Forwards Latest Revs of Panda Project Control Plan & QA Procedures
ML20101F298
Person / Time
Site: 05200004
Issue date: 03/20/1996
From: Quinn J
GENERAL ELECTRIC CO.
To: Quay T
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101F300 List:
References
MFN-042-96, MFN-42-96, NUDOCS 9603250445
Download: ML20101F298 (4)


Text

_ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

s..

GENuclearEnergy YMk BW a$ 75 ven $165 San Jose, CA 95125-1014 408 925-1005 (phone) 408 925-3991 (facsimile)

March 20,1996 MFN No. 042-96 Docket 52-004 Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Theodore R. Quay, Director Standardization Project Directorate

Subject:

SBWR - Latest Revisions of the PANDA Project Control Plan and Quality Assurance Procedures

Reference:

Letter MFN 028-95,J. E. Quinn (GE) to R. W. Borchardt (NRC),

Transmittal of PANDA Project Control Plan and Quality Assurance Procedures, dated February 16,1995.

Transmitted hereby for your information are copies of the latest revisions of four '

procedures originally submitted to the NRC by the referenced letter and subsequently revised during the course of the PANDA Test Program. Copies of these latest revisions to these procedures were provided to the NRC staff during the recent PANDA QA audit at PSI in Switzerland.

This GE PANDA Project Control Plan (PPCP) describes the organization, quality related activities, events and procedures necessary to ensure and verify that the PANDA 4 project at the Paul Scherrer institute (PSI) is conducted under the provisions of the GE SBWR Quality Assurance Plan as described in the SBWR Design and Ce' tification Program Quality Assurance Plan, NEDG-31831.

Sincerely, M, James LMR and SBWR Programs E. Quinn, Projects Manager Attachments: PPCP-QA4)l, Rev.1, PANDA Project Control Plan PQAP-DC, Rev.1, PANDA QA Procedure - Document Control l PQAP-TC, Rev. 3, PANDA QA Procedure - Test Control PQAP-V, Rev.1, PANDA QA Procedure - Verification 250124  ;

9603250445 960320

, PDR ADOCK 05200004 I A PDR 1

o O GENuclearEnergy j l

. cc:

! P. A. Boehnert (NRC/ACRS) (2 paper copies w/att. plus E-Mail w/o att.)

I. Catton (ACRS) (1 paper copy w/att. plus E-Mail w/o att.) i R. P. McIntyre (NRC)

(1 paper copy w/att. plus E-Mail w/o att.)

S. Q. Ninh (NRC) (1 paper copy w/att. plus E-Mail w/o att.)

l D. C. Scaletti (NRC) (1 paper copy w/att. plus E-Mail w/o att.)

l l

i l

1 i

l l l

l 1

I.

l 1 \

l l

O '

GENucleerEnergy MFN 042-96 tac: [E-Mail w/o att.]

E Lumini 8-011-39-10-655-8279 S Spoelstra 8-011-31-22-456-3912 V Cavicchia 8-011-39-68-509-8601 JJ Pena 8-011-34-1-347-4215 K Maubach 8-011 4 9-721-987-7257 C Witteman 8-011-31-48-841-2128 A Zimmermann 8-011-49-406-396 3661 J Yamashita 8-011-81-29-423-6750 ,

W van der Mheen 8-011-31-26-351-8092 I A van Dijk 8-011-31-20-580-7041 G Yadigaroglu 8-011-41-1-632-1166 K Petersen 8-011-49-201-122-4092 H Tonegawa 8-011-81-33-597-2227 l F Kienle 8-011-49-69-630-4420 l P Masoni 8-011-39-51-609-8639 W Mizumachi 8-011-81-33-597-2227 G Varadi 8-011-41-5-698-2327 R Tavoni 8-011-39-51-609-8688 11 Blaesig (site) 52700  !

J Faig (site) 52700 A Toba (site) 52700 i

)

l ATTACHMENT TO MFN 042-96

. PANDA Project ControlPlan, and Quality Assurance Procedures i

Table of Contents TAB Procedure No. Description Rev. Issue date 1 PPCP-QA-01 PANDA Project Control Plan 1 1 May.,1995 i

2 PQAP-DC Document Control 1 1 May.,1995 i 3 PQAP-PC Procurement Control 0 31 Jan.,1995 4 PQAP-TC Test Control 3 18 Sept.,1995 -

5 PQAP-CC Control of Measuring and Test Equipment 0 31 Jan.,1995 6 PQAP-DA Data Acquisition System Control 0 31 Jan.,1995 7 PQAP-V Verification 1 1 May.,1995 8 PQAP-NC Nonconformance Control and Corrective 0 31 Jan.,1995 Action 9 PQAP-R Quality Assurance Records 0 31 Jan.,1995 10 PQAP-PT Personnel Training and Qualification 0 31 Jan.,1995 The above quality assurance procedures are approved and issued for distribution.

Approved By: M JO $)

Date

  1. % /996'~

Manager, International Services Quality 175 Curtner Ave., MC 264 San Jose, CA 95125, USA Telephone: (408) 925-3270 FAX: (408) 925-4447

Attachment:

Distribution List