ML20244A619
ML20244A619 | |
Person / Time | |
---|---|
Site: | Millstone, Three Mile Island ![]() |
Issue date: | 04/23/1979 |
From: | Bryan S, Kilinger G, Nolan F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
To: | |
Shared Package | |
ML19220C708 | List: |
References | |
PNO-79-091, PNO-79-91, NUDOCS 7905140067 | |
Download: ML20244A619 (1) | |
Similar Documents at Millstone, Three Mile Island | |
---|---|
Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-I-99-022, on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions1999-05-11011 May 1999
[Table view]PNO-I-99-022:on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions PNO-I-99-016, on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve1999-04-0707 April 1999 PNO-I-99-016:on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve PNO-I-99-006, on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys1999-01-29029 January 1999 PNO-I-99-006:on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys PNO-I-99-004, on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review1999-01-20020 January 1999 PNO-I-99-004:on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review PNO-I-99-001, on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power1999-01-0404 January 1999 PNO-I-99-001:on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power PNO-I-98-062, on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch1998-12-15015 December 1998 PNO-I-98-062:on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch PNO-I-98-039, 980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 9808111998-08-12012 August 1998 PNO-I-98-039:980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 980811 PNO-I-98-026, on 980701,Millstone Unit 3 Criticality Update Made.Nrc Staff Continues to Provide Augmented Insp of Unit 3 Restart Activities,Including round-the-clock Coverage of Key Operational.Licensee Plans No Press Release1998-07-0101 July 1998 PNO-I-98-026:on 980701,Millstone Unit 3 Criticality Update Made.Nrc Staff Continues to Provide Augmented Insp of Unit 3 Restart Activities,Including round-the-clock Coverage of Key Operational.Licensee Plans No Press Release PNO-I-98-025, on 980630,unit 3 Established Reactor Criticality,However Reactor Was Shut Down When Control Room Operator Noticed Spiking Intermediate Range Monitor.Licensee Troubleshooting1998-06-30030 June 1998 PNO-I-98-025:on 980630,unit 3 Established Reactor Criticality,However Reactor Was Shut Down When Control Room Operator Noticed Spiking Intermediate Range Monitor.Licensee Troubleshooting PNO-I-97-071, on 971124,licensee Announced Some Senior Level Mgt Changes.Ns Carns Resigned as Chief Nuclear Officer of Northeast Nuclear Energy Co,Effective 971201.Press Release Was Issued1997-11-24024 November 1997 PNO-I-97-071:on 971124,licensee Announced Some Senior Level Mgt Changes.Ns Carns Resigned as Chief Nuclear Officer of Northeast Nuclear Energy Co,Effective 971201.Press Release Was Issued PNO-I-97-068, on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities1997-11-0505 November 1997 PNO-I-97-068:on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities PNO-I-97-018, on 970328,protest Related to TMI-2 Accident Occurred.Protesters Walked in Circle,Outside of Util Property,Blocking Plant Entrance Lane.Plant Notified NRC Headquarter to Inform of Event1997-03-28028 March 1997 PNO-I-97-018:on 970328,protest Related to TMI-2 Accident Occurred.Protesters Walked in Circle,Outside of Util Property,Blocking Plant Entrance Lane.Plant Notified NRC Headquarter to Inform of Event ML20203G2581993-02-19019 February 1993 PNO-IIT-93-001B:final Onsite Status Rept from NRC Iit. Team Has Completed