 1990 (9
V
((ldEE7w Page 49 of 62 ;
(0192Q/0018Q/011990) l
REV. 55 LOSS OF RH COOLING UNIT 1 IBWOA PRI-10 7_
STEP ACTION / EXPECTED REPuu5E PEIFONSE NOT OST AiNED ATIACHMEliT F Qage 1 of 4)
REEUEL_ CAVITY TO FULL POOL _C20LIliG
- n******************
- NOTE *
- This ATTACHMENT uses the Refueling *
- Water Purification pumps with *
- suction from the refueling cavity. *
- The pumps discharge to the Spent *
- Fuel Pool and the effluent is cooled *
- 'uy the FC trains. Cooler water from *
- the 5 tent Fuel Pit flows back to *
- the uavity. *
- v*************
1 CHECK REACTOR VESSEL _ HEAD _ REMOVED GO TO anot*'t ATf.^.0tIhENT for RCS cuo] '? per TABLE A i p +
.i .
2 CHECK SPENT FUELPQ0L C00 LING:
Ch
(_-) a. At least one cooling train a. Establis.. ..e 'ain of
- IN OPERATION FC coolits IE a train L... HQI be established, THEH GO T0 another ATTACHMENT for RCS coolin e
- per TABLE A (page 8). l 3 SIDE EEEUELING_ _ WATER PURIFLCAl108 kUMPSL
- a. LQCALLY STOP Refueling Water "
Purification pumps:
o 0A Pump (364' S12 CWA) o OB Pump (364' S12 CWA)
APPROVED APR 5 1990 EENEL%~
n U
Page 50 of 62 (0192Q/0018Q/031990)
REV. 55- LOSS-0F RH COOLING. UNIT 1 IBWOA !
- __ PRI-10 l p ,
V !
STEP ACTION / EXPECTED RESPON5E RE3FONSE NOT OBT AiNED f
i AIIAC M UT F fpage 2 of 4) [
EEEUEL CAVITY TO _ FUEldQQL COOLING (
i 4 REEUEL CAVITY TO FUEL P00L A_IG9MENIl l
- a. Check position of the following a. Open any closed component components: II all. components will HQI l open, '
- Fuel Pool Sluice Gate - QEEN T m GO To another -
- Transfer Canal Gate ATTACHMENT for RCS: cooling i valve 1FH001 - DEEH per TABLE A (page 8).
- Transfer Canal Flange - QPEH !
r 5
g A,l g g N g E g G WATEll REC RCULA" I s GlRE :UE _ CAVITY: i i
- a. Locally CLOSE the following i
..O valves:
V
- Unit-2 Refueling cavity Suction Valves-- CLOSED: !
- - 2FC009 (383' R26 P57) ;
2FC010 (383' CWA P57) .
- Unit-2 RWST Suction Isol +
valve - CLOSED: i
- - 2FC8758 (364' + 15' V23 CWA) i
- b. Unit-1 RWST Suction Isol valvn - CLOSED: !
- 1FC8758 (364' +-15' V13 CWA) c.. Unit-1 Refueling Cavity Suct !
valves - OPEN:
- 1FC009 (383' R7 P57)
- 1FC010 (383' CWA P57) APPROVED {
APR 5 1990 l Step continued.on next page gAgCO_O Page 51 of 62 .
(0192Q/0018Q/011990) ,
h
f
.h REV.-55 LOSS OF-RH' COOLING UNIT 1 1BWOA- !
-PRI-10 !
-STEP ACTION / EXPECTED RESPONSE PEIFONSE NOTROST AiNED i AIIACHMENT F (page 3 of 4) l REFUEL CAVITY TO FUEL POOL COOLING -;
. . I Step 5 (continue'd) :
l d, Cask Fill Isol viv - CLESED:
-t OFC001 (401' + 8' Y15 CWA) )
- e. Demin Inlet Isol Vivs - CLOSED:
- 1FC013 (401' Q17 Valve Aisle)
-2FC013 (401' Q19 Valve Aisle) !
i f 1 Spent Fuel Pit Inlet ]
- valve - QEEH:
-l *-LOFC002A (401' + 10' X15 CWA)
- g. OL Refueling Water Purification i
( Pump Suction Isol viv - OPEN: l l
- OFC003-(364' 512 CWA) 6 LOCA_LY S" ART-REFUE_IU3 }
'WAT E R PURL :ICATION 30 * )S: !
- OA Pump '(364' S12 CWA) }
- OB Pump (364' S12. CWA) ;
t 7- EVALUATE EF ECTIVENESS i
.0F C00LIN 3 1 ETHOD:
-a.. Check RCS-temperature - a GO To another I STABLE OR DECREASING -ATTACHMENT for RCS cooling per TABLE A-(page 8).
x- !
