MONTHYEARNOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With NOC-AE-000385, Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with NOC-AE-000357, Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With NOC-AE-000329, Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with NOC-AE-000296, Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With NOC-AE-000256, Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 2 NOC-AE-000233, Monthly Operating Repts for June 1998 for Stp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Stp,Units 1 & 2 NOC-AE-000202, Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 2 NOC-AE-000172, Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 2 ML20216G4911998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for South Texas Project,Units 1 & 2 NOC-AE-000108, Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 2 NOC-AE-000090, Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 2 NOC-AE-000061, Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station1997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station NOC-AE-000039, Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 2 ML20199K0571997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2 ML20198J9221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for South Texas Project,Units 1 & 2 ML20216H9651997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20210K5201997-07-31031 July 1997 Monthly Operating Repts for July 1997 for STP ML20141H3041997-06-30030 June 1997 Monthly Operating Repts for June 1997 for South Tx Project, Units 1 & 2 ML20148K5871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20141G2841997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20137X5811997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for South Tx Project Units 1 & 2 ML20137X6011997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2 ML20137B3981997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for STP ML20134M7421997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20133P3191996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20132C1301996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20134M7431996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20129A5961996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for South Texas Project Units 1 & 2 ML20129A6361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for South Texas Project Electric Generating Station ML20129A6541996-07-31031 July 1996 Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1 ML20116M6721996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for South Texas Project Electric Generating Station ML20115H0321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for South Tx Project, Units 1 & 2 ML20112H9921996-05-31031 May 1996 Monthly Operating Repts for May 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20117G0101996-04-30030 April 1996 Monthly Operating Repts for April 1996 for STP ML20100R2861996-02-29029 February 1996 Monthly Operating Repts for South Texas Project Electric Generating Station Units 1 & 2 ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for STP ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for South Texas Project ST-HL-AE-5256, Monthly Operating Repts for Nov 1995 for STP Units 1 & 21995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for STP Units 1 & 2 ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 21995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project1995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for South Tx Project ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station1995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for STP Electric Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
P The Light c o mp a ny Sout h Tem l'nded Deuric Genuating Station l'. O. Box 289 Wadmodh. Tem 77m Ilouston Lighting & Power l
June 15, 1994 I I
ST-HL-AE-4816 '
File No.: G02 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project i Units 1 and 2 l Docket Nos. STN 50-498, STN 50-499 Monthly Operatina Reports for May 1994 Pursuant to 10CFR50.71(a) and South Texas Project Electric l l Generating Station (STPEGS) Technical Specification 6.9.1.5, I attached are the Monthly Operating Reports for May 1994.
If you should have any questions on this matter, please l
contact Mr. S. M. Head at (512) 972-7136.
. F. Groth Vice President, Nuclear Generation MKJ/esh Attachments: 1) STPEGS Unit 1 Monthly Operating Report - May 1994
- 2) STPEGS Unit 2 Monthly Operating Report - May 1994 9406220001 940531 PDR ADOCK 05000498 .
R PDR A Subsidiary of flouston industiies incorporated /
MISC-94\94-164.001
Houston Lighting & Power Company ST-HL-AE-4816 South Texas Project Electric Generating Station File No.: G02 Page: 2 c:
Leonard J. Callan Rufus S. Scott Regional Administrator, Region IV Associate General Counsel U. S. Nuclear Regulatory Commission Houston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400 P. O. Box 61067 Arlington, TX 76011 Houston, TX 77208 Lawrence E. Kokajko Institute of Nuclear Power l Project Manager Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway l Washington, DC 20555-0001 13H15 Atlanta, GA 30339-5957 David P. Loveless Dr. Joseph M. Hendrie Sr. Resident Inspector 50 Bellport Lane l c/o U. S. Nuclear Regulatory Comm. Bellport, NY 11713 P. O. Box 910 Bay City, TX 77404-910 D. K. Lacker Bureau of Radiation Control J. R. Newman, Esquirc Texas Department of Health Newman, Bouknight & Edgar, P.C. 1100 West 49th Street STE 1000, 1615 L Street, N.W. Austin, TX 78756-3189 Washington, DC 20036 U. S. Nuclear Regulatory Comm.
K. J. Fiedler/M. T. Hardt Attn: Document Control Desk City Public Service Washington, D. C. 20555-0001 P. O. Box 1771 l San Antonio, TX 78296 J. C. Lanier/M. B. Lee J. R. Egan, Esquire City of Austin Egan & Associates, P.C.
Electric Utility Department 2300 N Street, N.W.