Initial fact-finding Phase at TMI, Middletown,Pa Site.Meeting W/Licensee TMI Site Emergency Review Group Was Held on 930215 ML20203G2941993-02-16016 February 1993 PNO-IIT-93-001A:IIT Remains Onsite Gathering Data,Conducting Interviews,Inspecting Equipment,Meeting W/Licensee, Concurring in Licensee Action Plans & Analyzing Facts.Onsite Interviews Should Be Completed by 930218 ML20203G3231993-02-10010 February 1993 PNO-IIT-93-001:IIT Arrived Onsite & Initiated Investigation, Toured Facility & Examined Equipment Associated W/Event. Team in Early Stage of Conducting Interviews,Reviewing Procedures & Drawings & Analyzing Facts PNO-I-93-011, on 930207,during Shift Change,Unauthorized Vehicle Driven Into Plant Protected Area.Site Area Emergency Declared.Caused by Former Mental Patient.Precautionary Measures to Secure Plant Vital Areas Implemented1993-02-0707 February 1993 PNO-I-93-011:on 930207,during Shift Change,Unauthorized Vehicle Driven Into Plant Protected Area.Site Area Emergency Declared.Caused by Former Mental Patient.Precautionary Measures to Secure Plant Vital Areas Implemented PNO-I-90-071, on 900829,resident Inspectors Informed That Concentration Value of 29,000 Pci/Liter of Tritium Found in Aug Sample of Groundwater Monitoring Station MS-2.No Tech Spec Release Limits Exceeded1990-08-30030 August 1990 PNO-I-90-071:on 900829,resident Inspectors Informed That Concentration Value of 29,000 Pci/Liter of Tritium Found in Aug Sample of Groundwater Monitoring Station MS-2.No Tech Spec Release Limits Exceeded PNO-I-90-041A, on 900509,75 Gallons of Contaminated Water Spilled Out of TN-RAM Cask & Into Trench.Cask Should Contain No free-standing Liquid.Cask Placed in Secured Parking Area within Burial Site.State of CT Notified1990-04-10010 April 1990 PNO-I-90-041A:on 900509,75 Gallons of Contaminated Water Spilled Out of TN-RAM Cask & Into Trench.Cask Should Contain No free-standing Liquid.Cask Placed in Secured Parking Area within Burial Site.State of CT Notified PNO-I-89-081, on 890925,two Laborers Inadvertently Handled Core Debris That Could Have Resulted in Overexposure. Detailed Assessment Performed by Licensee to Establish Time Individuals Handled Source & Actual Doses Received1989-09-28028 September 1989 PNO-I-89-081:on 890925,two Laborers Inadvertently Handled Core Debris That Could Have Resulted in Overexposure. Detailed Assessment Performed by Licensee to Establish Time Individuals Handled Source & Actual Doses Received PNO-I-89-080, on 890922,NRC Presented Preliminary Results of Requalification Exams Indicating Failure of Two Crews. Licensee Preparing Justification for Continued Operation for Region I Mgt Review1989-09-22022 September 1989 PNO-I-89-080:on 890922,NRC Presented Preliminary Results of Requalification Exams Indicating Failure of Two Crews. Licensee Preparing Justification for Continued Operation for Region I Mgt Review PNO-I-89-076, on 890906,contaminated Equipment Located in Unrestricted Areas.Equipment Included Hydrolaze Unit & Tools.Licensee Initiated Survey as Result of Ongoing Internal Assessment1989-09-0707 September 1989 PNO-I-89-076:on 890906,contaminated Equipment Located in Unrestricted Areas.Equipment Included Hydrolaze Unit & Tools.Licensee Initiated Survey as Result of Ongoing Internal Assessment PNO-I-89-063, on 890721,NRC Team Insp of Allegations Re Facility Completed.Insp Dealt W/Approx 120 Concerns from Three Allegers.Preliminary Results Indicate 44 Allegations Unsubstantiated & 19 Not within Charter of Insp Team1989-07-26026 July 1989 PNO-I-89-063:on 890721,NRC Team Insp of Allegations Re Facility Completed.Insp Dealt W/Approx 120 Concerns from Three