MONTHYEARML20217J3141999-10-15015 October 1999 Requests Emergency Publication of Document Entitled South Carolina Electric & Gas Co;Vc Summer Nuclear Station,Environ Assessment Transmitted on 991015 to Ofc of Fr for Publication ML20217J3281999-10-15015 October 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re Application for Exemption from Requiremets of 10CFR50,Section 50.60(a) for VC Summer Nuclear Station ML20217F8851999-10-0808 October 1999 Forwards Insp Rept 50-395/99-06 on 990801-0911.One Violation Occurred Being Treated as NCV RC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211Q8911999-09-0101 September 1999 Sumbits Summary of Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Exam Stds,New Insp Program & Other Training Issues.List of Attendees Encl RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211L5181999-08-30030 August 1999 Forwards Insp Rept 50-395/99-05 on 990620-0731.One Violation Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) ML20210Q4851999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at VC Summer.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210R5501999-08-0505 August 1999 Ack Receipt of 990707 Response to NCVs Identified on 990607 Re Activities Conducted at VC Summer.Informs That After Consideration of Basis for Denial of NCV 50-395/99-03, Concluded,For Reasons Stated,That NCV Occurred RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 ML20210B7451999-07-22022 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1 & Rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210E3771999-07-16016 July 1999 Forwards Insp Rept 50-395/99-04 on 990509-0619.One Violation Being Treated as Noncited Violation RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld ML20210B7111999-07-0606 July 1999 Provides Summary of 990701 Meeting with Sce&G in Atlanta, Georgia Re Recent Virgil C Summer Refueling Outage & Other Items of Interest.List of Meeting Attendees & Licensee Presentation Handouts Encl RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation ML20195H5861999-06-0707 June 1999 Confirms 990604 Telcon Between J Proper & R Haag Re Meeting Scheduled for 990701 in Atlanta,Ga,To Discuss Plant Refueling Outage & Items of Interest ML20207H5241999-06-0707 June 1999 Forwards Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207D1881999-05-28028 May 1999 Informs That Effective 990524,K Cotton Assigned as Project Manager,Project Directorate II-1,for Virgil C Summer Nuclear Station 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components ML20206L5121999-05-11011 May 1999 Informs That NRC Reorganized,Effective 990328.Reorganization Chart Encl ML20206P5771999-05-0707 May 1999 Informs That During 980519 Telcon Between T Matlosz & G Hopper,Arrangements Were Made for Administration of Licensing Exam at Virgil C Summer Nuclear Station During Wk of 990927 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b ML20206E1681999-04-29029 April 1999 Informs That FERC & NRC Will Conduct Category I Svc Water Pond (Swp) Dam Insp at Facility on 990610 ML20206P5021999-04-26026 April 1999 Forwards Insp Rept 50-395/99-02 on 990214-0327.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl ML20205T2311999-04-0909 April 1999 Informs That on 990318,A Koon & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Schedules for Wk of 000807 for Approx Eight Candidates ML20205G4181999-04-0101 April 1999 Advises That 970725 Application & Affidavit Which Submitted, WCAP-14932, Probabilistic & Economic Evaluation of Reactor Vessel Closure Head Penetration Integrity for Plant, Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(4) RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) RC-99-0066, Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.751999-03-31031 March 1999 Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.75 ML20205B9981999-03-29029 March 1999 Informs That Authority & Sce&G Has Ownership Interests of one-third & two-thirds,respectively in VC Summer Nuclear Station.Operating License Scheduled to Expire in 2022.Rept Addresses Decommissioning Cost Estimates & Financing RC-99-0054, Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii)1999-03-22022 March 1999 Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii) RC-99-0053, Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 121999-03-22022 March 1999 Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 12 RC-99-0048, Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info1999-03-10010 March 1999 Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info ML20207J5661999-02-16016 February 1999 Requests That Proprietary Rev 1 to WCAP-14932 Re Rv Closure Head Penetrations Integrity for VC Summer Nuclear Plant,Be Withheld from Public Disclosure,Per 10CFR2.790(b)(4) RC-99-0026, Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear1999-02-0505 February 1999 Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear RC-99-0023, Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed1999-02-0101 February 1999 Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed 05000395/LER-1998-009, Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated1999-01-28028 January 1999 Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated RC-99-0015, Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl1999-01-22022 January 1999 Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl RC-99-0005, Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations1999-01-15015 January 1999 Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations RC-98-0225, Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl1998-12-14014 December 1998 Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl RC-98-0226, Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl1998-12-14014 December 1998 Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl RC-98-0216, Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response1998-12-0404 December 1998 Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response RC-98-0189, Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f1998-11-24024 November 1998 Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f RC-98-0207, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment1998-11-11011 November 1998 Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment RC-98-0177, Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.71998-11-0909 November 1998 Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.7 RC-98-0194, Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs1998-11-0202 November 1998 Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs RC-98-0202, Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1998-10-30030 October 1998 Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions RC-98-0186, Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance1998-10-26026 October 1998 Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance RC-98-0185, Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 11998-10-0909 October 1998 Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 1 RC-98-0182, Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs1998-10-0808 October 1998 Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs RC-98-0178, Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes1998-10-0505 October 1998 Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes 1999-09-28
[Table view] |
Text
'
e So t Caro na Electric & Gas Cornpany J Sk a Jenkinulio, Sc ?900$ tuloar OperMons s -" (B03) 34%4040 ,
SCE&G
, u- -- .
