MONTHYEAR05000322/LER-1989-0051990-05-16016 May 1990 LER 89-005-01:on 890321,results of Local Leak Rate Test of Core Spray Suction Valve a Determined That Leakage,When Combined W/All Type B & C Penetration Leakages,Exceeded Tech Spec Limit.Caused by Normal Valve Degradation 05000322/LER-1989-0031990-05-16016 May 1990 LER 89-003-01:on 890310,emergency Diesel Generator (EDG) 102 Manually Shutdown During 18-month Surveillance Test Due to Failure of EDG Output Breaker.Cause Not Determined. Replacement Breaker Installed in Cubicle 102-8 05000322/LER-1988-0171990-05-16016 May 1990 LER 88-017-01:on 881025,discovered That Seismic Monitoring Instrumentation Returned to Svc Prior to Verifying Sys Operability & Special Rept Not Written.Caused by Personnel Error.Surveillance Engineer Reassigned 05000322/LER-1988-0151990-05-16016 May 1990 LER 88-015-02:on 880916,seismic Monitoring Instrumentation, Including Peak Acceleration Recorders,Removed from Svc for More than 30 Days Due to Corrosion on Scratch Plates.Cover Gasket Replaced & Thermal Barrier Mount to Be Installed 05000322/LER-1988-0031990-05-16016 May 1990 LER 88-003-01:on 880322,unplanned Automatic Initiation of Reactor Bldg Standby Ventilation Sys Side a Occurred During Deenergization of Relay.Caused by Close Placement of Relay Terminals.Wiring Inside Electrical Panels Reworked 05000322/LER-1987-0351990-05-16016 May 1990 LER 87-035-02:on 871221,880106 & 0330,high Energy Line Break Logic Isolations of RWCU & Main Steam Line Drain Valves Occurred.Caused by Problems W/Temp Monitoring Units. Grounding Scheme Changed & Transformers Rewired 05000322/LER-1987-0221990-05-16016 May 1990 LER 87-022-01:on 870604,HPCI Test Valve to Condensate Storage Tank,Globe Valve & Hpci/Rcic Test Valve to Condensate Storage Tank Failed to Close Against Sys Operating Pressure.Disc of motor-operated Valve 37 Modified 05000322/LER-1987-0121990-05-16016 May 1990 LER 87-012-01:on 870504,uplanned Actuation of ESF Occurred. Caused by Technician Loosing Footing & Accidently Hitting Outside Cover of Level Switch.Permanent Ladders & Platforms Installed at Head Tank Level Switches 05000322/LER-1986-0391990-05-16016 May 1990 LER 86-039-01:on 861006,unplanned Initiation of Reactor Bldg Standby Ventilation Sys Occurred W/All Rods Inserted in Core.Caused by Faulty Design of Retaining Device.Warning Signs Attached to Valve Actuator & Valve Mod Initiated 05000322/LER-1986-0321990-05-16016 May 1990 LER 86-032-01:on 860728,RWCU Isolated on High Differential Flow Sensed by Steam Leak Detection Sys While Placing Filter Demineralizers in Operation.Cause Not Determined. Operating Procedures Revised to Monitor RWCU Sys 05000322/LER-1986-0141990-05-16016 May 1990 LER 86-014-01:on 860305,full Reactor Trip Occurred Due to Momentary False Low Vessel Level Signal,Causing Hydraulic Pressure Spike in Ref Leg A.Bourton Tube Type Pressure Transmitter Replaced W/Rosemount Model 1153 05000322/LER-1985-0591990-05-16016 May 1990 LER 85-059-01:on 851219,half Reactor Trip,Full NSSS Shutoff Sys Isolation & Reactor Bldg Standby Ventilation Sys Initiation Occurred Due to Loss of Power to Reactor Protection Sys Bus B.Assembly Breaker Reset 05000322/LER-1987-0091990-05-16016 May 1990 LER 87-009-01:on 870203,full Reactor Trip Occurred Due to Perturbation in Ref Leg.Caused by Spurious Low Level Reactor Pressure Vessel Water Level Signal.Existing Level & Pressure Transmitters Replaced W/Newer Models 1990-05-16
