ML20096B853

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Info Re Sbwr - Panthers/Ic Apparent Test Results,Per .Encl Withheld (Ref 10CFR2.790)
ML20096B853
Person / Time
Site: 05200004
Issue date: 01/09/1996
From: Quinn J
GENERAL ELECTRIC CO.
To: Quay T
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19317C238 List:
References
MFN-005-96, MFN-5-96, NUDOCS 9601160441
Download: ML20096B853 (3)


Text

. - - . --. . -. - - . . - - . - - -

,d(3 GENuclearEnergy YMN BW ram 75 Curt Yen $165 San Jose, CA 95125-1014 406 925-1005 (phone) 408 925-3991 (facsimile)

January 9,1996 MFN 005-96 Docket 52-004 i

Document Control Desk U. S. Nuclear Regulatory Commission I Washington DC 20555 l i

Attention: Theodore E. Quay, Director l Standardization Project Directorate l

Subject:

SBWR - PANTHERS /IC Apparent Test Results (ATRs), Phase 3 '

(Proprietary)

Reference:

1. Letter from J. E. Quinn (GE) to T. E. Quay (NRC), SBWR - i Updated Status of Test Documentation Submittals, MFN 125-95, July 24,1995.
2. Letter from J. E. Quinn (GE) to T. E. Quay (NRC), SBWR - l PANTHERS /IC Apparent Test Results (ATRs), Phase 1 (Proprietary), l MFN 246-95, October 25,1995. l
3. Letter MFN 004-96 from J. E. Quinn (GE) to T. E. Quay (NRC), "SBWR l

- PANTHERS /IC Apparent Test Results (ATRs), Phase 3 (Non l Proprietary)", dated January 9,1996.

The attachment to this letter supplies the PANTHERS /IC Apparent Test Results (ATRs),

Phase 3, which satisfies Item 58 of Reference 1. These reports supplement those sent for Phase 1 in Reference 2. The Non Proprietary version of this information is presented in Reference 3.

l Please note that these reports contain information of the type which the General Electric Company (GE) and its associates maintain in confidence and withhold from public disclosure.

They have been handled and classified as proprietary to GE and its associates as indicated in the attached affidavit. We hereby request that this information be withheld from public disclosure in accordance with the provisions of 10CFR2.790. The proprietary information is delineated by a "GE PROPRIETARY" stamp on the applicable pages.and a line in the right hand margin to indicate the Proprietary material.

00'78

"" M"#

96011604 1 960109 9Ec - L 04d M" PDR A

ADOCK 05200004 PDR lj I

(D V

GENucleerEnergy MFN 005-96 Please contact Paul Billig of our staff on 408-925-1388 if you have any questions regarding the attachment.

Sinc rel ,

fm 16 1 hr ames E. Quinn, g Projects Manager

Attachment:

PANTHERS /IC Apparent Test Results (ATRs) Reportsfor tests: HSD13, TO7_2. T12, T13, T16_A, T16__B, T16_C, T16_D, T16_E, T16_F, T16_G, T16_H, T16_I, ,

T16_J, T'16_K1, and T16_L.

cc: P. A. Boehnert (NRC/ACRS) (2 paper copies plus E-Mail w/o att.)

1. Catton (ACRS) (1 paper copy plus E-Mail w/o att.)

S. Q. Ninh (NRC) (1 paper copies plus E-Mail w/o att.))

J. H. Wilson (NRC) (1 paper copy. plus E-Mail w/o att.)

D. Scaletti (NRC) (1 paper copy. plus E-Mail w/o att.)

l 1

i

_ _ _ _ .. _ . . = . _ _ , _

a 5

GENuclearEnergy MFN 005-%

bec: (E-Mail w/o att.except as noted) i J. A. Beard

- R. H. Buchholz T. Cook (doe) (2 paper copies plus E-Mail w/o att.)

R. T. Fernandez (EPRI)

J. N. Fox R. E. Gamble P. C. Hecht J. E. Leatherman j J. E. Quinn l T. J. Mulford (EPRI) (2 paper copies plus E-Mail w/o att.) I F. A. Ross (doe) I B. Shiralkar l' R. Srinivasan (EPRI)

J. E. Torbeck GE Master File (1 paper copy plus E-Mail w/o att.)  ;

SBWR Project File (1 paper copy plus E-Mail w/o att.) l 1

i I