ML20238B308

From kanterella
Revision as of 01:13, 24 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 870825 Meeting W/Util in Silver Spring,Md to Discuss New Nuclear Assurance Corp Cask Design & Util Part 72 License Amend Submittal
ML20238B308
Person / Time
Site: Surry, 07200002  Dominion icon.png
Issue date: 08/27/1987
From: Roberts J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 8709010161
Download: ML20238B308 (3)


Text

'79 ,1

. s r ... . .. _ .

  • yyc ! ,

, Wrj9l Of- . . _ . _

AUG 2 71987 mm _ / _

kc* il . 0 h l  ?  !

i I O ~ ~

Docket 72-2

\ Otw - --. -.. j MEMORANDUM FOR: Leland C. Rouse, Chief POR 'i

i. Fuel Cycle Safety Branch d 1 Division of Industrial and Medical Nucle 6r(p ef9 FROM: John P. Roberts, Section Leader

! R etum bThW --

J Irradiated Fuel Section SS 396 Fuel Cycle Safety Branch I l

Division of Industrial and Pedical Nuclear Safety  ;

SUBJECT:

NRC STAFF MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY (VEPC0) AND NUCLEAR ASSURANCE CORPORATION (NAC) l DATE AND l TIME: August 25, 1987 10:00 a.m.

)

LOCATION: 5th Floor Conference Room, Willste Building, j Silver Spring, Maryland ATTENDEES: See Enclosure l PURPOSE: Discussion of new NAC cask design and VEPCO Part 72 license amendment submittal. ]

l DISCUSSION: l Subrnittal of a new NAC cask design for storage of consolidated spent fuel was discussed in conjunction with the submittal of an ar.endment to VEPCO's Part 72 ,

license for dry cask storage at its Surry Power Station site. VEPC0 intends '

l to consolidate spent fuel in its Surry pool and store that fuel in the new NAC cask. Consolidated fuel will not remain in the Surry pool nor will storage capacity limits be increased for either pool storage or dry cask storage at the Surry site.

Submittal of the topical report for the NAC cask design is expected in October-November 1987. Submittal of the VEPC0 amendment to its Part 72 license is expected in November-December 1987.

  • VEPC0 has contracted with Corbustion Engineering, Inc., (CE) to consolidate spent fuel in the Surry pool for one cask. Consolidation and storage of consolidated spent fuel for more than one cask is not now planned by VEPCO.

Consolidation is to be perforned in 1988. VEPC0 will subsequently evaluate the option of further consolidated fuel storage.

8709010161 870827 PDR ADOCK 05000280 P PDR

i AUG 2 71987 Leland C. Rouse 2 VEPC0 is also planning to submit an amendment to store fuel in a dry storage J cask designed to allow reactivity credit for the burnup sustained by spent l fuel. VEPC0 will then evaluate'this option also. A date for this submittal i has not been specified.

Original Signed by John P. Roberts, Section Leader Irradiated Fuel Section Fuel Cycle Safety Branch Division of Industrial and Medical Nuclear Safety

Enclosure:

Attendance List DISTRIBUTION w/ enclosure Docket 72-2 i l

PCi<

LPDR NMSS R/F )

IMIF R/F JRoberts FSturz JSchneider CPatel. NRR i

FBrown l

Beveridge/ Cornell 1-23 Region II l

OFC: IMIF :IM  :  :

......c. ......L[I]Ff.,.......................:.........:..........:..........

NAME:J ts/as: rown :  :  :  :  :

s; Ji;;r- ;;m;;r;--  ;-- ;- T-- T----

0FFICIAL RECORD COPY L

1 i<

AUG 2 71987

' ATTENDANCE. LIST' l-John P. Roberts NRC/NMSS L Alan H. Wells Nuclear Assurance. Corporation 1 i

Jack Houston- Nuclear Assurance Corporation

~ Carol S. Thorup Nuclear Assurance Corporation .

David P. Batalo Virginia Electric and Power Company .a James Schneider .NRC/NMSS~

Marvin L.-Smith . Virginia Electric and Power Company.

Fritz Sturz NRC/NMSS 1

1 i

1 l

J 1

]

i 1

l

'I l

--___-___2____-_-____.