MONTHYEARNOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With NOC-AE-000385, Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with NOC-AE-000357, Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With NOC-AE-000329, Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with NOC-AE-000296, Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With NOC-AE-000256, Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 2 NOC-AE-000233, Monthly Operating Repts for June 1998 for Stp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Stp,Units 1 & 2 NOC-AE-000202, Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 2 NOC-AE-000172, Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 2 ML20216G4911998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for South Texas Project,Units 1 & 2 NOC-AE-000108, Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 2 NOC-AE-000090, Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 2 NOC-AE-000061, Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station1997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station NOC-AE-000039, Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 2 ML20199K0571997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2 ML20198J9221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for South Texas Project,Units 1 & 2 ML20216H9651997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20210K5201997-07-31031 July 1997 Monthly Operating Repts for July 1997 for STP ML20141H3041997-06-30030 June 1997 Monthly Operating Repts for June 1997 for South Tx Project, Units 1 & 2 ML20148K5871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20141G2841997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20137X5811997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for South Tx Project Units 1 & 2 ML20137X6011997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2 ML20137B3981997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for STP ML20134M7421997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20133P3191996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20132C1301996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20134M7431996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20129A5961996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for South Texas Project Units 1 & 2 ML20129A6361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for South Texas Project Electric Generating Station ML20129A6541996-07-31031 July 1996 Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1 ML20116M6721996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for South Texas Project Electric Generating Station ML20115H0321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for South Tx Project, Units 1 & 2 ML20112H9921996-05-31031 May 1996 Monthly Operating Repts for May 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20117G0101996-04-30030 April 1996 Monthly Operating Repts for April 1996 for STP ML20100R2861996-02-29029 February 1996 Monthly Operating Repts for South Texas Project Electric Generating Station Units 1 & 2 ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for STP ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for South Texas Project ST-HL-AE-5256, Monthly Operating Repts for Nov 1995 for STP Units 1 & 21995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for STP Units 1 & 2 ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 21995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project1995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for South Tx Project ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station1995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for STP Electric Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
,
The Light c
g,o mp ;a nySouth
- g p, Texas Project Electric Generating Station P. O. Box 289 Wadsworth, Texas 77483 July 11,1996 ST-HL-AE-005429 File No. G02 10CFR50.71 U. S. Nuclear Regulatory Commission Attention
- Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for June 1996 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for June 1996.
If you should have any questions on this matter, please contact D. M. Bergendahl at (512) 972-7688.
Sincerely, 1
F. H. Mallen Manager, Planning & Controls RLIUsl Attachments: 1) STPEGS Unit 1 Monthly Operating Report - June 1996
- 2) STPEGS Unit 2 Monthly Operating Report - June 1996 9607220189 960630 N(
PDR ADOCK 05000498 -
[
R PDR Project Manager on Behalf of the Participants in the South Texas Project
- -- -.-- . - - - - . . .-.-.-- - --=- .
Houston Lighting & Power Company ST-HL-AE-5429 South Texas Project Electric Generating Station File No.: G02 Page 2 Leonard J. Callan Rufus S. Scott Regional Administrator, Region IV Associate General Counsel i U. S. Nuclear Regulatory Commission Houston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400 P. O. Box 61067 Arlington, TX 76011-8064 Houston, TX 77208 Thomas W. Alexion Institute of Nuclear Power l Project Manager, Mail Code 13H3 Operations - Records Center :
U. S. Nuclear Regulatory Commission 700 Galleria Parkway i Washington, DC 20555-0001 Atlanta, GA 30339-5957 l i
David P. Loveless Dr. Bertran Wolfe Sr. Resident Inspector 15453 Via Vaquero c/o U. S. Nuclear Regulatory Comm. Monte Sereno, CA 95030 P. O. Box 910 Bay City, TX 77404-0910 Richard A. Ratliff !
Bureau of Radiation Control )
J. R. Newman, Esquire Texas Department of Health l Morgan, Lewis & Bockius 1100 West 49th Street 1800 M Street, N.W. Austin, TX 78756-3189 Washington, DC 20036-5869 U. S. Nuclear Regulatory Comm.
M. T. Hardt/W. C. Gunst Attn: Document Control Desk City Public Service Washington, DC 20555-0001 i P. O. Box 1771 San Antonio, TX 78296 J. C. Lanier/M. B. Lee J. R. Egan, Esquire City of Austin Egan & Associates, P.C.
Electric Utility Department 2300 N Street, N.W.
721 Barton Springs Road Washington, D.C. 20037 Austin, TX 78704 Central Power and Light Company J. W. Beck !
ATTN: G. E. Vaughn/C. A. Johnson Little Harbor Consultants, Inc.
P. O. Box 289, Mail Code: N5012 44 Nichols Road Wadsworth, TX 77483 Cohassett, MA 02025-1166 i
i
,w _ ,- - . --- n -, , , - - m an-,
.3 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT JUNE 1996 l
l HOUSTON LIGHTING AND POWER CO.
NRC DOCKET NO. 50-498 l
LICENSE NO. NPF-76 Reviewed By: 0 'AkI 7 h 6.hi.$E,tGEND K ' ~ Datd I l
Approved By: aSO N u
7f9/9/
L.W. MYERS Da'te - '
i l
I i
l A
f 2
e 1
MONTHLY
SUMMARY
t i
STPEGS Unit I began the reporting period shutdown for refueling and scheduled mamtei.ance.
The unit was returned to service on June 9 at 1515. Power ascension tests were completed and !
100% reactor power achieved on June 13, at 1449.
The unit operated for the remamder of the reponing period at full power with no unit shutdowns or significant power reductions. l I
i i
l t
I
(
P 6
I e
i f
a i
i i
I i
i ..
