MONTHYEARML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J2431999-06-29029 June 1999 Informs That Author Received Call from NRR on Dirt Spreading Ltr & Questions Re Cover Ltr Statement Where Util Asks to Be Allowed to Dispose of Future Soil in Same Manner Provided Same Acceptance Criteria Met ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195C5891999-05-27027 May 1999 Forwards Response to NRC 990301 RAI Re GL 96-05 Program at Vermont Yankee Nuclear Power Station ML20195D5341999-05-27027 May 1999 Forwards Description of Vermont Yankees Plans for Insp of & Mods to Certain Reactor Vessel Internals BVY-99-074, Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld1999-05-26026 May 1999 Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld ML20195B4081999-05-24024 May 1999 Withdraws Licensee Commitment,Contained in ,To Reinitiate ITS Project Following Completion of FSAR Accuracy Verification Project.Util Will Continue to Modify Current TS with Number of Improvements BVY-99-067, Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License1999-05-21021 May 1999 Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License ML20196L1801999-05-18018 May 1999 Withdraws Licensee & Attachment,Containing Rev 2 to Vermont Yankee Operational QA Manual, from Further Consideration by Nrc.Summary of Commitments Encl ML20206K3201999-05-0707 May 1999 Forwards Response to RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206D3731999-04-27027 April 1999 Informs NRC of Changes in Recipients of NRC Docketed Correspondence ML20206B1401999-04-23023 April 1999 Forwards Replacement of Section 3(a) of NSHC Determination Provided by Re TS Proposed Change 208,suppl Section 6 ML20205S3381999-04-16016 April 1999 Submits Revised Schedule for Response to NRC 990226 RAI Re 980630 Submittal of IPEEE Rept.Info Will Be Submitted by 991231 ML20205S3891999-04-16016 April 1999 Forwards non-proprietary & Proprietary Revised Page to Holtec Rept HI-981932,supplementing TS Proposed Changed 207 Re Spent Fuel Pool Storage Capacity Expansion ML20205S3031999-04-15015 April 1999 Forwards Revised TS Bases Pages 90,227,164 & 221a,accounting for Change in Reload Analysis from Yaec to GE Methodology, Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20205P9291999-04-14014 April 1999 Requests That Rev to NRC 821029 SER for NUREG-0737,Item II.K.3.24,be Issued to Clarify Util Installed RCIC & HPCI HVAC Configuration,As Discovered During Preparation of DBDs for Sys ML20205P8191999-04-13013 April 1999 Forwards Rev 2 to COLR for Vermont Yankee Cycle 20, Dtd Feb 1999,IAW TS Section 6.7.A.4 ML20205M3191999-04-0707 April 1999 Forwards 1998 Annual Rept of Results of Individual Monitoring, Per 10CFR20.2206(b).Licensee Is Submitting Matl to Only Addressee Specified in 10CFR20.2206(c).Without Encl ML20205K0351999-03-31031 March 1999 Informs That Certain Addl Corrections Warranted for 990121 SER for Amend 163 to License DPR-28 Re Suppression Pool Water Temp.Suggested Corrections Listed ML20205K1821999-03-31031 March 1999 Informs of Modifications That Util Made to CO(2) Fire Suppression Sys,Due to Sen 188 Which Occurred at Ineel on 980728.Compensatory Actions Will Remain in Place Until Modifications Are Complete & Systems Are Returned to Svc ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee 1999-09-29
[Table view] |
Text
l VERMONT YANKEE I NUCLEAR POWER CORPORATION l 1
l 3 Ferry Road, Brattleboro, VT 05301-7002 l
[ ENGINEERING OFFICE 580 MAIN STREET BOLTON, MA 01740 )
(508)779-6711 April 15,1996 l BVY 96-48 l
)
United States Nuclear Regulatory Commission l
- ATTN
- Document Control Desk Washington,DC 20555
References:
(a) License No. DPR-28 (Docket No. 50-271) ;
(b) Letter, USNRC to All Licensees, Generic Letter 94-03, NVY 94-124, dated i 7/25/94 (c) Letter, USNRC to VYNPC, NVY 95-55, dated 4/27/95 l
(d) " Safety Evaluation by the Division of Reactor Licensing, U.S. Atomic Energy Commission, in the Matter of Vermont Yankee Nuclear Power Company, Vermont Yankee Nuclear Power Station, Docket 50-271", dated 6/1/71 l
(e) Letter, USNRC to VYNPC, NVY 85-168, dated 8/12/85 i
Subject:
Vermont Yankee Core Shroud Modification i
Background
In Reference (b), the NRC identified Intergranular Stress Corrosion Cracking (IGSCC) of BWR internal components as a technical issue of concern and requested each licensee to inspect their core shroud no later than the next scheduled refueling outage. Vermont Yankee inspected its core shroud during the Spring 1995 refueling outage and detected indications of possible IGSCC in several welds. As required by Reference (b), the results of those inspections, along with Vermont Yankee's engineering evaluation of the indications, were submitted to the NRC.