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20140G4481997-05-0101 May 1997 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20135D8011996-11-26026 November 1996 Part 21 Rept Re Two Safety Related Valves Supplied by Velan Valve Corp Were Not in Compliance W/Originally Supplied QA Documentation.Returned Valves to Velan in May 1996 & on 961120 Velan Advised That Valves Had Been Misplaced ML20080G4691995-01-26026 January 1995 Record of Telcon W/Nrc & Licensees 950126 to Clarify Position Re Dispositioning of Exempt Sources Listed in Section 6.3.3 of Shoreham Termination Survey Final Rept Dtd Oct 1994 ML20069F0001994-01-24024 January 1994 Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20057F2261993-09-30030 September 1993 Safety Evaluation Supporting Exemption Request from Requirements of 10CFR50.54(q) for License NPF-82 ML20056C7181993-07-14014 July 1993 SE Supporting Amend 10 to License NPF-82 ML20045B3551993-06-11011 June 1993 LER 93-001-00:on 930429,refueling Jib Crane Moved in Vicinity of Spent Fuel Pool Using vendor-supplied Lifting Eye in Violation of NUREG-0612.Caused by Failure to Identify Crane as Heavy Load.Meetings held.W/930611 Ltr ML20045C8881993-06-0808 June 1993 Vols 1 & 2 to Refueling Jib Crane 1T31-CRN-008A Incident Root Cause Analysis. W/One Oversize Encl ML20044C1181993-02-28028 February 1993 Shoreham Nuclear Power Station Updated Decommissioning Plan. ML20128P6451993-02-28028 February 1993 Snps Decommissioning Project Termination Survey Final Rept for Steam Turbine Sys (N31) ML20128P7431993-02-19019 February 1993 Rev 3 to 93X027, Nuclear QA Surveillance Rept ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20128B9641992-10-31031 October 1992 Rev 0 to Shoreham Decommissioning Project Termination Survey Plan ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20099H5781992-07-31031 July 1992 Rev 4 to Shoreham Defueled Sar ML20114A6311992-07-28028 July 1992 Shoreham Decommissioning Plan ML20101K5791992-06-25025 June 1992 Long Island Power Authority Shoreham Decommissioning Project,Shoreham Nuclear Power Station,Technical Rept on Water Processing & Water Mgt Activities for Reactor Pressure Vessel & Wet Cutting Station ML20094L1271992-03-13013 March 1992 Amend 1 to Part 21 Rept 159 Re Potential Defect in Power Cylinder Liner.Initially Reported on 920115.Caused by Liner/ Block Fit & Localized Matl Microstructure.All Drawings & Specs Revised to Address Matl Design Requirements ML20082M5081991-08-26026 August 1991 Rev 3 to Shoreham Defueled Sar PM-91-125, Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station1991-07-31031 July 1991 Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station PM-91-112, Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station1991-06-30030 June 1991 Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station PM-91-075, Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station1991-04-30030 April 1991 Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station ML20024G7171991-04-22022 April 1991 LER 91-001-00:on 910324,RB Normal Ventilation Sys (Rbnvs) Outboard Exhaust Valve Closed for No Apparent Reason.Cause Inconclusive.Sys Restored to Normal Lineup & Rbnvs Outboard Valve Will Be Stroked on Routine basis.W/910422 Ltr SNRC-1806, Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 19901991-04-15015 April 1991 Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 1990 PM-91-058, Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station1991-03-31031 March 1991 Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station PM-91-037, Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station1991-02-28028 February 1991 Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station PM-91-016, Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station1991-01-31031 January 1991 Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station SNRC-1797, 