ML20071N232
From kanterella
ML20071N232 | |
Person / Time | |
---|---|
Site: | 05000000, Shoreham |
Issue date: | 04/30/1983 |
From: | STONE & WEBSTER ENGINEERING CORP. |
To: | |
Shared Package | |
ML20071N221 | List: |
References | |
NUDOCS 8306060359 | |
Download: ML20071N232 (87) | |
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20069F0001994-01-24024 January 1994
[Table view]Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept ML20045C8881993-06-0808 June 1993 Vols 1 & 2 to Refueling Jib Crane 1T31-CRN-008A Incident Root Cause Analysis. W/One Oversize Encl ML20128P6451993-02-28028 February 1993 Snps Decommissioning Project Termination Survey Final Rept for Steam Turbine Sys (N31) ML20128P7431993-02-19019 February 1993 Rev 3 to 93X027, Nuclear QA Surveillance Rept ML20099H5781992-07-31031 July 1992 Rev 4 to Shoreham Defueled Sar ML20101K5791992-06-25025 June 1992 Long Island Power Authority Shoreham Decommissioning Project,Shoreham Nuclear Power Station,Technical Rept on Water Processing & Water Mgt Activities for Reactor Pressure Vessel & Wet Cutting Station ML20082M5081991-08-26026 August 1991 Rev 3 to Shoreham Defueled Sar ML20005F2511990-01-0505 January 1990 Shoreham Nuclear Power Station Defueled Sar. ML17347B4621989-12-31031 December 1989 App a to USI A-46 & Generic Ltr 87-02. ML19332G1991989-09-18018 September 1989 Rev 0 to Radiological Safety Analysis for Spent Fuel Storage & Handling. ML20246D6871989-08-14014 August 1989 Rev 1 to Criticality Analysis of Byron & Braidwood Station High Density Fuel Racks ML18008A0311989-07-31031 July 1989 NTH-TR-01 Decrease in Heat Removal by Secondary Sys. ML19327B4011989-07-31031 July 1989 Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel. ML20246D6711989-06-30030 June 1989 Criticality Analysis of Byron/Braidwood Fresh Fuel Racks ML20247H0711989-06-30030 June 1989 Description & Verification Summary of Computer Program, Gappipe ML20247H0791989-06-22022 June 1989 App to Description & Verification Summary of Computer Program,Gappipe ML20245E0181989-06-19019 June 1989 QC 1989 Staffing Rept ML20247N0621989-05-31031 May 1989 Production Training Dept,Braidwood,Malfunctions & Initial Conditions ML20247K3011989-05-12012 May 1989 Leak-Before-Break Evaluation for Carbon Steel Piping ML20247L1841989-05-12012 May 1989 Leak-Before-Break Evaluation for Stainless Steel Piping, Byron & Braidwood Nuclear Power Stations Units 1 & 2 ML18094A3551989-04-30030 April 1989 Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemps Ridley (Lepidochelys Kempi) & Loggerhead (Carretta Caretta) Sea Turtles. ML20247F1321989-03-23023 March 1989 Post-Tensioning Sys Evaluation,Callaway Unit 1 Containment & Wolf Creek Unit 1 Containment ML20005G4211989-02-28028 February 1989 Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation. ML17251A4811989-02-28028 February 1989 Ultrasonic Indication Sizing Technique Development. Related Info Encl ML20206C7451988-11-30030 November 1988 ATWS Mitigation Sys Specific Design for Byron/Braidwood Stations, Rev 5 ML20205T7501988-11-0404 November 1988 Detection & Skin Dose Evaluation for Characteristic X-Ray in Activation Product Contamination ML20206K3101988-10-31031 October 1988 Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Limerick Generating Station Unit 1 ML20206K3021988-10-31031 October 1988 Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Peach Bottom Atomic Power Station Unit 3 ML20154N6081988-09-30030 September 1988 Rev 1 to Identification of Unisolable Piping & Determination of Insp Locations ML20154K2091988-09-0909 September 1988 Rev 0 to Response to NRC Bulletin 88-005,Nonconforming Matls Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co.... Proprietary Procedure 1404.1, Leeb Hardness Testing (Equotip).... Encl.Procedure Withheld ML20153G8941988-08-31031 August 1988 Rev 1 to Shoreham Nuclear Power Station Prompt Notification Sys Rept ML20245B4181988-08-17017 August 1988 Investigation Rept,Design & Operation of Sampling Sys for Analysis of High Purity Water ML20196K6311988-06-29029 June 1988 QC Div 1988 Staffing Rept ML17347A7981988-06-16016 June 1988 Radiological Data Prepared for Resolution of USI A-46. ML17347A7971988-06-16016 June 1988 Seismic Hazard Data Prepared for Resolution of USI A-46. ML20150F2941988-05-31031 May 1988 Rev 4 to, ATWS Mitigation Sys Specific Design for Byron/ Braidwood Stations ML20196L6281988-05-20020 May 1988 Rev 2 to ATWS Mitigation Sys Actuation Circuitry (Amsac) ML20196L6421988-05-0606 May 1988 ATWS Mitigation Sys Actuation Circuitry Response to Unit Transients ML20151H9581988-04-30030 