In Reference (c), the NRC concurred with Vermont Yankee's conclusion that there was adequate structural margin to allow operation for at least on : additional fuel cycle and required that Vermont Yankee reinspect and/or repair the core shroud prior to startup from the 1996 refueling outage. Following extensive evaluation, Vermont Yankee has decided to proceed with a l modification of the core shroud. t l
Discussion j
! The Vermont Yankee core shroud modification is a full structural repair in that it is capable of ,
fulfilling all safety and operational design bases of the core shroud, as defined in the Vermont ;
180057 j,y; gg)'
9604180366 960415 "
DR ADOCK 0500 1 ,- g j/
f i
l United States Nuclear Regulatory Commission VERMONT YANKEE NUCLEAR POWER CORPORATION April 15,1996 Page 2 of 4 Yankee FSAR, assuming the most adverse combination of any or all core shroud circumferential welds not performing their design function (see Figure 1).
I The modification is an alternative to the requirements of the ASME Boiler and Pressure Vessel Code,Section XI, and is being submitted for NRC approval under 10CFR50.55a(a)(3). An alternative repair concept is required since the typical method of repair under Section XI (removal of the flaw indication and rewelding) is not technically feasible for core shroud indications at this time. ,
l The request consists of two parts. Enclosure 1 is a non-propnetary summary of the modification, prepared in the format agreed to between the NRC and the Boiling Water Reactor Vessel and Internals Project (BWRVIP). Enclosure 2 is a proprietary design report containing engineering drawings and detailed engineering calculations.
l The design satisfies all Vermont Yankee FSAR requirements for the core shroud, as well as l
complying with the BWRVIP Core Shroud Repair Design Criteria. In addition to these l
i requirements, Vermont Yankee has incorporated the following conservative criteria:
l e Seismic Desien Innut - the design basis seismic design input for Vermont Yankee is the 1952 Taft earthquake anchored at 0.07g for the operating basis earthquake and 0.14g for the safe i shutdown earthquake [ Reference (d)]. To provide added conservatism, the shroud modification utilizes the NRC Regulatory Guide 1.60 earthquake response spectrum for the seismic analyses. The NRC has reviewed and accepted this alternative design approach for Vermont Yankee [ Reference (e)]. The original analysis methodology assumed no vertical amplification in structures and applied a constant 0.05g acceleration for the operating basis earthquake and 0.10g for the safe shutdown earthquake. The core shroud modification analyses explicitly account for vertical structural amplification.
l l e Load Combination Methodolony - The original design approach for Vermont Yankee was l based on a two-dimensional load combination of one horizontal direction and the vertical direction. Absolute summation was utilized and the greater of the north-south / vertical or l
l east-west / vertical was selected. The core shroud modification analyses are based on a three
! dimensional load combination using square root of the sum of the squares (SRSS) methods,
! as described in NRC Regulatory Guide 1.92.
. Structural Modeling - The structural model utilized in the core shroud modification analyses l
is a fully coupled model of the reactor building, drywell, reactor pressure vessel support, reactor pressure vessel and reactor internals. The model was first developed for the recirculation system piping replacement and is based on plant as-built drawings. The model is described in Appendix A.10 to the Vermont Yankee FSAR.
