ML20206R826

From kanterella
Revision as of 07:10, 28 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
EN-86-019A:on 860917,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Issued. Sufficient Bases for Mitigation or Remission of Penalty Not Provided in Util 860515 & 23 Responses to Notice
ML20206R826
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/17/1986
From: Axelrad J, Wong H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
EN-86-019A, EN-86-19A, NUDOCS 8609190209
Download: ML20206R826 (1)


Text

p C5

" September 17, 1986 i EN 86-19A OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT' CTION Licensee: South Carolina Electric and Gas: Company

-(V. C. Summer Nuclear Plant)

Docket No. 50-395

Subject:

IMPOSITION OF CIVIL PENALTY - $50,000 m By EN 86-19 dated April 10, 1986 the Commission was notified of the intent of IE 'to issue a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of ($50,000) to South Carolina Electric and Gas Company. This action was based on a violation involving the licensee's failure,to comply with plant technical specifications in that one of two independent component cooling water and service water loops was inoperable in excess of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

The licensee responded to- the Notice in letters dated May 15 and 23,1986.

After careful consideration of the licensee's responses, the staff has concluded that the violation did occur as set forth in the Notice of Violation and Proposed Imposition of Civil Penalty. and that sufficient bases for reduction-of the proposed. severity level or. mitigation or remission of the proposed civil penalty

.were not provided in their responses.

~

Accordingly, an Order Imposing Civil Penalty in the amount of $50,000 has been issued today. Under the terms of the Order, the licensee may within 30 days of the date'of the Order, pay the civil penalty or request a hearing.

Contact:

H. Wong, IE 29635 _

J. Axelrad, IE 24909 '

Distribution: yp ,

H Street /J:(/o MNBB /.30 Phillips /l:N EW Nillste /?d A Chairman Zech EDO ~ HRR IE NMSS' Com. Roberts DED/ROGR OIA Comm. Asselstine PA OI s

^

Comm. Bernthal ELD AE0D Comm. Carr RM , s ACRS Air Rights / M..

SECY Regi Offices i CA SP RI/h RIV/Lt W ,. MAIL ADM: Doc. Mgt. Br.

PE RII/AVf RV w:Vf' PDR Rill /p_;g RES

\

8609190209 860917 PDR I&E EN-86-019A PDR 1

n og fg:33 1  : -

-