Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210K3281999-07-30030 July 1999 Forwards Response to NRC RAI Re License Amend Request 98-17. North Atlantic Concurs with Staff That Bases Should State That Maintaining ECCS Piping Full of Water from RWST to Reactor Coolant Sys Ensures Sys Will Perform Properly ML20210H8991999-07-27027 July 1999 Forwards Tabulation of Current LBLOCA & SBLOCA Peak Clad Temp Margin Utilization Tables Applicable to Seabrook Station ML20210H0921999-07-27027 July 1999 Forwards Naesc Semi-Annual Fitness-for-Duty Rept,Jan-June 1999, Per 10CFR26.71(d).Rept Includes Data from 990101- 0610 ML20210S9911999-07-18018 July 1999 Requests NRC Intervene for All Shareholders of New England Electric System & to Help with Merger with National Grid Group & That NRC Petition Security & Exchange Commission to Investigate Matter Relative to No Shareholder Options ML20210A2521999-07-15015 July 1999 Forwards Rev 33 to Seabrook Station Radiological Emergency Plan & Rev 84 to Seabrook Station Emergency Response Manual ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1351999-07-0909 July 1999 Forwards Relief Request Re Repair Welding on SA-351 Matl to Be Installed in Seabrook Station SW Pumps & SW Cooling Tower Pumps ML20209D2871999-07-0606 July 1999 Submits Response to NRC AL 99-02,re Numerical Estimate of Licensing Actions Expected to Be Submitted in Fy 2000 & 2001.Schedule Does Not Include Activities Which Meet AL Definition of Complex Review ML20209C9021999-06-30030 June 1999 Provides Revised Distribution List for Seabrook Station Correspondence to Reflect Current Organization ML20196G2391999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant Encl ML20196G3381999-06-23023 June 1999 Forwards LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20195J0981999-06-17017 June 1999 Forwards Responses to Questions Posed in Re Application of New England Power Co for Transfer of Control of Licenses NPF-49 & NPF-86.Copy of 1998 Schedule 13G, Included,As Requested ML20196D0561999-06-16016 June 1999 Forwards Certified Copy of Endorsements 77 & 78 to Nelia to Policy NF-0296 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195J1221999-06-15015 June 1999 Forwards Addl Clarifying Info to Suppl Info Provided at 990602 Predecisional Enforcement Conference at Region I. Proprietary Declarations by Util Employees to Correct Inaccuracies Encl.Proprietary Info Withheld,Per 10CFR2.790 ML20210K4971999-06-15015 June 1999 Forwards Copy of Ltr from Concerned Constitutent AC Menninger from Franconia,Nh to Senator Smith Re Seabrook Nuclear Power Station Y2K Readiness ML20195E9731999-06-0707 June 1999 Forwards Rev 32 to Seabrook Station Radiological Emergency Plan & Rev 83 to Emergency Response Manual ML20206T4201999-05-20020 May 1999 Forwards Certified Copies of Resolution Adopted by Shareholders of National Grid Group Approving Acquisition of New England Electric Sys & Vote of New England Electric Sys Shareholders Approving Merger with National Grid Group ML20196L2001999-05-0707 May 1999 Forwards Rev 01-07-00 to RE-21, Cycle 7 COLR, Per TS 6.8.1.6.c ML20206K4301999-05-0707 May 1999 Forwards Copy of Corrective Order of Notice by State of Nh Nuclear Decommissioning Financing Committee ML20206J3321999-05-0505 May 1999 Forwards Tabulation of Number of Tubes Plugged in Each of Two SGs Inspected During Sixth Isi,Per Plant TS SR 4.4.5.5a. Sixth ISI Was Completed on 990420 ML20206J3341999-05-0505 May 1999 Informs That on 990501,ISO New England & New England Power Pool Implemented Restructured Wholesale Electricity Market. Summary of Util Action as Result of Implementation of Subject Market,Encl ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206G4371999-04-30030 April 1999 Forwards 1998 Annual Environ Operating Rept for Seabrook Station.Encl Rept Is Summary of Implementation of EPP for Period of Jan-Dec 1998 ML20206H4801999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Seabrook Station. Listed Info Provided in Encls 1999-09-08
[Table view] |
Text
_ _ _ __
1 I4 .
g%
1 North North Atlantic Energy Service Corporation l
'ty Atlantic d
P.O. Box 300 Seatreet, Nu 03874 (603) 474-9521 ,
The Northeast Utilities System February 13,1997 Docket No. 50-443 NYN-97021 United States Nuclear Regulatory Commission Attn.: Document Control Desk Washir. ton, D.C. 20555 Seabrook Station Response to Request for Additional Information Soent Fuel Assembly Dron Analyses North Atlantic Energy Service Corporation (North Atlantic) has enclosed the Seabrook Station response to the NRC Request for Additional Information (RAI)' letter dated January 9,1997. The NRC RAI requested similar infonnation for each of the Northeast Utilities nuclear units. The NU response for the other nuclear units will be provided under separate cover.
