Forwards Sbwr Status & Schedule 960214 & Payments Made to NRC for Last Four Yrs,In Response to Ref Telcon Requests
ML20097F710
Person / Time
Site: 05200004
Issue date: 02/15/1996
From: Quinn J
GENERAL ELECTRIC CO.
To: Quay T
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MFN-019-96, MFN-19-96, NUDOCS 9602200072
Download: ML20097F710 (5)


Text

- .- - -

e

./ T{;.

GENucleerEnergy

$B 7Y n $165 San Jose, CA 95125-1014 408 9251005 (phone) 408 925-3991 (facsimile)

February 15,1996 MFN 019-%

Docket No.52-004 Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Theodore E. Quay, Director i Standardization Project Directorate

Subject:

SBWR - Status and Schedule

Reference:

1. Telephone Requests, S. Ninh (NRC) to J. E. Leatherman (GE), Same Subject, l February 5 and 12,1995. l This letter is written in response to the Reference 1 Requests from your Staff asking for current status

]

and schedules from GE's point of view. These requests were made in order to help NRC plan for near term and future resource requirements. Attachment I to this letter, SBWR Status & Schedule, identifies recent past milestones and current and future open items, by program element. As requested in  !

Reference 1, we have suggested NRC dates using prior informal guidance from NRC. We have not yet  !

reached agreement on these specific dates, but wish to do so as quickly as possible.  !

l Attachment 2 to this letter, SBWR - NRC Payments, provides the payments we have made to the NRC for the last four years. We would also like to review this with you to obtain an estimate of the NRC expenditures required to complete the open items in Reference 1.

We wish to schedule an extended conference call or meeting with you on these topics in the next two weeks.

l

  • 1 Sincerely,

$$f JNANN) h James E. Quinn Attachments: 1. SBWR Status & Schedule 2/14/%

2. SBWR - NRC PAYMENTS  !

cc: P. A. Boehnert (NRC/ACRS) (2 paper copies plus E-Mail)

1. Catton (ACRS) (1 paper copy plus E-Mail)

D. M. Crutchfield (NRC) (1 paper copy plus E-Mail S. Q. Ninh (NRC) (2 paper copies plus E-Mail)

J. H. Wilson (NRC) (1 paper copy plus E-Mail)

D.C. Scaletti (NRC) (1 paper copy plus E-Mail)

Glenda Jackson (NRC) (1 paper copy plus E-Mail) nnnnen r.

9602200072 960215 PDR ADOCK 05200004 PDR

\\\\

A J

GENuclearEnergy MFN 019-95 bec: (E-Mail w/o att, except as noted)

J. A. Beard R. H. Buchholz T. Cook (doe) (2 paper copies plus E-Mail w/o att.)

R. T. Fernandez (EPRI)

J. N. Fox R. E. Gamble P. C. Hecht J. E. Leatherman J. E. Quinn T. J. Mulford (EPRI) (2 paper copies plus E-Mail w/o att.)  ;

F. A. Ross (doe) l B. Shiralkar l

R. Srinivasan (EPRI)

J. E. Torbeck i GE Master File (1 paper copy plus E-Mail w/o att.)  !

SBWR Project File (1 paper copy plus E-Mail w/o att.)

1 i

hd Atta hment 1 to MFN 019-96 SBWR Status & Schedule 2/14/96 ITEM STATUS ACTION DATE ORIGINAL COMMENTS DATE TAPD DRAFT Submitted GE 8/10/94 Rev.A Submitted GE 9/15/94 NRC DSER issued NRC 11/25/94 ACRS/NRC/GE IAecting ACRS 12/15&16/94 DSER & TRACG issues NRC/GE Meetings NRC 1/9&11/95 DSER & TRACG issues ACRS/NRC/GE Meetings ACRS 1/10&12/95 DSER & TRACG issues MFN 018-95 Submitted GE 2/14/95 Closure Process & List Rev.B Submitted GE 4/13/95 4/17/95 Programattic issues Close Rev.C Submitted GE 8/28/95 8/31/95 Testing issues Closed Supplement 1 Submitted GE 8/28/95 8/31/95 PIRT Parameters Scaling Report /0 Submitted GE 8/16/94 yFN 095-94 Scaling Report /1 Submitted GE 10/13/95 8/31/95 increased scope, Scaling issues Close ACRS/NRC/GE Meeting GE 11/28&29/95 Major SR issues Closed Scaling Report Meeting NRC ~2/15/95 Preliminary Feedback TAPD FSER Open NRC ~5/96 12/95 Date improvement Needed SR Acceptance Open NRC ~9/96 Scope Defn. / Date improve Needed SBWR Vscuum Breakers Close NRC participation during Manufacture and Testing MFN 065-94 Submitted GE 5/2/94 RAI 900.62, Design & Test MFN 113-94 Submitted GE 9/26/94 RAI 900.63, Analyses ACRS/NRC/GE Meetings ACRS/NRC 1/9-12/95 ldentified VBSF lssue MFN 018-95 Submitted GE 2/14/95 issue Closure Plan MFN 021-95 Submitted GE 2/16/95 SFE & White Paper NRC Letter Delay NRC 8/22/95 SFE - Design Resumption MFN 216-95 Open NRC 11/7/95 VB Testing Closure

, ~

Attachment 1 to MFN 019-96 ITEM STATUS ACTION DATE ORIGINAL COMMENTS DATE .