Allegers.Preliminary Results Indicate 44 Allegations Unsubstantiated & 19 Not within Charter of Insp Team PNO-I-89-056, on 890710,reactor Vessel Lower Head Cracks from Guide Tubes E-7 & G-6 Discovered.Tubes Substantially Damaged by Flow of Molten Fuel.Investigation & Cleanup Started1989-07-10010 July 1989 PNO-I-89-056:on 890710,reactor Vessel Lower Head Cracks from Guide Tubes E-7 & G-6 Discovered.Tubes Substantially Damaged by Flow of Molten Fuel.Investigation & Cleanup Started PNO-I-89-039, on 890527,unidentified RCS Leakage Exceeded 2.5 Gpm & Plant Shutdown Initiated.Rcs Pressure Increased to 46 Gpm.Containment Entry Planned on 890530,after Deinerting. Maint Team Insp Initiated1989-05-30030 May 1989 PNO-I-89-039:on 890527,unidentified RCS Leakage Exceeded 2.5 Gpm & Plant Shutdown Initiated.Rcs Pressure Increased to 46 Gpm.Containment Entry Planned on 890530,after Deinerting. Maint Team Insp Initiated PNO-I-89-028, on 890411,shutdown Initiated from Full Power When RCS Unidentified Leak Rate Reached 1.5 Gpm.Charging Flow Control Valves Closed to Limit Amount of Boron Injected.Caused by Crack on Leakage Monitoring Valve1989-04-13013 April 1989 PNO-I-89-028:on 890411,shutdown Initiated from Full Power When RCS Unidentified Leak Rate Reached 1.5 Gpm.Charging Flow Control Valves Closed to Limit Amount of Boron Injected.Caused by Crack on Leakage Monitoring Valve ML20244C6411989-04-0707 April 1989 PNS-I-89-003:on 890401,security Officer Allegedly Committed Homicide While on Vacation.Weapon Unconnected to Employment. Measures Taken to Preclude Individual from Returning to Work Pending Outcome of Case.Commonwealth of PA Informed PNO-I-88-118, on 881113,licensee Shutdown Plant in Response to High Unidentified Leakage Into Primary Containment.Caused by Increase in Unidentified Drywell Leakage.Licensee Will Replace Topwork for Both D & E Safety Relief Valves1988-11-14014 November 1988 PNO-I-88-118:on 881113,licensee Shutdown Plant in Response to High Unidentified Leakage Into Primary Containment.Caused by Increase in Unidentified Drywell Leakage.Licensee Will Replace Topwork for Both D & E Safety Relief Valves PNO-I-88-111, on 881022,manual Reactor/Turbine Trip Was Initiated Due to Lowering Main Condenser Vacuum.High Suction Differential Pressure Conditions Caused by Seaweed Impingement.All MSIVs Were Closed1988-10-24024 October 1988 PNO-I-88-111:on 881022,manual Reactor/Turbine Trip Was Initiated Due to Lowering Main Condenser Vacuum.High Suction Differential Pressure Conditions Caused by Seaweed Impingement.All MSIVs Were Closed PNO-I-88-101, on 881005,MSIV C Closed Fully During Partial Stoke Testing of Valve,Causing Water Level Decrease in Steam Generator C & Reactor Trip on lo-lo Steam Generator Level. Shutdown Extended to Perform Maint on Valve1988-10-0606 October 1988 PNO-I-88-101:on 881005,MSIV C Closed Fully During Partial Stoke Testing of Valve,Causing Water Level Decrease in Steam Generator C & Reactor Trip on lo-lo Steam Generator Level. Shutdown Extended to Perform Maint on Valve PNO-I-88-096, on 880917,licensee Shut Down Unit to Troubleshoot &/Or Repair Cause of High Flow in Seal leak-off Line 1 for Reactor Coolant Pump D1988-09-19019 September 1988 PNO-I-88-096:on 880917,licensee Shut Down Unit to Troubleshoot &/Or Repair Cause of High Flow in Seal leak-off Line 1 for Reactor Coolant Pump D PNO-I-88-084A, on 880829,resident Inspectors Informed of Results of Drug Testing on Licensee Reactor Operator Involved in Altercation Described in PNO-I-88-084.Licensee Terminated Employee on Basis of Positive Test Results1988-08-30030 August 1988 PNO-I-88-084A:on 880829,resident Inspectors Informed of Results of