ML20112J298
From kanterella
ML20112J298 | |
Person / Time | |
---|---|
Site: | Shoreham File:Long Island Lighting Company icon.png |
Issue date: | 08/30/1983 |
From: | Palast G UNION ASSOCIATES |
To: | |
Shared Package | |
ML20112J037 | List: |
References | |
FOIA-84-250 NUDOCS 8501180234 | |
Download: ML20112J298 (22) | |
Similar Documents at Shoreham | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20069F0001994-01-24024 January 1994
[Table view]Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept ML20045C8881993-06-0808 June 1993 Vols 1 & 2 to Refueling Jib Crane 1T31-CRN-008A Incident Root Cause Analysis. W/One Oversize Encl ML20128P6451993-02-28028 February 1993 Snps Decommissioning Project Termination Survey Final Rept for Steam Turbine Sys (N31) ML20128P7431993-02-19019 February 1993 Rev 3 to 93X027, Nuclear QA Surveillance Rept ML20099H5781992-07-31031 July 1992 Rev 4 to Shoreham Defueled Sar ML20101K5791992-06-25025 June 1992 Long Island Power Authority Shoreham Decommissioning Project,Shoreham Nuclear Power Station,Technical Rept on Water Processing & Water Mgt Activities for Reactor Pressure Vessel & Wet Cutting Station ML20082M5081991-08-26026 August 1991 Rev 3 to Shoreham Defueled Sar ML20005F2511990-01-0505 January 1990 Shoreham Nuclear Power Station Defueled Sar. ML19332G1991989-09-18018 September 1989 Rev 0 to Radiological Safety Analysis for Spent Fuel Storage & Handling. ML20245E0181989-06-19019 June 1989 QC 1989 Staffing Rept ML20153G8941988-08-31031 August 1988 Rev 1 to Shoreham Nuclear Power Station Prompt Notification Sys Rept ML20196K6311988-06-29029 June 1988 QC Div 1988 Staffing Rept ML20148A4851988-02-29029 February 1988 Shoreham Nuclear Power Station PRA W/Supplemental Containment Sys ML20214U2021987-01-31031 January 1987 Technical Rept 86.2SH Verification of IPE for Shoreham. W/ 870313 Release Memo ML20210M6001986-12-31031 December 1986 Emergency Planning Federal Involvement in Preparedness Exercise at Shoreham Nuclear Plant. Related Correspondence ML20214T6021986-12-31031 December 1986 Rev 6 to Plant Design Assessment Rept for Safety/Relief Valves & LOCA Loads, Vols 1 & 2.Proprietary Suppl Withheld (Ref 10CFR2.790) ML20210K2961986-12-31031 December 1986 Nuclear Regulation,Unique Features of Shoreham Nuclear Plant Emergency Planning. Related Correspondence ML20214U3641986-10-31031 October 1986 Shoreham Startup & Low Power Testing Operations,Special Rept:Lilco QA Audit on Training & Qualifications ML20237H6381986-07-31031 July 1986 Compliance W/10CFR50,App I ML20211P6851986-06-30030 June 1986 Implications of Chernobyl-4 Accident for Nuclear Emergency Planning for State of Ny ML20203N4171986-04-30030 April 1986 Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications SNRC-1207, Vols 1 & 2 of Colt Emergency Diesel Generator Info to Be Incorporated in Fsar. W/11 Oversize Drawings1985-11-30030 November 1985 Vols 1 & 2 of Colt Emergency Diesel Generator Info to Be Incorporated in Fsar. W/11 Oversize Drawings ML20128N9651985-05-31031 May 1985 New York Power Pool,1985 Summer Operating Reserve, Projection & Analysis ML20111C0961984-11-20020 November 1984 Rev 1 to Long Island Lighting Co,Shoreham Nuclear Power Station,Prompt Notification Sys Design Rept ML20091Q8851984-06-30030 June 1984 Colt Diesel Generator Summary for Shoreham Nuclear Power Station - Unit 1 ML20092N6631984-06-12012 June 1984 Seismic Survivability Study for MP-45 Diesel Generators ML20091M5451984-05-31031 May 1984 Design Review of Connecting Rods for Tdi DSRV-4 Series Diesel Generators, Final Rept Prepared for Tdi Diesel Generator Owners Group