DE[ l B 1990 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 GENERIC LETTER 89-06 SAFETY PARAMETER DISPLAY SYSTEM (LTR 890006-1)
South Carolina Electric & Gas Company (SCE&G) has completed the installation '
of new hardware and sof tware for the Safety Parameter Display Systein (SPDS) ,
at the Virgil C. Summer Nuclear Station. The new system has been evaluated ogAinst the guidelines contained in Generic Letter 89-06 and is considered to "
be in full compliance with NRC requirements addressed in Supplement 1 to NUREG 0737.
To facilitate NRC review (TAC NO. 73713) of the new system, SCE&G has -
attached to this letter a description of how the new SPOS meets or exceeds those areas previously evaluated. This documentation, along with the completed checklist and supporting photographs as addressed in Generic Letter 89-06, will be maintained for a minimum of three years.
If you should have any questions in regards to this certification, please contact Mr. Charles McKinney of my staff at (803) 345-4723.
Very truly yours.
John L. Skolds
(
CJM:JLS: Icd
. Attachment c: 0. W. Dixon, Jr. J. B. Knc , Jr.
E. C. Roberts J. F. Heibaan R. J. White D. C. Warner S. D.'Ebneter NSRC G. F. Wunder NPCF General Managers RiS (LTR890006)
NRC Residant Inspector File (815.14)
NUCLEAR EXCELLENCE - A SUMMER TRADITION! l t 9012270283 901218
]jf g DR ADOCK 0500 5
. __ . . _ . _ . _ _ _ . _ . _ . _ _ . . _ . - . _ . _ . _ . _ . ~
4 f i
C _ ,
EVALUATION OF:THE V.C. SUMMER NUCLEAR STATION SAFETY PARAMETER DISPLAY SYSTEM t
WITH REGARD TO DOCKET 50-395..
5 S
- _ = - .
Q r e
Table of Contents 1.0 I n t r od u c tio n . . . . . .. .. ... . . . . . . . . . . . . . . . . . .....
. . .... . 1 2.0 S PDS D escrip tion .... . . ..... ..... . .... ...... .... . .. ... . 1 3.0 Evaiuations............................................. 3 4.0 5ummary...................................................... 6 Attachment 1 Location of SPDS Terminals Attachment 2 SPDS and Supporting Displays Attachment 3 Keyboard / Keypad Layouts Attachment 4 Emergency Operating Procedure EOP-12 L
l l,
f l
l l
1.0 INTitO D UCTION In a Safety Evaluation Report (letter from J.B. Ilopkins to D.A. Nauman dated November 13, 1987) issued by the Ofuce of Nuclear Reuetor Regulation, the Nuclear Regulatory Commision identified the strengths and weaknesses of the V.C. Summer Nuclear Station (VCSNS) Safety Parameter Display System (SPDS). The staff audit concluded that the VCSNS SPDS met most of the applicable provisions of Supplement 1 to NUREG.0737 and found no serious safety concerns. As a response to this audit, and due to concerns regarding the ability to maintain the existing hardware, SCE&G committed to replace the existing SPDS . This report provides a description of how the new SPDS meets or exceeds those areas evaluated during the audit.
2.0 SPDS DESCill PTION The VCSNS SPDS is' based on the Westinghouse Owners Group Guidelines for display of the Critical Safety Functions (CSF). The top level display provides summary indication of several parameters of particular interest to operators during or immediately following the initiation of an event, and contains the CSF status boxes at the bottom of the page. The boxes are color coded in compliance with Westinghouse Owners Group recommendations. In addition, the boxes are arranged in order of significance from left to right, with left being the most significant and right being LS least significant.
The SPDS is hosted on a Gould 32/9780 computer, known as the Integrated Plant Computer System (IPCS). The IPCS combines the functions of the SPDS, BISI (Bypassed and Inoperable Status Indication), reactivity computer, and other process computer applications (previously hosted on a Westinghouse P2500 computer) onto one platform. The Gould computer contains a redundant CPU conGguration. During normal operations both processing unita are gerational and used in performing calculations. Should one processor fail, the computer may be restarted with only one processor operational to provide the necessary SPDS
y' c ,
~
information. The software was developed by Scientific Applications international Corporation (SAIC).
Sensor inputs are scanned at varying intervals depending on the type of input.