Drug Testing on Licensee Reactor Operator Involved in Altercation Described in PNO-I-88-084.Licensee Terminated Employee on Basis of Positive Test Results PNO-I-88-075, on 880720,results of Independent Investigation Re Operator Sleeping on Duty Announced.Disciplinary Actions Including Dismissal,Reassignments to Lower Positions & Formal Reprimands Made Effective on 8807191988-07-20020 July 1988 PNO-I-88-075:on 880720,results of Independent Investigation Re Operator Sleeping on Duty Announced.Disciplinary Actions Including Dismissal,Reassignments to Lower Positions & Formal Reprimands Made Effective on 880719 PNO-I-88-060, on 880607,while at 100% Power,Cedm 23 Dropped Into Core.Licensee Investigation Found CEDM 23 Breaker Had Tripped on Overcurrent & Upper Gripper Coil Had Electrical Short.Plant Shut Down for Estimated 4 Days for Repair1988-06-0707 June 1988 PNO-I-88-060:on 880607,while at 100% Power,Cedm 23 Dropped Into Core.Licensee Investigation Found CEDM 23 Breaker Had Tripped on Overcurrent & Upper Gripper Coil Had Electrical Short.Plant Shut Down for Estimated 4 Days for Repair PNO-I-88-055, on 880523,worker Slipped & Fell Into Reactor Vessel from Defueling Platform.Caused by Worker Unhooking Himself from Sling to Install Equipment in Reactor Vessel. Worker Decontaminated & Licensee Conducted Event Critique1988-05-23023 May 1988 PNO-I-88-055:on 880523,worker Slipped & Fell Into Reactor Vessel from Defueling Platform.Caused by Worker Unhooking Himself from Sling to Install Equipment in Reactor Vessel. Worker Decontaminated & Licensee Conducted Event Critique PNO-I-88-049, on 880506,plant Shutdown Commenced to Locate Source of Boric Acid Buildup on Control Element Drive Mechanism Coolers & Ventilation Shroud & Unidentified Leakage.Util Plans to Replace Reactor Vessel Head O-rings1988-05-0909 May 1988 PNO-I-88-049:on 880506,plant Shutdown Commenced to Locate Source of Boric Acid Buildup on Control Element Drive Mechanism Coolers & Ventilation Shroud & Unidentified Leakage.Util Plans to Replace Reactor Vessel Head O-rings PNO-I-88-041, on 880414,unidentified Leak Exceeded 6 Gpm Limit.Leak Identified from PORV Block Valve Packing Leakoff Line.Manual Valve in Leakoff Line Shut Off.Checks for Leaks & High Temp Investigation Continuing1988-04-15015 April 1988 PNO-I-88-041:on 880414,unidentified Leak Exceeded 6 Gpm Limit.Leak Identified from PORV Block Valve Packing Leakoff Line.Manual Valve in Leakoff Line Shut Off.Checks for Leaks & High Temp Investigation Continuing PNO-I-88-021, on 880216,licensee Commenced Power Decrease to Hot Shutdown Condition Due to Main Turbine Generator Stator Cooling Flow Problem.In Conjunction W/Ge,Licensee Plans Chemical Cleaning & Backflush Process of Sys1988-02-17017 February 1988 PNO-I-88-021:on 880216,licensee Commenced Power Decrease to Hot Shutdown Condition Due to Main Turbine Generator Stator Cooling Flow Problem.In Conjunction W/Ge,Licensee Plans Chemical Cleaning & Backflush Process of Sys ML20236V9011987-11-30030 November 1987 PNO-TMI-87-005:on 871124,licensee Informed NRC That Investigation Re 870709 Allegation of Shift Supervisor Sleeping on Shift Has Been Finalized & Rept Will Be Provided to Nrc.Util Dismissed Shift Supervisor Under Investigation ML20236P9971987-11-12012 November 1987 PNO-TMI-87-004:on 871026,improperly Solidified Shipment of Class B Waste Identified.Waste Transported to Barnwell Disposal Site from Facility.Corrective Actions to Be Submitted to State No Later than 871125 PNO-I-87-063A, on 870710,special Insp Team Dispatched to Facility to Review Licensee Efforts Re Allegations of Sleeping on Duty.Random Offshift Insp Identified No Evidence