TRACG Containment Meeting NRC/GE 3/8&9/95 San Jose MFN 074-95 Submitted GE 5/11/95 Analysis Deliverables Applicatica LTR Outline Model LTR lssued NRC 10/3/95 10/95 ' Progress Report, DSER NOT issued.

PANTHERS Meeting NRC/GE 2/15/96 Post Test Analyses Modelli LTR Open GE .~2/24/96 12/31/95 MFN 008-96 Model LTR DSER Open NRC TBD 4/96 Date needs to be confurmed Qual LTR Suppl. Open GE ~8/28/96 3/31/96 Delays in testing, increased scope Appi LTR Rev. Open GE -9/26/96 3/31/96 Delays in testing, increased scope Qual Supp. DSER Open NRC TBD 5/96 Date needed Appi LTR DSER Open NRC TBD 5/96 Date needed Model LTR FSER Open NRC TBD 9/96 Date needed Qual Supp. FSER Open NRC TBD 9/96 Date needed Appi LTR FSER Open INRC TBD 9/96 Date needed Testing See TAPD, above; Weekly Scheduled GE/NRC Phone Call MFN 030-95 Submitted GE 2/21/95 2/95 Testing Deliverables GIRAFFE Meeting NRC/GE 3/8&9/95 GIRAFFE QA Audit NRC/GE 6/8-14/95 Toshiba, Japan - Successful MFN 136-95 Submitted GE 7/28/95 //29/95 Testing RAI Responses PANTHERS QA Audit NRC/GE 7/19-21/95 SIET, Italy - Successful PANTHERS Meeting NRC/GE ~2/15/96 Test Results PANDA QA Audit NRC/GE ~3/5-8/96 PSI, Switzerte d - Planned Test Deliverables Open GE ASAP after test complete, ~1/ week Current status of Testing Deliverables:

PANTHERS ~18 delivered /~19 total GIRAFFE ~9 delinrod/~18 total PANDA ~13 denered/~26 total TOTAL ~40 delivered /~63 total Testing Summary Open GE ~6/21/96 3/25/96 Key Report NRC Letter Open NRC ~8/96 Concurrence Testing Report Complete

SBWR - NRC PAYMENTS ,

(Period Ccvered) 2Q92 3Q92 4Q92 1Q93 2Q93 3Q93 4Q93 1Q94 2Q94 3Q94 4Q94 1Q95 2Q95 3Q95 4Q96 1Q96 2Q96 3Q96 4Q96 SBWR QTRLY 49.7 196.5 336.4 169.1 265.7 402.0 392.0 400.6 531.1 78 6 428.9 273.2 303.2 276.7 ?72.1 CUM 49.7 246.2 582.6 751.8 1017.4 1419.4 1811.4 2212.0 2743.1 2821.7 3250.6 3523.8 3827.0 4103.7 4375.8 TRACG QTRLY 3.1 7.1 27.1 66.5 71.8 32A 27.7 23.6 41.4 56.9 89.1 117.5 58.6 CUM 3.1 10.2 37.3 103.8 175.6 208.0 235 ? 259.3 300.8 357.7 446.8 564.3 622.9 CY TOTAL' 585.7 1401.3 1564 4 1447.3 TOTAL QUARTERLY 49.7 196.5 339.5 176.3 292.7 468.5 4S3.8 433.0 558.8 102.3 470.3 330.2 392.2 394.2 330.7 CUM TOTAL 49.7 246.2 585.7 762.0 1054.7 1523.2 1987.0 2420.0 2978.8 3081.1 3551.4 3881.5 4273.8 4667.9 4998.7 l

Item Date Status Action Comments NRC Letter 06/27/95 Open NRC LLNL - SBWR ITAACS MFN 108-95 07/14/95 Open NRC LLNL - SBWR ITAACS MFN 255-95 11/21/95 Open NRC SSAR Chaps. 4 & 19 NRC Letter 01/17/96 Open NRC SSAR Chaps. 4 & 19 MFN 013-96 02/01/95 Open NRC SSAR Chaps. 4 & 14 i O TRACG' f M SBWR

-M--CUM $

f l; 600 7 6000 I

l 500! ~

5000 I I i 400 ' - - -

- 4000 o _ _ _ __

[2 i ' d.1__ Ek_YE; a 2092 3Q92 4092 1Q93 2093 3Q93 4Q93 1Q94 2094 3094 4094 1Q95 2095 3Q95 4Q95 1Q96 2096 3Q96 4096 h""

f l

l 960214.XLS Attachment 2 to MFN 019-96 2/15/96 l