There are six general scan classes ranging from 0.1 seconds to 60 seconds per scan. Sequence of Events points may also be designated which are timetagged to within 1 millisecond. Points are scanned relative to their importance to plant operations and emergency assessment. Generally, digital inputs are scanned once per second and analog inputs once per two seconds. Radiation and meteorological inputs are scanned once per ten seconds, averaged over selected intervals, and transferred to the VAX computer system for dose assessment use. This data is also accessible for display on the U)CS Most SPDS points are scanned once per two seconds, which is consistent with the display update rate for SPDS displays.
The usual time for SPDS display initialization is approximately I second with data updates occurring every 2 seconds. Many other diagnostic features are available on the IPCS; however, their update rate may be greater than 2 seconds based on the function performed and its priority relative to SPDS. In addition, all terminals on the IPCS have a continuous display of SPDS Critical Safety Function status in the upper right corner of the screen, and all terminals except the i dedicated alarm terminals on the Main Control Ikiard may access more detailed SPDS displays. SPDS terminais are provided at the same locations as the previous terminals but were upgraded as part of the replacement project. Attachment 1 L
shows the placement of the SPDS terminals in the Control Room, Technical Support Center , and Emergency Operations Facility.
All screens are easy to access through the use of a Turn.on. code or keyboard function keys. Turn on. codes are names of displays or programs which are accessed through keyboard input. Samples of SPDS and related displays are shown in Attachment 2, A general keyboard layout of both the standard keyboard and special function keypad are given in Attachment 3.
2
4 .
-4
~
3.0 RVALUATION This section provides responses to the staff's conclusions contained in the safety evaluation report for the VCSNS with regard to the essential elements of the SPDS required by Supplement I to NU REG-0737.
3.1 THE SPDS SHOULD PROVIDE A CONCISE DISPLAY uF Pl ANT V A RI A BLES.
The SPDS follows Westinghouse Owners Group recommendations for display of CSFs which have been previously approved by the Nuclear Regulatory Commission.
3.2 THE SPDS SHOULD BE LOCATED CONVENIENT TO THE CONTROL ROOM OPERATORS.
The previous evaluation noted that there were two SPDS terminals in the Control Room. At the time of this report, there are five SPDS terminals in the Control Room. All five terminals provide a summary indication of the CSFs.
Three of the terminals have access to more detailed information so that an accurate assessment of plant conditions may be made. Two additional terminals will be replaced following approval of the BlSI application on _the IPCS Contained in Figures 13 in Attachment 1 of this report are layout drawings which indicate the locations of SPDS terminals.
3.3 THE SPDS SH ALL CONTINUOUSLY DISPLAY INFORM ATION FROM WHICH THE SAFETY STATUS OF THE PLANT CAN BE ASSESSED, All SPDS displays except for the Operational Limits Curve contain the CSF s tatus boxes at the bottom of the page. In addition, each CSP ::tatus is displayed in the upper right corner of any terminal connected to the IPCS.
l With all CSFs fully satisfied the status box is solid green. Any CSF which is not fully satisfied will be indicated by p stripe of the appropriate color. CSPs which do not necessarily require operator action (completely satisfied
< green > or not completely satisfied < yellow >) are displayed as a solid bar in :he status block. All other conditions (threatened < orange >, severely
! 3 l
q' .. . .
4 threatened < red >, or indeterminate by the computer < magenta >) are displayed as a blinking bar in the status block to attract operator attention more quickly. This status bar is displayed continuously, updated approximately once per second, and not operator changeable.
3A TIIE SPDS SHALL llAVE RAPID AND RELIABLE DISPLAY OF THE SAFETY STATUS OF THE PLANT.
SPDS CSF status is cc-tinuously displayed at each terminal and updated once per secor.d. System response to operator commands for SPDS displays is extremely fast, usually within 1 second, but occasionally as long as 3 seconds.
Currently both SPDS systems are operational and available in the Control Room.The old system is only being used to run the BISI applica tion a not a part of SPDS), Combined system availability has been nearly perfect. Following the certification of the BlSI application on the IPCS, the old system will be formally decomissioned. SCE&G fully expects, and operating statistics indicate, that overall system availability will remain at the intended goal of greater than 99 percent.
3.5 THE SPDS SUALL BE SUITABLY ISOLATED PROM ELECTRICAL OR E LECTRONIC LNTERFERENCE.
The isolation of the SPDS inputs met the requirements of NUREG 0737, Supplement 1. No changes to the input isolations were made as a part of this computer replacement therefore the existing isolation still satisfies the requirement.
3.6 THE SPDS DISPLAY SHALL BE DESIGNED TO INCORPORATE HUMAN FACTORS PRINCFPL,ES.
Scientific Applications International Corporation performed a complete review of the SPDS displays based on the Westinghouse Owners Group critical safety function status trees used as a part of the Emergency Response Facility Information System for Carolina Power and Light Company's Shearon Harris and H.B. Robinson plants. The V.C. Summer Nuclear Station SPDS was designed and built using these same human factors principles.
