Informs That GE Redirecting Focus of Sbwr Program from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger. Listing of Open Activities,Desired Closure Objective & Schedule Encl
ML20100N930
Person / Time
Site: 05200004
Issue date: 03/04/1996
From: Quinn J
GENERAL ELECTRIC CO.
To: Quay T
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MFN-034-96, MFN-34-96, NUDOCS 9603060563
Download: ML20100N930 (4)


Text

,

('N y I ,'d]

GENuclearEnergy 4 $ l$e?"$9%*$$llleT*

March 4,1996 MFN 034-96 Docket 52-004 Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Theodore R. Quay, Director Standardization Project Directorate

Subject:

SBWR - Redirecting Focus ,

GE Nuclear Energy is redirecting the focus ofits Simplified Boiling Water Reactor (SBWR) )

programs from plants of the 670 Mwe size to plants of 1,000 MWe or larger. Consequently, GE l will be substantially reducing the level of activity on the current 670 Mwe plant Technology )

Phase, which has been the focus of GE's SBWR efforts with the NRC over the past 20 months. )

However, GE wishes to complete key ongoing test and analysis activities to make this data available for other applications of this technology.

In line with redirecting the SBWR focus, GE would like to review with NRC the orderly closure  ;

of open NRC activities for the 670 Mwe plant. The Attachment to this letter presents our listing of the open activities and our desired closure objective, output, and schedule. We look forward to discussing the efficient close out of the open items in the manner which can provide the best results for both the NRC and GE.

Sincerely, l JllbucWe ~W James E. Quinn

Attachment:

SBWR Project Redirection - NRC Activity Closure Plan cc: P. A. Boehnert (NRC/ACRS) (2 paper copies w/att. plus E-Mail w/att.)  !

I. Catton (ACRS) (1 paper copy w/att, plus E-Mail w/att.)

S. Q. Ninh (NRC) (1 paper copy plus E-Mail w/att.)

D. C. Scaletti (NRC) (1 paper copy w/att. plus E-Mail w/att.)

9603060563 960304

{DR ADOCK 05200004 PDR I C60035 N{ I h

v Attachment to MFN 034-%  ;

SBWR Project Redirection - NRC Activity Closure Plan (i

Opened NRC ACTIVITY NRC OBJECTIVE NEXT OUTPUT SCHEDULE FOR NEXT OUTPUT Review of TAPD Rev C Agree Testing and Analysis FSER 5/15/96-  !

submitted 8/28/95 Program Document is complete &  ;

resolves prior issues Review of Scaling Report Agree that the methodology used Written status report 3/15/96 Rev 1 submitted 10/13/95 to scale the tests is correct & of preliminary complete & resolves prior issues review Testing Data Reports Agree that the required Written letter of <6/15196 MFNs 057-95,058-95,075-95, parameters are properly & concurrence 086-95,109-95,121-95,157- completely included 95,194-95,245-95,246-95, 273-95,274-95,025-96,024-96,018-96,005-96,004-96 GIR He FINAL DTR 4/26/96 glr SIT FINAL DTR 5/17/96 PANDA FINAL DTR 5/24/96 PANTHERS IC TR 3/12/96 PANDAl Confirm that Testing was done in Written report of 4/15/96 ANSALDO QA accordance with procedures and audit / findings

! NRC Inspection 3/5-8/96 & meets NQA1 3/11/96 Test Analyses Closing status Written summary of 3/15/96 MFNs 119-94, 270-95, 261-95, status at point of 193-95,185-95,178-95,161- "stop work" 95,159-95,098-95,097-95, 006-96.

1

+? ,'

GENuclearEnergy MFN 034-96 ~

bec: (E-Mail w/att. except as noted)

J. A. Beard R. H. Buchholz T. Cook (doe) (2 paper copies w/att. plus E-Mail w/att.)

R. T. Fernandez (EPRI)

J. N. Fox P. C. Hecht M. Herzog J. E. Leatherman J. E. Quinn T. J. Mulford (EPRI) (2 paper copies w/att. plus E-Mail w/att.)

F. A. Ross (doe)

B. Shiralkar R. Srinivasan (EPRI)

J. E. Torbeck GE Master File (1 paper copy w/att. plus E-Mail w/att.)

SBWR Project File (1 paper copy w/att. plus E-Mail w/att.)

l l

, ,, a

(

, GENuclearEnergy MFN 034-96 l 1

~

tac: [E-Mail] I E Lumini 8-011-39-10-655-8279 S Spoelstra 8-011-31-22-456-3912

V Cavicchia 8-011-39-68-509-8601 JJ Pena 8-011-34-1-347-4215 K Maubach 8-011-49-721-987-7257 l

C Witteman 8-011-31-48-841-2128 A Zimmermann 8-011-49-406-396-3661 J Yamashita 8-011-81-29-423-6750 W van der Mheen 8-011-31-26-351-8092 A van Dijk 8-011-31-20-580-7041

, G Yadigaroglu 8-011-41-1-632-1166 j K Petersen 8-011-49-201-122-4092 H Tonegawa 8-011-81-33-597-2227 F Kiente 8-011-49-69-630-4420

P Masoni 8-011-39-51-609-8639 W Mizumachi 8-011-81-33-597-2227 G Varadi 8-011-41-5-698-2327 R Tavoni 8-011-39-51-609-8688 II Blaesig (site) 52700 J Faig (site) 52700 A Toba (site) 52700