MONTHYEARML20207L5671999-03-12012 March 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 981130,1204-14 & 18 ML20207E6091999-03-0303 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980622-26 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20203M6681998-02-23023 February 1998 Forwards SER Re TR CENPD-199-P,Rev 1-P-A,Suppl 2-P, CE Setpoint Methodology Proposing CRGR Review Be Waived IAW Suggested Procedures in 890929 Memo ML20202E0141997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted1997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted ML20205D4281997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump IA-99-106, Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump1997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure IR 05000335/19970051997-07-17017 July 1997 Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116 ML20202E0261997-04-23023 April 1997 Discusses Technical Staff Actions Associated W/Three Concerns in Allegation RII-96-A-0251 ML20137L2971997-03-31031 March 1997 Forwards Matrix Containing Answer to Listed Questions in ,Rev 1 ML20137R8831997-03-27027 March 1997 Provides Info Requested by 960208 Memo from J Stolz Re Review of Spent Fuel Pool Practices & Current Licensing Basis ML20137L0981997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 37 to St Lucie Physical Security Plan,Case Control Number N5S63VA50033593.W/o Encl ML20137L2311997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 47 to St Lucie Physical Security Plan,Case Control Number N5S76VA50033596.W/o Encl ML20136E9261997-03-0606 March 1997 Forwards SALP Input Feeder Info at St Lucie Facility from 940102-960106 & Requests That Technical Staff Complete Review by 951222 ML20136A9241997-02-28028 February 1997 Partially Withheld Memo Discussing drop-in Visit of J Broadhead,Chairman & CEO FPL Group & Chairman & CEO FP&L Co & J Goldberg ML20137L2751996-12-16016 December 1996 Requests Guidance in Addressing Issues Re Use of Temporary Fire Pump W/O Evaluation & Construction of Enclosure for Control Rod Drive Electronic Equipment within Cable Spreading Room,W/O Appropriate Evaluation ML20136A6751996-12-0909 December 1996 Partially Withheld Memo Discussing Directors Decision 96-19 Under 10CFR2.206 Re Steam Generator Issued at St Lucie ML20137R5381996-11-22022 November 1996 Informs That Rept IR 94-008 for St Lucie Opens Item 94-008-02-URI Quality Level of PORV & SRV Discharge Piping ML20136E6991996-11-19019 November 1996 Requests Info Re Sheron St Lucie Visit.Info Requested by 961120 ML20136E6221996-11-19019 November 1996 Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed ML20136E6881996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instumentation Insp ML20136E6791996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instrumentation Insp ML20136E6081996-11-15015 November 1996 Provides List of Corrective Actions That Have Been Rolled Into Speakout Program ML20136E5461996-11-14014 November 1996 Forwards File Submitted to Kerry on 961024 Re PIM-like Summary of Events from 92-93 ML20136E4911996-11-13013 November 1996 Forwards Updated Schedule for St Lucie FY1 ML20140E5361996-11-12012 November 1996 Forwards Plant EA Worksheet ML20138G4131996-11-12012 November 1996 Requests Technical assistance,TIA-019,re Discrepancies Between Containment Radiation Monitoring Sys Described in Usfar & Regulatory Guide 1.45 at Plants ML20140E6591996-11-12012 November 1996 Provides Revs of Plant Violations for Current Hour ML20140E5301996-11-0808 November 1996 Forwards Input Received from Dan & Revised EA Worksheet from Incorporating Input.Few Slight Revs Were Made to Notice of Violation ML20140E6521996-11-0707 November 1996 Informs That D Barss Will Be e-mailing Input on Items 5 & 6 for Incorporation Into EA Worksheet ML20140E6201996-11-0707 November 1996 Provides Two Violations That Are Subjects of EA Worksheet ML20137R9031996-11-0606 November 1996 Requests That Info Re St Lucie Be Mailed to Author.Info May Be Found in Plan of Day Handout,Provided by Residents ML20140E5941996-11-0606 November 1996 Informs That Plant Violations 1 & 2 Re Emergency Prepardness Program Insp,Being Looked at for Escalated Enforcement.Feedback Requested ML20137Y5401996-11-0505 November 1996 Forwards Info on Two Issues to Be Discussed W/Panel at Meeting Scheduled for 961106.Partially Deleted ML20138G3651996-11-0505 November 1996 Requests That Listed Info Be Forwarded to Licensee in Connection W/Unescorted Access Visits to Plant by Listed NRC Contractor Employees During 961118-970110 for Purpose of