OPERATING DATA REPORT DOCKETNO. 50-498 UNIT 1 DATE July 3.1996
}
l COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 OPERATING STATUS
- 1. REPORTING PERIOD: 6/1/96 4'30/96 GROSS HOURS IN REPORTING PERIOD: 7LO
- 2. CURRENTLY AUTHORIZED POWER LEVEL (Mut): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): Ngn;
- 4. REASONS FORRESTRICTION(IF ANY) N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR CRITICAL LL9,8 3.825.2 45.462.5
- 6. REACTOR RESERVE SHUTDOWN HOURS 9 0 9
- 7. HOURS GENERATORON LINE 1[12 3.797.1 44.136.4
- 8. UNIT RESERVE SHUTDOWN HOURS Q Q Q
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 1.805.136 14.220.859 162.377.194
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 615,540 4.891.840 55.273.510
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 586,230 4.682.910 52.495.630
- 12. REACTOR SERVICE FACTOR 73.6 % 12,6% M
- 13. REACTOR AVAILABILITY FACTOR 73.6 % 87.6 % 66.1 %
- 14. UNIT SERVICE FACTOR 71.3 % 32,9% 64l%
m i
i
- 15. UNIT AVAILABILITY FACTOR 71.3% 87.0 % 642%
- 16. UNIT CAPACITY FACTOR (Using MDC) 65.1 % 85.7 % 61 0 %
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 65.1% 57 15.7% 6_LQ%
- 18. PNTT FORCED OUTAGE RATE Q,9% Q,9% 24 61,
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERACE DAILY UNIT POWER LEVEL DOCKETNO. 50-498 UNIT 1 ,
DATE July 3.1996 l COMPLETED BY R.L Hill ,
TELEPHONE 512 972-7667 MONTH EJNU ;
1 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER l LEVEL LEVEL (MWe-Net) (MWe-Net) .
-1 9 17 1250 ;
2 9 18 12}_0 !
3 9 19 1252 5 ,
4 9 20 1259 5 9 21 1211 ,
6 9 22 1241 7 9 23 1151 l 8 9 24 1211 9 9 25 .L2_il !
10 241 26 1249 ,
11 112 27 12M i
12 229 28 12_52 13 11.91 29 1257 14 1211 30 1252 15 1252 31 E/L4 l
16 1;!jl0 J
\
rn
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-498 UNIT 1 DATE July 3.1996 COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 REPORTMONTH JUNE I 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Caix ; & Corrective Action to Present Recurrence (Hours) Shutting Event Code Code Down Report #
Reactor 96-02 960518 S 206.1 C 4 N/A N/A N/A Refueling and scheduled maintenance outagc.
96-03 960609 S 0.2 B 9 N/A TA TRB Main Turbinc Ostrspeed Trip Test.
1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
i l
. i PORVS AND SAFETY VALVE
SUMMARY
I There were no PORV or Safety Valves challenged during the reponing period.
a ..
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION I
UNIT 2 MONTHLY OPERATING REPORT l
JUNE 1996 ,
HOUSTON LIGHTING AND POWER CO.
NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Resiewed By: / 7 )\ #
D.M. C21l PAIL'" Da'te/ l Approved By: C
~
I!fd R.E. h4ASSE Date I
)
i l
I j
a .
MONTIILY
SUMMARY
STPEGS Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
< o, OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE July 3.19%
COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 OPERATING STATUS
- 1. REPORTING PERIOD;.6/1/96-6/30/% GROSS HOURS IN REPORTING PERIOD: 22Q
- 2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): Nonc
- 4. REASONS FORRESTRICTION(IF ANY) N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REAC1DR CRITICAL 720.0 4.036.7 42,137,4
- 6. REACTOR RESERVE SHUTDOWN HOURS Q 9 9
- 7. HOURS GENERATORON LINE 720.0 2,9_5_70 5 40 775.5
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 g
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 2.747. % 5 14.987.160 149.% 1.837
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 941.500 5.147.200 50.975.581
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 900.550 4.927.190 48.576.536
- 12. REACTOR SERVICE FACTOR 100.0 % 92 4 % 613%
- 13. REACTOR AVAILABILITY FACTOR 100,0 % 92.4 % 681%
- 14. UNIT SERVICE FACTOR 100.0 % 90.6 % MJ%
- 15. UNIT AVAILABILITY FACTOR 100.0 % 90.6 % 66J%
- 16. UNTT CAPACITY FACTOR (Using MDC) 100.0 % 90.2 % 63.0 %
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 100.0 % 90.2 % 61Q%
- 18. UNIT FORCED OUTAGE RATE 0.0% J4% 24J%
- 19. SHUIDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): .
N/A
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARIUP: N/A
l a .,
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 ;
~
UNIT 2 DATE July 3.1996 :
COMPLETED BY R.L. Hill j TELEPHONE 512 972-7667 MONTH EINE DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 R12 17 125J 2 1251 18 1242 f I
3 1212 19 1232 4 1253 20 1247
122_51 6 1251 22 1241 7 1212 23 1251 ;
8 1211 24 1251 9 1211 25 1211 j 10 122J52 26 1242 j 11 1212 27 1231 l 12 1212 28 1211 13 12.51 29 1211 ,
i 14 1211 30 1242 i 15 12551 31 E!A !
16 1251 t
l 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-499 UNIT 2 DATE July 3.1996 COMPLETED BY R.L Hill TELEPHONE 512 972-7667 REPORTMONTH JUhT 1 2 3 4 5 No. Date Type Duration Reason Method of Licensec System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCrlONS DURING THE REPORTING PERIOD 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-OperatorTraining & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
o ,;
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.
1 1
I l
l l
l l
l l