of Operators Inattention to Duties1987-07-13013 July 1987 PNO-I-87-063A:on 870710,special Insp Team Dispatched to Facility to Review Licensee Efforts Re Allegations of Sleeping on Duty.Random Offshift Insp Identified No Evidence of Operators Inattention to Duties PNO-I-87-063, on 870709,NRC & Util Received Anonymous Allegation Re Shift Supervisor Sleeping on Duty.Makeshift Beds Identified & Dismantled & Three Contract Employees Terminated for Sleeping Onsite1987-07-10010 July 1987 PNO-I-87-063:on 870709,NRC & Util Received Anonymous Allegation Re Shift Supervisor Sleeping on Duty.Makeshift Beds Identified & Dismantled & Three Contract Employees Terminated for Sleeping Onsite PNO-I-87-055, on 870612,reactor Shut Down Due to Increased Leakage from Letdown Cooler A.Letdown Cooler Will Be Replaced During 1-month Outage1987-06-15015 June 1987 PNO-I-87-055:on 870612,reactor Shut Down Due to Increased Leakage from Letdown Cooler A.Letdown Cooler Will Be Replaced During 1-month Outage PNO-I-87-049B, on 870612,NRC Informed That Confirmed Positive Drug Test Results Received on 10 Employees.One Employee Fired,One Reassigned & Eight Suspended.Positive Results for Licensed Operators or Mgt Personnel Not Received1987-06-15015 June 1987 PNO-I-87-049B:on 870612,NRC Informed That Confirmed Positive Drug Test Results Received on 10 Employees.One Employee Fired,One Reassigned & Eight Suspended.Positive Results for Licensed Operators or Mgt Personnel Not Received PNO-I-87-052, on 870605,reactor Trip Occurred Due to Closure of All Four Msivs.Caused by Loss of One of Two Safeguards Electrical Buses.On 870606,MSIV a Failed Part Stroke Testing.Reactor in Cold Shutdown for MSIV Repair1987-06-0808 June 1987 PNO-I-87-052:on 870605,reactor Trip Occurred Due to Closure of All Four Msivs.Caused by Loss of One of Two Safeguards Electrical Buses.On 870606,MSIV a Failed Part Stroke Testing.Reactor in Cold Shutdown for MSIV Repair PNO-I-87-049A, updates Licensee Drug Investigation at Facility.Licensee Not Releasing Details to Media or Public Due to Ongoing Investigation.Notification Issued on 870601 Contained Typo.Actual Date of Notification Should Be 8705191987-06-0303 June 1987 PNO-I-87-049A:updates Licensee Drug Investigation at Facility.Licensee Not Releasing Details to Media or Public Due to Ongoing Investigation.Notification Issued on 870601 Contained Typo.Actual Date of Notification Should Be 870519 ML20214R5151987-06-0202 June 1987 PNS-I-87-049:on 870319,licensee Notified Region I of Ongoing Drug Investigation.On 870601,local Tv Staion Told by Anonymous Source That Plant Workers Suspended as Result of Drug Testing.Licensee Ack Drug Investigation to Reporter PNO-I-87-043, on 870514,during Reactor Trip Breaker Response Time Testing,Reactor Trip Occurred.Steam Generator Feedwater Isolation Pressure Transient Resulted in Failure of Two Lines to Thermal Relief Valves.Cause Under Investigation1987-05-15015 May 1987 PNO-I-87-043:on 870514,during Reactor Trip Breaker Response Time Testing,Reactor Trip Occurred.Steam Generator Feedwater Isolation Pressure Transient Resulted in Failure of Two Lines to Thermal Relief Valves.Cause Under Investigation ML20210C7191987-05-0404 May 1987 PNO-TMI-87-003:on 870503,4-inch Diameter Reinforced Rubber Pump Discharge Hose Ruptured on Defueling Water Cleanup Sys Spilling Approx 150 Gallons of Unfiltered Reactor Coolant. Three Persons Sprayed W/Water Decontaminated PNO-I-87-037, on 870425,util Employee Arrested Offsite for Possession of Coccaine W/Intent to Sell.Employee Authorization to Enter Vital Areas Terminated 1 H After Arrest1987-04-27027 April 1987 PNO-I-87-037:on 870425,util Employee Arrested Offsite for Possession of Coccaine W/Intent to Sell.Employee Authorization to Enter Vital Areas Terminated 1 H After Arrest ML20205H2711987-03-26026 March 1987 PNO-TMI-87-002:on 870324,train Carrying Two Shipping Casks Containing TMI-2 Core Debris Struck Automobile in St Louis, Mo.Train Engine Received Minor Damage But Shipping Casks Not Damaged.No Release of Radioactive Matls Detected 1999-05-11 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000289/19990071999-09-27027 September 1999