. Loss-of-Coolant Accident Loadings - In order to allow for possible future increases in core
- flow and/or plant licensed power, the pressure loadings on the core shroud resulting from
m_ _ , . . _ _ _ __.__ _ ____ _ . _ _ _____ _.
United States Nuclear Regulatory Commission VERMONT. YANKEE NUCLEAR POWER CORPORATION April 15,1996 Page 3 of 4 i
normal and accident conditions are increased 15 percent above the values documented in the Vermont Yankee FSAR. The pressure loadings in the FSAR are based on a reactor thermal power of 1665 MWt; the licensed plant power is 1593 MWt, which provides an additional l conservatism.
. Design Reliant Weld Evaluations - Core shroud modifications generally assume conservatively that all circumferential welds are not performing their design function and rely )
on portions of the vertical welds to hold the shroud segments together as cylinders. These I
, welds are called design reliant welds. The Vermont Yankee repair is designed and analyzed l to eliminate reliance on any or all circumferential welds.
Previous shroud modifications have performed limited visual examinations of selected vertical welds to ensure that there was no unacceptable cracking of the vertical welds. While it is accepted that a properly performed visual examination can detect core shroud weld cracks, Vermont Yankee believes that greater assurance of weld integrity is assured by ultrasonic examinations. For this reason Vermont Yankee has decided to perform ultrasonic l examinations of all design reliant welds during the 1996 refueling outage.
The welds to be ultrasonically inspected are the three segment welds in the top guide support ring, the vertical welds between Welds H3 and H4, the vertical welds between Welds H4 and H5, the three segments welds in the core plate support ring, the two vertical welds between Welds H6 and H7, Weld H8 and Weld H9 (see Figure 2).
Because of tooling limitations it is currently not practical to inspect the vertical welds between welds H1 and H2 or the segment welds in the top ring above weld H1 (those welds will be visually inspected). For this reason, portions of circumferential Welds H1 and H2 will be designated as design reliant welds. Since Welds H1 and H2 were ultrasonically inspected in 1995 those results will be used to ensure that sufficient design-reliant weld length exists. Even though Vermont Yankee is taking this conservative approach relative to weld inspections, all analyses for the repair design were performed assuming the potential failure of any or all circumferential welds, which is a more limiting condition for the repair i design, and is consistent with BWRVIP guidance.
Vermont Yankee has evaluated the modification under 10CFR50.59 and concluded that the modification does not involve an unreviewed safety question. A copy of the safety evaluation will be submitted to the NRC within two vseeks following resolution of any NRC comments on the modification design, thus ensuring that the submitted safety evaluation reflects the approved design.
NRC approval of the core shroud modification as an alternative to the requirements of Section XI j is requested by August 15,1996.
1 United States Nucl:ar Regulatory Commission VERMONT YANKEE NUCLEAR POWER CORPORATION April 15,1996 Page4of4 is considered proprietary information by MPR Associates. In accordance with 10CFR2.790(b)(1), an affidavit attesting to the proprietary nature of the enclosed information is attached. As such, MPR Associates requests that Enclosure 2 be withheld from public disclosure.
We trust that the information provided is acceptable; however, should you have any questions, please contact this office.
Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION M
y K. Thayer Vice President, Engineering i - Core Shroud Repair Summary l - Core Shroud Repair Design Report (3 volumes)- PROPRIETARY c: with Enclosures 1 and 2: i USNRC Project Manager - VYNPS c: with Enclosure 1 USNRC Region I Administrator USNRC Resident Inspector - VYNPS i
COMMONWEALTH OF MASSACHUSETTS ) )
)ss i WORCESTER COUNTY )
Then personally appeared before me, Jay K. Thayer, who, being duly sworn, did state that he is Vice President-Engineering, of Vermont ' Yankee Nuclear Power Corporation, that he is duly authorized to execute and file the foregoing document in the name and on the behalf of Vermont Yankee Nuclear Power Corporation, and that the statements therein are true to the best of his knowledge and belief.
