Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20069F000 | 24 January 1994 | Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept | Non-Destructive Examination Offsite Dose Calculation Manual Post Accident Monitoring Process Control Program Chernobyl Biofouling |
ML20045C888 | 8 June 1993 | Vols 1 & 2 to Refueling Jib Crane 1T31-CRN-008A Incident Root Cause Analysis. W/One Oversize Encl | |
ML20128P645 | 28 February 1993 | Snps Decommissioning Project Termination Survey Final Rept for Steam Turbine Sys (N31) | Scaffolding |
ML20128P743 | 19 February 1993 | Rev 3 to 93X027, Nuclear QA Surveillance Rept | |
ML20099H578 | 31 July 1992 | Rev 4 to Shoreham Defueled Sar | Safe Shutdown Fitness for Duty High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Met Tower Operating Basis Earthquake Nondestructive Examination Incorporated by reference Tornado Missile Protection Design basis earthquake Process Control Program Feedwater Controller Failure Safeguards Contingency Plan Earthquake Chernobyl Fuel cladding Fire Protection Program |
ML20101K579 | 25 June 1992 | Long Island Power Authority Shoreham Decommissioning Project,Shoreham Nuclear Power Station,Technical Rept on Water Processing & Water Mgt Activities for Reactor Pressure Vessel & Wet Cutting Station | |
ML20082M508 | 26 August 1991 | Rev 3 to Shoreham Defueled Sar | |
ML20005F251 | 5 January 1990 | Shoreham Nuclear Power Station Defueled Sar. | Safe Shutdown Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Met Tower Reserve Station Service Transformer Nondestructive Examination Incorporated by reference Design basis earthquake Process Control Program Safeguards Contingency Plan Earthquake Chernobyl Fuel cladding Fire Protection Program |
ML19332G199 | 18 September 1989 | Rev 0 to Radiological Safety Analysis for Spent Fuel Storage & Handling. | Feedwater Controller Failure Fuel cladding |
ML20245E018 | 19 June 1989 | QC 1989 Staffing Rept | Nondestructive Examination |
ML20153G894 | 31 August 1988 | Rev 1 to Shoreham Nuclear Power Station Prompt Notification Sys Rept | |
ML20196K631 | 29 June 1988 | QC Div 1988 Staffing Rept | Nondestructive Examination |
ML20148A485 | 29 February 1988 | Shoreham Nuclear Power Station PRA W/Supplemental Containment Sys | Probabilistic Risk Assessment Reserve Station Service Transformer Earthquake Turbine Missile Fatality |
ML20214U202 | 31 January 1987 | Technical Rept 86.2SH Verification of IPE for Shoreham. W/ 870313 Release Memo | Reactor Vessel Water Level Internal Flooding Probabilistic Risk Assessment Reserve Station Service Transformer Fuel cladding |
ML20210M600 | 31 December 1986 | Emergency Planning Federal Involvement in Preparedness Exercise at Shoreham Nuclear Plant. Related Correspondence | |
ML20214T602 | 31 December 1986 | Rev 6 to Plant Design Assessment Rept for Safety/Relief Valves & LOCA Loads, Vols 1 & 2.Proprietary Suppl Withheld (Ref 10CFR2.790) | |
ML20210K296 | 31 December 1986 | Nuclear Regulation,Unique Features of Shoreham Nuclear Plant Emergency Planning. Related Correspondence | |
ML20214U364 | 31 October 1986 | Shoreham Startup & Low Power Testing Operations,Special Rept:Lilco QA Audit on Training & Qualifications | |
ML20237H638 | 31 July 1986 | Compliance W/10CFR50,App I | |
ML20211P685 | 30 June 1986 | Implications of Chernobyl-4 Accident for Nuclear Emergency Planning for State of Ny | Chernobyl |
ML20203N417 | 30 April 1986 | Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications | Nondestructive Examination Liquid penetrant |
SNRC-1207, Vols 1 & 2 of Colt Emergency Diesel Generator Info to Be Incorporated in Fsar. W/11 Oversize Drawings | 30 November 1985 | Vols 1 & 2 of Colt Emergency Diesel Generator Info to Be Incorporated in Fsar. W/11 Oversize Drawings | |
ML20128N965 | 31 May 1985 | New York Power Pool,1985 Summer Operating Reserve, Projection & Analysis | |
