GFPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE VERIFY MSIS - UNIT 2 NRC S-1 Developed/Revised by: ---=0=-=e:...:....:n.:...:.:.ni-=-s=Em..:....:..:b=-=o~rs:..:...:.kYL_____ 6/28/11 Date Line Management Review: _ __:_N.:.:...:../A...:!..,....:....:N~ot:.....:..R..:..=e_:_v-=--0_ _ N/A Date Training Management Approval: _ _R:.. . ::..:o::.. .=b-=S:.. :.:. im.:. . :.J:p:.. .=.so=-:.n.:. ___ 7/6/11 Date NRC S-1 Rev. 0

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS Verify MSIS on Unit 2.

Faulted JPM? Yes Facility JPM #: 0821016A KIA Rating(s): 039-A4.01 Ability to manually operate and/or monitor in the control room: Main steam supply valves 2.9 I 2.8 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the candidate has verified proper MSIS alignment and notified the US of task completion and contingencies taken to manually close HCV-09-28.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X X X

References:

  • 2-EOP-99, Table 5, Main Steam Isolation Signal Validation Time: 5 minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • 2-EOP-99, Table 5, Main Steam Isolation Signal Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None NRC JPM S-1 Rev. 0 Page 2 of 8

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Verify MSIS on Unit 2.
  • The performance level to be used for this JPM is Perform, or Simulate.

(Circle the performance level being used for this implementation of the JPM.)

  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

A Loss of Coolant Accident (LOCA) inside containment is in progress on Unit 2. 2-EOP-3 is being implemented.

INITIATING CUES:

You are the Desk RCO. The US has directed you to verify MSIS lAW 2-EOP-99, Table 5.

NRC JPM S-1 Rev. 0 Page 3 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME:----

2* EOP-99, Table 5, Main Steam Isolation Signal STEP1(1): ENSURE Main Steam Hdr AlB Isolation Valves CLOSED. FAULTED STEP

  • HCV-08-1A
  • HCV-08-1B

- - SAT STANDARD: ENSURE HCV-08-1A and -1 Bare CLOSED.

OBSERVE HCV-08-1 B is OPEN.

- - UNSAT EXAMINER'S CUE: HCV*08-1A shows Green light ON, Red light OFF HCV-08*18 shows Green light OFF, Red light ON EXAMINER'S NOTE: Faulted step- HCV-08-18 failed to auto close COMMENTS:

STEP 2(1): ENSURE Main Steam Hdr AlB Isolation Valves CLOSED. CRITICAL STEP STANDARD: POSITION HCV-08-1B control switch to CLOSE.

- - SAT EXAMINER'S CUE: HCV-08*1 B shows Green light ON, Red light OFF COMMENTS: - - UNSAT

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC JPM S-1 Rev. 0 Page 4 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3(2): ENSURE Header AlB Bypass Valves CLOSED.

  • MV-08-1A
  • MV-08-1B - - SAT STANDARD: ENSURE MV-08-1A and -1B are CLOSED.

- - UNSAT EXAMINER'S CUE: MV-08-1A and -18 show Green lights ON, Red lights OFF COMMENTS:

STEP 4(3}: ENSURE Feedwater Hdr AlB lsol Valves CLOSED. FAULTED STEP

  • HCV-09-1A
  • HCV-09-1B - - SAT
  • HCV-09-2A
  • HCV-09-2B

- - UNSAT STANDARD: ENSURE HCV-09-1A, -1B, -2A and -2B are CLOSED.

OBSERVE HCV-09-2B is OPEN.

EXAMINER'S CUE: HCV-09-1A, -18 and -2A show Green lights ON, Red lights OFF HCV-09-28 shows Green light OFF, Red light ON EXAMINER'S NOTE: Faulted step- HCV-09-28 failed to auto close COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC JPM S-1 Rev. 0 Page 5 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 5(3}: ENSURE Feedwater Hdr AlB lsol Valves CLOSED. CRITICAL STEP STANDARD: POSITION HCV-09-26 control switch to CLOSED.

