ML20107A468

From kanterella
Jump to navigation Jump to search
Requests Copies of English Translations of Repts on Par, to Facilitate Sbwr Review
ML20107A468
Person / Time
Site: 05200004
Issue date: 04/10/1996
From: Quinn J
GENERAL ELECTRIC CO.
To: Quay T
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MFN-049-96, MFN-49-96, NUDOCS 9604120310
Download: ML20107A468 (6)


Text

p.

, O l GENuclearEnergy J. E. Quinn ects Manager GeneralElectdc LMR and SB Programs 175 Curtner Avenue, 165 San Jose, CA 951251014 l 408 9251005 (phone) 408 9254991 (facsimile)

[

I April 10,1996 M FN 049-96 Docket 52-004 Document Control Desk U. S. Nuclear Regulatory Commission

! Washington DC 20555 l

l Attention: Theodore E. Quay, Director Standardization Project Directorate l

Subject:

SBWR - ENGLISH TRANSLATIONS OF GERMAN PAR REPORTS:

Reference:

1. Letter, L. Seyfferth (NIS) to John Leatherman (Ub), ENGLISH VERSION OF REPORTS ON PAR, DATED 02.04.1996 (copy transmitted herewith).

l 2. Letter, L. Seyfferth (NIS) to Son Ninh (NRC), ENGLISH VERSION OF

! REPORTS ON PAR, dated 02.04.1996 (original letter transmitted herewith)

For several months we have been discussing with your staff our desire to obtain English translations made by the NRC of NIS reports submitted by GE on the SBWR docket in response to NRC Requests for Additions! Information (RAls). The reports were submitted in German and l then were translated into English to facilitate the SBWR review. Because the reports were l properly marked proprietary both as originally submitted and after translation, this letter and the two Reference letters were developed to assure that distribution was made in accordance with proper binding agreements. Reference 1 reflects that relationship between NIS and GE, and Reference 2 provides NIS' authorization to NRC to make the requested distribution, j We understand that the translation was made by NRC to facilitate the SBWR review and further understand that NRC cannot be held liable for the accuracy of the translation.

Accordingly, GE hereby requests copies of the English translations of the reports identified in the Reference 2 letter from NIS to NRC.

If you have any questions regarding this issue please contact John Leatherman of our Staff on j 408-925-2023.

Sincerely, t~,d

[

) kames E. Quinn, f- Projects Manager noon s o 9604120310 960410 PDR ADOCK 05200004 h PDH u__

GENuclearEnergy Attaciunents: Copy of Reference 1 and original of Reference 2.

cc: P. A. Boehnert (NRC/ACRS) (2 paper copies plus E-Mail)

I. Catton (ACRS) (1 paper copy plus E-Mail)

S. Q. Ninh (NRC) (1 paper copy plus E-Mail)

D. C. Scaletti (NRC) (1 paper copy plus E-Mail) 1 1

l l

l l

l

l q.

v GENuclearEnergy i

MFN 049-96 l l

bec: (E-Mail only except as noted)

R. Asamoto P. F. Billig R. H. Buchholz

T. Cook (doe) (1 paper copy plus E-Mail)

J. D. Duncan R. T. Fernandez (EPRI) l l J. R. Fitch j J. N. Fox i

P. C. Hecht J. E. Leatherman l J. E. Quimi

! T. J. Mulford (EPRI) (2 paper copies plus E-Mail)

F. A. Ross (doe) (1 paper copy plus E-Mail)

B. Shiralkar G. Sliter (EPRI)

R. Srinivasan (EPRI) l J. L. Thompson J. E. Torbeck  !

GE Master File M/C 747 (1 paper copy plus E-Mail)

SBWR Project File (1 paper copy plus E-Mail) i 1

1 I l t

l 4

1 e

i i

l 1

1

Al I.CHMENT TO MFN 049-96 c

[ h Nis ingenieurgesellschaft mbH '

NIS '

\ J v

tJiS incymourgeschchaM rnth6 Donaustdie 23 GM52ttrwu Telefon 06181/185-0 TtMax 06181/120033 Mr. John Leatherman ourcnwan' -1s9 GE General Electric unwr zecnen sy/m 175 Curtner Avenue * *" 02.04.1996 San Jose, CA 95125 USA English version of reports on PAR l

Dear Mr. Leatherman,

I from communications with EPRI, Mr. George Sliter, we are informed about the existance of English translations of some of the reports on PAR, which we delivered in November 1994 to General Electric (GE) under the Confidentiality Agreement between GE and NIS signed in summer 1994. The translations were obviously produced by NRC.

We understand that GE and EPRI are interested in this English version. Following suggestions from George Sliter we wrote a letter to NRC to authorize the release of the reports to GE. This Letter for authorization is enclosed for you to be submitted to NRC.

l We request to receive a copy of the reports for our files.

Please contact us if you should have any questions.

Sincerely yours NIS Ingenieurg alls; aft mbH Seyff h Manager Marketing & Sales Copy: EPRI, Mr. George Sliter

. __ _ _ _ _ _ _ . ___ ~ _ . .

Ula"lY" ?llG? "'*" ww-

5. .n ,:n '% C.N,-

e

,a ,Ul sw ",

o

[ h NIS Ingenieurgesellschaft mbH NIS l

\ J v

~Nts ingencurge&chan noH Omaowane 23 031$2 Hanau

~

idefon 06181/185-0 Tdelax o6181/120033 Mr. Son Nimh ourentani 1s9 SBWR Project Manager unser zechert sy/rw U.S. Nuclear Regulatory Commission Datum 02.04.1996 Washington, DC 20555 USA English version of reports on PAR

Dear Mr. Nimh,

NIS has been informed that General Electric (GE) has transmitted certain NIS proprietary i reports to the NRC in connection with their proposed use of passive autocatalytic recombiners ]

(PARS) in GE's application for design certification of the SBWR advanced light water reactor.

That transmittal of proprietary information was in conformance with a licensing agreement i between NIS and GE. We have been informed further that the NRC has produced English l translations of these reports and that these translations would be useful to GE. NIS hereby authorizes the NRC to provide GE with a copy of the English translations of the four reports l

listed below:

- Behrens, U. et. al., "Experimentelle Untersuchungen zum Verhalten des von NIS entwickelten Katalysator-Modell-Moduts bei verschiedenen Systemzustanden und Anordnungen (ExperimentalInvestigations of the Behavior of the NIS Developed Catalyst Model Module under Various System Conditions and Arrangernents)," Battelle Institute, Volume 1 (Report) and Volume II (Test Data), March 1991 (PROPRIETARY).

- Behrens, U.,"Experimentelle Untersuchungen zum Verhalten des von NIS entwickelten l Katalysator-Moduts im 1:1-MaGstab bei verschiedenen Systemzustanden im Modell-i Containment (ExperimentalInvestigations of the Behavior of the NIS Developed Catalyst l Module in Full Scale under Various System Conditions in the Model-Containment),"

l Battelle Institute Report, June 1991 (PROPRIETARY).

1 1

1 W FMfFehi bp%H cf .dr $& #f f*&d3W 4 7/2 GL M Iff

"*'" ~ Tri';'* ""* it %"abx

!  : .1

\

(lNIS]

I" 2

Fischer, K. and H. Holzbauer,"Model!rechnungen zur Wirkung von NIS-Katalysatormodulen im DWR-Sicharheitsbehalter (Model Calculations of the Effect of NIS-Catalyst Modules in the OWR Containment)," Battelle Institute Report, July 1991 (PROPRIETARY).

Sincerely yours NIS Ingenieu esel cc aft mbH 6

L. Seyfferth Manager Marketing and Sales

.