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 19901990-12-31031 December 1990 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 1990 SNRC-1794, Shoreham Nuclear Power Station Annual Operating Rept,19901990-12-31031 December 1990 Shoreham Nuclear Power Station Annual Operating Rept,1990 SNRC-1799, Lilco 1990 Annual Rept1990-12-31031 December 1990 Lilco 1990 Annual Rept ML20069Q3901990-12-31031 December 1990 Shoreham Nuclear Power Station Decommissioning Plan. (Filed in Category P) ML20028H0231990-09-28028 September 1990 LER 90-007-00:on 900907,unplanned Actuation of ESF Sys Occurred During I&C Surveillance Test.Caused by Inadequate procedure.SP44.650.16 Revised to Require That Leads Lifted & Individually separated.W/900928 Ltr ML20056A2001990-07-31031 July 1990 Safety Evaluation Supporting Amend 6 to License NPF-82 PM-90-097, Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station1990-06-30030 June 1990 Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station ML20055E3911990-06-25025 June 1990 Safety Evaluation Supporting Amend 5 to License NPF-82 PM-90-083, Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station1990-05-31031 May 1990 Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station 05000322/LER-1988-0151990-05-16016 May 1990 LER 88-015-02:on 880916,seismic Monitoring Instrumentation, Including Peak Acceleration Recorders,Removed from Svc for More than 30 Days Due to Corrosion on Scratch Plates.Cover Gasket Replaced & Thermal Barrier Mount to Be Installed 05000322/LER-1986-0391990-05-16016 May 1990 LER 86-039-01:on 861006,unplanned Initiation of Reactor Bldg Standby Ventilation Sys Occurred W/All Rods Inserted in Core.Caused by Faulty Design of Retaining Device.Warning Signs Attached to Valve Actuator & Valve Mod Initiated 05000322/LER-1986-0321990-05-16016 May 1990 LER 86-032-01:on 860728,RWCU Isolated on High Differential Flow Sensed by Steam Leak Detection Sys While Placing Filter Demineralizers in Operation.Cause Not Determined. Operating Procedures Revised to Monitor RWCU Sys 05000322/LER-1987-0091990-05-16016 May 1990 LER 87-009-01:on 870203,full Reactor Trip Occurred Due to Perturbation in Ref Leg.Caused by Spurious Low Level Reactor Pressure Vessel Water Level Signal.Existing Level & Pressure Transmitters Replaced W/Newer Models 05000322/LER-1987-0221990-05-16016 May 1990 LER 87-022-01:on 870604,HPCI Test Valve to Condensate Storage Tank,Globe Valve & Hpci/Rcic Test Valve to Condensate Storage Tank Failed to Close Against Sys Operating Pressure.Disc of motor-operated Valve 37 Modified 05000322/LER-1989-0051990-05-16016 May 1990 LER 89-005-01:on 890321,results of Local Leak Rate Test of Core Spray Suction Valve a Determined That Leakage,When Combined W/All Type B & C Penetration Leakages,Exceeded Tech Spec Limit.Caused by Normal Valve Degradation 05000322/LER-1989-0031990-05-16016 May 1990 LER 89-003-01:on 890310,emergency Diesel Generator (EDG) 102 Manually Shutdown During 18-month Surveillance Test Due to Failure of EDG Output Breaker.Cause Not Determined. Replacement Breaker Installed in Cubicle 102-8 05000322/LER-1985-0591990-05-16016 May 1990 LER 85-059-01:on 851219,half Reactor Trip,Full NSSS Shutoff Sys Isolation & Reactor Bldg Standby Ventilation Sys Initiation Occurred Due to Loss of Power to Reactor Protection Sys Bus B.Assembly Breaker Reset 05000322/LER-1987-0351990-05-16016 May 1990 LER 87-035-02:on 871221,880106 & 0330,high Energy Line Break Logic Isolations of RWCU & Main Steam Line Drain Valves Occurred.Caused by Problems W/Temp Monitoring Units. Grounding Scheme Changed & Transformers Rewired 05000322/LER-1988-0031990-05-16016 May 1990 LER 88-003-01:on 880322,unplanned Automatic Initiation of Reactor Bldg Standby Ventilation Sys Side a Occurred During Deenergization of Relay.Caused by Close Placement of Relay Terminals.Wiring Inside Electrical Panels Reworked 1997-05-01