ML20091M5511984-05-23023 May 1984 Investigation of Types AF & Ae Piston Skirts, Final Rept Prepared for Tdi Diesel Generator Owners Group ML20091M5201984-05-22022 May 1984 Draft Final Rept, Evaluation of Emergency Diesel Generator Crankshafts at Shoreham & Grand Gulf, Prepared for Tdi Diesel Generator Owners Group ML20084E5421984-04-30030 April 1984 Emergency Diesel Generator Engine & Auxiliary Module Wiring & Termination Qualification to IEEE-383-1974 ML20087L3511984-03-31031 March 1984 Emergency Diesel Generator Air Start Valve Capscrew Dimension & Stress Analysis, Prepared for Transamerica Delaval,Inc (Tdi) Diesel Generator Owners Group ML20081C4721984-03-12012 March 1984 Design Review of Connecting Rod Bearing Shells for Transamerica Delaval Enterprise Engines ML20087L2851984-02-27027 February 1984 Control Bldg Category I Equipment Balance-of-Plant Qualification Level, Monthly Status Rept ML20086S2221984-02-27027 February 1984 Investigation of Types AF & Ae Piston Skirts ML20080U3971984-02-10010 February 1984 Rept on Special Lifting Devices ML20083F6511983-12-15015 December 1983 Analysis of Replacement Connecting Rod Bearings Emergency Diesel Generators,Fatigue Life Prediction,Shoreham Nuclear Power Station ML20083C6681983-12-0808 December 1983 Metallurgical Analysis of Cracked Piston Skirts from Emergency Diesel Generators,Shoreham Nuclear Power Station ML20081C1571983-10-20020 October 1983 Diesel Generator Status Rept ML20112J2501983-08-31031 August 1983 Critique of Hudson Inst/Lilco Defense of Shoreham Economics. Related Info Encl ML20082D8831983-08-30030 August 1983 Suppression Pool Local-to-Bulk Temp Difference,Shoreham Nuclear Power Station - Unit 1 ML20112J2981983-08-30030 August 1983 Lilco/Hudson Inst Rept on Shoreham:Analysis of Errors Re Property Taxes & Employment. Related Info Encl ML20081L6891983-08-29029 August 1983 Excerpt from Draft FSAR Section 5.2.8, Inservice Insp Program, & Section 5.2.8.1 Provisions for Access to Rcpb ML20085D8921983-07-26026 July 1983 Books 1-3 of Independent Design Review for Shoreham Nuclear Power Station, Final Technical Rept ML20072J9521983-06-30030 June 1983 Independent Design Review for Shoreham Nuclear Power Station, Executive Summary of Final Rept ML20058N6071983-06-30030 June 1983 Environ Qualification Rept for Class 1E Equipment for Shoreham Nuclear Power Station Unit 1 Lilco ML20072K0141983-06-27027 June 1983 Rev 1 to Independent Design Review,Shoreham Nuclear Power Plant ML20076M0861983-06-27027 June 1983 Rev 5 to Environ Qualification Rept for Class IE Equipment for Shoreham Nuclear Power Station Unit 1 ML20072F2401983-06-22022 June 1983 Element-By-Element Review of Lilco Transition Module of Shoreham Nuclear Power Station Offsite Radiological Emergency Response Plan ML20079R7351983-05-31031 May 1983 Shoreham Common Sensors Failures Evaluation Rept ML20073L5911983-04-30030 April 1983 Cable Separation Analysis Rept 1994-01-24 Category:TEXT-SAFETY REPORT MONTHYEARML20140G4481997-05-0101 May 1997
[Table view]Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20135D8011996-11-26026 November 1996 Part 21 Rept Re Two Safety Related Valves Supplied by Velan Valve Corp Were Not in Compliance W/Originally Supplied QA Documentation.Returned Valves to Velan in May 1996 & on 961120 Velan Advised That Valves Had Been Misplaced ML20080G4691995-01-26026 January 1995 Record of Telcon W/Nrc & Licensees 950126 to Clarify Position Re Dispositioning of Exempt Sources Listed in Section 6.3.3 of Shoreham Termination Survey Final Rept Dtd Oct 1994 ML20069F0001994-01-24024 January 1994 Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20057F2261993-09-30030 September 1993 Safety Evaluation Supporting Exemption Request from Requirements of 10CFR50.54(q) for License NPF-82 ML20056C7181993-07-14014 July 1993 SE Supporting Amend 10 to License NPF-82 ML20045B3551993-06-11011 June 1993 LER 93-001-00:on 930429,refueling Jib Crane Moved in Vicinity of Spent Fuel Pool Using vendor-supplied Lifting Eye in Violation of NUREG-0612.Caused by Failure to Identify Crane as Heavy Load.Meetings held.W/930611 Ltr ML20045C8881993-06-0808 June 1993 Vols 1 & 2 to Refueling Jib Crane 1T31-CRN-008A Incident Root Cause Analysis. W/One Oversize Encl ML20044C1181993-02-28028 February 1993 Shoreham Nuclear Power Station Updated Decommissioning Plan. ML20128P6451993-02-28028 February 1993 Snps Decommissioning Project Termination Survey Final Rept for Steam Turbine Sys (N31) ML20128P7431993-02-19019 February 1993 Rev 3 to 93X027, Nuclear QA Surveillance Rept ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20128B9641992-10-31031 October 1992 Rev 0 to Shoreham Decommissioning Project Termination Survey Plan ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20099H5781992-07-31031 July 1992 Rev 4 to Shoreham Defueled Sar ML20114A6311992-07-28028 July 1992 Shoreham Decommissioning Plan ML20101K5791992-06-25025 June 1992 Long Island Power Authority Shoreham Decommissioning Project,Shoreham Nuclear Power Station,Technical Rept on Water Processing & Water Mgt Activities for Reactor Pressure Vessel & Wet Cutting Station ML20094L1271992-03-13013 March 1992 Amend 1 to Part 21 Rept 159 Re Potential Defect in Power Cylinder Liner.Initially Reported on 920115.Caused by Liner/ Block Fit & Localized Matl Microstructure.All Drawings & Specs Revised to Address Matl Design Requirements ML20082M5081991-08-26026 August 1991 Rev 3 to Shoreham Defueled Sar PM-91-125, Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station1991-07-31031 July 1991 Monthly Operating Rept for Jul 1991 for Shoreham Nuclear Power Station PM-91-112, Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station1991-06-30030 June 1991 Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station PM-91-075, Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station1991-04-30030 April 1991 Monthly Operating Rept for Apr 1991 for Shoreham Nuclear Power Station ML20024G7171991-04-22022 April 1991 LER 91-001-00:on 910324,RB Normal Ventilation Sys (Rbnvs) Outboard Exhaust Valve Closed for No Apparent Reason.Cause Inconclusive.Sys Restored to Normal Lineup & Rbnvs Outboard Valve Will Be Stroked on Routine basis.W/910422 Ltr SNRC-1806, Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 19901991-04-15015 April 1991 Revised Pages 2 & 6 to Encl a of 10CFR50.59 Annual Rept for 1990 PM-91-058, Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station1991-03-31031 March 1991 Monthly Operating Rept for Mar 1991 for Shoreham Nuclear Power Station PM-91-037, Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station1991-02-28028 February 1991 Monthly Operating Rept for Feb 1991 for Shoreham Nuclear Power Station PM-91-016, Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station1991-01-31031 January 1991 Monthly Operating Rept for Jan 1991 for Shoreham Nuclear Power Station SNRC-1797, 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 19901990-12-31031 December 1990 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 1990 SNRC-1794, Shoreham Nuclear Power Station Annual Operating Rept,19901990-12-31031 December 1990 Shoreham Nuclear Power Station Annual Operating Rept,1990 SNRC-1799, Lilco 1990 Annual Rept1990-12-31031 December 1990 