I i
APPROVED {
APR5 1990 i O .= =.: 4 i
i t
I Page 52 of 62 I
(0192Q/0018Q/011990) $
u ... cz. _ ,, __
1 REV. 55 LOSS OF RH COOLING UNIT 1 1Bw0A PRI-10 STEP ACTION / EXPECTED RES;ON5E PEIFONSE NOT ObT AiNED ATTACHMERT_11page_4._.oL4J REEUEL_CAV1TY TO JUEL_EQQL CQQLING
~
R
- a. II at anytime an RH train becomes available, THEN:
- 1) Immediately align the RH train for RCS cooling per Bw0P RH-6, PLACING THE RH SYSTEM IN SHUTDOWN COOLING
- 2) Return FC System lineup to normal per SE direction
- 3) RETURN TO 1Bw0A PRI-10, Step 7
- END -
APPROVED APR5 1990 Q .
Eb'E N Ew Page 53 of 62 (0192Q/0018Q/011990)
1 i,
~~
LOSS OF RH COOLING UNIT 1 IBWOA !
r REY. 55 PRI-10
(>j l I
STEP- ACTION / EXPECTED RESPON5E PE3FONSE NOT-OST AiNED
]
ATTACHMENT G (PAGE 1 of 4) [
SI PUMP HOT LEG INJECTION I
-***************************************** l
- liOIE
- r
- This ATTACHMENT uses an SI pump in
- l
- a hot' leg injection mode. It should *
- be-noted that a finite volume of * :!
- water exists'in the RWST, and'that
- i
- overspill from the RCS may be *
- . unavailable for injection. *
- www=*=****wA*AwwAa** j
- liDIE *
- Evacuate the Containment if any *
=!
- overspill is expected to occur.
- j
- w*******ww*n********* ;
() 1 CHECK RWST LEVEL: I
- a. RWSTilevel - GREATER THAN 6% a. GO TO another ATTACHMENT i for RCS cooling per )
TABLE A (page:8).
2 CHECK SI PUMPS: !
I
- a. SI-pump - AVAILABLE: a. Restore one-pump in a !
reasonable-period of time l14 or GO TO-another 'i o lA SI-Pump ATTACEMENT for RCS' cooling o 1B SI Pump _per TABLE A (page 8). l. ,
e
-3' VERIFY ECCS VALVE LINEUP:
e a./SI' pumps miniflow isolation 'I-valves - OPEN: }
- 1SI-8813 o 15I-8814_(lA SI Pp) o ISI-8920 (1B SI Pp) APPROVED APR 5 1990 l Step continued on next page e nsysw --
samowevo ,
i Page 54 of 62 i (0192Q/0018Q/011990) ,
v -,
1 I
LOSS OF RH COOLING UNIT 1 1Bw0A -'
REV. 55 , PRI-10 O
STEP ACTION / EXPECTED RE5?ON5E i PEiFON$E NOT OSTMED l
ATIAClil1ERI_G..lPAGI 2 of 41 SLEME,RQI_ LEG _IHJECTIDE Step 3 (continued)
- b. SI pumps suctior valves - DEIN:
- c. RCS Hot Leg injection valves -
QEEU:
o 1GI-3802A (lA SI Pp) o ISI-8802B (lB ST Pp)
- d. RCS Cold Leg injection valves -
CLQSID:
(
'--~)
- 151-88213
- <**w********************
liGTE
- Use the SI Pump Injection only ac *
- necessary to maintain Reactor Vessel
- l
- Level GREATER THAIL213_L6" and to 'i
- limit RCS average temperature so *
- that RWST level can be conserved * <
- and overspill from the RCS *
- minimized. *
- =************www***
4 S_ TART ONE SI PUMP 5 QNU~OR CNMT 20 REX ERSPILL CON)1T10i:
- a. At the first indication of any APPROV ED containment overspill -
EVACUATE CONTAINMENT APR5 1990
$ $ UvYw Page 55 of 62 (0192Q/0018Q/011990)
. - , ,_._ ___.._. _ _ _.._._ ._.__.._ _ _ > _ _ . , ~ .
- e. ,
j y
LOSS OF RH COOLING UNIT .1 ,
1BWOA .. l
/,.
c 1REVa 55 PRIwl0 !
. t :
l l-)
s, a;< \ ,
STEP ACTION / EXPECTED RE5 DON 5E - PTTFONSE NOT OLT AiNED
, .:~ ;
1 :
L ..