[Table view] |
LER-2088-017, |
Event date: |
|
---|
Report date: |
|
---|
3222088017R00 - NRC Website |
|
text
,g geht #0 men 3os W8 kUCt&O a IULathyCOMMi&% ION
- tiPR0vtD Owlt ND vilD010s i
4 x,,on . u
$$1tMattb Duf;DtN ti3, Et&PONst TO COM>tv ettM TMil E'#i,4'Of&A'S%*t '
d,','MAV?,U'iTi(c'MDi LICENSEE EVENT REPORT (LER) '
1 '
Erile".','s'#0'?,a'iYte',?'# A*W '"
E'wE'AEttSU AE' loft's%fd.Scis?i.'c%S"
. A.,,,,v N A t n , oocMi hv-.i. it, -+ ,
Shoreham Nuclear power Station Unit 1 o l61010 I o l 312 l 2 1 lod 014 l Seismic Manitoring Instrumentation was Inop for greater than 30 days without thn inmunn~n nr n em-i ni nnm + -inio4n~ t-u nn e*n+nont h on mremm1 nr-n"-
tvekt cett isi tln seveset n is, alp 0mt cett eri Otuta e Acetivits .Nvo6ven ici CONTM YtAR vleh M,N WDN1H Dev vtAm sativvwhavel DOCMi huw9tt hi [
DAY "[$ i'6 o 16 l 0 t o I o r l l l
~ ~
1l n dn o. o do q l1l7 n l1 0l5 1l6 9h oisiogoio r l l M4 hp0M $6 SVDMimD Nm6VANT M TMt MouskiWINn Op u tem 6 (Cnece one e, pie.e e, ee ,eupma,s nu Ort hatsNG moo
- 4 a eoaisi n enisi 60 nientH => n viisi n H eatteH1Hil H MleHit to 734eH3Het f a it tel A i q) A N 4064eHilM $0 Mtsitti H 73 eHitiv6sl OTMt 1106
_ _ _ t{e sa A6,7c, n niemHo a nieH H.,un Ai u. A ,
n .wieniH.i u _
30 406telHluvi M 93tsH3 Het M f aisuttivihuel 90 astialH Het H taieH8Hml M 731eHtHai ,
4tCIN8tt CONT ACT FOR TMit Lt m H3)
%vt 1ttipwoNt huvstm Amt A cotit George D. Schnaars, Operational Ccmpliance Engineer Si l; 6 9: 2 i 9 -l8l 3l0 0 1
COMPLif t ONG LING #0h 8 ACH COMPONENT F AILutt DischittD IN THl4 StPont (13:
CJ.Vst $vlit w Cou'ONIN1 %g "Yo$,'m"NI Cav$t l* st t u CowPONENT wNC sit *0m t,Ag e i i I I I I I i 1 1 1 1 1 1 1 I l l l i l I l i i 1 1 i SVPPLEMINT&4 $$ PORT 4 RtlCTBD 114' MONtr Dev vtAR q vu us, re. a.n. e : A ucreo svowss,ok u tu, X) No l 1 l An uc , m-, ,e . . ., . . . ,e. . , .. e. e ,,,, ..,,s. ,. n. ,
On October 25, 1988, it was discovered that seismic monitoring instrumentation was returned to service prior to completing all cetions necessary for verifying operability as delineated in the curveillance procedure SP 44.655.03, Seismic Monitoring Instramentation Cal, and Funct. Test'. The plant was in Operational Condition 4 with the mode switch in Shutdown and all rods inserted in the core. These instruments are required to be operable at all times per Tech Spec 3.3.7.2. When the instruments were taken out of cervice for calibration, they were required to be returned to cervice within 30 days or the Action Statement would apply. This requires the submittal of a Special Report within 10 days. These instruments were not properly returned to service due to an inadequate review of the test procedure by the surveillance engineer cnd the Action Statement was not met. This event was discovered l during an I&C review of the surveillance tests. Upon discovery, the instruments and their associated monitors were declared inoperable, cwaiting data review and completion of the surveys. Plant Management was notified of the event and the NRC was notified at 0950 on 10/26/88e per 10CFR50.72. This Supplemental Report is being submitted to inform the Commission of the status of corrective l cotions.
l 9005240088 900516 PDR ADOCK 03000322 Nmc ,. ne see, S PDC
,~
u.. .o~
g vCa.. . 0vuto.. Mi ,,,,,,,,,,,,,,,,,,
w,usmm UCENSEE EVENT REPORT (LER) (5,';*',2!,0 *fg,g?of;;i,"ji,%ep;t,v ,gyjgig TEXT CSNTINUATION 1*,%',',*,'o'[, ,i'*tn*ciasi','W'"f,'l# 'v".' d!"f 5
"'P M i"M i*t45Jf,*a'! O '?" # J R 0 ?,1?
