Discusses Redirecting Focus of Sbwr Programs from 670 Mwe Size to 1,000 Mwe or Larger Size Plants Reducing Activity Level on Tracg Effort as It Applies to 670 Mwe Plant
ML20101B738
Person / Time
Site: 05200004
Issue date: 03/13/1996
From: Quinn J
GENERAL ELECTRIC CO.
To: Quay T
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MFN-036-96, MFN-36-96, TAC-M85913, NUDOCS 9603150026
Download: ML20101B738 (3)


Text

. n GENuclearEnergy YMN nd BW 7Y n $en $165 San Jose, CA 9S125-1014 406 925-1005 (phone) 406 925-3991 (facsimile)

March 13,1996 MFN 036-%

Docket 52-004 i Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Theodore R. Quay, Director Standardization Project Directorate

Subject:

TRACG - Redirecting Focus

Reference:

1. Letter MFN 034-96, J. E. Quinn (GE) to T. R. Quay (NRC), SBWR -

Redirecting Focus, dated March 4,1996.

2. Letter MFN 008-96, J. E. Quinn (GE) to T. R. Quay (NRC),  !

TRANSMITTAL OF GE PROPRIETARY LICENSING TOPICAL REPORT NEDE-32176P, "TRACG Model Description", Revision 1, dated February 1996, letter dated February 12.1996

. 3. Letter J. H. Wilson (NRC) to J. E. Quinn (GE), PROGRESS REPORT ON STAFF'S REVIEW OF GE LICENSING TOPICAL REPORT NEDE-32176P, REVISION 0,"TRACG MODEL DESCRIPTION" (TAC NO. M85913), dated Octcher 3,1995 As discussed in the Reference 1 letter, GE Nuclear Energy is redirecting the focus ofits Simplified Boiling Water Reactor (SBWR) programs from plants of the 670 MWe size to plants of 1,000 MWe or larger. In addition to the topics addressed in Ref.1, GE will be substantially reducing the level of activity on the TRACG effort as it applies to the 670 MWe plant.

Specifically, GE would like NRC to stop work on the review of the TRACG Application Licensing Topical Report (LTR) NEDE-32178 and prepare a written summary of status of the review of this document at the point of the "stop work". With regards to the TRACG j Qualification LTR NEDE-32177 GE would like written feedback that the responses to the NRC <

Requests for Additional Information (RAls) are satisfactory and then stop work on the review of this document and prepare a written summary of status of the review of this document at the point of the "stop work".

In addition, GE wishes to continue the review of the TRACG Model LTR NEDE-32176. This report has been under active review by the NRC for over two years with considerable investment by both GE and NRC. There have been meetings with both NRC and ACRS (the most recent subconunittee meeting dealing with TRACG was December 15-16,1994) and all questions 150005 9603150026 760313 a

PDR ADOCK 05200004 mt.0 Li A PDR -

i c' l GENuclearEnergy applicable to NEDE-32176 have been answered as detailed in responses to RAIs and References ,

2 and 3. Therefore we request that a letter of acceptability of NEDE-32176 be issued by April l I

12,1996 (2 month review cycle recommended by NRC) and Draft Safety Evaluation Report (DSER) be issued by June 12,1996, and a Final Safety Evaluation Report could be issued by ,

October 1996.

We would like to discuss a plan to meet these objectives and agree upon a schedule. We look forward to discussing this letter and developing a communication plan with you.

i Sincerely, p / ,--

g$.Ips; Quinn ec: P. A. Boehnert (NRC/ACRS) (2 paper copies)

I. Catton (ACRS) (1 paper copy)

S. Q. Ninh (NRC) (1 paper copy)

D. C. Scaletti (NRC) (1 paper copy)

I l

e f.

GENuclearEnergy MFN 036-%

bec: (E-Mail except as noted)

J. G. M. Andersen J. A. Beard

)

R. H. Buchholz S. P. Congdon J. N. Fox P. C. Hecht M. Herzog J. E. Leatherman J. E. Quinn J. R. Rash R. J. Reda B. Shiralkar G. L. Sozzi J. E. Torbeck GE Master File (1 paper copy plus E-Mail)

SBWR Project File (1 paper copy plus E-Mail)

.