Lilco 1990 Annual Rept ML20069Q3901990-12-31031 December 1990 Shoreham Nuclear Power Station Decommissioning Plan. (Filed in Category P) ML20028H0231990-09-28028 September 1990 LER 90-007-00:on 900907,unplanned Actuation of ESF Sys Occurred During I&C Surveillance Test.Caused by Inadequate procedure.SP44.650.16 Revised to Require That Leads Lifted & Individually separated.W/900928 Ltr ML20056A2001990-07-31031 July 1990 Safety Evaluation Supporting Amend 6 to License NPF-82 PM-90-097, Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station1990-06-30030 June 1990 Monthly Operating Rept for June 1990 for Shoreham Nuclear Power Station ML20055E3911990-06-25025 June 1990 Safety Evaluation Supporting Amend 5 to License NPF-82 PM-90-083, Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station1990-05-31031 May 1990 Monthly Operating Rept for May 1990 for Shoreham Nuclear Power Station 05000322/LER-1987-0351990-05-16016 May 1990 LER 87-035-02:on 871221,880106 & 0330,high Energy Line Break Logic Isolations of RWCU & Main Steam Line Drain Valves Occurred.Caused by Problems W/Temp Monitoring Units. Grounding Scheme Changed & Transformers Rewired 05000322/LER-1986-0321990-05-16016 May 1990 LER 86-032-01:on 860728,RWCU Isolated on High Differential Flow Sensed by Steam Leak Detection Sys While Placing Filter Demineralizers in Operation.Cause Not Determined. Operating Procedures Revised to Monitor RWCU Sys 05000322/LER-1987-0091990-05-16016 May 1990 LER 87-009-01:on 870203,full Reactor Trip Occurred Due to Perturbation in Ref Leg.Caused by Spurious Low Level Reactor Pressure Vessel Water Level Signal.Existing Level & Pressure Transmitters Replaced W/Newer Models 05000322/LER-1989-0031990-05-16016 May 1990 LER 89-003-01:on 890310,emergency Diesel Generator (EDG) 102 Manually Shutdown During 18-month Surveillance Test Due to Failure of EDG Output Breaker.Cause Not Determined. Replacement Breaker Installed in Cubicle 102-8 05000322/LER-1985-0591990-05-16016 May 1990 LER 85-059-01:on 851219,half Reactor Trip,Full NSSS Shutoff Sys Isolation & Reactor Bldg Standby Ventilation Sys Initiation Occurred Due to Loss of Power to Reactor Protection Sys Bus B.Assembly Breaker Reset 05000322/LER-1988-0151990-05-16016 May 1990 LER 88-015-02:on 880916,seismic Monitoring Instrumentation, Including Peak Acceleration Recorders,Removed from Svc for More than 30 Days Due to Corrosion on Scratch Plates.Cover Gasket Replaced & Thermal Barrier Mount to Be Installed 05000322/LER-1988-0031990-05-16016 May 1990 LER 88-003-01:on 880322,unplanned Automatic Initiation of Reactor Bldg Standby Ventilation Sys Side a Occurred During Deenergization of Relay.Caused by Close Placement of Relay Terminals.Wiring Inside Electrical Panels Reworked 05000322/LER-1986-0141990-05-16016 May 1990 LER 86-014-01:on 860305,full Reactor Trip Occurred Due to Momentary False Low Vessel Level Signal,Causing Hydraulic Pressure Spike in Ref Leg A.Bourton Tube Type Pressure Transmitter Replaced W/Rosemount Model 1153 05000322/LER-1987-0121990-05-16016 May 1990 LER 87-012-01:on 870504,uplanned Actuation of ESF Occurred. Caused by Technician Loosing Footing & Accidently Hitting Outside Cover of Level Switch.Permanent Ladders & Platforms Installed at Head Tank Level Switches 05000322/LER-1988-0171990-05-16016 May 1990 LER 88-017-01:on 881025,discovered That Seismic Monitoring Instrumentation Returned to Svc Prior to Verifying Sys Operability & Special Rept Not Written.Caused by Personnel Error.Surveillance Engineer Reassigned 1997-05-01 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20112J298&oldid=2811777"