ML20094D593
ML20094D593 | |
Person / Time | |
---|---|
Site: | 05200004 |
Issue date: | 10/25/1995 |
From: | Quinn J GENERAL ELECTRIC CO. |
To: | Quay T NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
MFN-245-95, NUDOCS 9511060104 | |
Download: ML20094D593 (2) | |
Text
-m . - . . ._,_.A.
jo _ 13 s GENuclearEnergy
~f-E. Quinn, Projects Manager General Electric Com LMR and SBWR Programs 17S Curtner Avenue. A 16S San Jose. CA 951251014 408 925-1005 (phone) 408 925-3991 (facsimile)
October 25,1995 MFN 245-95 Docket 52-004 Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Theodore E. Quay, Director Standardization Project Directorate
Subject:
SBWR - PANTHERS /IC Apparent Test Results (ATRs), Phase 1 (Non-Proprietary)
Reference:
- 1. I.etter from J. E. Quinn (GE) to T. E. Quay (NRC), SBWR -
Updated Status of Test Documentation Submittals, MFN 125-95, July 24,1995.
The attachment to this letter supplies the PANTHERS /IC Apparent Test Results (ATRs),
Phase 1, which satisfies Item 56 of Reference 1.
Si a es nn, P s Manager
Attachment:
PANTHERS /IC Apparent Test Results (ATRs) Reportsfor tests: HSD03, HSD09, HSD10, HSD12, T02, T03, T04, TOS, T06, T07_1, T08, T09. T10, T11, T14, T15, T17_A, T17_B, T17_C, T17_D, and T17_E.
CC:
P. A. Boehnert (NRC/ACRS) (2 paper copies w/att. plus E-Mail w/ att.)
I. Catton (ACRS) (1 paper copy w/att. plus E-Mail w/ att.)
S. Q. Ninh (NRC) (2 paper copies w/att. plus E-Mail w/ att.)
J. H. Wilson (NRC) (1 paper copy w/att. plus E-Mail w/ att.)
00099 9511060104 951025 PDR ADOCK 05200004 A PDR ghg',
7 j 1 ,
G
GENuclearEnergy MFN 245-95 bec: (E-Mail w/ att. except as noted)
N. E. Barclay J. A. Beard P. F. Billig R. H. Buchholz T. Cook (doe) (2 paper copies w/att. plus E-Mail w/ att.)
J. D. Duncan R. T. Fernandez (EPRI)
J. R. Fitch J. Fox P. C. Hecht J. E. Leatherman J. E. Quinn T. J. Mulford (EPRI) (2 paper copies w/att. plus E-Mail w/ att.)
P. E. Novak F. A. Ross (doe)
B. Shiralkar R. Srinivasan (EPRI)
J. E. Torbeck GE Master File (1 paper copy w/att. plus E-Mail w/ att.)
SBWR Project File (1 paper copy w/att. plus E-Mail w/ att.)
.~
Date Description Prepared by , , Checked by Approved by Pace Of
// by LETM N.2.s43 01 Aug.1995 Issue %Sjppfu[/..
/
S. B P. Masoni 1 /#
SIET spa PANTHERS-IC APPARENT TEST RESULT TEST TYPE : Shakedown NUMBER : HSD03 TEST DATE : 05 July 1995 TEST OBJECTIVE :
Measure the heat loses in the steam inlet line at 4 MPa.