4
t 4
3.7 THE SPDS SHALL DISPLAY MINIMUM INFORM ATION SUFFICIENT TO DETERMINE THE PLANT SAFETY STATUS (CRITIC A L S A FETY FUNCTIONS) DURING ABNORMAL AND EMERGENCY CONDITIONSa Westinghouse Owner's Group Guidelines for evaluation and display of the CSFs were used extensively in the development of the SPDS. The second level displays provide paths which lead the operator to the appropriate Emergency Operating Procedures for further action. Additionally, a tabular summary of the relevant information for each tree is displayed on the page along with information on the trend of the parameter.
L l
3.8 PROCEDURES TO BE DEVELOPED AND OPERATORS SIIOULD BE TRAINED TO RESPONL) TO ACCIDENT CONDITIONS BOTil WITH OR WITHOUTTHE SPDS AVAILABIL
- A user's guide is available in the Control Room, TSC, and EOF along with a list of points used on the SPDS. The SPDS displays are designed for minimal operator action and an online help facility provides operators with an easy to use quick reference guide. A copy of the help file for SPDS is provided in Attachment 2 along with the SPDS displays and a copy of Emergency Operating Procedure EOP 12 is enclosed in Attachment 4. Operators are trained to respond to plant conditions both with and without the SPDS and use it routinely in simulator scenarios.
3.9 NUREG-0800 SECTION 18.2 REVIEW OF SPDS VERIFICATION AND LALIDATION.
Both the factory and cite acceptance tests were conducted by the vendor and witnessed by Nuclear Computer Services and-Operations personnel. In addition to these tests, the Nuclear Regulatory Commission witnessed the use of the SPDS on the VCSNS Training Simulator during an on site EOP audit in August 1990. The SPDS received only favorable responses from the audit team.
5
1 g :.: , -
_ 1 i The VCSNS verifies and: validates the use of all software applications ,
o including SPDS, through a. Quality Review Board process. The Quality Review i Board is a multidisciplined group whose job is to review the verification and validation process and results to ensure that the application is consistent with
' station requirements.
4.0 SUMM A RY ,
The VCSNS SPDS is an entirely new system written primarily by SAIC and 4 based on Westinghouse Owners Group recommendations for display of CSFs.
-This system provides continuous display-on all SPDS terminals with the -
ability to acquire : detailed information quickly and reliably. Terminals are located in strategic areas in the plant: Control . Room, Technical Support -
- Center, Emergency Operations Facility,'and Central Command Centers, An -
- Operator's Guide and information specifically concerning the SPDS are ;
.available~ in 'these areas, along with a complete list of computer points. The
. software is hosted on a Gould computer system, a hardware platform which has been proven reliable throughout the nuclear industry for many years. The
.VCSNS SPDS provides concise, rapid, and reliable information so -that
. Operations personnel may continuously assess the safety status of the unit.
f l
- ,S . ,
S ( f' 6
/ 2-f .
-4
! '[
e i
6
% ~. . . . -- _~ . . .. -. - -, .
Attachment 1 Location of SPDS Terminals s
_. . _ . _ = . __ _ _. _- . .- _.
1 :. >
. ,; a-Attachment 1 'l Page l of 3
/- .'
Figure 1 CONTROL ROOM LAYOUT [
1-7 SPDS terminals
- 4 and *7 are future IPCS SPDS-terminals and are currently TSC BlSI terminals 2 Main Control Board 1
-*4 5
~
/ _
P-P; NIS Panel P-3' i
, . . --e - -
r . ., .. - _ . _ - , , , , - - - _ - -_ _ _ _ _ _ _ _
- Attachment 1 Page 2 of 3-Figure 2 .
-TSC LAYOUT 16L SPDSterminals*
65 ' Slaved Monitor P Printer V Video Copy RM RMS/ MET Data DA Dose Assess
_ lPCS SPDS Shift Supervisor Command Center p
RM L
Communications L Area
- l. ..
l6 l:.
65
, - Office _ Future p Dose Assess 1- V '2 RM DA
l L ~ Office '
TSC L -
4 3.
l '
l I, -
.- ~
- o . . ..
.i'
-:y -- -.4 ..- . Attachment 1
-Page 3 of 3 Figure 3 EOF LAYOUT 14 SPDS terminals P Printer V Video Copy RM RMS/fAET Data 3
V
.2 RM EOF 1
\ /
P
/
\ EOF Command Center m
4
4
- , , ..e .
4 Attachment 2 SPDS and Supporting Displays 1..
l l a:
f i
l-l l
l=
SELECT F U N C .' KEY OR TURH-OH CODE
~ ' '
5:2 31 ,
S F'D S T O F' LEVEL CONTAINHENTC0llDITIONS: INORNAL
~
SI TERMINATION: IN0 i INTEGRATED CONTAINHENT DOSE: I (1.0E6 R ll S T S t.l A P O V E R NOTREQUIRED CST SilAPOVER h0TREQUIRED RCPTRIPCRITERIA NOTSATISFIED NATURAL CIRCULATION HOTAPPLICABLE FEED & BLEED (E0P-15,0) I NOT REQUIRED T>
l
~if P, e
}' { 6 j ~',
' ^ C ~* .