721 Barton Springs Road Washington, D.C. 20037 Austin, TX 78704 G. E. Vaughn/C. A. Johnson Central Power and Light Company P. O. Box 2121 Corpus Christi, TX 78403 l
l l
i i
l l
t e
~
ATTACHMENT 1 l
- ST-HL-AE- 4Bik l PAGE 1 0F k SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 NONTHLY OPERATING REPORT MAY 1994 HOUSTON LIGHTING AND POWER CO. l NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 i
Reviewed B b a [/[!fM' Supervisor Date Reviewed By: hb Nk [!d[9%
Engineering Manag/r 'D' ate Approved Byg d d N iM le[/0[9V Plant Manager " Date l
l
l ATTACHMENT I ST HL AE-istt.
Monthly Summary PAGE _2_ 0F _ I, STPEGS Unit 1 began the reporting period operating at 48% reactor power with scheduled maintenance in progress. Maintenance was completed and the unit was returned to full power operation on 5/3/94.
The unit operated for the remainder of the reporting period with no shutdowns or significant power reductions.
1 1
1 ATTACHMENT 1 'l ST-HL AE- 43tta I OPERATING DATA REPORT PAGE 3 0F 6 '
l I
DOCKET NO. 50-498 j UNIT 1 !
DATE Jun. 6, 1994 COMPLETED BY R.L. Hill TELEPHONE 512/972-7667 i I
OPERATING STATUS
- 1. REPORTING PERIOD: 05/01/94-05/31/94 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY. AUTHORIZED POWER LEVEL (MWt): 3800 MAX. DEPEND. CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net):'_ Hone l
- 4. . REASONS FOR RESTRICTION (IF ANY): N/A J 1
1 THIS MONTH YR TO DATE CUMULATIVE j
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 744.0 1988.7 28861.3 i
- 6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0 0
- 7. HOURS GENERATOR ON LINE.................. 744.0 1772.5 27696.3
- 8. UNIT RESERVE SHUTDOWN HOURS.........,.... 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWt).... 2735140 5895982 100561490
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH).. 941300 2006670 34021330
- 11. NET ELECTRICAL ENERGY GENERATED (MWH).... 893962 1903985 32163529
- 12. REACTOR SERVICE FACTOR................... 100.0% 54.9%' 57.1%
- 13. REACTOR AVAILABILITY FACTOR.............. 100.0% 54.9% 57.1%
- 14. UNIT SERVICE FACTOR...................... 100.0% 48.9% 54.8%
- 15. UNIT AVAILABILITY FACTOR................. 100.0% 48.9% 54.8%
- 16. UNIT CAPACITY FACTOR (Using MDC)......... 96.1% 42.0% 50.9%
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 96.1% 42.0% 50.9%
- 18. UNIT FORCED OUTAGE RATE.................. 0.0% 51.1% 33.9%
l.
! 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i
h a
ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL ST-HL-AE 'Olb PAGE 4 0F 4 i
DOCKET NO. 50-498 !
UNIT .1 DATE Jun. 6, 1994-
- COMPLETED BY R.L. Hill
. TELEPHONE }J2/972-7667 i
MONTH MAY 9
i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) f 1 539 17 1232
, 2 543 18 1232 3 1142 19 1232 4 1254 20 1252 5 1261 21 1256 6 1260 22 1256 7 1260 23 1255 8 1258 24 1260 9 1256 25 1263 10 1257 26 1261 j 11 1258 27 1259-i
- 12 1259 28 1259 i
13 1235 29 1238 14 1232 30 1255 15 1233 31 1259 7
16 1235 k
i l
l 4
3 1 r i
i UNIT SHUTDOWNS AND POWER REDUCTIONS -
DOCKET 20. 50-498 UNIT 1 DATE Jun. 6, 1994
- COMPLETED BY R.L. Hill TELEPHONE 512/972-7667 REPORT MONTH MAY j i
1 2 3 4 5 No. Oate Type Duration Reason Method of Licensee System Component Cause & Corrective Action to l (Hours) Shutting Event Code Code Prevent Recurrence ;
Down Report # ,
t Reactor ;
96-03 940429 S 0.0 B 5 N/A SL P Reactor power was reduced to just below r 50% to allow for the inspection and clean- ,
ing of steam generator feedwater pump l turbine 11 and 12 lubricating oil coolers, corrective maintenance on the feedwater j booster pumps, and weld repair on a condensate system header drain line. ;
Additional repairs were performed on various other steam leaks. l 4
I 1
1
'o to >
b --4--i cn.1.-m m A 3>
1 2 3 4 5 79 F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 Umb S: Scheduled A-Equipment Failure (Explain) 1-Manual yy B-Maintenance or Test 2-Manual Scram oo --!
C-Refueling 3-Automatic Scram o5-n D-Regulatory Restriction 4-Cont. of Existing
. E-Operator Training & License Exam Outage I F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other
w_ -.
ATTACHMENT 1 ST-HL AE- 411' PORVs and Safety Valves Summary PAGE lo 0F k There were no PORV or Safety Valves challenged during the reporting period.