Assisting NRC in Conduct of Design Insp.Partially Deleted ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20136E3961996-10-31031 October 1996 Informs That Violation Withdrawn Re Licensee Use of Ccw/Icw (Svc Water) in Mode 5 at Plant ML20136E4691996-10-31031 October 1996 Discusses Criticality Monitoring Ltr & Requests Response to Listed Question ML20140E5801996-10-29029 October 1996 Discusses EA Worksheet on Plant Re Wiring Error Affecting Nuclear Instrumentation ML20140E5191996-10-29029 October 1996 Discusses Addl Info for Plant Panel,Just Received from Inspector ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20140E5241996-10-29029 October 1996 Forwards Wordperfect Version as Requested ML20140E5901996-10-29029 October 1996 Forwards Enforcement Action Worksheet ML20136E5641996-10-28028 October 1996 Replies to News Summary Re Escalated Enforcement for Plant on 961025 IR 05000335/19950151996-10-28028 October 1996 Forwards Draft Insp Repts 50-335/95-15 & 50-389/95-15 on 960907-1012 ML20136E5791996-10-28028 October 1996 Discusses Plant Ni Eaw 1999-03-03
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20207L5671999-03-12012 March 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 981130,1204-14 & 18 ML20207E6091999-03-0303 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980622-26 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20203M6681998-02-23023 February 1998 Forwards SER Re TR CENPD-199-P,Rev 1-P-A,Suppl 2-P, CE Setpoint Methodology Proposing CRGR Review Be Waived IAW Suggested Procedures in 890929 Memo ML20202E0141997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted1997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted ML20205D4281997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump IA-99-106, Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump1997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure IR 05000335/19970051997-07-17017 July 1997 Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116 ML20202E0261997-04-23023 April 1997 Discusses Technical Staff Actions Associated W/Three Concerns in Allegation RII-96-A-0251 ML20137L2971997-03-31031 March 1997 Forwards Matrix Containing Answer to Listed Questions in ,Rev 1 ML20137R8831997-03-27027 March 1997 Provides Info Requested by 960208 Memo from J Stolz Re Review of Spent Fuel Pool Practices & Current Licensing Basis ML20137L0981997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 37 to St Lucie Physical Security Plan,Case Control Number N5S63VA50033593.W/o Encl ML20137L2311997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 47 to St Lucie Physical Security Plan,Case Control Number N5S76VA50033596.W/o Encl ML20136E9261997-03-0606 March 1997 Forwards SALP Input Feeder Info at St Lucie Facility from 940102-960106 & Requests That Technical Staff Complete Review by 951222 ML20136A9241997-02-28028 February 1997 Partially Withheld Memo Discussing drop-in Visit of J Broadhead,Chairman & CEO FPL Group & Chairman & CEO FP&L Co & J Goldberg ML20137L2751996-12-16016 December 1996 Requests Guidance in Addressing Issues Re Use of Temporary Fire Pump W/O Evaluation & Construction of Enclosure for Control Rod Drive Electronic Equipment within Cable Spreading Room,W/O Appropriate Evaluation ML20136A6751996-12-0909 December 1996 Partially Withheld Memo Discussing Directors Decision 96-19 Under 10CFR2.206 Re Steam Generator Issued at St Lucie ML20137R5381996-11-22022 November 1996 Informs That Rept IR 94-008 for St Lucie Opens Item 94-008-02-URI Quality Level of PORV & SRV Discharge Piping ML20136E6991996-11-19019 November 1996 Requests Info Re Sheron St Lucie Visit.Info Requested by 961120 ML20136E6221996-11-19019 November 1996 Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed ML20136E6881996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instumentation Insp ML20136E6791996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instrumentation Insp ML20136E6081996-11-15015 November 1996 Provides List of Corrective Actions That Have Been Rolled Into Speakout Program ML20136E5461996-11-14014 November 1996 Forwards File Submitted to Kerry on 961024 Re PIM-like Summary of Events from 92-93 ML20136E4911996-11-13013 November 1996 Forwards Updated Schedule for St Lucie FY1 ML20140E5361996-11-12012 November 1996 Forwards Plant EA Worksheet ML20138G4131996-11-12012 November 1996 Requests Technical assistance,TIA-019,re Discrepancies Between Containment Radiation Monitoring Sys Described in Usfar & Regulatory Guide 1.45 at Plants ML20140E6591996-11-12012 November 1996 Provides Revs of