)'- 4 E p KBD= NORMAL AMODE=POWE OPERATION E h= 0% P'.NT
- Attachment 2 Page 2 of 11 I
O O m e p
. . . . 2 fn tn tn tn ,
i C" Ow Om O- E i la i l- I t- I . Fl .
! Q. CL Q. L I- G. L.f-1 O OO CO 00 (O C 00 :^ rt F OW WW OW UM OU 3A
)
< 7" l *N ;; i j
U-g
- l ur y ~ ,~ C C 1 E 1 C 2 l WG C 0 1 Q e-e Q: o 1 ' C CD D O J N N G G)
+-
W C0 O F
l E cp W e
"' g Q' W O OW G g j I ..
WW I NO *'
W j
FZ D .'7. n, 4
O i ZC CC 6 '
w Q' A CO Q: A . ri I
l V w' b') Q:
kW 3
W '.
O l- Q' Q, CW .. ll MC , y l
l W OO , ,
o 0 W Q. 4 JJ ... u o l
Z C Q. Q.
~
.7,'
g
' C EW u t.i C Q: WO A v ,
i j
e FZ .",-
4 WW [ ZC y ll FF g HN .
CC w
HW l O G
- W Q.
CD GC Q: H Q.
W C.: O 1- .
f- C .r '
Z i- ub W mm A T 4.
O v
! z N W C W 4 .
It o ." H [
o g u -ce .
W roe a pg - .. . .., C
,i O O rom ,
r G- ^ V 7 w ,; g
[
y
] j Q .) O D I1 x t ' ,;, ti T. O l l m H ^ ti g, M x ~
W F "an "'
wgg
M o n. n, W= ,' h :"
. 100 h l[I [vv 2 D -- um ou ,
L EDD O E.
- Wmm D '3
-< h H i 3 .
OEN O O (-(.g W a,
-J L, i W .
LO 1
. Attachment 2 Page 3 of 11 O O - .-. N - N 4-
. . . . . . . 2 y e 1 o d 7 7 . -
Ow O- O .* Ow Ow Ow Ow a Q-Fi Fi t- I l- 1 Fl I- I l- 1 . ...
CL .
Q. Q. CL CL Q. Q. k t- a' CD OO OO OO OO OO CO OO DT Cr OW OW OW OW O ki OW OW OW ...e Cr N :
wN . ia 11 Ecp . .
J LA.
. j ,
Oh W e
W O Z WC3 o Z N N N NW N N . O T "
" 'O O f O CD $ @
D O
b 2 7 2 2 Q ,,s g
Z Z % %
y) O O W w CL CC Li, }' O.
J Q' Ce t'c
' O DC C w Il V g' .,
' a v 3 .
CL Z _ _ _ -
.2 Z , ,.
0%
Ci) k k 3 C3 0 g O h D- LJ LJ 0-9 X O c .4 11 W .. . W W G Z c . . ,
Q O O Z , .n O F ^ N ..i., n t- Z o iU C M Q @ Z ..
CL W C D J U n. W Q' .. Il CC Q, V J ' '
y 7 o F CL LA J F U J W C CC g C
O W .I ;
O O w,.
O 1..
LA. CD ','
O D W W v gi C
m o -e O Cp G LA. -+ -e LL U G '
wh OGNM CD O N 4-N7 z gy.' [ -Q s g
O x C6 M 4-; i e d
~ Z W M1-AN N*
,* . j "J '
y 0- ^
f I--4 8- N [ ' 'i ' ,
I- t ,". O O
J H H Cg ==== '
M Q II ^ 'I' il
' ^ N N y II O^ v^ k W I.- .l
--a x y Lu y)O O Q. W ^ O Uv 1 g ..
. WvCM ZW me O O v Cl3 g-Z v &) h. NZ gg 3 WJO C gg '
W 1,- l- % O v *
- j F Il X OMw&W 1 o W U)CD Q. J E O O -
W II . . ODUDCM 11 J F%m%%Z3 -
L, W
M
. . , Attachment 2
. 1> age 4 of 11 l
O m N m ~2 G
6 0 0 0 0 -
O- C" Os O --' O* " 0 Fl Fl Fi FI l- I . .4 I CL n. CL CL CL LF . u o oc oo oo CO OC WC ,,
Cr QW WW QW OW C' W W C0 .,it TD . . .-
-Q u ia 11 WN - .- &
- ,/ N .. L-
oo =d F" CD >
cg *W
g'
n-D @ ,.j 1 . G m - . O M A h y 40 '
a cc > b *-'
" CO ' C
,,,j ce .~ 11 y .\, C d G- -
Oh O ~, N O L. k w
O g g v n- . .