1 j
i l
l l
l l
i l
,n' e ~ -
ATTACHMENT 1 ST-HL-AE- 4 Sib PAGE 1- 0F b 1
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT MAY 1994 HOUSTON LIGHTING AND POWER CO.
NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Reviewe : /.4 ,) %._ '
b Supervisor Date Reviewed By: db M b!br N4-Engineering Managdr Da'te Approved By: / ((/[ff' Pl[nt Manager [ Ddte
l 1
ATTACHMENT A.
ST-HL-AE- 4 31G Monthly Summary PAGE 1 0F _le ;
STPEGS Unit 2 experienced an automatic reactor scram during February 1993 and subsequently remained shutdown due to auxiliary feedwater system component failures. While the unit was shutdown, corrective maintenance was performed and organizational and work process changes were implemented, q l
Upon the resolution of the auxiliary feedwater system component failures l and the additional issues, efforts were resumed on the refueling and scheduled l maintenance outage.
l l
On 5/17/94 the Nuclear Regulatory Commission acknowledged completion of the l Confirmatory Action Letter issues associated with Unit 2 and authorized the I restart of the unit in accordance with the startup and power ascension plan.
The unit was returned to service on 5/30/94 at 0202 and concluded the )
reporting period operating at 40% reactor power with the power ascension testing 1 program in progress.
l l
I
)
ATTACHMENT 1 ST-H L-AE- 4 BE OPERATING DATA REPORT PAGE ?; 0F 4 DOCKET NO. 50-499 UNIT 2 DATE Jun. 6. 1994 COMPLETED BY R.L. Hill TELEPHONE 512/972-7667 OPERATING STATUS
- 1. REPORTING PERIOD: 05/01/94-05/31/94 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 l MAX. DEPEND.CAPACIT1' (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 1
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(HWe-Net): None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE l l
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 223.1 223.1 24979.3 l 6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0- 0 i
- 7. HOURS GENERATOR ON LINE.................. 57.6 57.6 23791.3
- 8. UNIT RESERVE SHUTDOWN HOURS.............. 0 0 0 1
l l l 9. GROSS THERMAL ENERGY GENERATED (MWt)..... 89867 89867 86523389 1
- 10. GROSS ELECTRICAL ENERGY GENERATED (HWH).. 11300 11300 29215890
- 11. NET ELECTRICAL ENERGY GENERATED (HWH).... 9048 9048 27744327
- 12. REACTOR SERVICE FACTOR................... 30.0% 6.2% 57.6% i
- 13. REACTOR AVAILABILITY FACTOR.............. 30.0% 6.2% 57.6%
- 14. UNIT SERVICE FACTOR...................... 7.7% 1.6% 54.8%
- 15. UNIT AVAILABILITY FACTOR................. 7.7% 1.6% 54.8%
- 16. UNIT CAPACITY FACTOR (Using MDC)......... 1.0% 0.2% 5 LtL%,
l
- 17. UNIT CAPACITY FACTOR (Using Design HWe).. 1.0% 0.2% 51.1%
- 18. UNIT FORCED OUTAGE RATE.................. 92.2% 98.4% 34.7%
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
l N/A l 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A l
1
~
ATTACHMENT 2.
ST HL-AE-4 Sib AVERAGE DAILY UNIT POWER LEVEL PAGE._4 0F 6 DOCKET No. 50-499 UNIT 2 DATE Jun. 6, 1994 COMPLETED BY R.L. Hill TELEPHONE 512/972-7667 MONTH MAY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (HWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 l 4 0 20 0 5 0 21 0 l 6 0 22 O l
l 7 0 23 0 l 8 0 24 0 l
9 0 25 0 l 10 0 26 0 11 0 27 0 12 0 28 0 13 0 _ 29 23 14 0 __ 30 81 15 0 31 273 l
16 0
UNIT SHUTDOWNS AND POWER REDUCTIONS '
DOCKET MO. 50-499 UNIT 2 DATE Jun. 6, 1994 COMPLETED BY R.L. Hill TELEPHONE 512/972-7667 REPORT MONTH MAY 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down Report # ,
Reactor 93-07 930524 F 677.7 F 4 N/A N/A N/A Upon the resolution of the auxiliary -
feedwater system corrective actions and additional issues, the refueling and scheduled maintenance outage was resumed.
94-01 940529 S 8.7 8 9 N/A TA TRB Main turbine overspeed trip test.
1 2 3 4 5 >m>
T wH F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 M-i-y S: Scheduled A-Equipment Failure (Explain)
B-Maintenance or Test 1-Manual 2-Manual Scram 7]
IJi m M C-Refueling 3-Automatic Scram jQ D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage o$
Tl 6p F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
ATTACHMENT 2.
S I-HL-AE- 9 si c.
l IMRVs and Safety Valves Sununary _
There were no PORV or Safety Valves challenged during the reporting period.