ML20238B099

From kanterella
Revision as of 01:26, 24 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Amend 85 to License DPR-54,revising Tech Specs to Include Fire Protection Components in Auxiliary,Turbine & Nuclear Svc Electrical Bldgs & Clarifing Requirements on Fire Barriers
ML20238B099
Person / Time
Site: Rancho Seco
Issue date: 08/27/1987
From: Knighton G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20238B046 List:
References
NUDOCS 8709090528
Download: ML20238B099 (25)


Text

_ _ - _ _ _ _ _ _ _ - - - _ - _ - _ _ _ - _ - - _ - - - - - - . _ - - - - -

m *

~

UNITED STATES 8 NUCLEAR REGULATORY COMMISSION

$ WASHINGTON, D. C. 20666 g

SACRAMENTO f10NICIPAL UTILITY DIGTRICT DOCKET NO. 50-312 RANCHO SECO NUCLEAR GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE k

l Amendment No. 85

( License No. DPR-54 I

1. The Nuclear Regulatory Comission (the Comission) has found that:

1 A. The application for amendment by Sacramento Municipal Utility i District (the licensee) dated August 1, 1985 as supplemented, '

November 25, 1985, February 20, 1986, and December 26, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter It' B.- The facility will operate in conformity with the application, the' provisions of trie Act, and the regulations of the Comission; C. There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance 6 ith the Comission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

8709090529 070027 -

DR ADDCK0500g2 -

u... . . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ' ^ - - - " - - - - - - - ^ ^ ~ - - - ^ ^ ^ ~ ^ ~ ~ ~ ~ '

G.1

  • r F

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-54 is hereby amended to read as follows:

Tachnical Specifications The Technical Specifications contained in Appendices A and P as revised through Amendment No. 84 are hereby 2

incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION j/ ,

George . Knighto Director Projec' Directorate'V Division of Reactor Projects - III, IV, V Special Projects

Attachment:

) Changes to'the Technical Specifications Date of Issuance: August 27, 1987.

e

g, :  :... .

August'27, 1987.

{

^

m. .

a.

y ATTACHMENTTOLICENSEAMENDMENTN0h: 85's s- '

, 4 .

,, [:qr- ,

. FACILITY OPERATING LICENSE WO. DPR-54 DOCKET NO. 50-312 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages as indicated. The revised pages are identified by Amendment number tai contain vertical lines indicating the area of change.

t a

Remove Insert-

' iv iv lx ix  ;

3-53 3-53 3-54 3-54 I. 3-55 3-55 3-55a 3-55a 3-55b 3-55c 3-56 3-56 3-56a 3-56b 3-56c.

3-56d 3-56e 3-57 57-

) 3-57a 3-57a 3-57b 3-58 3-58 59 3-59 .

4-62 4-62 6-0.2 f 6-12f 6-12g f

i i

. 4 1

~. I 1

' 16 j$: '

!c A ne! MD. .

f ry s 44;-

)

+

. -- ,. < _!, i .

mai; s l m_ G_:_ _ _ _ __:_E _ __ ._ :_ 1 _. - - - S- ' ~* *

. *'i,.

~

RANCHO SECO UNIT 1

, TECHNICAL SPECIFICATIONS TABLE OF CONTENTS (Continued)'

Section P,ag a

3.14.5 Fire Hose Stations l 3-56a 3.14.6 Fire Rated Assemblies 3-58

]

3.15 RADI0 ACTIVE LIQUID EFFLUENT INSTRUMENTATION 3-60 3.16 RADI0 ACTIVE GASEOUS EFFLUENT MONITORING' INSTRUMENTATION 3-63 3.17 LIQUID EFFLUENTS 3-70 3.17.1 Concentration 3-70 3.17.2 Dos e_e 3-71 +

l

]

3.17.3 Liquid Holdus, Tanks 3-72 3.18 GASEOUS EFFLUENTS 3-73 i 1.18.1 Dose Rate 3-73 3.18.2 Noble Gases 3-74 3.18.3 Iodine-131. Tritium and Radionuclides in Particulate Form 3-75 b 3.19 GASEOUS RADWASTE TREATMENT 3-78 3.20 GAS STORAGE TANKS 3-79 3.21 1

_ SOLID RADI0 ACTIVE WASTES 3.-80 j

. 3.22 RADIOLOGICAL ENVIRONMENTAL MONITORING 3-81 l 3.23 LAND USE CENSUS 3-87 3.24 EXPLOSIVE GAS MIXTURE 3-89 3.25 FUEL CYCLE DOSE 3-90 3,2fi INTERLABORATORY COMPARISON PROGRAM 3-92

. 1 iv l

l um _ - - - - - mm s

n

)

n g .,

RANCHO SECO UNIT 1-TECHNICAL SPECIFICATIONS

, LIST OF TABLES.