3 J (o C 1 J h O Q: ?. J - 11 W M Z N C 6 k g N
> vg .. c D O Z q) - i. C O \ C .J v. E W ^ Co .J a ta C W C 1;
~
Z 0 (' .',
e v- ,il c
s
[g' '
'o J
CW
~
G. M W M g _
N g g w t -
g ,/ \x 'l .
<a..
m / I y \ ,, A k
M M M Cr N (D CD N ,,
il W >D . 47F U* W 7 ,.,
M O O\ N ... .. .
O ZW N WMW NNw k O W --- 444 O .J E C U" F U" J
= n'.J Q. Q.
D
., C O WC D g g g 9 E I E g g ' i J" , -4 m Z
Q:
WO F
N N
-y '
.',. 9 A
o .J 9 ^ ,
' '. . 11 F a.,w/.
C3 .,,- p' ^e . . O P Fo EM (D cg . - , . o .,J G.(o ^ M o .t F h. O Q. N '.'
il W
F-I ......V......
y W x x su a a x ff.I ., .y o m e tn u w e cn o L
- m o ,
- d kM W - i e E- y v . 20 O f cc m> d !" bi E
" " 4G $'
r Ld _ se e 'S o o\ \
w y
1 E- m (o il
,.s y L.
M
l SELECT FUNC. KEY OR TURH-OH CODE . - - - - - - - - - - - - -
E u --
DEC 09;13:40 7,1990 -!)
~
RCS I N T E G R I T '1 eCs eRESSuRE - COtD leu TEt1P POIHTS O GO TO !
EOP-16.O !
COLD LEG TEMP DECREASES
'ANY LEFT OF LIMIT A V "
COLD LEG TEMPS GO TO ANY > 100 EOP-16.0 DEGF
< 2 DN l
i
' IN LAST 60 tII H COLD LEG TEt1PS - GO TO A L L. RIGHT OF :
LIf1IT A ANY < EOP-16.1 .
i 275 DEGF ALL > CSF !
- 245 ^ RT* I DEGF ALL > 275 i
DEGF i j COLD LEG TEt1PS h GO TO l PRESSURE
~
0 ANY < 245 l
DEGF i
RCS TE!1P PSIG 450 O GO TO l EOP-16.1 l< 3000EGF ALL > 245 V DEGF
~
l CSF ALL <
IN LRST 60 MIM 100DEGF s 450PSIG Q/
. CSF S A T, ,
HIGH COLD LEG TEMP t>
DECREASE <DEGF/HR'> 0.26 $$l RCS PRES ( PSIG) 2242.85 oa RCS TEMP < DEGF ) 552.45 c, S
- ( LOW COLD LEG TEMP) u oo s
, ma G p .
~
3 m
~
c.
~
. S U 91: sit: - ':t 4
-E r ;~
~. . , c .^. . c ~ .; - 5' C i CALITi . 1 ~: . : . ~- -
E : w. < p E ;:~:
- C'4'~5r . s Fl= F2= F3= F4= F5= Fb=
l KBD=HORMAL AMODE= POWER OPERATION PLHT i
- ----._--?
l l.l{i 1i{ ii ;
~
N $o:! r "
I$ao ~
T H
L
. P 0 _
9 _
98 i _
14 _
. =
TT 0 6 1 i0 F _
5
_ C9 _
_ E0 N _
O O -
I _
T e E A
R v L B 0 E
P r )
N HTT A
5 D E
t0 0
=
O u E P
PA ER 7
5 4 5R FE c O C C
4 4 t
O L P r
s L =
U E F a. D -
_. t D e 0 1
.i E 0 a r A
M i0 m U 3 E S F R =
.i S G 4 .
A -
? E L F L c n:t 6
~ - D "
GU S
E - .
4 N .
l I L -
0 2 E
a SR "E
PU l0 0 5
- 5 n
2 0Y 6T
_ E o 5E 2F T
=
D i A
S 3 O P F S
C t R F L H
O a Z P
G ES DP 0 A
M N
r ( i0 R O
R U e 0O 9
1 H
=
T p 1 D
B R
O
-U =
K 2
Y F E
K C 0 0 0 0 0 0 o N 0 0 0 0 0 0 U 0 5 0 5 0 5 F 3 2 2 1 1 t T 0 C .
G E D 0 I =
C- 1 j 3 S L
E S
g n CTj D. 3 n 2 P 2 -
l F
l . lll1lil ' lIll i\ ll l{ i! l';i
_ _ _ _ _ _ _ _ - ~ _ _ _
j ' '
Attachment 2
! Page 7 of 11 2 O O +-s N F
! . . . . Z i r- r- f- r- . J O ,-. O ,4 Ow Os
- CL F- l F- l f- I t- l . u A
CL CL 0. L4., F-O 00 00 00 00 MC Cr
- O LJ WW Q LJ O LJ O (0 ,,
l CF 0
,, a
. -N /
%.. il f* C l
.'. La OCr I- N N WO Z Z Z Z l
O LJ Z \ \ O
.J EO % % ', M L4 ' ZM -
I-
- p wF a * !"