[Table view]Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000245/19990081999-09-14014 September 1999 Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations Noted & Being Treated as Ncvs. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000423/19990071999-08-27027 August 1999 Insp Rept 50-423/99-07 on 990614-0715.Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Review of C/A Program Using IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000336/19990061999-07-19019 July 1999 Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations Occurred & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000336/19982191999-06-10010 June 1999 Insp Rept 50-336/98-219 on 981214-18,990126-29,0208-19 & 0301-05.Noncited Violations Identified.Major Areas Inspected:Exam of Licensee Corrective Action Implementation IR 05000245/19990051999-06-0404 June 1999 Errata to Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05,consisting of Figure 1 ML20207G1211999-06-0303 June 1999 Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05 on 990302-0419.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20207F1521999-05-25025 May 1999 Notice of Violation from Investigation Rept 1-94-021 on 940506-960329.Violation Noted:Between 740831-910407,licensee Made Changes to Facility Described in Safety Analysis Rept for Refueling Core Offloads Without Performing Evaluation ML20196K2621999-05-24024 May 1999 EN-99-020:on 980525,notice of Violation & Exercise of Enforcement Discretion Will Be Issued to Licensee.Action Based on Severity Level III Problem Consisting of Four Individual Violations Involving Refueling Outage IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements PNO-I-99-022, on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions1999-05-11011 May 1999 PNO-I-99-022:on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions IR 05000336/19990031999-05-10010 May 1999 Insp Rept 50-336/99-03 on 990322-26.No Violations Noted. Major Areas Inspected:Review of Actions Taken by Util to Resolve Significant Issues List Item 21,fire Protection ML20206F4601999-04-30030 April 1999 Insp Rept 50-336/99-04 on 990315-31.Violation Noted.Major Areas Inspected:Monitored Licensee Activities During Plant Transition Between Operational Modes,Both During Normal & off-normal Working Hours IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support PNO-I-99-016, on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve1999-04-0707 April 1999 PNO-I-99-016:on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve ML20205M7201999-04-0606 April 1999 Notice of Violation from NRC OI Case 1-96-002 & Conclusions of Millstone Independent Review Team.Violation Noted. E Debarba,Deliberately Discriminated Against Supervisor in Performance Engineering Group at Millstone Station ML20205M7351999-04-0606 April 1999 Notice of Violation from Investigation in Case Numbers 1-96-002 & 1-97-007.Violation Noted:Licensee Discriminated Against Supervisor in Performance Engineering Group at Plant Due to Involvement in Protected Activities IR 05000245/19990021999-04-0202 April 1999 Insp Repts 50-245/99-02,50-336/99-02 & 50-423/99-02 on 990112-0301.