ML20094B766

From kanterella
Revision as of 08:42, 3 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Quarterly Update Re Const Schedule,In Response to HR Denton 840529 Ltr.Critical Path Schedule Analysis Shows That Limiting Sys Schedule for Reactor Water Cleanup Approx 53 Days Behind Schedule
ML20094B766
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/30/1984
From: Hall D
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
0982-L, 982-L, NUDOCS 8408070219
Download: ML20094B766 (1)


Text

ILLINOIB POWEl100MPANY O9B jf]

o sur son. P o Bo* s'** CU"'*** *" *"

July 30, 1984 Docket No. 50-461 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Clinton Unit I Construction Schedule Update

Dear Mr. Denton:

The USNRC letter dated May 29, 1984 from H. R. Denton to-W._J. Kelley requested Illinois Power Company to provide a-quarterly update concerning the Clinton I construction schedule.

The critical path. schedule analysis shows that the limiting system schedulei Reactor Water Cleanup, is about 53 days behind. The critical path analysis is performed each month tc f.dentify problem areas sufficiently in advance so-that timely corrective actions can be taken. The target

! dates for Fuel Load and Commercial Operation remain at January 3 and November 1, 1986, respectively.

h--

I ~

We will' continue to submit quarterly updates of the Unit I construction schedule.

Sin rely yours, D. P. Hall Vice President REW/ psf-cc Mr. B. Siegel, NRC Clinton Project Manager NRC Resident Office Illinois _ Dept. of Nuclear Safety Regional-Administrator, Region III, USNRC

~

j'J"E8u'S8Eh p>ilc