3 Of MAkAQtWINT AND $VDGET,malMINQToN,DC 20bO3 P&Clutt teaML til DOCett, seuMDE. (3' ORNUMDthISI P&OI (31 vsa, 56 ge gg6 jty e,yp Shoreham Nuclear power Station Unit 1 o 16 lo lo j o l 3l2 l 2 Al 8 -
0 l1l7 -
0 l1 0l2 0F 0 l4 vert - . = M we w mia w nn PLANT AMD_M ETEM.IDERIIEICAllOR General Electric - Boiling Water Reactor Energy Industry Identification System (EIIS) codes are identified in the text as [xx).
IDENTIFICATION OF THE EVENT Seismic Monitoring Instrumentation (IN) was out for more than 30 days without the submittal of a Special Report violating a Tech.
L Spec. action statement due to personnel error.
Event Date: 10/25/88 Report Date: 5/16/90 l CONDITIONS PRIQB TO THE EVEHI l Operational Condition 4 (Cold Shutdown)
Mode Switch - Shutdown RPV Pressure : O psig RPV Temperature = 106 Degrees F i POWER LEVEL - 0 All rods inserted in the core.
DESCRIPTION _0E_IHE EVENI e
.On October 25, 1988, it was discovered that seismic monitoring instrumentation was returned to service prior to completing all cetions necessary for verifying operability as delineated in the curveillance procedure SP 44.655.03, Seismic Monitoring l Instrumentation Calibration and Functional Test. These instruments cre required to be operable at all times per Tech Spec. 3.3.7.2.
When-the instruments were taken out of service for calibration, they were required to be returned to service within 30 days or the Action Statement would apply. The Action Statement required the submittal of a Special Report within 10 days. These instruments were not J properly returned to service by procedure and the Action Statement was not met. This event was discovered during an I&C review of the l I
aurveillance_ tests. Upon discovery, the instruments and their associated monitors were declared inoperable, awaiting data review cnd completion of the surveys. Plant Management was notified of the cvent and the NRC was notified at 0950 on 10/26/88 per 100FR50.72.
88AC Poesn 306A (6401
u.muet..a..v6 .., co
.y, o ,
- E RP6:Its 4/30?2 l LICENSEE EVENT REPORT (LER) 5,96*f)),*A180,MM',8;ghtp%5fT.',' 70."J"4' !
TEXT CSNTINUATlON c?,7,'f,y,y,5^nDac, *E,,f',% U/e'"^,'j,;M".' SEftil
- M f"t.'A ce um W *=o
- ciuswT J "."it$2 evocev wa Mmoto
'.E.ruosos.
2.il?' J d 2 0;
.ACILiv,8.AML 01 oOCR t , ,uven$t h (U PA06135 Ltk edutettR 166 ei.a " a M.4 l'a?.?
Shoreham Nuclear pcwer Station Unit 1 0l6l0l0l0l3l212 0l 8 -
01117 -
011 0 13 0F 0 14.
virr u . = w we ,.-am.u nn The following identifies the inoperable monitors and their reason for inoperability:
Date l Taken out of i instrument Eersice Beamon for Innnerabilitz 1Z94-ZR 005 BY 8/29/88 Survey not performed ;
-ZR 005 BZ 8/31/88 Survey not performed I
-ZR 005 CX 8/19/88 Survey not performed 1
-ZR 006 C 9/03/88 Survey not performed 1
-ZR 004 X 4/22/88 Cal. data out of spec. I
-ZE 003 A 4/24/88 Survey data out of spec.
CAUSE QLIBLEYEH The root cause of the event was personnel error. The individual responsible for the review of the surveillance test did not-odequately ensure that the acceptance criteria was met prior to placing the instruments back in service. In addition, there are inadequacies in SP 44.655.03 that contributed to this event.