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19990011999-03-29029 March 1999 Insp Rept 50-336/99-01 on 990117-0217.Violations Noted.Major Areas Inspected:Licensee C/A Program Implementation Using Guidance of NRC IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20205J0941999-03-12012 March 1999 Rept of Review of Millstone Units 1,2 & 3:Allegations of Discrimination in NRC Ofc of Investigations Cases 1-96-002, 1-96-007,1-97-007 & Associated Lessons Learned ML20207M1131999-03-0909 March 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $88,000.Violation Noted:Employment of Two Contractor Employees Terminated in Aug 1997,in Part Because Individuals Raised Concerns Re MOV Program Manual ML20205G6161999-03-0909 March 1999 EN-99-010:on 990309,notice of Proposed Imposition of Civil Penalty in Amount of $88,000 Issued to Licensee.Action Based Upon Severity Level II Problem Involving Discrimination Against Two Contractor Employees at Millstone MOV Dept IR 05000289/19980091999-03-0505 March 1999 Insp Rept 50-289/98-09 on 981227-990130.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000245/19980061999-03-0101 March 1999 Insp Repts 50-245/98-06,50-336/98-06 & 50-423/98-06 on 981123-990111.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support PNO-I-99-006, on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys1999-01-29029 January 1999 PNO-I-99-006:on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys IR 05000245/19982171999-01-22022 January 1999 Evaluation Repts 50-245/98-217,50-336/98-217 & 50-423/98-217 Conducted on 981026-30.Areas Evaluated:Whether NNECO Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ PNO-I-99-004, on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review1999-01-20020 January 1999 PNO-I-99-004:on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199C6381999-01-0707 January 1999 Notice of Violation from Insp on 981006-1123.Violation Noted:On or Before 981120,conduit 9-15,in Fire Area A-24,not Sealed & Tested in Accordance with Astme E-119,fire Endurance Test IR 05000336/19980051999-01-0707 January 1999 Insp Repts 50-336/98-05 & 50-423/98-05 on 981006-1123. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support PNO-I-99-001, on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power1999-01-0404 January 1999 PNO-I-99-001:on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power PNO-I-98-062, on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch1998-12-15015 December 1998 PNO-I-98-062:on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls ML20195H6901998-11-18018 November 1998 Notice of Violation from Insp on 980818-1005.Violation Noted:Engineering Evaluations Not Performed When RCS Heatup Rate Limit Exceeded on 951217 & When RCS Cooldown Rate Limit Exceeded on Three occasions,940424,0728 & 951215 IR 05000245/19982161998-11-18018 November 1998 Insp Repts 50-245/98-216,50-336/98-216 & 50-423/98-216 on 980818-1005.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000336/19982031998-11-0505 November 1998 Insp Rept 50-336/98-203 on 980824-0904.No Violations Noted. Major Areas Inspected:Effectiveness of Configuration Mgt Plan ML20155B1521998-10-23023 October 1998 Notice of Violation from Insp on 980810-0903.Violation Noted:Design Basis,As Described in FSAR Chapter 14,Accident Analyses Had Not Been Correctly Translated Into Plant Procedures & Acceptance Criteria IR 05000336/19982131998-10-23023 October 1998 Insp Rept 50-336/98-213 on 980810-0903.Violations Noted. Major Areas Inspected:Certain Aspects of Accident Mitigation Sys ML20154M0251998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 ML20154L9821998-10-15015 October 1998 Notice of