9%
Kathryn GatesfNotarf Public My Commission Expires 1/24/97 1
WITIIIIOLD ENCLOSURE 2 FROM PUBLIC DISCLOSURE PER 10CFR2.790 l
MMPR A SSO CI AT E S IN C.
ENGlNEERS April 3,1996 Affidavit Pursuant to 10 CFR 2.790 >
Relative to Core Shroud Repair for Vermont Yankee Nuclear Power Station MPR Associates,Inc.
The Commonwealth of Virginia City of Alexandria I, Noman M. Cole, depose and say that I am a Principal of MPR Associates, Inc. duly authorized to make this affidavit, and have reviewed or caused to have reviewed the information which is identified as proprietary and referenced in the paragraph immediately below. I am submitting this affidavit in conformance with the provisions of 10 CFR 2.790 of the Commission's regulations in conjunction with Vermont Yankee Nuclear Power Corporation.
The information for which proprietary treatment is sought is contained in the attached report titled," Vermont Yankee Nuclear Power Station Core Shroud Design Report,"
MPR-1730, Volumes 1,2, and 3. This report contains information on the design of the shroud repair system for the Vermont Yankee Nuclear Power Station.
This document has been appropriately designated as proprietary.
I have personal knowledge of the criteria and procedures utilized by MPR Associates in designating information as a trade secret, privileged or as confidential commercial or financial information.
Pursuant to the provisions of paragraph (b) (4) of Section 2.790 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure, included in the above referenced document, should be withheld.
- 1. The information sought to be withheld from public disclosure, which is owned and has been held in confidence by MPR Associations,is the design of the shroud repair system for the Vermont Yankee Nuclear Power Station.
- 2. The information consists of design information or other similar data concerning a repair system, method or component, the application of which results in substantial competitive advantage to MPR Associates. MPR has a patent application pending for this shroud repair system.
0 3.
The information is of a type customarily held in confidence by .MPR Associates and not I customarily disclosed to the public. MPR Associates has a rational basis for determining the types ofinformation customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. This system was applied in determining that the subject document herein is proprietary.
4.
The information is being transmitted to the Commission in confidence under the provisions of 10 CFR 2.790 with the understanding that it is to be received in confidence by the Commission.
5.
The information, to the best of my knowledge and belief, is not available in public sources, and any disclosure to third parties has been made pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the information in confidence.
- 6. Public disclosure of the information is likely to cause substantial harm to the competitive position of MPR Associates because:
a.
Other repairs for similar purposes are performed and sold by major light water reactor competitors of MPR Associates.
b.
Development of these repair designs by MPR Associates required thousands of manhours and hundreds of thousands of dollars. To the best of my knowledge and belief, a competitor would have to undergo similar expense in generating equivalent information.
c.
In order to acquire such information, a competitor would also require considerable time and inconvenience to develop these repair designs.
d.
The information consists ofinformation related to repair of cracked shrouds in the Vermont Yankee Nuclear Power Station and other BWRs as well. The application of which provides a competitive economic advantage. The availability of such information to competitors would enable them to modify their designs to better compete with MPR Associates, take marketing or other actions to improve their position or impair the position of MPR Associates' design, and avoid developing similar data and analyses in support of their design methods or shroud repair system, e.
In pricing MPR Associates products and services, significant research, development, engineering, analytical, manufacturing, quality assurance and other costs and expenses must be included. The ability of MPR Associates' competitors to utilize such information without similar expenditure of resources may enable them to sell at prices reflecting significantly lower costs.
l
O
- f. Use of the information by competitors in the international marketplace would increase their ability to market such repair designs by reducing the costs associated with their technology development. In addition, disclosure would have an adverse economic impact on MPR Associates' potential for obtaining or maintaining foreign licensees.
Further the deponent sayeth not.
/ /m
'140 man M. Cole A Principal l
l Sworn to before me l this)_ day of hM ,1996 !
/
- k. {d _
=
Notary Pub My commission expires: MJt JC# o i
I I