DATA RECORDING PERIOD REFERENCE TEST TIME Stan : 16:17 Stop : 16:44 Start : 16:17 Stop : 16:42 I DATA FILE NAMES Historic TH values: SH060795.STO TM quantities: not recorded TH quantities: HSD03.DAT Vibrations: not recorded FAILED OR UNAVAILABLE INSTRUMENTS:
T-N001 T-1001 T-1002 T-2001 T-Q010 T-Q014 T-QO21 F-2001 P-E001 DP004 LDT001 LDT002 LDT003 All accelerometers ZERO NOT IN TOLLERANCE INSTRUMENTS :
DP001 DP006 DP008 DP020 DP021 DP023 DP025 DP028 DP029 DPEFM1 DP-I001 DP-Q005 DP-Q006 F-A001\a F-A001\b L-H001 L-1001 P-A002\a P-F001 ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
DP010 DP012 L-P001 L-Q001 L-Q002 OVER RANGE SIGNALS : NONE
-DEVIATIONS FROM TEST PROCEDURES-: NONE PROBLEMS AND DISFUNCTIONS :
Loss of steam on the steam vessel inlet flange. This dose not effect the test results.
HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
Date Description Prepared byl , Checked by Approved by Page Of Ev t im A 1[tl, i2/ Pgasong i //
01 Aug.1995 Issue .-
S. Both" SIET spa PANTHERS-IC APPARENT TEST RESULT 1
TEST TYPE : Shakedown NUMBER : HSD09 TEST DATE : 19 July 1995 TEST OBJECTIVE :
Part 1 - Measure the heat loses in the steam inlet line at 8 Mpa Part 2 - Measure the effect of smallleakage of Drain Valves F117 and F136 DATA RECORDING PERIOD REFERENCE TEST TIME Start : 16:53 Stop : 18:14 Part 1 Start : 16:54 Stop : 17:08
- Part 2 Start : 17:40 Stop : 18:14 DATA FILE NAMES Historic TH values: SH190795.STO TM quantities: HSDTM09.DAT TH quantities: HSD09.DAT Vibrations: not recorded FAILED OR UNAVAILABLE INSTRUMENTS:
T-1001 T-1002 T-2001 T-Q010 T-Q014 DP004 LDT001 LDT002 LDT003 l
- T-Q021 All accelerometers ZERO NOT IN TOLLERANCE INSTRUMENTS
DP004 DP005 DP006 DP029 DPEFM1 DP-1001 L-A001 L-1001 ,
ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL DP010 DP012 L-P001 L-Q001 L-Q002 DP-Q005 DP-QOO6 OVER RANGE SIGNALS : NONE DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS :
Valve F131 was out of order and therefore bypassed for this test.
Part 2 has been performed with IC pool level lower than requested i
HAS THE TEST CBJECTIVE BEEN REACHED ? ;
Part 1: YES Part 2: NO HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
4 Date Description Prepared by, Checked by Approved by Page Of j b >' t.iT T W-
,4vegih, il S. Bohr {. pag /g 01 Aug.1995 Issue 1 1
SIET spa PANTHERS-IC APPARENT TEST RESULT l i
TEST TYPE : Shakedown NUMBER : HSD10 TEST DATE : 26 July 1995 TEST OBJECTIVE :
Measure the effect o. small leahge cf Drain Valves F117 and F136 DATA RECORDING PERIOD REFERENCE TEST TIME i Start : 16:37 Stop : 17:04 Start : 16:37 Stop : 17:04 DATA FILE NAMES i Historic TH vi.:s: SH260795.STO TM quantities: HSDTM10.DAT TH quantities: HSD10.DAT Vibrations tape n. not recorded
{ FAILED OR UNAVAILABLE INSTRUMENTS:
F-2001 DP004 L-P001 T-1001 T-1002 5
T-2001 LDT001 LDT002 LDT003 All accelerometers T-QO10 T-Q014 T-Q021 ZERO NOT IN TOLLERANCE INSTRUMENTS :
DF001 DP006 DP026 DP-1001 l
ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FUi L :
l DP010 DP012 DP-Q005 DP-QOO6 L-Q001 L-Q001 L-1001 OVER RANGE SIGNALS : NONE l
DEVIATIONS FROM TEST PROCEDURES : NONE i
PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBJECTIVE BEEN REACHED ? 'YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
1 Date Description Prepared by , Checked by Approved by Page Of by L.T sch !
01 Aug.1995 Issue Si1v y S. Bp P hjasog 1 // j SIET spa PANTHERS-IC APPARENT TEST RESULT TEST TYPE : Shakedown NUMBER: HSD12 TEST DATE : 26 July 1995 TEST OBJECTIVE : !