- - SAT EXAMINER'S CUE: HCV-09-28 shows Green light ON, Red light OFF, P-36 and P-56 Alarm

- - UNSAT COMMENTS:

STEP (done}: NOTIFY US of task completion and of contingencies taken.

STANDARD: NOTIFY US that MSIS has been VERIFIED lAW 2-EOP-99, Table 5 and that HCV-08-16 and HCV-09-26 had to be manually CLOSED. - - SAT EXAMINER'S CUE: US ACKNOWLEDGES

- - UNSAT COMMENTS:

END OF TASK STOP TIME: - - - -

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC JPM S-1 Rev. 0 Page 6 of 8

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC-22 from the JPM Group. DO NOT UNFREEZE the Simulator.
2. SELECT the JPM Lesson File Folder.
3. OPEN and EXECUTE the lesson for 0821016A. TRIGGER Step 1.
4. UNFREEZE the Simulator. The Simulator will automatically freeze when the setup is complete.
5. Make a STORE POINT if more than one student will be taking the JPM.
6. The lesson does NOT need to be stopped andre-executed after the IC is restored for subsequent students.
7. UNFREEZE the Simulator when the student is ready. The audible alarms will be reinstated.

Acknowledge but do not reset non-JPM related alarms to prevent nuisance alarms.

NRC JPM S-1 Rev. 0 Page 7 of 8

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

A Loss of Coolant Accident inside containment is in progress on Unit 2. 2-EOP-3 is being implemented.

INITIATING CUES:

You are the Desk RCO. The US has directed you to verify MSIS lAW 2-EOP-99, Table 5.

NRC JPM S-1 Rev. 0

JOB PERFORMANCE MEASURE

-+ FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE Respond to Abnormal Pressure Control - PCV-11 OOE Fails Open - Unit 2 NRC S-2 Developed/Revised by: _ _ _ _ _ __

Date Training Management Approval: _ _ _ _ _ __

Date JPM NRC S-2, Rev 0 Simulator Page 1 of 12

JOB PERFORMANCE MEASURE Task: Respond to Abnormal Pressure Control- PCV-11 OOE Fails Open- Unit 2 Alternate Path JPM? Yes Facility JPM #: XXXXXXXA KIA: A2.02 Ability to (a) predict the impacts of a spray valve failure on the PZR PCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of a spray valve failure KIA Rating(s): 3.9/3.9 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the reactor is tripped and the 282 RCP is secured.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • 2-AOP-01.1 0, "Pressurizer Pressure and Level" Validation Time: xx minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • None Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC S-2, Rev 0 Simulator Page 2 of 12

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: respond to plant conditions- Unit 2
  • The performance level to be used for this JPM is Perform
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 is operating at 100% power.

INITIATING CUES:

RCS pressure is lowering. Investigate the cause and take the appropriate actions for RCS pressure lowering.

JPM NRC S-2, Rev 0 Simulator Page 3 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME:----

STEP 1 Applicant notes lowering RCS pressure OR receives annunciator(s) H-9 and/or H-10, PZR CHANNEL X (Y) PRESSURE HIGH/LOW. SAT STANDARD: NOTES lowering pressure or alarm. If in response to alarm, looks up H-9 o 10 which directs him to 2-AOP-01.1 0 _ _ UNSAT COMMENTS:

2-AOP-01.1 0, Pressurizer Pressure and Level, Section 4.0 Section 4.1, Immediate Operator Actions STEP 2 (4.1.1) If at Normal Operating Pressure, THEN VERIFY PIC-1100X(Y), Pressurizer Pressure, stable _ _ SAT STANDARD: Looks at PIC-1100X(Y) and determines that pressurizer pressure is lowering

_ _ UNSAT COMMENTS:

STEP 3: (4.1.1.1 RNO) If Pressurizer pressure less than 2300 psia AND PORV leakage is indicated or PORV has failed OPEN THEN PLACE affected PORV in OVERRIDE and CLOSE associated block valve: _ _ SAT STANDARD: Notes that PORV is NOT OPEN as indicted by tell pipe temperatures normal, QT temperature and pressure are not rising and no lights are on acoustic _ _ UNSAT monitor. No action required.

