Category:Letter
MONTHYEARML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report ML24093A2612024-04-0202 April 2024 – Investigation Summary, Office of Investigations Case Number 2-2023-005 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes ML24078A2622024-03-26026 March 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML24058A1572024-03-19019 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24017A2092024-03-12012 March 2024 – Issuance of Amendment Nos. 254 and 209 to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-027, Safety Injection Tank Vent Through Wall Leakage2024-02-29029 February 2024 Safety Injection Tank Vent Through Wall Leakage 2024-09-09
[Table view] Category:License-Operator
MONTHYEARML22332A0562022-11-21021 November 2022 301 License Exam Corporate Notification Letter L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment L-2021-146, Change Requested to Schedule of Operator Licensing Examination2021-07-19019 July 2021 Change Requested to Schedule of Operator Licensing Examination ML21137A3652021-05-13013 May 2021 Plan, Unit 1 and 2, Operator Licensing Retake Written Examination Approval 05000335/2021301 and 05000389/2021301 ML21083A1332021-03-19019 March 2021 Notification of Licensed Operator Intake Initial Examination 05000335/2021301 and 05000389/2021301 ML21034A5192021-02-0303 February 2021 1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key ML21034A5312021-02-0303 February 2021 1B Psl 2020-301 NRC Exam Post Exam Comments and References_Redacted (PII Redacted) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21193A0872020-12-16016 December 2020 File 2A3 Exam Administrative Items ML21193A1052020-12-16016 December 2020 File 2A2 Exam Final Items ML21193A0522020-12-16016 December 2020 File 2B Normal Release Exam Administrative Items ML20351A2022020-12-15015 December 2020 301 Written Exam Approval Letter ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20115E3532020-04-24024 April 2020 Psl 2020 Exam Corporate Notification Letter Aka 210-day Letter NUREG Rev 111 L-2020-038, Preparation and Scheduling of Operator Licensing Examinations2020-03-0606 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19158A3312019-06-0707 June 2019 SL-2019-301 Exam Administrative Items (ADAMS 2D) ML19100A2442019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for St. Lucie Nuclear Power Plant ML19099A2902019-04-0909 April 2019 2019 Schedule Confirmation for St. Lucie ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18039A9282018-02-0808 February 2018 301 Exam Report Items RO as Given - Delay Release 2 Yrs ML18039A9332018-02-0808 February 2018 301 Exam Report Items SRO as Given - Delay Release 2 Yrs ML17164A0852017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 IR 05000335/20173012017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 L-2016-033, NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update2016-02-22022 February 2016 NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update ML15201A5382015-07-16016 July 2015 301 Draft Simulator Scenarios ML15201A5642015-07-16016 July 2015 301 Other Documents for Retention ML15201A5612015-07-16016 July 2015 301 Final Administrative JPMs ML15201A5602015-07-16016 July 2015 301 Final Simulator and in Plant JPMs ML15201A5582015-07-16016 July 2015 301 Final Simulator Scenarios ML15201A5572015-07-16016 July 2015 301 Final Administrative Documents ML15201A5532015-07-16016 July 2015 301 Draft Administrative JPMs ML15201A5452015-07-16016 July 2015 301 Draft Simulator and in Plant JPMs ML15201A5372015-07-16016 July 2015 301 Draft SRO Written Exam ML15201A4962015-07-13013 July 2015 301 Draft RO Written Exam ML15201A4942015-07-13013 July 2015 301 Draft Administrative Documents ML15142A4002015-05-21021 May 2015 Initial Exam 2009302 Final Admin Documents ML15142A4012015-05-21021 May 2015 Initial Exam 2009302 Draft Admin Documents ML15097A2692015-04-0707 April 2015 301 Post Exam Comments ML15097A2672015-04-0707 April 2015 301 Final SRO Written Exam ML15097A2642015-04-0707 April 2015 301 Final RO Written Exam ML14318A9192014-11-12012 November 2014 Notification of Licensed Operator Initial Examination 05000335/2015301 and 05000389/2015301 ML13225A1322013-08-0808 August 2013 Initial Exam 2012-301 Draft SRO Written Exam ML13225A1352013-08-0808 August 2013 Initial Exam 2012-301 Draft Simulator Scenarios ML13225A1382013-08-0808 August 2013 Initial Exam 2012-301 Draft Sim/In-plant JPMs ML13225A1402013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative JPMs ML13225A1662013-08-0808 August 2013 Initial Exam 2012-301 Final Administrative Documents 2022-04-20
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22332A0562022-11-21021 November 2022 301 License Exam Corporate Notification Letter L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment L-2021-146, Change Requested to Schedule of Operator Licensing Examination2021-07-19019 July 2021 Change Requested to Schedule of Operator Licensing Examination ML21137A3652021-05-13013 May 2021 Plan, Unit 1 and 2, Operator Licensing Retake Written Examination Approval 05000335/2021301 and 05000389/2021301 ML21083A1332021-03-19019 March 2021 Notification of Licensed Operator Intake Initial Examination 05000335/2021301 and 05000389/2021301 ML21034A5312021-02-0303 February 2021 1B Psl 2020-301 NRC Exam Post Exam Comments and References_Redacted (PII Redacted) ML21034A5192021-02-0303 February 2021 1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21193A0522020-12-16016 December 2020 File 2B Normal Release Exam