Table Page 2.3-1 REACTOR PROTECTION SYSTEM TRIP SETTING LINITS 2.-9 3.5.1-1 INSTRUMENTS OPEPATING CONDITIONS 3-27' .i 3.6 SAFETY FEATURES' CONTAINMENT ISOLATION VALVES 3 3.7-1 VOLTAGE PROTECTION SYSTEM RELAY TRIP VALUES 3-41a 3.7-2' -VOLTAGE PROTECTION SYSTEM LIMITING CONDITIONS 3-41b 3.14-1 FIRE DETECTION INSTRUMENTS FOR SAFETY SYSTEMS '3-55 7 3.14-2 WATER SUPPRESSION ZONES 3-56b,c L

g 3.14-3 CARBON DIOXIDE SUPPRESSION ZONES- 3-56d,e f

3.14-4 FIRE HOSE' STATIONS 3-57a,b  :

3.15-1 .RADI0 ACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION 3-61 i'

3.16-1 RADI0 ACTIVE GASES EFFLUENT MONITORING INSTRUMENTATION 3-64 3.22-1 -RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM 3-83 3.22-2 REPORTING LEVELS FOR RADI0 ACTIVITY CONCENTRATIONS 3-65 IN ENVIRONMENTAL SAM *LES 4.1-1 INSTRUMENT SURVEILLANCE REQUIREMENTS 4-3 4.1-2' NINIMUM EQUIPMENT 1EST FREQUENCY . 4-8 4.1 MINIMUM SAMPLING FREQUENCY 4-9 4.2-1 CAPSULE ASSEMBLY WITHDRAWAL SCHEDULE A7 OAVIS-BESSE 1 4-12b 4.14-1

. , SNUBBERS ACCESSIBLE DURING POWER OPERATIONS 4-47c 4.17 MINIMUM NUMBER OF STEAM GENERATORS TO BE 4-56 INSPECTED DURING INSERVICE INSPECTION 4.17-2A STEAM GENERATOR TUBE INSPECTION 4-57 4.17-2P STEAM GENERATOR TU8E ' INSPECTION (SPECIF!f, LIMITED AREA) 4-57a 4.17-3 OTSG AUXILIARY FEEDWATER HEADER SURVEILLANCE 4-57b, 4-5'-

4.19-1 RADIOACTIVE LIQUID EFFLliENT MONITORING INSTRUMENTATION 4-64 SURVEILLANCE REQUIREMENTS 4.20-1 RADI0 ACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 4-66 SURVEILLANCE REQUIREMENTS j

_ . . ,;fx' j n ., .~ wa wa -

, . 1 A RANCHO SECO UNIT 1

[- TECHNICAL SPECIFICATIONS.

i Limiting! Conditions'fori Op ~eration i

'3.14- FIRE SUPPRESSION 3.14.1 INSTRUMENTATION SPECIFICATION 3.14.1.1 r!re detection zones shown in Table 3.14-1 shall have all derection instrumentation OPERABLE.

e 3.14.1.2 With any instrumentation NOT OPERABLE in the zones shown -in Table 3.14-1:

a.-Within11 hour establish-a fire watch patrol to inspect zone (s) with the inoperable instrunent(s) at least once per hour, unless the instrument (s) is loceted inside the 4' containment, then inspect.the containment at least or.ca per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor the containment air temperature at least once per hour at the points below:

TE-52009 Reactor Building Cooling Units A & B Air In TE-52010' Reactor Building Cooling Units C & D Air In TE-53406 Top of Reactor-Shielding TE-53405 Top of Reactor Shielding y .TE-53202 Top of Reactor Building h' b. Restore the-inoperable instrument (s)'--to OPERABLE status within fourteen (14) days; or' .

c. In lieu of any other report required by specification 6.9, prepare and submit a special report to the commis-
  • sion pursuant to specification 6.9.5.E within the next 30 days outlining the action taken,-the cause of the inoperability and the plans and schedule for restoring the instrument (s) to OPERADLE status.  !