Verify the adequacy of the facility for IC stan-up tests i
DATA RECORDING PERIOD REFERENCE TEST TIME Start : 18:27 Stop : 19:43 Start : 18:27 Stop : 19:43
^
DATA FILE NAMES I Historic TH values: SH260795.STO TM quantities: HSDTM12.DAT TH quantities: HSD12.DAT Vibrations tape n. not recorded FAILED OR UNAVAILABLE INSUUJMENTS:
l F-2001 DP004 L-P001 T-1001 T-1002 T-2001 LDT001 LDT002 LDT003 All accelerometers T-Q010 T-Q014 T-QO21 i l
ZERO NOT IN TOLLERANCE INSTRUMENTS :
DP001 DP006 DP026 DP-1001 ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
DP010 DP012 DP-Q005 DP-Q006 L-Q001 L-QOO1 L-1001 OVER RANGE SIGNALS : NONE DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS :
Loud booms were heard when the drain valve was opened. This is probabily due to a too short valve opening time.
HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
Date Description Prepared by, Checked by Approved by Page Of
>. W LEYrs L 27 Sep.1995 Issue g// /(/ilv,efi, _. S. Bot Pggso 1 iy i
SIET spa PANTHERS-IC APPARENT TEST RESULT TEST TYPE : 1 NUMBER: T02 TEST DATE : 27 Sep.1995 TEST OBJECTIVE : l Measure the IC performance in steady-state conditions at fixed inlet pressure.
DATA RECORDING PERIOD REFERENCE TEST TIME Start : 12:45 Stop : 13:22 Start : 12:45 Stop : 13:15 DATA FILE NAMES l Historic TH values: TH2 70995.STO TM quantities: T02TM02.DAT TH quantities: T02TH2.DAT Vibrations tape n. 001 FAILED OR UNAVAILABLE INSTRUMENTS:
T-Q010 T-Q014 T-Q021 DX-A009 DX-B015 DX-BB003 ZERO NOT IN TOLLERANCE INSTRUMENTS :
The zero check is not significant because all lines, pools and tanks were full or in pressure.
ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
The zero check is not significant because all lines, pools and tanks were full or in pressure.
OVER ' RANGE SIGNALS :
F-R001 DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
. . . . . . _ .- .,_ - - -. - - - - . . = - - . ..
- t Date Description Prepared bvt Checked by Approved by Page Of
'- ~
/ / DV L=TT i: R 27 Sep.1995 Issue inveti C. S. P4 Masoni 1 /y
.n rs.lua e 1 SIET spa PANTHERS-IC APPARENT TEST RESULT i TEST TYPE : 1 NUMBER: T03 TEST DATE : 26 Sep.1995 TEST OBJECTIVE :
Measure the IC performance in steady-state conditions at fixed inlet pressure.
DATA RECORDING PERIOD REFERENCE TEST TIME )
l Start : 17:11 Stop : 17:42 Start : 17:11 Stop : 17:42 G) DATA FILE NAMES l l Historic TH values: TH260995.STO TM quantities: T03TM01.DAT
] TH quantities: T03THl.DAT Vibrations tape n. 001 l FAILED OR UNAVAILABLE INSTRUMENTS:
T-QO10 T-Q014 T-QO21 DX-A009 DX-B015 4
DX-BB003 l ZERO NOT IN TOLLERANCE INSTRUMENTS :
j DP030 DP-IO01 F-M00 i L-0001 !
l P-H00 t l 1 ;
j ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
. DP-Q005 DP-Q006 L-100i L-P001 L-QOO1 4
L-QOO2 DP010 DP011 OVER RANGE SIGNALS : NONE DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS : NONE s
HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
Description Prepared by Checked by Approved by Page Of Date o tw carru 25 Sep.1995 Issue gS,il , ,. S.Bo '
gsgy 1 ?J SIET spa PANTHERS-IC APPARENT TEST RESULT TEST TYPE : 1 NUMBER: T04 TEST DATE : 20 Sep.1995 TEST OBJECTIVE :
Measure the IC performance in steady-state conditions at fixed inlet pressure.
DATA RECORDING PERIOD REFERENCE TEST TIME Start : 15:06 Stop : 15:36 Stan : 15:06 Stop : 15:36 g, DATA FILE NAMES T04TM01.DAT Historic TH values: TH200995.STO TM quantities:
TH quantities: T04TH1.DAT Vibrations tape n. 001 FAILED OR UNAVAILABLE INSTRUMENTS:
T-Q014 T-QO21 DX-A009 DX-3015 T-QO10 DX-BB003 ZERO NOT IN TOLLERANCE INSTRUMENTS :
The zero check is not significant because all lines, pools and tanks were full or in pressure. l l
ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
The zero check is not significant because all lines, pools and tanks were full or in pressure.
OVER RANGE SIGNALS :
DP-QOO6 DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
Date Description Prepared by Checked by Approved by Pace Of
'. W L'ETTE R 25 Sep.1995 Issue givg/, 2 S.Bo [ Pg Mgs,og i Jg SET spa PANTHERS-IC APPARENT TEST RESULT TEST TYPE : 1 NUMBER : T05 TEST DATE : 20 Sep.1995 TEST OBJECTIVE :
Measure the IC performance in steady-state conditions at fixed inlet pressure.
DATA RECORDING PERIOD REFERENCE TEST TIME Start : 13:58 Stop : 14:30 Start : 14:00 Stop : 14:30
-~ 's DATA FILE NAMES Historic TH values: TH200995.STO TM quantities: T05TM01.DAT TH quantities: T05THl.DAT Vibrations tape n. 001 FAILED OR UNAVAILABLE INSTRUMENTS:
T-Q010 T-Q014 T-QO21 DX-A009 DX-BOIS DX-BB003 ZERO NOT IN TOLLERANCE INSTRUMENTS :
The zero check is not significant because all lines, pools and tanks were full or in pressure.
ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
The zero check is not significant because all lines, pools and tanks were full or in pressure.
i OVER RANGE SIGNALS :
DP-QOO6 DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
Description Prepared by Checked by Approved by Dare Of date l ,
EY Lh.TTiiW, 25 Sep.1995 Issue Rhlvp],y S. Bot gason 1 73 o1E T spa PANTHERS-IC APPARENT TEST RESULT TEST TYPE : 1 NUMBER: T06 TEST DATE : 20 Sep.1995 TEST OBJECTIVE :
Measure the IC performance in steady-state conditions at fixed inlet pressure.
DATA RECORDING PERIOD REFERENCE TEST TIME Start : 12:59 Stop : 13:29 Start : 12:59 Stop : 13:29
[, DATA FILE NAMES Historic TH values: TH200995.STO TM quantities: T06TM02.DAT TH quantities: T06TH2.DAT Vibrations tape n. 001 FAILED OR UNAVAILABLE INSTRUMENTS:
T-Q010 T-Q014 T-Q021 DX-A009 DX-B015 DX-BB003 ZERO NOT IN TOLLERANCE INSTRUMENTS : ,
The zero check is not significant because all lines, pools and tanks were full or in pressure. )
ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
The zero check is not significant because all lines, pools and tanks were full or in pressure.
OVER RANGE SIGNALS :
DP-QOO6 DEVIATIONS FROM TEST PROCElh1RES : NONE PROBLEMS AND DISFUNCTIONS: NONE HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
,Date Description Prepared by, Checked by Approved by Paec Of 27 Sep.1995 Issue hi,1,ve S. B h n 1 )J SIET spa PANTHERS-IC APPARENT TEST RESULT TEST TYPE : 1 NUMBER : T07_.1 TEST DATE : 26 Sep.1995 TEST OBJECTIVE :
Repeat Test T07.