Administrative Items ML21193A1052020-12-16016 December 2020 File 2A2 Exam Final Items ML21193A0872020-12-16016 December 2020 File 2A3 Exam Administrative Items ML20351A2022020-12-15015 December 2020 301 Written Exam Approval Letter ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20115E3532020-04-24024 April 2020 Psl 2020 Exam Corporate Notification Letter Aka 210-day Letter NUREG Rev 111 L-2020-038, Preparation and Scheduling of Operator Licensing Examinations2020-03-0606 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML19158A3312019-06-0707 June 2019 SL-2019-301 Exam Administrative Items (ADAMS 2D) ML19100A2442019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for St. Lucie Nuclear Power Plant ML19099A2902019-04-0909 April 2019 2019 Schedule Confirmation for St. Lucie ML18039A9282018-02-0808 February 2018 301 Exam Report Items RO as Given - Delay Release 2 Yrs ML18039A9332018-02-0808 February 2018 301 Exam Report Items SRO as Given - Delay Release 2 Yrs ML17164A0852017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 IR 05000335/20173012017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 L-2016-033, NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update2016-02-22022 February 2016 NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update ML15201A5372015-07-16016 July 2015 301 Draft SRO Written Exam ML15201A5642015-07-16016 July 2015 301 Other Documents for Retention ML15201A5612015-07-16016 July 2015 301 Final Administrative JPMs ML15201A5602015-07-16016 July 2015 301 Final Simulator and in Plant JPMs ML15201A5582015-07-16016 July 2015 301 Final Simulator Scenarios ML15201A5572015-07-16016 July 2015 301 Final Administrative Documents ML15201A5532015-07-16016 July 2015 301 Draft Administrative JPMs ML15201A5452015-07-16016 July 2015 301 Draft Simulator and in Plant JPMs ML15201A5382015-07-16016 July 2015 301 Draft Simulator Scenarios ML15201A4962015-07-13013 July 2015 301 Draft RO Written Exam ML15201A4942015-07-13013 July 2015 301 Draft Administrative Documents ML15142A4002015-05-21021 May 2015 Initial Exam 2009302 Final Admin Documents ML15142A4012015-05-21021 May 2015 Initial Exam 2009302 Draft Admin Documents ML15097A2642015-04-0707 April 2015 301 Final RO Written Exam ML15097A2672015-04-0707 April 2015 301 Final SRO Written Exam ML15097A2692015-04-0707 April 2015 301 Post Exam Comments ML14318A9192014-11-12012 November 2014 Notification of Licensed Operator Initial Examination 05000335/2015301 and 05000389/2015301 ML13225A1382013-08-0808 August 2013 Initial Exam 2012-301 Draft Sim/In-plant JPMs ML13225A1282013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative Documents ML13225A1352013-08-0808 August 2013 Initial Exam 2012-301 Draft Simulator Scenarios ML13225A1322013-08-0808 August 2013 Initial Exam 2012-301 Draft SRO Written Exam ML13225A1302013-08-0808 August 2013 Initial Exam 2012-301 Draft RO Written Exam ML13225A1402013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative JPMs ML13225A1722013-08-0808 August 2013 Initial Exam 2012-301 Final Administrative JPMs ML13225A1712013-08-0808 August 2013 Initial Exam 2012-301 Final Sim/In-plant JPMs ML13225A1692013-08-0808 August 2013 Initial Exam 2012-301 Final Simulator Scenarios 2022-04-20
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 24, 2020 Mr. Don Moul Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478
SUBJECT:
ST. LUCIE NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000335/2020301 AND 05000389/2020301
Dear:
Don Moul During a telephone conversation on April 2, 2020, between Mr. T. Ouret, Operations Training Supervisor, and Mr. M. Meeks, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the St. Lucie Nuclear Plant. The on-site preparatory week is scheduled for the week of November 02, 2020. The operating test is scheduled to be administered during the week of December 07, 2020. The written examination is scheduled to be administered the week of December 21, 2020.
As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by July 10, 2020. Mr. Meeks provided the written examination outline to your staff in February 2020. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by September 23, 2020. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
D. Moul 2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver and/or excusal requests (Office of Management and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. Meeks to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary.
Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications StatementLicensee, or as directed by Mr. Meeks when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
D. Moul 3 Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information, unless the document requesting or requiring the collection displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the agencys Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection through the Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html.
Thank you for your cooperation in this matter. Mr. Ouret has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Meeks at (404) 997-4467, (Internet E-mail:
Michael.Meeks@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).
Sincerely,
/RA/
Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-335 and 50-389 License Nos.: DPR-67 and NPF-16 cc: Distribution via Listserv
ML20115E353 _ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE NAME M.MEEKS K. KIRCHBAUM G. MCCOY DATE 4/23/20 4/23/20 4/24/20 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO