ML20112J079

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Version of Rev 0 to 00458RP95, PANTHERS-IC Test Rept. Rept Prepared for GE by Siet S.P.A Under Contract to Enea.Rept Withheld from Public Disclosure Per 10CFR2.790
ML20112J079
Person / Time
Site: 05200004
Issue date: 06/14/1996
From: Quinn J
GENERAL ELECTRIC CO.
To: Quay T
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19344C990 List:
References
MFN-085-96, MFN-85-96, NUDOCS 9606190193
Download: ML20112J079 (3)


Text

p i

. GENuclearEnergy J. E. Quinn. Projects Manager General Electric Company LMR and SBWR Programs 175 Curtner Avenue, M/C 165 San Jose, CA 95125-1014 408 925-1005 (phone) 408 925-3991 (facsimile)

June 14,1996 MFN 085-96 Docket 52-004 Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Theodore R. Quay, Director Standardization Project Directorate

Subject:

SBWR - PROPRIETARY PANTHERS-IC TEST REPORT

Reference:

1. Letter from J.E. Quinn (GE) to T.R. Quay (NRC), SBWR - Updated Status of Test Documentation Submittals, MFN 125-95, July 24,1995 The attachment to this letter supplies the Proprietary PANTHERS-IC Test Report (SIET document No. 00458 RP 95, Rev. 0). This transmittal satisfies item number 59 of Reference 1.

This report was prepared for GE by SIET S.p.A. under contract to ENEA. As stated on the title page, the report has not yet been approved by the ENEA Responsible Test Engineer. However,in order to expedite the issue of this report,it has been reviewed and approved by the GE Project Engineer who has been authorized to act as Responsible Test Engineer.

Please note that this report contains information of the type which the General Electric Company (GE) and its associates maintain in confidence and withhold from public disclosure. The information has been handled and classified as proprietary to GE and its associates as indicated in the attached aflidavit. We hereby request that this information be withheld from public disclosure in accordance with the provisions of 10CFR2.790.

The proprietary information is delineated by a line in she right hand margin to indicate the Proprietary material.

Should you have any questions concerning the attached report contact P. F. Billig of our staff on 408-925-1388.

Sincerel , ./ A

/ hl o 93 mes EfQuinn,4- j4 ]q 0

u 1 ly s 9606190193 960614 \

PDR ADOCK 05200004 A PDR

F h .

GENuclearEnergy cc: P. A. Boehnert (NRC/ACRS) (2 paper copies ofletter & report plus E-Mail)

1. Catton (ACRS) (1 paper copy ofletter & report plus E-Mail)

S. Q. Ninh (NRC) (2 paper copies of letter & report plus E-Mail)

J. H. Wilson (NRC) (1 paper copy of letter & report plus E-Mail)

D. Scaletti (NRC) (1 paper copy ofletter & report plus E-Mail)

A. Levin (NRC) (1 paper copy of letter & report plus E-Mail)

GENuclearEnergy MFN 085-%

bec: . (E-Mail of transmittal letter only except as noted)

J. A. Beard P. F. Billig R. H. Buchholz T. Cook (doe)

R. T. Fernandez (EPRI)

J. N. Fox P. C. Hecht J.D. Duncan J. E. Leatherman J. E. Quinn T. J. Mulford (EPRI)

F. A. Ross (doe)

B. Shiralkar -

R. Srinivasan (EPRI) 1 J. E. Torbeck GE Master File (1 paper copy of letter and Affid. plus E-Mail) 5 a