Plant Violations for Current Hour ML20140E5301996-11-0808 November 1996 Forwards Input Received from Dan & Revised EA Worksheet from Incorporating Input.Few Slight Revs Were Made to Notice of Violation ML20140E6521996-11-0707 November 1996 Informs That D Barss Will Be e-mailing Input on Items 5 & 6 for Incorporation Into EA Worksheet ML20140E6201996-11-0707 November 1996 Provides Two Violations That Are Subjects of EA Worksheet ML20137R9031996-11-0606 November 1996 Requests That Info Re St Lucie Be Mailed to Author.Info May Be Found in Plan of Day Handout,Provided by Residents ML20140E5941996-11-0606 November 1996 Informs That Plant Violations 1 & 2 Re Emergency Prepardness Program Insp,Being Looked at for Escalated Enforcement.Feedback Requested ML20137Y5401996-11-0505 November 1996 Forwards Info on Two Issues to Be Discussed W/Panel at Meeting Scheduled for 961106.Partially Deleted ML20138G3651996-11-0505 November 1996 Requests That Listed Info Be Forwarded to Licensee in Connection W/Unescorted Access Visits to Plant by Listed NRC Contractor Employees During 961118-970110 for Purpose of Assisting NRC in Conduct of Design Insp.Partially Deleted ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20136E3961996-10-31031 October 1996 Informs That Violation Withdrawn Re Licensee Use of Ccw/Icw (Svc Water) in Mode 5 at Plant ML20136E4691996-10-31031 October 1996 Discusses Criticality Monitoring Ltr & Requests Response to Listed Question ML20140E5801996-10-29029 October 1996 Discusses EA Worksheet on Plant Re Wiring Error Affecting Nuclear Instrumentation ML20140E5191996-10-29029 October 1996 Discusses Addl Info for Plant Panel,Just Received from Inspector ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20140E5241996-10-29029 October 1996 Forwards Wordperfect Version as Requested ML20140E5901996-10-29029 October 1996 Forwards Enforcement Action Worksheet ML20136E5641996-10-28028 October 1996 Replies to News Summary Re Escalated Enforcement for Plant on 961025 IR 05000335/19950151996-10-28028 October 1996 Forwards Draft Insp Repts 50-335/95-15 & 50-389/95-15 on 960907-1012 ML20136E5791996-10-28028 October 1996 Discusses Plant Ni Eaw 1999-03-03
[Table view] |
Text
.y
t . UNITED STATES '
- p f E8%g NUCLEAR REGULATORY COMMISSION
. jo,, ,
f 8, n REGION tl J 61 Fon$ r4 STREET SW TE 23TB$
uwnA.oEonoiA so3o3
%,, * * ", * /
July 17. 1997 .
MEMORANDUM FOR: Oscar DeMiranda Senior Allegation Coordinator Enforcement and Investigation Coordination Staff FROM: Kerry D. Landis. Chief n / //.
Reactor Projects Branch 3 g gA Division of Reactor Projects SUBJECT: Ril 97 A-0116 - FOREIGN MATERIAL EXCLUSION MONITORING INSUFFICIENT- ;
'
The Division of Reactor Projects performed a review and independent inspection of this anonymous concern. Our inspection regarding this matter has been completed and our inspection findings were documented in tne enclosed NRC Inspection Report 50 335.389/97-05, paragraph 03.1.
Based on the information provided. concern I was substantiated and a violation of regulatory requirements was identified and cited in Enclosure 2. Concern 2 was unable to be substantiated. Concern 3 was determined not to be an allegation. '
This concludes the staff's activities regarding this matter. These allegations are considered closed, if you have any questions regarding this matter, please contact me.
Enclosures:
1. Allegation Evaluation Report 2. NRC Inspection Report 50 335.389/97 05
.
i 9902160055 990121 T 484 PDR D- l" * *
,
_ _ _ _
_ ._ _ _ _ __ _ _ _ . - . - . . _ _ . _ _ _ -
_ _ _ _ _ _ _ _ _ _ _ __
c
.
ALLEGATION EVALUATION REPORT ALLEGATION RI! 97 A 0116 00ALIFIED AND TRAINED FME MONITOR NOT STATIONED AT UNIT 2 CONTAINMENT ST. LUCIE NUCLEAR PLANT DOCKET NO. 50 335, 389 CONCE.;N 1: A " qualified and trained" Foreign Material Exclusion Monitor was not stationed at the entrance to the to the Unit 2 containment although it was considered a FME zone at that time.
DISCUSSION: The following findings were documented in NRC Ins)ection Report 50 335.389/97-05.
the Unit 2 Containment paragga h 03.1. Foreign Material Exclusion ( ME) Control of j1 ding.
03.1 oreinn Material Exclusion (FME) Control of the Unit 2 Containment 3uildina (7D9].),
a. Inspection Scope The inspector reviewod the FME controls associated with control of material being used inside the Unit 2 containment building during the refueling outage after the containment closeout was complete. This inspection consisted of a review of the FME log, discussions with FME monitors, and Quality Instruction 0113 PR/PSL 2. Revision 29.