, c
- LJ CC ". %
.J t- w W
20 ,
I CL A OC O E 01 ^ V ~'. Il D -
AE k LJ CO I
3 p t-- F O LJ , LJ cg l LJ W LJ ,, i;
= Lt. . L' , , td Z co - CD
- O W w ,,, , .i, O N I y . .y , , , , E I D b sea ts C l M Z g l t.0 O A v 7 LJ U ..- li r
j .
I s- e Q w
= w m W to O E 1 1
- t ld M ,@
- ,3 p 1 ..
(0 2 CO O
y NOQ W LJ O .-s O n ','
Il O N ... .
t(
O CL O CD C La.
O G ** -
O H O 1 J Z Z M - (0
,,, c O y ~
- g i n CL i CL t.1 7, y Z Z N - tw L2
..j O g ,. m g g . --
D & T
^
., if F- F ,, O 2 pn --
O
% =r== O A v ^WE y
/ OW;C O O .
11
- r. ~
M La. N .' N
>< A'-. CD v E k g F-4 g '"' 4 WZ t~ ^
, l[ y30 "F
U gWM l Z b 3.J I-m e o a l O ,.
GT La. .L. (/) CL +-4 LJ E Q 3
I-.I F
U W 8. .I EDE Cumx ?f . ,-
n
.J ~
LJ La U)
f
- Attachment 2 Page 8 of 11 1
2 .
I O - N g.
j N Z 4
Co CO CO O' J C- O- Os O- % a I" I 4 6- I l- I l- 1 CL Q. Q. h. L.I- "
'f CO CO C' C' MC o CO CW Om l 7 OW OW OW .h' .
q 7*
- 2 / '4 (J n
i i ...
t-G . J h.
\ N a
} ,
x J x x ,
4 UT *s. WW y WW 1 2 2 Z '
WO pw 7 ~ >w I 7 O O wz 7 yz ,
M
.J C JC -
b E E ,
C w m '.
! ~W -W CC W
JO _J O . , . ,' . .
+
ps v Dw .i 0.
Cc 3 Cg 2 y .
o 2
. Il f
~
' 0%
CC N LW y '
3
Q.
i ce p I - Il c<> s
- e. W mW .- O LJ D
<- O CM W Q. .J y u {
g W I' O : n W '"
.t
.J L.
CC e W
<a m N '
7 0~ +
cc .
D .L' :
O .
i.l*-
- t. >
@ 1 W
CL W Q. 'V n O
C' . m O _ . L.
O ~
H m og "J Z af CO O4 ,, c O U - 7 e e e 17m w
9 o,
I Z II O h" tJ{"
u O l ~ '
2 I $ E. F:e t- x w ;;; O
. r_ m M
b nn O. -
n
._ ^
xx vv c
==r. '
kl N
x c O
J .J Z Z ~F 0 W G., C Z th. "
Z ? ND OJ D -
W W g Gh C L. I.. I .I 3u
. fmWW II w Q. O M - M F E .J Q. M Q. O U =
NDD2O l
W I.I a. N N n
.J W L.
CfD
DEC 11,1990,' .
SELECT FUNCTION KEY OR HELP FILE N. 10:37:49 _
l HELP PAGE FOR SPTOP SPDS TOP LEVEL DISPLAY ( SPTOP)
SPTOP gives a summary of the Critical Safety Functions in the 4 plant. The six critical safety functions are: Subcriticality, Core Cooling, Heat Sink, RCS Integrity, Containment, and r RCS Inventory. Additionally, the Operational Limits Curve is available as a part of Integrity. The CSF Boxes are color coded for severity and are interpeted as follows:
GREEN -- CSF fully satisfied ( no further action required)
YELLOW -- CSF not fulig satisfied ( action may be necessary)
ORRHGE -- CSF is threatened (action is required) 1 RED -- CSF is severly threatened ( immediate action)
MAGENTA -- Computer is not currently calculating the CSF due to a problem. ( USE E0P-12 MANURL STFPS)
In addition to the CSF status boxes at the bottom, additional information which may be of interest to the op_. . tor is provided on the top level display. A brief description of each parameter followsi Containment Conditions -- either NORMAL or RDUERSE. This is determined by either high containment pressure as indicated by P1003D or high integretated containment dose ( U6054 > 1.0E6 rem). i SI Termination -- either YES or HO. This status message informs the operator if the conditions for terminating safety injection exist ( or if safety injection is not yet JK necessary). Safety injection can be terminated if: gg o
- 1) RCS pressure is stable or increasing, and *[
oo
- 2) RCS subcooling is >= 30 DEGF, and
- 3) PZR Level i s > = 4% for normal containment; 39% for , "i adverse containment, and 1 [g
- 4) R healthy heat sink exists, defined as heat sink csf status not in a red color.
