Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1
ML20129A654
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 07/31/1996
From: Hill R
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20129A626 List:
References
NUDOCS 9609180368
Download: ML20129A654 (1)


Text

,* . ,

OPERATING DATA REPORT DOCKETNO. 50-498 UNIT 1 DATE Seo.5.1996 COMPLETED BY R.L. Hill TELEPHONE $12 972-7667 OPERATING STATUS 1 REPORTING PERIOD: 7/1/96-7/31/ % GROSS HOURS IN REPORTING PERIOD: 244

2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250/>

DESIGN ELECTRICAL RATING (MWe-Net): 1250 6

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): Nec
4. REASONS FORRESTRICTION(IF ANY) N/A THIS MONDI YRTO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 744.0 4 569,2 46.206.5
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATORON LINE 24_4 0 4.542.0 44.881.3
8. UNIT RESERVE SIIUTDOWN HOURS 9 9 9 9 GROSS THERMAL ENERGY GENERATED (MWH) 2.839.756 17.060.616 165.216.951
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 970.600 5.862.440 56.244.110
11. NET ELECTRICAL ENERGY GENERATED (MWH) 928 440 3 611.350 53.424.070
12. REACTOR SERVICE FACTOR JQO.Lf 89.4 % 66.4 %
13. REACTOR AVAILABILITY FACTOR 100.0*/, 89 4% 66.4 %
14. UNIT SERVICE FACTOR 100.0 % 38 2% 64.5 %
15. UNIT AVAILABILITY FACTOR 100.0 % 8_8ff 8 6__4l%
16. UNIT CAPACITY FACTOR (Using MDC) 99.8 % 87.8 % 61.4'/.,
17. UNIT CAPACITY FACTOR (Using Design MWe) 99.8 % 7 378% 614%
18. UNIT FORCED OUTAGE RATE 9.0'Q% 0.0% 241%
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

N/A

20. IF SHUTDOWN AT END C'F REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 9609180368 960910 PDR ADOCK 05000498 R PDR.