DATA RECORDING PERIOD REFERENCE TEST TIME Start : 14:59 l
Stop : 15:29 Start : 14:59 Stop : 15:29 I DATA FILE NAMES Historic TH values: TH260995.STO TM quantities: T07TM04.DAT TH quantities: T07TH4.DAT Vibrations tape n. 001 i
l l
FAILED OR UNAVAILABLE INSTRUMENTS:
T-Q010 T-QO14 T-QO21 DX-A009 DX-B015 DX-BB003 ZERO NOT IN TOLLERANCE INSTRUMENTS :
DP030 DP-IO01 F-M001 L-0001 P-H001 ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
DP-Q005 DP-Q006 L-IO01 L-P001 L-Q001 L-Q002 DP010 DP011 OVER RANGE SIGNALS :
DP-Q006 DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
Prepargd byl , Checked by Approved by Page Of Da're Description O' L Ewh(
fj gasg JJ IJ/'
1 07 Aug.1995 Issue ilve g S. Bohc SIET spa PANTHERS-IC APPARENT TEST RESULT :
NUMBER : T08 TEST DATE : 02 Aug.1995 TEST TYPE : 1 TEST OBJECTIVE : I Measure the IC performance in steady-state conditions at fixed inlet pressure.
DATA RECORDING PERIOD REFERENCE TEST TIME Start : 19:26 Stop : 19:57 Start : 19:26 Stop : 19:57
- DATA FILE NAMES TM quantities: T08TM01.DAT Historic TH values: TH020895.STO 001 T08THl.DAT Vibrations tape n.
TH quantities:
FAILED OR UNAVAILABLE INSTRUMENTS:
T-1002 T-2001 T-Q010 T-Q014 T-1001 T-QO21 F-2001 ZERO NOT IN TOLLERANCE INSTRUMENTS :
DP030 ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
DP-QOO6 L-OOO1 DP010 DP012 DP-Q001 L-P001 L-Q001 OVER RANGE SIGNALS :
DP001 DP-QOO6 DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBIECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
I Description Prepared by / 4 Checked by Approved by Pase Of i Date 07 Aug.1995 Issue j _h S. Bob son 1
)/
SIET spa PANTHERS-IC APPARENT TEST RESULT NUMBER : T09 TEST DATE : 02 Aug.1995 TEST TYPE : 1 TEST OBJECTIVE :
Measure the IC performance in sterdy-state conditions at fixed inlet pressure.
DATA RECORDING PERIOD REFERENCE TEST TIME Stop : 18:42 Start : 18:11 Stop : 18:42 Start : 18:11 JPy DATA FILE NAMES TM quantities: T09TM01.DAT Historic TH values: TH020895.STO T09THl.DAT Vibrations tape n. 001 TH quantities:
FAILED OR UNAVAILABLE INSTRUMENTS:
T-1001 T-1002 T-2001 T-Q010 T-Q014 T-QO21 F-2001 ZERO NOT IN TOLLERANCE INSTRUMENTS :
DP030 ZERO NOT CHECKED BECAUSE.0F LINES, TANKS OR POOLS FULL :
DP012 DP-Q001 DP-QOO6 L-0001 DP010 L-P001 L-Q001 OVER RANGE SIGNALS :
DP001 DP-QOO6 DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
I l
Description l Prepared by // Checked by Approved by. Page Of Dste - sy tem 1
< ~
07 Aug.1995 Issue
//
Rj;S j
J 1,yeg)g..
S.Bo Pgson 1
//
1 SIET spa PANTHERS-IC APPARENT TEST RESULT I NUMBER : T10 TEST DATE : 02 Aug.1995 TEST TYPE : 1 i l
TEST OBJECTIVE :
Measure the IC performance in steady-state conditions at fixed inlet pressure.
DATA RECORDING PERIOD REFERENCE TEST TIME Stop : 17:35 Start : 17:05 Stop : 17:35 Start : 17:05
^
DATA FILE NAMES TM quantities: T10TM01.DAT 1 Historic TH values: TH020895.STO )
TH quantities: T10TH1.DAT Vibrations tape n. 001 l
FAILED OR UNAVAILABLE INSTRUMENTS:
T-1001 T-1002 T-2001 T-Q010 T-Q014 T-Q021 F-2001 ZERO NOT IN TOLLERANCE INSTRUMENTS :
DP030 ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL DP012 DP-Q001 DP-Q006 L-0001 DP010 r L-P00i L-Q001
~
OVER RANGE SIGNALS :
DP-QOO6 DEVIATIONS FROM TEST PROCEDURES : NONE l PROBLEMS AND DISFUNCTIONS : NONE j
HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES l 4
3 Description Prepared by i . Checked by Approved by Page Of Date
$7 Aug.1995 Issue R S Iver;fh.
S.Bo[ bhfasonN#- 1 lJ SIET spa PANTHERS-IC APPARENT TEST RESULT NUMBER : Tl1 TEST DATE : 02 Aug.1995 TEST TYPE : 1 TEST OBJECTIVE :
Measure the IC performance in steady-state conditions at fixed inlet pressure.
DATA RECORDING PERIOD REFERENCE TEST TIME Stop : 16:07 Start : 15:37 Stop : 16:07 Start : 15:37
^
DATA FILE NAMES TM quantities: T11TM02.DAT Historic TH values: TH020895.STO T11TH2.D AT Vibrations tape n. 001 TH quantities:
FAILED OR UNAVAILABLE INSTRUMENTS:
T-1001 T-1002 T-2001 T-Q010 T-Q014 T-QO21 F-2001 ZERO NOT IN TOLLERANCE INSTRUMENTS :
DP030 ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
DP012 DP-Q001 DP-QOO6 L-0001 DP010 L-P00I L-Q001 OVER RANGE SIGNALS : NONE i
DEVIATIONS FROM TEST PROCEDURES : NONE l anw PROBLEMS AND DISFUNCTIONS :
Displacement signals (LVDT) have been acquired in volts. l l
HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES l
Prepared by Checked by Approved by Pase I Of Date Description l 23 Aug.1995 Issue i .
S. Bh P Ma 1 /f SIET spa PANTHERS-IC APPARENT TEST RESULT _
NUMBER: T14 TEST DATE : 03 Aug.1995 TEST TYPE : 4 TEST OBJECTIVE :
Measure the effect of pool water level decrease / increase at 0.58 MPa initial pressure.
DATA RECORDING PERIOD REFERENCE TEST TIME Start : 11:27 Stop : 19:24 Start : 11:27 Stop : 19:24
^
DATA FILE NAMES TM quantities: T14TM02+10.DAT Historic TH values: TH030895.STO 001 T14TH2+10.DAT Vibrations tape n.
TH quantities:
FAILED OR UNAVAILABLE INSTRUMENTS:
T-1002 T-2001 T-Q010 T-Q014 T-1001 T-QO21 F-2001 ZERO NOT IN TOLLERANCE INSTRUMENTS : NONE ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
DP004 DP005 DP006 DP002 DP003 DP012 DP010 DP007 DP008 DP011 DP021 DP025 DP027 DP009 DP020 DP023 DP024 DP026 DP029 DP022 DP-Q'O 5 DP-QOO6 L-A001 DP028 DP030 L-IO01 L-OOO1 L-P00i L-Q001 L-H001 P-A002\a P-A002\b P-A003\a L-QOO2 P-1002 P-B001\b P-E001 P-I001 P-A003\b P B001\a OVER RANGE SIGNALS :
DP001 DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
I Prepared by i e Checked by Approved by Pase Of Date Description ]
23 Aug.1995 Issue lvef
. S. B a 1 )/
SIET spa PANTHERS-IC APPARENT TEST RESULT 1 3
TEST TYPE : 4 NUMBER : T15 TEST DATE : 04 Aug.1995 TEST OBJECTIVE :
Measure the effect of pool water level decrease / increase at 2.17 MPa initial pressure.