3.14.2 Water System i specification 3.14.2.1 The fire suppression water system shall be OPERABLE with:

a. Two high-pressure pumps with a capacity of 2000 gal / min with their discharge aligned to the fire suppression header.
b. Two separate water supplies containing'a minimum of 2,000,000- gallons each.

u 3-53 -

'7 Amendment'No. )(g 85 g

-]

ma - m = - .

m

n;

,a g"(- m a P RANCHO SEC0' UNIT 1.~

W TECHNICAL SPECIFICATIONS .. ..

L101 ting Conditions for Operation .3 3.14.2.1 (Continued) l

c. An CFERABLE flow path capable of taking suction from the circulating wa'ar system and the $1te Reservoir or the Folsom South Canal and transferring the water through. distribution piping with OPERA 8LE sectionalizing Wntrol 4r isolation valves to the yard hydrant curb valves', the last valve ahead of the water flow alars device on each sprinkler or hose standpipe, and the last valve ahead of the deluge valve on ,

each deluge or spray system required to be OPERABLE per Specifications 3.14.3.1 and 3.14.5. l 3.14.2.2 With one pump and/or one water supply inoperable, restore the r, - inoperable equipment to OPERABLE status within 7 days or, in lieu of any other report required by Specification 6.g. prepare and submit a Special Report to the Commission pursuant to Specification 6.g.5.E within the next 30 days outlining the plans and grocedures to be used to restore the inoperable equipment ~ to OPERABLE status or to provide an alternate backup pump of supply.

3.14.2.3 With no fire suppression water system 0PERABLE:

a. Establish a backup fire suppression water system equivalent 7

to Specification 3.14.2.1 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.. ,

b. In Iteu of any other report required tty Specification 6.g.

submit a Special Report in accordance with Specification '

6.g.5.E:

1) By telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
2) Confimed by telegraph, mailgram of facsimile transmission no later than the first working day following the event, and
c. In writing within 14 days following the event, outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to GPERA8LE status.

1

d. If a. above cannot be fulfilled, place the reactor in Hot l Standby within the next six (6) hours and cold shutdown I within the following thirty (30) hours.

1 l

. 1 l

l 3-54 l l

Amendment No. M M 85 l

. .  ?

i________.___.__.____ _.m.'., _. * -.t- m.m. 1 *

.. I b RANCHO SECO UNIT 1 '

L TECHNICAL SPECIFICATIONS I Limiting conditions for Operation TABLE 3.14-1

~ FIRE DETECTION INSTRUMENTS FOR SAFETY SYSTEMS

. Detection .

Number of detectors in zones-

. Zone- Instrument Locati>n All Required to be OPERABLE Heat Flame Smoke

-4 control and computer Room Cabinets 0 0 48 5 South East' Uncontaminated Area - 0 0 3 Turbine Deck, Auxiliary Building 7 Contaminated Area - Turbine Deck, 0 0 3 Auxiliary Building a .

0 West Battery Room - Mezzanine Level, 11 0 0 8 Auxiliary Building 12 Erst Battery Charger Room - 0 0 4 Mezzanine Level, Auxiliary Building 13- West 480V switchgear~ Room - 0 0' 4 Mezzanine Level, Auxiliary Building 14 West cable shaft - Auxiliary Building 0 0 6

. .15. East cabin shaft - Auxiliary Building 0 -0 6

~

y 16 East-480V switchgear Room - 0 0. 4 Mezzanine Level, Auxiliary Building 17 East Battery Charger Room - 0 0 4 Mezzanine Level, Aux'iliary Building 19 Communication Room - Mezzanine 0 0 8 Level, Auxiliary Building 20 Electrical Penetration Room - 0 0' 21 Mezzanine Level, Auxiliary Building 21 Reactor Building, 20 feet to 40 feet 0 0 3 Level 3-55 Amendment No. g g 85

_..............a . . . 6  :- -- - , -

r 1

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting conditions for Operation l

TABLE 3.14-1 l FIRE DETECTION INSTRUMENTS FOR SAFETY SYSTEMS (Continued)

Detection Number of detectors in zones-Zone Instrument Location All Required to be OPERABLE  !

Heat Flame Smoke i 31 Auxiliary Lube oil Area - 6 0 0 Grade Level, Turbine Building 32 Main Lube oil - 8 0 0 Grade Level, Turbine Building ,

33 Hydrogen Sealed 011 Unit - 4 0 0

' Grade Level, Turbine Building 35 Main Feed Pump Area 16 0 0 36 West Nuclear Battery Room - 0 0 8 Grade Level, Auxiliary Building 37 West 4160V Switchgear Room - 0 0 4 Grade Level, Auxiliary Building 38 East 4160V Switchgear Room - 0 0 4 Grade Level, Auxiliary Building 39 East Nuclear Battery Room - 0 0 8 Grade Level, Auxiliary Building -

40 North Diesel Generator Room - 4 0 0 Grade Level, Auxiliary Building

. 41 South Diesel Generator Room - 4 0 0 Grade Level, Auxiliary Building 42 Electrical Penetration Room - 0 0 19 Grade Level, Auxiliary Building 43 chemical Mix Area - 0 'O 7 Grade Level, Auxiliary Building 3-55a ,

Amendmen t No. 4fri 85

$e .

RANCHO SECO UNIT 1.

l TECHNICAL SPECIFICATIONS

~

Limiting Conditions for Operation

. TABLE 3.14-1 FIRE DETECTION INSTRUMENTS FOR SAFETY SYSTEMS (Continued)

Detection Number of detectors in sone-Zone' Instrument Location All required to be OPERABLE Beat Flame Smoke

.44' Reactor _ Building, 0 feet to 20 feet 0 4 0 Level -

E 45 Electrical Penetration Area - 0 0. 4

, Reactor Building j p 46 Hut Area - Basement Level, 0 0 25 e ' Auxiliary Building 47 ' Pipe Penetration Area - Basement

- 0 0 18 Level, Auxiliary Building

/ 48 Decay Heat Room - Auxiliary Building 0 0 3 53-54 Turbine Area 8 0 0

. 75 NSEB'Switchgear Room B 4 0 4 7

.. ' ~ , - 76 NSEB Switchgear Room A 4 0 4 77 NSEB B Electrical Equipment 2 0, 3 78 NSEB A Electrical Equipment 2 0 3.

79 NSEB Battery GB 1 0 1

~

80 NSEB Battery GA 1 0 1 81 NSEB B Cable Shaft- 0 0 6 42 NSEB A Cable Shaft 0 0 6 83 NSEB Corridor, 1 foot Level 0 0 2 84 NSEB Corridor, 21 feet Level 0 - C 4 85' NSEB Corridor, 40 feet Level 0 0 6 3-55b -

t

. Amendment No.'85.-

F. .

.. 4 RANCHO SEC0 UNIT 1 .

TECHNICAL SPECIFICATIONS Limiting Conditions for. Operation - 1 TABLE 3.14-1 FIRE DETECTION INSTRUMENTS FOR SAFETY SYSTEMS (Continued)

Detection Number of detectors in zones-Zone Instrument Location All Required to be OPERABLE Heat Flame Smoke 87' NSEB Computer Room B 0 0 5 i

n 89 NSEB Computer Room A 0 0 5 104- -Technical Support Ct.nter 0 0 15 109- Chemical Lab Area - 0 0' 19 e ,

Auxiliary Building 110 Auxiliary Feedwater Pump Area 0 4 0

/

9 3-55c Amendment No. 85 a__.._-- - -- --. _-. -.14 -

i

4 g

RANCH 0'SECO UNIT 1 L  :

TECHNICAL SPECIFICATIONS Limiting conditions,for operation 3.14.3 Spray and sprinkler systems specification 3.14.3.1 The spray and/or sprinkler systems for each suppression zone shown in Table 3.14-2 shall be OPERABLE.

L 3.14.3.2 With.one or more of the required spray and/or sprinkler systems-inoperable, within one hour establish a continuous fire watch with backup fire suppression equipment for those areas protected by inoperable sprinkler and/or spray sys-tem (s) in which redundant systems or components required to safely. shut down and cool down the plant could be damaged; p ' for other areas, protected by inoperable. sprinkler and/or i

spray. system (s) establish an hourly fire watch patrol. Re- I store the system to OPERABLE status within 14 days or, in lieu of any other report required by specification 6.9, prepare and submit a special Report to the Commission pur-suant to specification 6.9.5.E. within the next 30 days outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to CPERABLE status.