H ATIACf21EhT_G._ RAGE 3 .of_1). l
- l. SIJR1P HOT LEG 1NJECI1Qll j
=
6 tiORIIGLRWSI_LEXB.: 1 3
- a. VXEH RWST. EMPTY ALARM is LII ;
. . TEN stop the Turining SI pump- ;
and either use another ATTACFMZNT ;
or-make-up to RWST with a !
p bore,ted source ] .,
': 7- CHEC( IF SI FLOW' -;
~'
CAN BE STOPPE); j
.a. Check reactor vessel level: a. Do HQI stop SI
( flow. RETURN TO-
_o -RVLIS plenum. region-- Step 5 of this j '
GE ATIE THAN QR ATTACHMENT.
l.
EQUAL TO 37% !
I -OR-g:- 1 o ILI-RYO46,.RV HL LEVEL - l s
GE ATIB THAN OR_IQlIAL 1 -T0 393'6"= ,
-OR- :
I o 'Tygon hose GE ATER IRAN 393'6" ,
- b. Do HQI stop SI !
lb. Check RCS temperature -
SIABLE;OR DECE. EASING flow. RETURN TO !
Step-5 of this !
ATTACHMENT.
- c. Verify SI pumps miniflow t
irolation valves - DEEH: :
e- 1SI8813
- o 15I8814 (lA SI Pp) APPROVED :
o 15I8920 (1B SI Pp) t APR'5 1990 Step continued on next page
,,,, o, yo, _ _;
e nsmw 6 l
i
'Page 56 of 62 ,
~(0192Q/0018Q/011990) .;
i t
w ., ,. .. ._ ~_ _
~
LOS$ OF RH COOLING UNIT 1 1BWOA REY. 55 PRI-10 4
O _
ST r.P _
l ACTION / EXPECTED RE9?CNEE RE?FONSE NOT 06TyNED AIIACHliMT_Gl EAGE 4 of_O ELPUMP EQI_J,4GJ1LTIC.T1011 Step 7 (continued)
- d. Close the RCS hot leg injection valves:
= ISIE802A o ISI8802B e . Ve rif y SI putep HQI_ LEG e. Stop the running injection flow - RIQfEED SI pump.
8 TEMPTS _10 RESTORE QM}gf
- a. IE at anytime an RH train becomes available.
( HM:
- 1) Immediately align the RH train for RCS cooling per Bw0F PJI-6, PLACING THE RH SYSTEM IN SIPJTE0WN COOLING
- 3) RETURN TO 1Bw0A PRI-10, Step 7
- END -
APPROVED APR 5 1990 Q ll$AEL&*~
Page 57 of 62 (0192Q/0018Q/011990)
t v
LOSS-OF RH UNIT 1 - 1BWOA - j REY. 55 PRI-10 !
i(
STEP- l ACTION / EXPECTED RESPON5E REEFONSE NOT OST AiNED ATIACIDfEliT H (PAGE 1 of 3) :
ACCHHULATOR INJECTIOS l I
CAUTION l A rapid high pressure accumulator ;
injection may disarrange fuel ;
assemblies if the upper internals ;
are removed. !
~
CAUTION !
The minimum ambient temperature for t pressurization of the accumulator (s) i 1s 70*F.
(
) *****************************************
- N01I * !
- This ATTACHMENT utilizes accumulator * !
- injection to obtain RCS cooling.
- i i
- Accumulator injection should be used *
- only as necessary to' limit cavity
- p
- -spillover.
- t 1 CHECK ACCUMULATOR STATUS: --
6 a'. OneTaccumulator pressure - a. Attempt to restore
! - INDICATING ON SCATI accumulator (s) or-Go To :
another ATTACHMENT for RCS- ;
cooling per TABLE A l (Page 8). .
- b. One accumulator. level - b. Attempt.to restore INDICATING ON SCATI accumulator (s) or:GO To-another ATTACEMENT for RCS i cooling per TABLE A .
l (page 8),
l-L !
j
-(~ APPROVED ADDC .
1000 samowuvo amens av== ;
! Page 58 of 62 (0192Q/0018Q/011990) l
LOSS OF RH UNIT 1 1Bw0A n REV. 55 PRI-10 V _- -
- -- 1 STEP CT10.uEXPECTED RESPON5E PE?FONSE NOT 06T AiNED I l
MTACH11MT R (PAGE 2 of 3) !
SC&lDWiATOL1UJLC11D11 2 EVA _UATEJEEU E . VITY LEVil FOR OVEb )
- a. Refuel cavity level low a. Lower refuel cavity level enough to accept contents per Bw0P RE-4 FINAL DRAIN of accumulator without OF REFUEL CAVITY, TRANSFER overspill CANAL AND UPENDER AREAS.
