Category:Letter
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] Category:Licensee Response to Notice of Violation
[Table view] |
Text
(£# ,,.,_>, Exelon Generation RA-16-069 August 4, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Subject: Reply to a Notice of Violation; EA-16-057 Inspection Report No. 05000219/201601 O; 10 CFR 2.201 Reference: U.S. Nuclear Regulatory Commission Letter to Exelon Generation, Oyster Creek Nuclear Generating Station -Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation -Inspection Report 05000219/2016010, dated July 6, 2016. The referenced letter identified a violation that has been considered for escalated enforcement action related to an NRC inspection performed at the Oyster Creek Nuclear Generating Station (OCNGS) involving the failure by Exelon Generation Company, LLC (Exelon) to maintain a flexible coupling hose, which provides cooling water to the Emergency Diesel Generator (EOG) No. 1. The letter is considered a notice of escalated enforcement action and, therefore, requires a response in accordance with NRC Enforcement Policy. Exelon accepts the violation of low to moderate safety significance (White). As requested per the NRC in the referenced letter the following is OCNGS response: 1) The Reason for the Violation: Failure by Exelon to maintain a flexible coupling how, which provides cooling water to the Emergency Diesel Generator (EOG) No.1, in support of its safety function. Specifically, the flexible coupling hose was in service for approximately 22 years and subjected to thermal degradation and aging that eventually led to the failure of EOG No. 1 on January 4, 2016. Additionally, Exelon violated Technical Specification 3.7.C, since EOG No. 1 was determined to be inoperable for greater than the technical specification allowed outage time of seven day U.S. Nuclear Regulatory Commission Reply to a Notice of Violation; EA-16-057 Docket No. 50-219 August 4, 2016 Page 2 of 4 2) The corrective steps that have been taken and the results achieved: OCNGS, in order to correct the issue identified with the failure of EOG No. 1 and to ensure that a similar failure would not occur on the EOG No. 2, replaced the failed right bank and the non-faileo left bank cooling water tank-to-pump inlet flexible hose on EOG No. 1 and replaced left and right bank cooling water tank-to-pump inlet flexible hoses on EOG No. 2. EOG No.1 was returned to operable status on January 5, 2016. The station also developed an EOG Performance Improvement Plan and as part of the corrective steps OCNGS performed a Root Cause Investigation. The following actions were created and completed out of the Root Cause Investigation: o Performed the following reviews and documented any gaps identified: Identified other nonmetallic flexible hoses within the Emergency Diesel Generator system and compared against the current Preventive Maintenance (PM) Program. Implemented additional PMs and Corrective Maintenance (CM) to address any gaps identified during the review that will ensure that all non-metallic flexible hoses within the EOG system meet the requirements of the Performance Centered Maintenance (PCM) Template. -Actions Completed April 21, 2016 o Performed the following reviews and documented any gaps found: Reviewed the PM Program for the EDGs to ensure preventive maintenance is consistent with PCM template, vendor's recommendations, Appendix 1 of Procedure 636.1.010, Revision 25, and all learnings from the EOG Excellence Team. This review included a walkdown to identify components that do not have a Component Record Listing (CRL). Implemented additional actions to address gaps identified during the review (e.g., PMs, CMs, etc.). -Actions Completed April 21, 2016 o. * Document CA review of Work Order C2035542 that replaced the failed hose on EOG No. 1. -Action Completed April 22, 2016 o Documented CA review of Work Order C2035546 that replaced the hoses on EOG No. 2. -Action Completed April 13, 2016 o Increased the scope of the inspection to include coolant hose replacement (Met Tower Back-up Generator) every 12 years with the initial replacement in 2016 due to age of component. -Action Completed April 23, 2016 U.S. Nuclear Regulatory Commission Reply to a Notice of Violation; EA-16-057 Docket No. 50-219 August 4, 2016 Page 3 of 4 3) The corrective steps that will be taken: The following corrective actions were created out of the Root Cause Investigation and are awaiting o Replace Flexible Fuel Line, Y-39-8 on EDG No. 2 in the next window of sufficient duration -Due December 30, 2017. o Replace Fuel Oil Hose on Fire Diesel Engine No. 1 in the next window of sufficient duration -Due December 16, 2016. o Replace Lube Oil Hose on Fire Diesel Engine NQ: 1 in the next window of sufficient duration -Due December 16, 2016. o Replace Oil Hose on Turbocharger on Fire Diesel Engine No. 1 in the 11ext window of sufficient duration -Due December 16, 2106. o Implement a case study to address* knowledge weaknesses of station personnel related to EOG reliability, top 10 PRA issues, and charter development (problem statement development, desired outcome, and engaging the correct people) along with the 5 weak/ineffective/failed barriers identified in the Barrier Analysis of the Root Cause as determined through the systematic approach to training. -Due September 30, 2016 \ 4) The date when full compliance will be achieved: OCNGS achieved full compliance on January 5, 2016 at 0141 when EOG No.1 was declared operable following replacement of the failed right bank and the non-failed left bank cooling water tank-to-pump inlet flexible hose, and following satisfactory completion of EDG No.1 Operability Surveillance Test. The NRC completed the separate supplemental inspection for this White Finding in accordance with Inspection Procedure (IP) 95001 during the week of July 25, 2016 which exited on July 29, 2016. The NRC inspection team final report is expected to be published within 45 days of the inspectio U.S. Nuclear Regulatory Commission Reply to a Notice of Violation; EA-16-057 Docket No. 50-219 August 4, 2016 Page 4 of 4 Should you have any questions concerning this letter, please contact Michael McKenna, Regulatory Assurance Manager, at (609) 971-4389.
Sincerely,Garey Stathes Site Vice President Oyster Creek Nuclear Generating Station cc: USNRC, Administrator, Region I USNRC, Senior Resident Inspector -OCNGS