7 3.14'.4 CO2 System Specification ~

3.14.4.1 The co2 systems for each suppression sene shown in

  • Table

~ 3.14-3 shall be OPERABLE with a minimum capacity of 66% and a minimum pressure of 275 psig in the storage tank.

3.14.4.2 With one or more of the required co2 systems inoperable, within one hour establish a continuous fire watch with backup fire suppression equipment for those areas protected by inoperable C02 system (s) in which redundant systems or components required to safely shut down and cool the plant could be damaged; for other areas protected by inoperable  !

co2 system (s) establish an hourly fire watch patrol. Restore 1 the system to CPERABLE status within 14 days or, in lieu of any other report required by Specification 6.9 prepare and i j

submit.a Special Report to the Commission pursu, ant to Speci- 1 fication 6.9.5.E within the next 30 days outlining the action taken, the cause of the inoperability.and the pl,ans and schedule for restoring the system to CPERABLE status. j 3-56 l 1

Amendment No. ,RG ,4 g 85 I u' - ,

r, . f}_ . . , __ o- *

..' ' ~

- i

-i

,y' -

g ..

RANCHO SECO UNIT 1 '

ti TECHNICAL SPECIFICATIONS y

~

Limiting conditions for Operation c ,3.14.5 Fire Hose Stations -

specification

-3.14.5.1 The fire hose stations listed in Table 3.14-4 shall be OPERABLE. '

3.14.5.2 with one or.more of the fire hose stations above inoperable,

. routs.an additional equivalent size fire hose to the unpro-tected area (s) from an OPERABLE hose str. tion within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> if the inoperable fire hose is the prinary means of fire suppressions otherwise, route the additional hose within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore the fire hose station to OPERABLE status within.14 days or, in lieu of any other report required by L specification 6.9, prepara and submit a special Report to F. -

the commission pursuant to specification 6.9.5.5 within the next 30 days outlining the action taken, the cause of the inoperability,'and plans and schedule for restoring the {

station to OPERABLE status.

, ]

) i l

I i

l l

3-56a 7

Amendment No. 85

[> '

y }. .

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation Table 3.14-2 WATER SUPPRESSION ZONES ZONES AREAS 3 Control Room - Turbine Deck, Aux 111aty Building ,,

5 South East Uncontaminated Area - ju.rbine Deck, Auxiliary Building 6 North West Uncontaminated Area - Turbine Deck, Auxiliary Building 7 Contaminated Area - Turbine Deck, Auxiliary B"ilding 10 Mezzanine Level - Turbine Building 18 Air condition Equip,it7t Room - Mezzanine Level, Auxiliary Building 19 Communication Room - Mezzanine Level, Auxiliary Building 20 Electrical Penetration Room - Mazzartine Level, Auxiliary Building 31 Auxiliary Lube Oil Area - Grade Level, Turbine Building 32 Main Lube 011 - Grade Level, Turbine Building l 33 Rydrogen Seal Oil Unit 34 Heater Water Pump Area - Grade Level, Turbine Building 35 Main Feed Pump Area 40 North Diesel Generator Room - Grade Level, Auxiliary i Building 1 1

6 3-56b Amendment No. 85 1

= - - _ - _ _ ._. _

l p

p:

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS i limiting Conditions for Operation '

Table 3.14-2 WATER SUPPRESSION ZONES (Continued) l ZONES AREAS 41 South Diesel Generator Room - Grade Level, Auxiliary Sullding 42 Electrical Penetration Room, Grade Level Auxiliary Building

} 43 Chemical Mix Area - Grade Level Auxiliaty Building 46 Hut Area - Basement Level, Auxiliary Buf1 ding 47 Pipe Penetration Area - Basement Level, Auxiliary Building 81 NSEB B Cable Shaft 82 NSE8 A Cable Shaft ,

83 NSEB Corridor,1 foot Level 84 ,

NSE8 Corridor, 21 feet Level 85 NSEB Corridor, 40 feet Level

  • 87 NSE8 Computer Room B 89 NSEB Computer Room A

{

104 Technical Support Center, 40 feet level of Aux. Bldg.

110 Auxiliary Feedwater Pump Area i

3-56c l Amendment.No. 85 1

k' RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation Table 3.14-3 CARBON DIOXIDE SUPPRESSION ZONES i

ZONES AREAS 11 West Battery Room - Me Ianine Level, Auxiliary B,ut1 ding 12 West Battery Charger Room - Mezzapi.ne Levci, A'uxiliary Building .

13 West 480V Switchgear Room - Hezzanine Level., Auxiliary Building 14 West Cable Shaft - Auxiliaty Building ,

15 East Cable Shaft - Auxiliary Building 16 East 480V Switchgear Room - Mezzanine Level, Auxiliary Building 17 East Battery Charger Room - Mezzanine Level, Auxiliary Building 19 Communication Room - Mezzanine Level, Auxiliary Building 36 West Nuclear Battery Room - Grade Level, Auxiliary Building 37 West 4160 V Switchgear Room - Grade Level, Auxiliary Building 38 East 4160 V Switchgear Room - Grade Level, Auxiliary i Building 39 East Nuclear Battery Room - Grade Level, Auxiliary .

Building  !

40 North Diesel Generator Room - Grade Level, Auxiliary Building 3-56d Amendment No. 85 w=- _=_.

5- RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation Table 3.14-3 CARBON DIOXIDE SUPPRESSION ZONES, Continued ZONES AREAS 41 South Diesel Generator Room - Grade Level, Auxiliary Building

53-54 Turbine Area l 75 NSEB Switchgear Room B ,

76 NSEB Switchgear Room A ,

77 NSEB B Electrical Equipment -

l 78 NSEB A Electrical Equipment 79 NSEB Battery GB 80 NSEB Battery GA 3-56e Amendment No. 85

)

J

g'

  • RANCHO SECO UNIT 1 -

i;e TECHNICAL SPECIFICATIONS

h. Limiting Conditions for Operation Teble 3.14-4 FIRE HOSE STATIONS ID No. Location

,I- Auxiliary Building Hose Stations FPHS-A-001 +40 ft. Level Corridor by Counting Room f""::::'  ::: ::: ::::::::::'^;'::: m :::'l:::"'"-

FPHS-A-004 +40 ft. Level Corridor by Cleaning Room j

+20 ft. Level in Ventilation Equipment Room FJHS-A-005 FPHS-A-006 +20 ft. Level Corridor by Communications Room I FPHS-A-007 Grade Level by CRD Cooling Water Heat Exchanger

-FPHS-A-008- +20 ft. Level Corridor by Ventilation Equipment Room FPHS-A-009 +20 ft. Level Corridor by A/C Equipment Room FPHS-A:010 Grade Level Corridor by Diesel Generator Room FPHS-A-011 Grade Level Corridor Across from East 4160 Switchgear Rm l FPES-A-012 Grade Level Corridor Across from East Battery Room FPHS-A-013 Grade Level Corridor by East End Stairwell FPHS-A-014 Grade Level by Waste Solidification Area FPHS-A-015 -20 ft. Level HPI Pump A Room FPHS-A-016 -20 ft. Level Containment Penetration Valve Area FPHS-A-017 -20 ft. Level Corridor by Waste Gas Decay Tank Room 3-57 Amendment No. 85

  • m

{ .

W <-

RANCHO SECO UNIT l- ".

p, .TECHNICALLSPECIFICATIONS  :

,$ Limiting' Conditions for Operation # i n.

Table 3.14-4. -

l FIRE HOSE STATIONS'(Continued)

'ID-No. , Location p.,

T 'FPHS-A-018 -20'ft. Level Corridor North of BA Evaporator Room FPHS-A-019 -47 ft. Level Stairkay by Sast and West DHR' Pump Rooms.

, FPHS-A-020- -20.ft. Level Corridor East of HPI Pump B Room

. i 1

!fT II NSEB Hose Stations FPHS-N-001 NSEB First Floor Corridor North' FPHS-N-002' NSEB First Floor Corridor South i 1FPHS-N-003 NSEB Second Floor Corridor North FFHS-N-004 NSEB.Second Floor Corridor South

)

p FPHS-N-005. NSEB Third Floor Corridor North FPHS-N-006 NSEB Third Floor Corrider South -l t

III Turbine. Building Mose Stations -

l FPHS-T-001 ' 1 Station North Wall Elevation O' FPHS-T-002 1 Station South Wall Elevation O' FPHS-T-003) 2 Stations East Wall Elevation O' 3 FPHS-T-004) 1 FPHS-T-005) 2 Stations West Wall Elevation O' FPHS-T-006)

FPHS-T-007 1 Station North Wall Elevation 20' FFHS-T-008- 1 Station South Wall Elevation 20'-

3-57a -

Amendment No. 85 a

b n

h RANCHO SECO UNIT 1 b .