As part of the procedure, when the seismic instruments are calibrated and placed back in the recorder, the recorder is reinstalled from where it was removed and then surveyed to ensure it is properly positioned. The need to perform this survey before returning the recorder to service'is identified in the Discussion cection (3.2) of the procedure. Although there are procedural steps for performing the survey, the body of the procedure does not cpecifically state that this must be done prior to returning the rscorders to service. In addition, there are sign-off steps in the instrument Time Keeping Log (Appendix 12.30) to verify removal from cnd return to service of the recorders, however, the sequencing of
.the steps does not ensure that the survey is performed before being i
returned to service, l
i ANALYSIS _QE_IBE_ EYE R This event resulted in the violation of the reporting requirements specified in Technical Specification Section 3.3.7.2, Action Statement "a" and is reportable per 10CFR50.73(a)(2)(1). Technical Specifications require a Special Report to be submicted within 10 days following 30 days of seismic monitoring instrumentation inoperability. As discussed above, this reporting requirement was not met.
82CPom 3 6A(6491
i
~ ~
- u. ve m . t.utAT.. co Mi o., ,,,,,,,,,,,,,,,,, ,
.,.;,. .A
.an,mm a 5.yl* f 49 Avi g tgl'o!'n s tit' .!? W ,T ," 'a j
>- LIOENSEE EVENT REPORT (LERI R*"4'fo*A!6nfai%f!Mfe'.*, f,'!2 M' Mif"f.t TEXT CONTINUATlON '
2 W "tA,'M Jt".*s % *~',e"E hJfd"c'k Mili 0, MANAGEMLNT AND DubGLT W ASHINGToh DC 2M03
,AOL (31
. ACILity hAMG Hi DoCR4188WM04. (21 Lt. NUMet.146
Shoreham Nuclear Power Station Unit 1 nla O' n la-o15101010131212 s i e o b 17 nh ,
mw-. - a w -on There was no safety significance to the event. All others seismic instrumentation identified in Tech. Spec. Table 3.3.7.2-1 was unaffected by the.inoperability of the subject recorders. These recorders are passive devices and do notTherefore, serve to provide their indication :
of'a seismic event to the Control Room.
inoperability had no effect on the ability to detect a seismic cvent. They serve to provide. data for analysis following a seismic cvent. Other Control Building, Reactor Building and free field ceismic instrumentation identified in Tech. Spec. Table 3.3.7.2-1 ^
was operable to provide data for analysis and to provide Control Room indication of a seismic event.
CORRECTIVE ACTIONS H
- 1. . The surveillance engineer responsible for the event has been reassigned. .
- 2. Station Procedure SP 44.655.03 has been replaced with five smaller surveillance procedures. This will allow the testing required by Technical Specification 4.3.7.2.1 to be performed in stages and will minimize the chance of a seismic monitoring instrument being inoperable for more than 30 days. These new Procedures clearly identify that the survey requirements must j ,~
be met before returning the instruments to service. Additional reviews have also been added to the procedure.
3- An Engineering Evaluation and Assistance Request.(EEAR 89-002) has been initiated to request the installation of permanent alignment pins or mounting plates. These will eliminate the need for surveying the recorders and reduce the 3 mount of time the recorders are inoperable due to surveillance testing. Work i
on the EEAR has been deferred indefinitely due to the New York
! State - LILCO Shoreham Settlement Agreement.
ADDITIONAL INFORMATION ,
1 L a .- tianuf acturar_and_mndal_numhar_nt_f ailed _pomponent_Lal l None
- b. LEB_ numbers of orevious_similar events LER 88-008 l ..e .. A usi
-
|
---|
|
|
| | Reporting criterion |
---|
05000322/LER-1988-003 | LER 88-003-01:on 880322,unplanned Automatic Initiation of Reactor Bldg Standby Ventilation Sys Side a Occurred During Deenergization of Relay.Caused by Close Placement of Relay Terminals.Wiring Inside Electrical Panels Reworked | | 05000322/LER-1988-015 | LER 88-015-02:on 880916,seismic Monitoring Instrumentation, Including Peak Acceleration Recorders,Removed from Svc for More than 30 Days Due to Corrosion on Scratch Plates.Cover Gasket Replaced & Thermal Barrier Mount to Be Installed | | 05000322/LER-1988-017 | LER 88-017-01:on 881025,discovered That Seismic Monitoring Instrumentation Returned to Svc Prior to Verifying Sys Operability & Special Rept Not Written.Caused by Personnel Error.Surveillance Engineer Reassigned | |
|