ML20072T219
| ML20072T219 | |
| Person / Time | |
|---|---|
| Site: | 05200004 |
| Issue date: | 08/31/1994 |
| From: | Marriott P GENERAL ELECTRIC CO. |
| To: | Borchardt R NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20072T223 | List: |
| References | |
| MFN-101-94, NUDOCS 9409150120 | |
| Download: ML20072T219 (1) | |
Text
.. -
GENuclear Energy i
P. W. Marriott, Manager GeneralElectric Cornpany i
AdvancedPlant Technologies 175 Curtner Avenue, MC 781 San J6se, CA 95125-1014 i
406 925-6948(phone) 408925-1193(facsimile) i August 31,1994 MFN No.101-94 Docket STN 52-004 i
t
^
Document Control Desk U. S. Nuclear Regulatory Commission j
Washington DC 20555 l
Attention:
Richard W. Borchardt, Director i
]
Standardization Project Directorate i
i
Subject:
Transmittal of Simplified Boiling Water Reactor (SBWR)
PANTIIERS Test Requirements and Test Specification Attached is Revision 2 of the PANTHERS Test Requirements and Test Specification j
(23A6999). This revision supersedes the one sent earlier in letter MFN No.119-92 (May 27,1992).
The major change in this revision is the elimination of the one-module Passive Containment Condenser (PCC) tests, Type B.1, with the helium tests from that matrix moved to the full unit matrix, Type B.2.
Sincerely,
/
P. W. Marriott, Manager Advanced Plant Technologies Enclosure cc:
P. A. Boehnert (w/l copy of Enclosure)
F. W. Hasselberg (w/l copy of Enclosure)
M. Malloy (w/2 copies of Enclosure) 0 000007 0