DATA RECORDING PERIOD REFERENCE TEST TIME 10:42 Stop : 17:21 Start : 10:42 Stop : 17:21 Start :
DATA FILE NAMES T15TM02+17.DAT Historic TH values: THM0895.STO TM quantities:
TH quantities: T15TH2+17.DAT Vibrations tape n. 001 FAILED OR UNAVAILABLE INSTRUMENTS: i T-1001 T-1002 T-2001 T-Q010 T-Q014 T-QO21 F-2001 ZERO NOT IN TOLLERANCE INSTRUMENTS : NONE ZERO NOT CHECKED BECAUSE OF LINES, TANKS OR POOLS FULL :
DP003 DP004 DP005 DP006 DP002 DP011 DP012 DP010 DP007 DP008 DP020 DP021 DP025 DP027 DP009 DP022 DP023 DP024 DP026 DP029 DP030 DP-Q005 DP-Q006 L A001
, DP028 L-H00i L-1001 L-OOO1 L-P001 L-QOO1 P-IO02 P-A002\a P-A002\b P A003\a L-Q002 P B001\a P-B001\b P-E001 P IO01 P-A003\b OVER RANGE SIGNALS :
DP001 DEVIATIONS FROM TEST PROCEDURES : NONE I
l PROBLEMS AND DISFUNCTIONS : i At apprximately 12:28 when the level in the PCC pool was 1.7 m, a high temperature alarm caused an automatic inlet steam shutdown.
4 HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES
.m_.m._
I Date Desenption Prepared by i, Checked by Approved by Pare Of
,05 Sep.1995 Issue R.hiverij .. S. B (gaso I y SIET spa PANTHERS-IC APPARENT TEST RESULT TEST TYPE : 6 NUMBER : T17_A TEST DATE : 30 Aug.1995 TEST OBJECTIVE :
Perform Heatup/Cooldown cycles without IC operation at maximum rate of 100*C/ hour
- .nd maximum pressure 8720 kPa.
DATA RECORDING PERIOD REFERENCE TEST TIME Start : 11:10 Stop : 15:41 Start : 11:10 Stop : 15:41 DATA FILE NAMES Historic TH values: TH300895.STO TM quantities: T17TMAl+6.DAT TH quantities: T17 THAL +6.DAT Vibrations tape n. not recorded FAILED OR UNAVAILABLE INSTRUMENTS:
T-1001 T-1002 T-2001 T-Q010 T-Q014 T-QO21 F-2001 DX A009 DX-BB003 DX-B015 OVER RANGE SIGNALS :
PO-A002 DEVIATIONS FROM TEST PROCEDURES : NONE 1
PROBLEMS AND DISFUNCTIONS : NONE l HAS THE TEST OBJECTIVE BEEN REACHED ? YES l
HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES l l
l
Date l Description l Prepared byl Checked by Approved by Page Of os sep.1995 Issue fS,ilv S. Bh s 1 /3 SIET spa PANTHERS-IC APPARENT TEST RESULT TESTTYPE : 6 NUMBER : T17_B TEST DATE : 31 Aug.1995
} TEST OBJECTIVE :
i Perform Heatup/Cooldown cycles without IC operation at maximum rate of 100'C/ hour and maximum pressure 8720 kPa.
DATA RECORDING PERIOD REFERENCE TEST TIME Start : 10:42 Stop : 15:17 Start : 10:42 Stop : 15:17 "i DATA FILE NAMES Historic TH values: TH310895.STO TM quantities: T17TMB 1+11.D AT TH quantities: T17THB l+11.DAT Vibrations tape n. not recorded l FAILED OR UNAVAILABLE INSTRUMENTS: l T-1001 T-1002 T-2001 T-QO10 T-Q014 !