TECHNICAL' SPECIFICATIONS

Limiting Conditions for Operation Table 3.14-4 i FIRE HOSE STATIONS j ID No. Location a

'FPHS-T-009) 2 Stations Ea.st Wall Elevation 20' FPHS-T-010)  !

'FPHS-T-011) 2 Stations West Wall Elevation 20' f t

FPHS-T-012)

, .FPHS-T-013 1 Station: North Wall Elevation 40' fb FPHS-T-014 1 Station South Wall Elevation 40' FPHS-T-015) 2 Stations East Wall Elevation 40' FPHS-T-016)

, FFHS-T-017) 2 Stations West Wall Elevation 40' FPHS-T-018)

IV/ Hydrants

> FHV-002 Hydrant No. 2

'FNV-003 Hydrant No. 3 FHV-024' Hydrant No. 24 FHV-026 Hydrant No. 26 1

I l

l H

i 3-57b l l

Miendrrent No. 85 j I

5 w }

I k . no RANCHO SECO UNIT 1.

S TECHNICAL SPECIFICATIONS P , i y

Limiting conditions for Operation.

3.14.6 Fire Rated Assemblies .

Specification 3.14.6.1 All~ fire rated assemblies (walls, floor / ceilings, cable P" tray enclosures and other fire barriers) separating safety-related fire arean or separating portions of redundant sys- i M tems important to safe shutdown within a fire area and all 3 ' sealing devices in fire. rated assembly ~(fire doors, fire  !

  • windows, fire dampers, cable, piping, and ventilation duct penetration seals) shall be OPERABLE.

3.14.6.2 With one or more of.the above required fire rated' assemblies L

and/or sealing devices inoperable, within one hour either Y' establish a continuous fire watch on at least one side of the affec.ted. assembly, or verify the OPERABILITY of fire detectors on at least one side of the inoperable assembly and establish an hourly fire watch patrol. Restore the (

inoperable fire rated assembly and sealing device to OPERABLE within 7 days or, in lieu of any other reports re-

./ quired by Specification 6.9, prepare and submit a Special -

Report to the Commission pursuant to Specification 6.9.5.E within the next 30 days outlining the action.taken, the cause of the inoperable fire rated assembly and/or sealing device and plans and schedulu for restoring the fire

) ' assembly and sealing device to OPERABLE status.

Bases OPERABILITY of all fire detection instrumentation ensures that adequate

' warning capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early etogrs. Prompt detection of fires will reduce the potential for damage tu ecfety-related equipment or redundant systems important to safe shut-down and is an integral element in the overall facility fire protection program.

In the event that a portion of the fire detection instrumentation is intperable, the establishment of frequent fire patrols in the affected crocs is required to provide detection capability until the inoperable instrumentation is returned to service.

j 3-58 .

l Amendment No. 85 w:-_____- _. - - _ _ _ - -

RANCHO SECO UNIT 1 '

TECHNICAL SPECIFICATIONS L,

Limited Conditions for Operation:

Bases?(Continued) .

'Tha OPERABILITY of the fire suppression systems ensures that adequate '

fira suppression capability is-available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment

~cr redundant systems important to safe shutdown is located. The fire suppression system consists of the water. system, spray and/or rprinklers, f.C32,andfirehosestations. The collective capability of the fire

. suppression systems is adequate to minimize potential damage to safety rolcted equipment or redundant systems important to safe shutdown and is

.o major element in the facility fire protection program.

>In the event that portions of the fire suppression systems are inoper-

~

ablo,-alternate backup fire fighting equipment is required to be made

! cvailable in the affected arec' until the affected equipment can be

.rdstored to. service.

'Inlthe event that the fire suppression water system becomes, inoperable, immsdiate' corrective measures,must be taken since this system provides ths: major fire suppression capability.of the plant. The requirement for

-def"""C'r'^"T"li257 RrgiggC,ognissi6t:r:E3EJCt*

cvalnatlonofthe~accepta25lIyofthecorrectivemeasurestoprovide cd3quate. fire suppression capability for the continued protection of the nuclear plant.

