ML20094P022

From kanterella
Revision as of 17:46, 2 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rept of Facility & Procedure Changes Made at Seabrook...Per 10CFR50.59 for Period Apr 1991-Dec 1991
ML20094P022
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/31/1992
From: Feigenbaum T
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094P025 List:
References
NYN-92041, NUDOCS 9204070165
Download: ML20094P022 (2)


Text

. _ - --. .

e e New Hampshire Tee C Fe;genbaum

( P,cudent ond CM E mshe O m N YN-9 D Il WM HiF3}7142 t* g United States Nuclear Regulatory Cotuminion Washington. D.C 20555 Attentior Document Control Desk

References:

(a) Facility Opetaling License No. NFF 86, Docket No. 50-40 o .

(b) NHY Letter NYN.91090 dated May 30, 1991, "10CFR50.54 Quarteri)

R eport". T. C. Feip nhaum to USNRC

(() NHY Letter NYN 910e dated June 17. 1991, Trequencs of 10CFR50 50 Submittals", T. C. Feigenbaum to LISNRC (d) USNRC Letter dated July 11, 1991, " Frequency of 10C F R 50.50 S u b mit t a lt , G. E. Edison to T. C. Feigenbaurn S ubject: 10CFR50.59 Annua Report Gentlemen:

Enclosed please find the report of facility and procedure changes made at Seabrook Station pursuant to 10CFR50.59 during the final three quarters of 1991. The report h r the first quarter of 1991 was subrnitted by Reference (b).

liased upon a 1986 commitment, NHY had been submitting the 10CFR50.59 Rrooct on a quarterl) basis. In Reference (c), NHY requested a return to an annual submittal

., frequency for this report, in Reference (d), the NRC concurred with this request; and specified a submittal date for this report of March 31st.

New Hampshiro Yankee has deterrf ned that the reporting requirements of 10CFR50.59(b)(2) and 10CFR50.71(e) can be more efficiently met by combining the annual 10CFR50.59 Report with the annual revision to the Updated FSAR (UFSAR). Revision 1 to the UFSAR is cbeduled to be ;ubmitted by May 26, 1991, and will bring the UFSAR up to date as of March 15, 1992. In order to synchronize the annual 10CFR50.59 Report with the UFSAR revisions, the May 1992 submittal forwarding Revision 1 to the UT<SAR will include a Supplemental 10CFR 50.59 Report covering the period January 1,1992 to March 15, 1992. New Hampshire Yankee proposes that future submittals forwarding the annual UFS AR revi= ion will include the 10CFR50.59 Report for the same period.

9204070165 20331 PDR ADDCK 3000443 PDR New Hampshire Yonkee Division of Public Service Company of New Hampshire P.O. Box 300

  • Seabrook, NH 03874
  • Telephone (603) 474 9521

'/(

m._ __. .. . . _ _ - . - - . _ _ . _ _ . _ . . _ _ _ _ _ _ _ . . _ _ . _ _ _ _ . . . _ . . . . . . _ . . = _ . _ _ . _-. ._ _

e n ,

United States Nuclear Regulatory Commission March 31,1992 Attention: D( came nt Control Dest Page two Should you require further information regarding tLs matter, please contact Mr. James M. Peschel, Regulatory Compliance Manager at ((>03) 474-952), externion 3772. ,

/

/

Very truly yours, /

":' h c . ,

- - C n.- 8. .

Ted C. Feigent.!aum w

Enclosus e(s)

'l CF:G Klact cc: Mr. Thomas T. M artin Regional Administrator United States Nuclear Regulatory Commission Region !

475 Allendale Road King of Prussia, PA 19406 Mr. Gordon Edison, Sr. Project Mgr.

P:4 oject Directorate 13 Division of Reactor Projects U.5. Nuclear Regulatory Commission Washing!on, DC 20555 Mr. Noel Dudley NRC Senint Resident laspector P.O. Enx 1149 Seabrook, NH 03874

-,.--n. , - - , .,n .. , - , , . , , . - - , ., . , , - - - . . , . . . . , - - . - ., e- - r.,- --v,-.