T-QO21 F-2001 DX-A009 DX BB003 OVER RANGE SIGNALS : NONE DEVIATIONS FROM TEST PROCEDURES : NONE 1 i
I l
PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES 1
l l
_ _ _ _ _ - - _ - - _ - - - - - - - - - - - - - - - - - - - - - - - - J
Date Description Prepared by / Checked by Approved by Pave Of 05 Sep.1995 Issue R dilve S.Bo a n 1 )J SIET spa PANTHERS-IC APPARENT TEST RESULT TEST TYPE : 6 NUMBER : T17_C TEST DATE : Ol Sep.1995 TEST OBJECTIVE :
Perform Heatup/Cooldown cycles without IC operation at maximum rate of 100*C/ hour and maximum pressure 8720 kPa.
DATA RECORDING PERIOD REFERENCE TEST TIME Start : 10:06 Stop : 15:14 Start : 10:06 Stop : 15:14 DATA FILE NAMES Historic TH values: TH010995.STO TM quantities:
TH quantities: T17TMCl+7.DAT T17THCl+7.DAT Vibrations tape n. not recorded FAILED OR UNAVAILABLE INSTRUMENTS:
T-1001 T-1002 T-2001 T-Q010 T-Q014 T-QO21 F-2001 DX-A009 DX-BB003 OVER RANGE SIGNALS NONE DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED 7 YES
Date l Description Prepared by
- i Checked by Approved by Page Of l
/ m EY LsXTE ri '
05 Sep.1995 Issue ge/.Sily,etlih,S. B gasogg, I l/
SIET spa PANTHERS-IC APPARENT TEST RESULT TEST TYPE : 6 NUMBER : T17_D TEST DATE : 04 Sep.1995 TEST OBJECTIVE :
Perform Heatup/Cooldown cycles without IC operation at maximum rate of 100*C/ hour and maximum pressure 8720 kPa.
DATA RECORDING PERIOD REFERENCE TEST TIME Stan : 10:23 Stop : 15:23 Stan : 10:23 Stop : 15:23
{} DATA FILE NAMES Historic TH values: TH040995.STO TM quantities: T17TMDl+5.DAT TH quantities: T17THDI+5.DAT Vibrations tape n. not recorded FAILED OR UNAVAILABLE INSTRUMENTS:
T-1001 T-1002 T-2001 T-Q010 T-Q014 T-QO21 F-2001 DX-A009 DX-BB003 OVER RANGE SIGNALS : NONE DEVIATIONS FROM TEST PROCEDURES : NONE l
PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES 4
l
Prepared by ,1 Checked by Approved by Paec Of Date Description i ET b7 Sep.1995 Issue S. B P.g i b>'g(asg'TEP- i ff i}v
/
SIET spa PANTHERS-IC APPARENT TEST RESULT !
NUMBER : T17_.E TEST DATE : 05 Sep.1995 TEST TYPE : 6 TEST OBJECTIVE :
Perform Heatup/Cooldown cycles without IC operation at maximum rate of 100*C/ hour and maximum pressure 8720 kPa.
DATA RECORDING PERIOD REFERENCE TEST TIME 14:59 Start : 10:02 Stop : 14:59 Start : 10:02 Stop :
, DATA FILE NAMES TM quantities: T17TMEl+5.DAT Historic TH values: TH050995.STO T17 THEL +5.DAT Vibrations tape n. not recorded TH quantities:
FAILED OR UNAVAILABLE INSTRUMENTS:
T-1002 T-2001 T-Q010 T-QOJ4 T-1001 F-2001 DX-A009 DX-BB003 T-QO21 OVER RANGE SIGNALS : NONE DEVIATIONS FROM TEST PROCEDURES : NONE PROBLEMS AND DISFUNCTIONS : NONE HAS THE TEST OBJECTIVE BEEN REACHED ? YES HAVE THE MEASUREMENTS BEEN CORRECTLY RECORDED ? YES l