D LTh3 operable integrity of the fire rated assemblies ensures that fires-will be confined or adequately retarded from spreading to adjacent

. portions of the facility. This design feature minimizes the possibility of a' single fire rapidly involving several areas of the facility prior to datoction and extinguishment. The fire rated assemblies are a passive alcment in the facility fire protection program and are subject to l periodic inspections. During periods of time when the fire rated esssmblies are' inoperable, an hourly or continuous fire watch, as appropriate, is required to be' maintained in the vicinity of the affected ess:mbly.until the assembly is restored to operabic status.

3-59 ,

kiendment No. 85 D

7 '

b ,

. g' 1; k"' RANCHO SECO UNIT 1 *

$ TECHNICAL. SPECIFICATIONS- . _

4 -

- Surveillance Standards ,

li. . a.- Once per 31 days by visual inspection of the-station to' >

. ,  ; assure all equipment is available at the station. .

b.- Once per 18 months inspect and replace all gaskets in the couplings'that are degraded, and remove the hose for-inspection and re-racking.

c. Occe per three (3) years, partially open hose station valves to verify valve operability and no valve blockage.

~

F d.: Once per three (3) years hy removing and replacing all ' hose with new hose that meets or exceeds NFPA guidelines _or C . recommendations.

4.18.6 Fire Rated Assemblies ,

~

4.18.6.1- Each of the. fire rated assemblies specified in Section 3.14.6.1 t,

e shall be verified to be functional: .

a. At least once per.18 months hy'a visual inspection.

~

b. ' Prior to returning a fire rated assembly to functional' status following repairs or maintenance by performance of a visual' inspection of the affected fire rated assembly (s).

)

6

. i 4-62 Amendment No. M )!f,JfI,85 >

h gM M

[; .. . .

iR., RANCHO SECO UNIT 1 lq TECHNICAL SPECIFICATIONS P

Administrative controls Special Reports e 6.9.5 Special reports shall be submitted to the Director of the Regulatory Operations Regional Office within the time period

.specified for each~ report. These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable. reference specification:

A. A one-time only, " Narrative Summary of Operating Ex-a' perience" will be submitted to cover the transitioh period (calendar year 1977). ,

  • B. A Reactor Building structural integrity report shall be

' submitted.within ninety (90) days of completion of each of the following tests covered by Technical Specifica-O tion 4.4.2 (the integrated leah rate test is covered in y Technical Specification 4.4.1.1).

1. Annual Inspection 2.' Tendon Stress surveillance
3. End Anchorage Concrete Surveillance
4. {

Liner Plate Surveillance i In-Service Inspection Program C.

3 D. Reserved for Proposed Amendment No. 43 E. Status of Inoperable Fire Protection Equipment -

30 days.(3.14.1.2, 3.14.2.2, 3.14.3.2, 3.14.2.3 3.14.5.2, 3.14.4.2, 3.14.6.2) i F. Inoperable Emergency Control Room /TSC Ventilation Room Filter System G. Radioactive Liquid Effluent Dose 30 days (3.17.2)

H. Noble Gas Limits 30 days (3.18.2)

I. Radio-Iodine and Particulate 30 days (3.18.3),

6-12f i

kundment No. 85 i

hS:.'. . . :c-,i -

3 49-1;,e - y .

~

4

- n 7

k.Ii E RANCHO SECO UNIT 1 '

? ,

U2 TECIDtICAL- SPECIFICATIONS g- .r Administrative' Controls' ,

Special Reports (Continued)

J. Gaseous Radwaste Treatment 30 days (3.19)

(ll K. Radiological Monitoring Program 30 days (3.22)

. n . k.

_ 7 '.

i?

L. Monitoring Point Substitution 30 days (3.22) ,.

1 f M. Deleted. rp,.

r -

J -

N. Fuel Cycle Dose 30 days (3.25)

?. t I

-[i ' O. Deleted ,

~

,.T L' , y 5 -, , ,

f.

j-P. Steam Generator Tube Inspection 30 days (4.17.5) p s t .

't t

.p 4

4 L

l.:. ,

I*

e It r, .. .

t A t l ha 'u - gy .