ML20072T219

From kanterella
Revision as of 17:44, 21 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 2 to 23A6999, Isolation Condenser & Passive Containment Condenser Test Requirements Legend or Description of Groups
ML20072T219
Person / Time
Site: 05200004
Issue date: 08/31/1994
From: Marriott P
GENERAL ELECTRIC CO.
To: Borchardt R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20072T223 List:
References
MFN-101-94, NUDOCS 9409150120
Download: ML20072T219 (1)


Text

. . -

, GENuclear Energy i

P. W. Marriott, Manager GeneralElectric Cornpany i AdvancedPlant Technologies 175 Curtner Avenue, MC 781 San J6se, CA 95125-1014 i 406 925-6948(phone) 408925-1193(facsimile) i August 31,1994 MFN No.101-94 I I

Docket STN 52-004 i

t

^

Document Control Desk U. S. Nuclear Regulatory Commission j Washington DC 20555 l l

Attention: Richard W. Borchardt, Director i

]

Standardization Project Directorate l i

i

Subject:

Transmittal of Simplified Boiling Water Reactor (SBWR) l PANTIIERS Test Requirements and Test Specification l Attached is Revision 2 of the PANTHERS Test Requirements and Test Specification j

(23A6999). This revision supersedes the one sent earlier in letter MFN No.119-92 (May 27,1992).

The major change in this revision is the elimination of the one-module Passive Containment Condenser (PCC) tests, Type B.1, with the helium tests from that matrix moved to the full unit matrix, Type B.2.

Sincerely,

/

P. W. Marriott, Manager Advanced Plant Technologies

, Enclosure cc: P. A. Boehnert (w/l copy of Enclosure)

F. W. Hasselberg (w/l copy of Enclosure)

M. Malloy (w/2 copies of Enclosure) 0 000007 40 9409150120 PDR 940831 1k ADOCK 05200004 PDR