April 1988 CASMO-3G Validation ML20148A4851988-02-29029 February 1988 Shoreham Nuclear Power Station PRA W/Supplemental Containment Sys ML20151T4681988-01-31031 January 1988 Experimental & Finite Element Evaluation of Spent Fuel Rack Damping & Stiffness ML20148G5431988-01-15015 January 1988 Nonproprietary Mods to Critical Flow Model in RELAP5YA ML20155K1391987-12-30030 December 1987 Final Rept MSIV 3-Way Dual Solenoid Valve Failures ML20235F0881987-12-17017 December 1987 Marked-up Draft Seismological Analysis of Bodega Head,Ca ML20236Y0941987-10-21021 October 1987 Epri/Westinghouse Owners Group Analysis of DHR Risk at Point Beach, Final Rept ML20235G3041987-09-29029 September 1987 Partially Withheld, Preliminary Investigation of Enrico Fermi II Nuclear Power Plant ML20235B3121987-08-31031 August 1987 Comparison of Monticello & Brunswick Recirculation Pump Trip ML18151A1351987-08-28028 August 1987 Rev 1 to SPDS SAR for VEPCO NUREG-0696 Computer Project, North Anna & Surry Nuclear Power Stations. ML20237K8201987-08-26026 August 1987 TVA Employee Concerns Special Program Bellefonte Nuclear Plant Element Rept BLN-NSRS-2, Review of Nuclear Safety Review Staff Non-Startup Items at Bellefonte ML20237K7691987-08-0606 August 1987 Rev 3 to TVA Employee Concern Special Program Browns Ferry Nuclear Plant Element Rept BFN-NSRS-1, Review of Nuclear Safety Review Staff Restart Items at Browns Ferry 1994-01-24 Category:TEXT-SAFETY REPORT MONTHYEARML20140G4481997-05-0101 May 1997
[Table view]Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20135D8011996-11-26026 November 1996 Part 21 Rept Re Two Safety Related Valves Supplied by Velan Valve Corp Were Not in Compliance W/Originally Supplied QA Documentation.Returned Valves to Velan in May 1996 & on 961120 Velan Advised That Valves Had Been Misplaced ML20080G4691995-01-26026 January 1995 Record of Telcon W/Nrc & Licensees 950126 to Clarify Position Re Dispositioning of Exempt Sources Listed in Section 6.3.3 of Shoreham Termination Survey Final Rept Dtd Oct 1994 ML20069F0001994-01-24024 January 1994 Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20057F2261993-09-30030 September 1993 Safety Evaluation Supporting Exemption Request from Requirements of 10CFR50.54(q) for License NPF-82 ML20056C7181993-07-14014 July 1993 SE Supporting Amend 10 to License NPF-82 ML20045B3551993-06-11011 June 1993 LER 93-001-00:on 930429,refueling Jib Crane Moved in Vicinity of Spent Fuel Pool Using vendor-supplied Lifting Eye in Violation of NUREG-0612.Caused by Failure to Identify Crane as Heavy Load.Meetings held.W/930611 Ltr ML20045C8881993-06-0808 June 1993 Vols 1 & 2 to Refueling Jib Crane 1T31-CRN-008A Incident Root Cause Analysis. W/One Oversize Encl ML20128P6451993-02-28028 February 1993 Snps Decommissioning Project Termination Survey Final Rept for Steam Turbine Sys (N31) ML20044C1181993-02-28028 February 1993 Shoreham Nuclear Power Station Updated Decommissioning Plan. ML20128P7431993-02-19019 February 1993 Rev 3 to 93X027, Nuclear QA Surveillance Rept ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20128B9641992-10-31031 October 1992 Rev 0 to Shoreham Decommissioning Project Termination Survey Plan ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20099H5781992-07-31031 July 1992 Rev 4 to Shoreham Defueled Sar ML20114A6311992-07-28028 July 1992 Shoreham Decommissioning Plan ML20101K5791992-06-25025 June 1992 Long Island Power Authority Shoreham Decommissioning Project,Shoreham Nuclear Power Station,Technical Rept on Water Processing & Water Mgt Activities for Reactor Pressure Vessel & Wet Cutting Station ML20094L1271992-03-13013 March 1992 Amend 1 to Part 21 Rept 159 Re Potential Defect in Power Cylinder Liner.Initially Reported on 920115.Caused by Liner/ Block Fit & Localized Matl Microstructure.All Drawings & Specs Revised to Address Matl Design Requirements ML20082M5081991-08-26026 August 1991 Rev 3 to Shoreham Defueled Sar PM-91-125, Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station1991-07-31031 July 1991 Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station PM-91-112, Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station1991-06-30030 June 1991 Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station PM-91-075, Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station1991-04-30030 April 1991 Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station ML20024G7171991-04-22022 April 1991 LER 91-001-00:on 910324,RB Normal Ventilation Sys (Rbnvs) Outboard Exhaust Valve Closed for No Apparent Reason.Cause Inconclusive.Sys Restored to