The NRC RAI as it pertained to Seabrook Station requested a basis and justification to support further NRC evaluation of apparent inconsistencies between the Technical Specifications and Updated Final Safety Analysis Report regarding (1) the weight of a spent fuel assembly and its associateo handling and !
lifting components and, (2) the impact load for the design of the spent fuel pool storage racks. The l
enclosure to this letter addresses the apparent inconsistencies identified in the NRC RAI. 1 North Atlantic performed confirmatory calculations verifying that the drop of a load of 2l00 pounds (the Technical Specification nominal value for the weight of a spent fuel assembly and handling tool, the actual value is 1976 pounds) on the spent fuel storage racks will not result in exceedence of specified margins with respect to rack configuration and fuel criticality. Seabrook Station spent fuel racks were designed to accommodate consolidated spent fuel and thus the racks are relatively stronger and more resistant to impact loads than conventional storage racks.
f :
i 4
- ' NRC Letter dated January 9,1997," Request for Additional Information Regarding Moving a Spent Fuel I
(
Assembly and Its Associated Lifting and Handling Components" P.F. McKee to B. D. Kenyon.
9702200328 970213 PDR ADOCK 05000443 P_,,_ PDR m
- =
,Un ited States Nuclear Regulitery Commission
, NYN-97021/Page 2 Should you have any questions regarding this letter, please contact Mr. Anthony M. Callendrello, Licensing Manager at (603) 773-7751.
Very truly yours, NORTH ATL. ANTIC ENERGY SERVICE CORP.
i hh/As?
- l. W7 . DiProfio [
Station Director i
cc: Hubert J. Miller, Region I Administrator Mr. Albert W. De Agazio, Sr. Project Manager Mr. John B. Macdonald, NRC Senior Resident Inspector i
l i
l l
l l
1 9
4
~ , . -- , ,
O e
o S
e ,
1 ENCLOSURE TO NYN-97021 1
i 1
SEABROOK STATION RESPONSE to NRC REOUEST for ADDITIONAL INFORMATION MOVEMENT of SPENT FUEL ASSEMBLIES and ASSOCIATED LIFTING and HANDLING COMPONENTS NRC Reauest for Additional Information dated January 13.1997 (edited to address Seabrook Statinn anestions oniv)
Section 3.9.7 of the Seabrook Station Technical Specifications (TS) states that loads in excess of 2l00 pounds shall be prohibited from travel over fuel assemblies in the storage pool. The Bases for TS 3.9.7 state that the restriction on movement of loads in excess of the nominal weight of a fuel assembly and associated handling tool over the fuel assemblies in the storage pool ensures that in the event this load is dropped: (1) the activity release will be limited to that contained in a single fuel assembly, and (2) any possible distortion of fuel in the storage racks will not result in a critical array.
Section 9.1.4.3 of the Updated Final Safety Analysis Report (UFSAR) states that the spent fuel handling tool weighs approximately 400 pounds and the weight of one fuel assembly is 1600 pounds. Section 9.1.2.1 of the UFSAR states that the impact load for the design of the racks is based on a 17x17 fuel assembly,8.426 inches square,167 inches long, weighing 1616 pounds, and falling a distance of 18 inches to the racks at the worst possible orientation.
The TS seem to imply that the weight of one fuel assembly and its associated handling tool is 2l00 pounds.
Ilowever, the UFSAR seems to indicate that the weight of one fuel assembly and its associated handling tool is approximately 2000 pounds. Further, if the spent fuel storage rack design impact load is 1616 pounds as given in Section 9.1.2.1. of the UFSAR, this is significantly less than the previously mentioned TS limits.
In order to support funher NRC evaluation of this apparent inconsistency and resulting potential safety concern, Northeast Utilities (NU) is requested to provide to the NRC its basis and justification for the previously described inconsistencies.