3 g g {UMULATOR DIS (HARGE VALVES
- a. At associated MCC Energize accumulator discharge valves:
(q j
- 1SI8808C (MCC 132X2A Cub A2)
- 1SI8808D (MCC 131X2A Cub A2) 4 INJECT ACCUMULATOR:
, teraperatures - GREATER THAN OR EUAL TO 140'F
- b. Inject one accumulator by b. II all accumulators manually opening its discharge injected isolation valve: IHFJi GO TO another j
ATTACHMENT for RCS cooling
- o ISI8808A per TABLE A (page 8). ,
l o 1SI8808B o 1SI8808C o 1SI88030 1
APPROVED APR 5 1990
~S $7#sw (b
Page 59 of 62 (0192Q/0018Q/011990)
LOSS OF Ril UNIT'.1 IBWOA REV. 55- PRI-10 O
STEP- ACTION / EXPECTED RESPON5E REIFONSE NOT OBTA!NED I
ATTACHMENT _R_(PAGE 3 of 3_)
/(C.CUMULAIQH_INJECTIOli Y H a.--At first indication of any overspill - EYACUATE_C.011TAIEMENT 6 EVALUATE lEF::CTIVENESS OF C00LIN 3 i ETHOD:
~
l o lLI-RYO46'RV HL LEVEL -
GREATER THAN OR EOUAL TO f 393'6" l- .o -Tygon hose - GREATER THAN QR EOUAL TO 393 ' 6_'_'
- 7. CON"I$JE eTTEM 3"S TO RES"O tER -
CO0 iNG:
a, II at. anytime an RH-train becomes-available,-
THEH: ,
- 1) Immediately align 1.he RH k train -f or~ RCS cool: ng using i c Bw0P RH-6, PLACING THE RH !
SYSTEM IN SHUTDOWN COOLING !
-i
- 2) Return SI accumualtors to APPROVED i normal lineup _per SE direction i APR.5 1990 i l; 3) RETURN TO 1BwoA PRI-10, Step 7 ,,, !
! . mens nav=w ;
- END - !
l 'l l
Page 60 of 62 l
.(0192Q/0018Q/011990) ;
.. . -.i
4 LOSS OF RH COOLING UNIT 1 IBw0A .
7_s REV. 55 ,
PRI-10 ,
( l x_/
STEP ACTION /EMPECTED RES;0N5E PE3FONS6 NOT 00T A#NED ATTACIIMEllT_1_QAGE 1 of 2) ,
IWST_GRAYlTY FEED 1 CHECK RRSI_LEYEL:
- a. RWST level - ANY INDICAIED a. GO TO another ATTACHMENT ,
LEYEL for RCS cooling per TABLE A (page 8).
2 ESTABLISH FILL PATH FROM RWSI:
- a. Verify containment sump ,
outlet isol vivs - CLQSED:
- 1SI8811A
- 1SI8811B
- b. Verify RH pump suct from hot
,-s leg isol vivs - CLQSED: ,
U o 1RH8701A and B o 1RH8702A and E
- c. Verify RH pump dsch viva -
QEEH:
o 1RH8724A
- o 1RH8724B
- d. Verify RH EX Flow control vivs - QEEH:
o 1RH606 o 1RH607
- e. Verify RE Pp 1A/B Mini-Flow ,
vivs - QEEH:
o 1RH610 o 1RH611 APPROVED >
APR 5 1990 Step continued on next page ,auo ,ooo em+ns ===
Page 61 of 62 (0192Q/0018Q/011990)
t LOSS OF RH COOLING UNIT 1 IBWOA REV, 55 9 PRI-10 STEP- ACTION /ERCTED RESPON5E REiFONSE NOT OST AiNED AITACHMEliT I (PAGE 2 of 21 RWST GFAVITY FEED Step 2 (continued)
- f. Verify RH Ex Dsch.Line [
Dwst Isol Vivs - DEEN: {
o ISIB809A I o- ISIB809B
- g. Verify RH pump Suct from RWST '
Isol-.Vivs .DIEN: j o ISI8812A- +
o 1SI8812B [
3- :
EgATEEFFECTIVENESSOFCOOLING O :
- a. Chech RCS level - INCREASIliG a. GO T0 another ATTACHMENT i
i for RCS cooling per l TABLE A (page-8). !
I 4 -CONTINIJE ATTEMPTS TO RESTORE i RH C00 _IN3:
a.=II at anytime an RH train becomes , !
available, j IHEH: t
- 1) Immediately align the RH train- ;
for RCS cooling per Bw0P RH-6, PLACING THE RH SYSTEM IN f SHUTDOWN COOLING- '{
2)-Return CV/SI systems co normal
-lineup per SE direction
. APPROVED f
- 3) RN'TO 1Bw0A PRI-10, APR 5 - 1990-l
-END-
)