Integrated. Containment Dose -- either (1.0E6 or > 1. 0 E 6. This F2= F3= F4= F5= F6=
Fl= PLHT KBD=HORMRL RMODE= POWER OPERATION
DEC 11,1990 -
SELECT FUNCTION KEY OR HELP FILE EEEEEEEE 10:39:1T l HELP PAGE FOR SPTOP is calculated by converting RMG7 and RMG18 readings to 6 Rem based on the calculation intervals of points and '
summ i ng ( i ntegrat i ng ) over time. The integrated dose may be reset to 0 using L6096.
RMST Swapover -- either REQUIRED or HOT REQUIRED. This .
message informs the operator if the RMST has reached '
i low level, and the suction of the SI pumps must be switched to the RHR/RBS Sumps. IF 1/2 of the RMST levels, LO990R and LO992R are < 18% swapover is required.
CST Swapover -- either REQUIRED or HOT REQUIRED. This status message informs the operator if 2/4 of the CST press. ( Y9008R , Y9009R , Y9010R, Y9011R ) have reached the low setpoint of 11.94 psis indicating that EFW Pump suction must be switched from the CST.
RCP Trip Criteria -- either SRTISFIED or HOT SRTISFIED. This message informs the operator if the conditions for tripping the RCPs have been met. The trip is allowed if RCS pressure is <= 1380 psig.
Natural Circulation -- either SRTISFIES (color), HOT SRTISFIED, or HOT APPLICROLE. This message informs the operator if natural circulation is in effect. A loop is in natural circulation if:
- 1) RCS Subcooling > 30 DEGF, and 2E
- 2) Core exit Temp is stable or decreasing, and
- 3) SG Pressure is stable or decreasing, and jg
- 4) Hot Les Temp is stable or decreasing, and o
- 5) Cold les Temp is at the saturation temp for El '
the prevailing SG Pressure.
o@
me In addition to the above criteria, natural circulation wo is NOT APPLICABLE unless all RCP breakers are open. "
Each RC loop is checked and determined to see if it is in natural circulation based on the criteria above.
If all loops are in natural circulation, the displau will Fl=: F 2 = F ._' M F3=
F4= F5= F6=
KBD=HORMAL RMODE= POWER OPERATION PLHT
DEC 11,1990
- SELECT FUNCTION KEY OR HELP FILE WWWNEMMW 10:40:41
. HELP PAGE FOR SPTOP show SATISFIED in green. If only two loops are in natural cire. the display will show SATISFIED in vellow. If only one RC Loop is in Natural Cire. the dispia9 will show SATISFIED in orange. If no loops are in natural circulation the display will show HOT SATISFIED in red.. There is a 5 minute delay after the RCP breakers open prior to .I a proper natural circ. indication. Until that time, the display will indicate NOT APPLICABLE.
Heat Si nk ( Feed & Bleed) -- either REQUIRED or HOT REQUIRED.
This message alerts the operator that Feed & Bleed per EOP-15.0 may be necessary. The underiving assumption is that the Steam Generators are not serving as a viable heat sink and additional heat removal capabilities may be required. This occurs if 2 of 3 Steam Generator Levels are < 10% OR Primary Pressure > 2335 with loss of Heat Sink as indicated by a RED Heat Sink CSF Status.
By each parameter on the top level display and asterisk may or may not appear. This is the suspect tag for computer points and is usually used to indicate a calculated point which uses several inputs did not use all of them to perform the calculation. An example of this would be Average SG Level where 3 inputs are averaged. If one of the input levels is bad, it will not be used, the level calculated using the other two inputs,and the resultant value tagged as suspect.
m>
We c&
C&
w wu e
oo
%e WM M
Fi= F2=i ._ -
F3= F4= F5= F6=
KBD=HORMAL AMODE= POWER OPERATION PLHT
, s, I
Attachment 3 Keyboard / Keypad Layouts
i
' 51 ANT ARD VT220 l<EYBOARD LAYOUT
/ '
i GRP GRP GRP GRP GRP GRP MAP ZZ OF5 SPDS St31 PJL RBU RAOC LIB AS DIS B TND 1
LOG AFDCALM MENU 2P51 MENU 4RW1 LMT !
I I I ll l 1 I E 11 I I I I E ll 11IrRvil c^Nc !I ll 11 Il ,
F1 F2 F3 F4 F5 F6 A PPLICA TICeN STANDARD QWERTY KEYBOARD KEYPAD
< r 4
SPECIAL FUNCTION KEYPAD LAYOUT l
l 1
01 02 03 04 5 " "'a" B !
p u.i l
D 5
- 05 06 07 ~80 5 a^o on I WAUf IMI (
09 10 11 12 PRV CANC 13 14 15 '16 F1 F2. F3 17 18- 19 20- F4 F5 F6
~
21 22 23 24 - :: -/\ E i- -