Seabrook Station Resnonse to NRC RAI dated January 13.1997 The actual weightsfor a rodded spentfuel assembly and handling tool are asfollows:
(Ref: Foreign Prints $5127for the handling tool and 50597for thefuel assembly)
Spent fuel assembly (rodded): 1616 pounds llandling Tool: 360 pounds Total Weight assembly and handling tool: 1976 pounds Sources ofApparent inconsistencies:
Updated FinalSafety Analysis Report (UFSAR):
UFSAR Section 9.1.4.3 UFSAR Section 9.1.4.3 states the following regarding the spent fuel handling tool:
l 1
l
"When the fingers are latched a pin is inserted into the operating handle which prevents inadvertent actuation. The tool weighs approximately 400 pounds and is tested at 125 percent of the weight of one fuel assembly (1600 pounds)."
This section of the UFSAR is specifying an " approximate" weight for the handling tool (actual weight is 360 pounds for handling tool). This section is apparently specifying an approximate weight for a fuel assembly (actual is 1616 pounds). To eliminate any apparent inconsistency this section will be revised to eliminate discussion of specific weights. 7he testing referred to in this section was performed by the supplier of the handling tool, Westinghouse Electric Corporation. Foreign Print 55127 for the handling tool specifies that a load test is performed at 2500 pounds and that "2500 lbs. Capacity" is inscribed on the tool.
UFSAR Section 9.1.2.1 UFSAR Section 9.1.2.l(g) states the following regarding the analysis of a dropped fuel assembly:
"the impact load for the design of the racks is based on a 17XI7 fuel assembly,8.426 inches square,167 inches long, weighing 1616 pounds, and falling a distanu of 18 inches to the racks at the worst possible orientation."
The design analysis impact load is based upon the Standard Review Plan 3.8.4, Appendix D, " Technical Position on Spent Fuel Pool Racks". North Atlantic committed to Standard Review Plan 3.8.4 Appendix D in response to NRC RAI 220.35 which was incorporated into the FSAR in Amendment 45, June 1982.
SRP 3.8.4 Appendix D requires spent fuel storage racks be evaluated for the accidental drop of a fuel assembly. The handling tool is not included in the SRP guidelines for analysis of loads and load combinations. Spent fuel pool impact load analyses which assumed the weight of a rodded fuel assembly (1616 pounds) as the dropped load, complied with the guidelines of the SRP The Seabrook Station Safety Evaluation Report Section 9.1.2 contains the following conclusion: "The racks can withstand the impact of a dropped fuel assembly without unacceptable damage to the fuel and can withstand the maximum uplift forces exerted by the fuel handling machine. Thus the requirements of GDC 61 and 62 and the guidelines of RG 1.13 concerning the protection of fuel from mechanical damage and prevention of criticality are met."
North Atlantic conducted additional confirmatory analyses to ensure that an assumed impact load of 2100 pounds, the nominal weight of a fuel assembly and handling tool as stated in Technical Specification 3/4.9.7, would not result in any unacceptable damage to the fuel. It would not be expected that the Seabrook Station spent fuel storage racks which were designed to accept consolidated spent fuel would be effected by a load drop of 2100 pounds. This confirmatory analysis conservauvely neglected the effects of fuel assembly displacement in water which was considered in the original analysis. Calculation C-S ,
10069 demonstrated that the conclusions of the original design analysis were still valid, that is, the spent fuel storage racks remain within specified margins with respect to rack configuration and fuel criticality.
UFSAR Section 9.1.2.1 will be updated to reflect that the impact load for the design of the racks is 2l00 pounds. This UFSAR change will result in full analytical consistency between the UFSAR and Technical Specification 3/4.9.7.
BASESfor TechnicalSpect)1 cation 3M.9.7 The BASES for Technical Specification 3/4.9.7 state the following:
"The restriction on movement ofloads in excess of the nominal weight of a fuel and control rod assembly and associated handling tool over other fuel assemblies in the storage pool ensuret that in the event that this load is dropped: (1) the activity release will be limited to that contained in a single fuel assembly and (2) any possible distortion of fuel in the storage racks will not result in a critical array. This assumption is consistent with the activity release assumed in the safety analysis."
o- #
It is clear that this Technical Specification pertains to the nominal weight of a rodded fuel assembly and handling tool. The nominal weight of a todded spent fuel assembly and handling tool as specified in Technical Specification 3/4.9.7 is 2100 pounds. The Technical Specification nominal weight of 2100 pounds corresponds to the actual weight of 1976 pounds.
1 i
I J
I i
e