ML20111C096 | 20 November 1984 | Rev 1 to Long Island Lighting Co,Shoreham Nuclear Power Station,Prompt Notification Sys Design Rept | |
ML20091Q885 | 30 June 1984 | Colt Diesel Generator Summary for Shoreham Nuclear Power Station - Unit 1 | Safe Shutdown |
ML20092N663 | 12 June 1984 | Seismic Survivability Study for MP-45 Diesel Generators | |
ML20091M545 | 31 May 1984 | Design Review of Connecting Rods for Tdi DSRV-4 Series Diesel Generators, Final Rept Prepared for Tdi Diesel Generator Owners Group | Finite Element Analysis Breakaway torque |
ML20091M551 | 23 May 1984 | Investigation of Types AF & Ae Piston Skirts, Final Rept Prepared for Tdi Diesel Generator Owners Group | Hydrostatic Nondestructive Examination Finite Element Analysis |
ML20091M520 | 22 May 1984 | Draft Final Rept, Evaluation of Emergency Diesel Generator Crankshafts at Shoreham & Grand Gulf, Prepared for Tdi Diesel Generator Owners Group | Finite Element Analysis |
ML20084E542 | 30 April 1984 | Emergency Diesel Generator Engine & Auxiliary Module Wiring & Termination Qualification to IEEE-383-1974 | |
ML20087L351 | 31 March 1984 | Emergency Diesel Generator Air Start Valve Capscrew Dimension & Stress Analysis, Prepared for Transamerica Delaval,Inc (Tdi) Diesel Generator Owners Group | |
ML20081C472 | 12 March 1984 | Design Review of Connecting Rod Bearing Shells for Transamerica Delaval Enterprise Engines | Nondestructive Examination Finite Element Analysis |
ML20087L285 | 27 February 1984 | Control Bldg Category I Equipment Balance-of-Plant Qualification Level, Monthly Status Rept | |
ML20086S222 | 27 February 1984 | Investigation of Types AF & Ae Piston Skirts | Hydrostatic Nondestructive Examination Finite Element Analysis |
ML20080U397 | 10 February 1984 | Rept on Special Lifting Devices | |
ML20083F651 | 15 December 1983 | Analysis of Replacement Connecting Rod Bearings Emergency Diesel Generators,Fatigue Life Prediction,Shoreham Nuclear Power Station | Nondestructive Examination |
ML20083C668 | 8 December 1983 | Metallurgical Analysis of Cracked Piston Skirts from Emergency Diesel Generators,Shoreham Nuclear Power Station | |
ML20081C157 | 20 October 1983 | Diesel Generator Status Rept | Nondestructive Examination |
ML20112J250 | 31 August 1983 | Critique of Hudson Inst/Lilco Defense of Shoreham Economics. Related Info Encl | |
ML20082D883 | 30 August 1983 | Suppression Pool Local-to-Bulk Temp Difference,Shoreham Nuclear Power Station - Unit 1 | |
ML20112J298 | 30 August 1983 | Lilco/Hudson Inst Rept on Shoreham:Analysis of Errors Re Property Taxes & Employment. Related Info Encl | |
ML20081L689 | 29 August 1983 | Excerpt from Draft FSAR Section 5.2.8, Inservice Insp Program, & Section 5.2.8.1 Provisions for Access to Rcpb | |
ML20085D892 | 26 July 1983 | Books 1-3 of Independent Design Review for Shoreham Nuclear Power Station, Final Technical Rept | |
ML20072J952 | 30 June 1983 | Independent Design Review for Shoreham Nuclear Power Station, Executive Summary of Final Rept | |
ML20058N607 | 30 June 1983 | Environ Qualification Rept for Class 1E Equipment for Shoreham Nuclear Power Station Unit 1 Lilco | |
ML20072K014 | 27 June 1983 | Rev 1 to Independent Design Review,Shoreham Nuclear Power Plant | |
ML20076M086 | 27 June 1983 | Rev 5 to Environ Qualification Rept for Class IE Equipment for Shoreham Nuclear Power Station Unit 1 | Safe Shutdown Post Accident Monitoring Anchor Darling Excess Flow Check Valve |
ML20072F240 | 22 June 1983 | Element-By-Element Review of Lilco Transition Module of Shoreham Nuclear Power Station Offsite Radiological Emergency Response Plan | |
ML20079R735 | 31 May 1983 | Shoreham Common Sensors Failures Evaluation Rept | |
ML20073L591 | 30 April 1983 | Cable Separation Analysis Rept | Safe Shutdown Fire Barrier |