" Housekeeping and Cleanliness Control Methods."
b. Observations and Findings At the end of the Unit 2 refueling outage. the containment building was ,
controlled as an FME area. On May 23, 1997, the insnector reviewed the FME log book' associated with the containment building, inside the book were instructions Uhich stated that With the exception of maintenance personnel working on the Reactor Drain Tank / Containment Sump Project all other personnel shall complete the FME log. Health Physics personnel (later changed to Security) shall man the FME log desk and ensure that the log is completed for )ersonnel entering and exiting the RCB, Maintenance personnel worting on the Reactor Drain Tank / Containment Sump Project are not required to comply with the FME log requirements since a FME walk down of the work area will be performed at the completion of theproject." Also in the log book, were log sheets indicating the material that was taken into and out of containment.
On May 29. after the containment was closed cut and t! FME erea released, the inspector reviewed these log sheets and . .ed several items that had not been logged as having been removed from the
-
containment. These items included: pacer, safety belt, paperwork. pen.
tape, bolts, radio with ear muffs. rub)er suit. flashing light, clearance tags. miscellaneous hand tools, pipe wrench, five flashlights, crescent wrench, one bottle of snoop, and a gauge. in addition.
Enclosure
,
-. - _ _ - - - _ . _ - . .. -- .- -- - .-
, c>
i
. .
'
l nineteen individuals signing in on the log failed to sign out upon i exiting.
The inspector discussed the instructions listed in the FME log with various licensee management stating that these instructions did not 1 agree with the site procedure for control of FME. The licensee sto:?d l
that it was not their intention to maintain the containment as en f i l area as defined in the 01. Their philosophy was that after the sump i work was complete the entire area would be inspected and any remaining items would then be removed. Therefore it- was not necessary to log all items entering into this particular area. However, they did require that personnel not working on the sump job complete the FME log. The ins)ector noted that the entrance to the containment was identified as an ME area, that an FME log was established to control material entering and exiting the area, and that an FME monitor 'as established.
Procedure 01 1? PR/PSL-2. Section 5.5. stated, in part, that for Quality Group B systems and components. "if an FME Control Area is required the control area and controls shall be established prior to opening the system or
REGION 11 E o 101 MARIETTA STREET, N.W.. SUITE 2900 D j ATLANTA, GEORGIA 303234190
%
4.....$
Report Nos.: 50-335/94-21 and 50-389/94-21 Licensee: Florida Pwer and Light Company 9250 West Flagler Street Miami, FL 33102.
Docket Nos.: 50-335 and 50-389 License Nos.: DPR-67 and NPF-16 Facility Name: St. Lucie Plant Units 1 and 2 Inspection Conducted: September 26 - 30, 1994 Inspector: [lhh b b W. Tobin,iSenior Safegeacds llatpector L
/d W 'f[
Date Signed Accompanying Personnel: L. Stratton, Safeguards-Inspector Approved by: - -
( .
( 4 !'dY V D. R. McGuirek Qhief /Q ' Date Signec Safeguards Secffon
-
Nuclear Materials Safety and Safeguards Branch Division of Radiatien Safety and Safeguards SUMMARY Scope:
This routine, unannounced inspection was conducted in the areas of the Safeguards Program for Nuclear Power Reactors, specifically, the Security Organization, Quality Control Audits, Access Controls, Records and Reports, and Licensee Event Report (LER) No. 594-001.
Results:
In the areas inspected, violations or deviations were not identified. With respect to the inspected areas, the licensee continues to have an effective and well managed Safeguards Program. The security force is adequately staffed, audits appear thorough, access controls are dependable, and records and reports are timely and accurate. LER No. S94-001 was closed, heument transmitted hefewtfi
- Mtams senstrwe unclasched
- PSrmatm When stocrated I'DM d ~ ~ ' ""~'"""~"~'
mAFEGUARDS !NFORM ATION
, 9
- _ _ _ _ _ - _ _ _ _ _--_
.
UNITED STATES
[p cfog% NUCLEAR REGULATORY COMMISSION p* -* i , r,EGloN li g 's*' S 101 MARIETTA STREET, N.W,. SUITE 2900 g (j ATLANTA, GEORGIA 3332Ml99
%, a
%, .....f July 26, 1996 EA 96-236 & EA 96-249 Florida Power & Light Company ATTN: T. F, Plunkett President - Nuclear Division P. O. Box 14000 Juno Beach, Florida 33408-0420 SUBJECT: NRC SPECIAL INSPECTION REPORT 50-335/96-12, 50-389/96-12 Dear M