Violation from Insp on 980810-27.Violation Noted: in Oct 1997,change to Facility as Described in Section 6.1, Eccs,Of TMI-1 Ufsar,Involving Unreviewed Safety Question,Was Made Without Prior Commission Approval IR 05000245/19982151998-10-14014 October 1998 Evaluation Repts 50-245/98-215,50-336/98-215 & 50-423/98-215 on 980824-28.Major Areas Evaluated:Whether Licensee Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements IR 05000336/19980041998-10-0101 October 1998 Insp Rept 50-336/98-04 on 980914-18.No Violations Noted. Major Areas Inspected:Mov Program Associated with GL 89-10 IR 05000245/19982121998-09-25025 September 1998 Insp Repts 50-245/98-212,50-336/98-212 & 50-423/98-212 on 980630-0817.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support ML20153E9471998-09-24024 September 1998 Exam Rept 50-289/98-301 Conducted on 980824-27.Exam Results: Four SRO Applicants Passed All Portions of Initial License Exam ML20154D1151998-09-11011 September 1998 Notice of Violation from Insp on 980413-24-0511-15,27-29, 0609-11 & 23-25.Violation Noted:Program Implemented TS 6.8.4.a,failed to Include Provisions to Reduce Leakage from RSS Heat Exchangers to SW Sys 1999-09-27 |
Text
_ _ _ - ____-_ __-__
PRELIMINARY NOTIFICATION E
~
April 23,1979 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-79-91
- i This preliminary notification constitutes EARLY notice of event of [
POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation '
and is basically all that is known by IE staff on this date.
Facility: Northeast Nuclear Energy Company -
Millstone Point Unit 2 (DN 50-336) /
Waterford, Connecticut *
Subject:
VAPOR BINDING 0F SHUTDOWN COOLING SYSTEM PUMP
" ' ' ' Reportable Occurrence 79-08, Loss of Shutdown Cooling (SDC) and subsequent RCS heatup to Mode 4, describes operation of the SDC system in a degraded mode on March 14, 1979 (30 Day LER). While in the SDC mode the LPSI ;
pump.became air bound resulting in a loss of SDC flow. Subsequent RCS i heatup up to 208 degrees F resulted in entry into Mode 4 (Hot Shutdown). l Compliance with Mode 4 LCO's was verified. To restore LPSI suction the -
licensee took safety measures including establishing containment integrity and having all personnel leave the containment. Suction to the LPSI pump was then shif ted to the RWST and SDC was restored by RCS floodup. Full suction was restored by vacuum priming' the SDC suction lo'o p seal. These -
f planned restoration actions. resulted in the spillover of appro,ximately W2 15,000 gallons of water through an open Steam Generator Manway to the cg containment. There was no release of r Jioactive material to the environs.
This PN is issued for information only due to media interest. The Stat'e '
of Connecticut has been informed. A press release is not planned by the licensee nor NRC. ,
l 8 i NRC, Region 1, (Philadelphia) received notification of this occurrence l by telephone from the Resident Inspector at 2:15 PM on March 14, 1979. >
I l
Contact:
GKlingler, IE x28019 FNolan, IE x28019 SEBryan, IE x28019 ]
Distribution: Transmitted H St Z]c'} ,
Chairman Hendrie Commissioner Bradford S. J. Chilk, SECY !
Commissioner Kennedy Commissioner Ahearne .C. C. Kamerer, CA Commissioner Gilinsky (For Distribution)
Transmitted: MNBB ?*f3) P. Bldg 2'33 IE L. V. Gossick, ED0 '
H. R. Denton, NRR J. G. Davis,2 Region 1 TO H. L..Ornstein, ED0 R. C. DeYoung, NRR
. J. J. Fotghard , PA .. R. J. Mattson, NRR N. M. Haller, MPA >
V. Stello, NRR (MAIL)
~ ~
l R. G. Ryan, OSP R. S. Boyd, NRR J. J. Cummings, OIA i H. K. Shapar, ELD SS Bldg 2l 257 R. Minogue, SD W. J. Di rcks ,' NMSS S. Levine, RES PRELIMINARY NOIIEICATION t x -
'g7 90 SMoo67 g,
- -