Normal Lineup & Rbnvs Outboard Valve Will Be Stroked on Routine basis.W/910422 Ltr SNRC-1806, Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 19901991-04-15015 April 1991 Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 1990 PM-91-058, Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station1991-03-31031 March 1991 Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station PM-91-037, Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station1991-02-28028 February 1991 Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station PM-91-016, Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station1991-01-31031 January 1991 Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station ML20069Q3901990-12-31031 December 1990 Shoreham Nuclear Power Station Decommissioning Plan. (Filed in Category P) SNRC-1797, 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 19901990-12-31031 December 1990 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 1990 SNRC-1794, Shoreham Nuclear Power Station Annual Operating Rept,19901990-12-31031 December 1990 Shoreham Nuclear Power Station Annual Operating Rept,1990 SNRC-1799, Lilco 1990 Annual Rept1990-12-31031 December 1990 Lilco 1990 Annual Rept ML20028H0231990-09-28028 September 1990 LER 90-007-00:on 900907,unplanned Actuation of ESF Sys Occurred During I&C Surveillance Test.Caused by Inadequate procedure.SP44.650.16 Revised to Require That Leads Lifted & Individually separated.W/900928 Ltr ML20056A2001990-07-31031 July 1990 Safety Evaluation Supporting Amend 6 to License NPF-82 PM-90-097, Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station1990-06-30030 June 1990 Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station ML20055E3911990-06-25025 June 1990 Safety Evaluation Supporting Amend 5 to License NPF-82 PM-90-083, Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station1990-05-31031 May 1990 Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station 05000322/LER-1987-0091990-05-16016 May 1990 LER 87-009-01:on 870203,full Reactor Trip Occurred Due to Perturbation in Ref Leg.Caused by Spurious Low Level Reactor Pressure Vessel Water Level Signal.Existing Level & Pressure Transmitters Replaced W/Newer Models 05000322/LER-1989-0051990-05-16016 May 1990 LER 89-005-01:on 890321,results of Local Leak Rate Test of Core Spray Suction Valve a Determined That Leakage,When Combined W/All Type B & C Penetration Leakages,Exceeded Tech Spec Limit.Caused by Normal Valve Degradation 05000322/LER-1989-0031990-05-16016 May 1990 LER 89-003-01:on 890310,emergency Diesel Generator (EDG) 102 Manually Shutdown During 18-month Surveillance Test Due to Failure of EDG Output Breaker.Cause Not Determined. Replacement Breaker Installed in Cubicle 102-8 05000322/LER-1987-0221990-05-16016 May 1990 LER 87-022-01:on 870604,HPCI Test Valve to Condensate Storage Tank,Globe Valve & Hpci/Rcic Test Valve to Condensate Storage Tank Failed to Close Against Sys Operating Pressure.Disc of motor-operated Valve 37 Modified 05000322/LER-1987-0121990-05-16016 May 1990 LER 87-012-01:on 870504,uplanned Actuation of ESF Occurred. Caused by Technician Loosing Footing & Accidently Hitting Outside Cover of Level Switch.Permanent Ladders & Platforms Installed at Head Tank Level Switches 05000322/LER-1986-0391990-05-16016 May 1990 LER 86-039-01:on 861006,unplanned Initiation of Reactor Bldg Standby Ventilation Sys Occurred W/All Rods Inserted in Core.Caused by Faulty Design of Retaining Device.Warning Signs Attached to Valve Actuator & Valve Mod Initiated 05000322/LER-1988-0171990-05-16016 May 1990 LER 88-017-01:on 881025,discovered That Seismic Monitoring Instrumentation Returned to Svc Prior to Verifying Sys Operability & Special Rept Not Written.Caused by Personnel Error.Surveillance Engineer Reassigned 05000322/LER-1986-0321990-05-16016 May 1990 LER 86-032-01:on 860728,RWCU Isolated on High Differential Flow Sensed by Steam Leak Detection Sys While Placing Filter Demineralizers in Operation.Cause Not Determined. Operating Procedures Revised to Monitor RWCU Sys 05000322/LER-1986-0141990-05-16016 May 1990 LER 86-014-01:on 860305,full Reactor Trip Occurred Due to Momentary False Low Vessel Level Signal,Causing Hydraulic Pressure Spike in Ref Leg A.Bourton Tube Type Pressure Transmitter Replaced W/Rosemount Model 1153 05000322/LER-1985-0591990-05-16016 May 1990 LER 85-059-01:on 851219,half Reactor Trip,Full NSSS Shutoff Sys Isolation & Reactor Bldg Standby Ventilation Sys Initiation Occurred Due to Loss of Power to Reactor Protection Sys Bus B.Assembly Breaker Reset 1997-05-01 |
Text