COMMENTS:

STEP 4: (4.1.2) Verify selected Pressurizer pressure control channel PIC-11 OOX(Y),

PRESSURE, NORMAL.

_ _ SAT STANDARD: Notes pressure controller is operating normally. No action required.

_ _ UNSAT COMMENTS:

JPM NRC S-2 RevO Simulator Page 4 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 5: (4.1.3) VERIFY selected RRS channel Pressurizer level set point NORMAL as indicated on LR-111 0, PRESSURIZER LEVEL

- - SAT STANDARD: Notes that level setpoint is normal. No action required.

- - UNSAT COMMENTS:

STEP 6: (4.1.4) Verify Selected Pressurizer level control channel LIC-111 OX(Y), LEVEL, - - SAT NORMAL.

STANDARD: Notes that level control channel is normal. No action required. - - UNSAT COMMENTS:

Section 4.2 Subsequent Operator Actions JPM NRC S-2 RevO Simulator Page 5 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE:

  • Attachment 2, Automatic Response to Pressurizer Deviations, contains a listing of automatic actions associated with Pressurizer pressures.
  • Attachment 3, Automatic responses to Pressurizer Level Deviations, contains listings of automatic actions associated with Pressurizer levels.
  • Attachment 4, Pressurizer Level Program Graph, provides Pressurizer level program vs T-avg.

STEP 7: (4.2.1.1) PERFORM applicable section per Table 1.

STANDARD: Chooses Section 4.2.4, Pressurizer Spray or Auxiliary Spray Valves OPEN or leaking - - SAT

- - UNSAT COMMENTS: If applicant has not recognized spray valve open, he may choose to go to Section 4.2.7, Pressurizer pressure or level abnormal. This will have him verify T-avg and T-ref are matched, verify level is stable, then take manual control of spray valves. When he sees that he does not have control of the spray valve, he should go to Section 4.2.4 JPM NRC S-2 RevO Simulator Page 6 of 12

JOB PERFORMANCE MEASURE PERFORMANCECHECKUST Section 4.2.4, Pressurizer Spray or Auxiliary Spray Valves OPEN or Leaking STEP 8 (Note) NOTE: Divergence of spray line temperatures between 281 and 282 spray lines may indicate a stuck open spray valve. The stuck open spray valve would have the - - SAT spray line with the higher temperature approaching cold leg temperature.

STANDARD: Acknowledges Note. No action required - - UNSAT COMMENTS:

STEP 9 (4.2.4.1} IF either of the following conditions are met:

  • Pressurizer pressure is less than 2275 psia - - SAT
  • Pressurizer pressure is lowering uncontrollably THEN VERIFY spray valves CLOSED: - - UNSAT
  • PCV-1100E, SPRAY VALVE 282, status lights
  • PCV-1100F, SPRAY VALVE 281, status lights
  • TIA-1103, 281 SPRAY LINE (Water Temperature), and TIA-1104, 282 SPRAY LINE (Water Temperature), indicate approximately equal temperatures.

STANDARD: Identifies PCV-1100E is OPEN COMMENTS:

STEP 10 (4.2.4.1.1 RNO} FAULTED STEP IF PCV-11 OOE, SPRAY VALVE 282, is OPEN, THEN PLACE Pressurizer spray valve selector switch in 11 OOF. - - SAT STANDARD: Places selector switch in 11 OOF. Valve remains open.

- - UNSAT COMMENTS:

JPM NRC S-2 RevO Simulator Page 7 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 11 (4.2.4.1.2 RNO)

_ _ SAT IF PCV-1100F, SPRAY VALVE 281, is OPEN, THEN PLACE Pressurizer spray valve selector switch in 11 OOE.

_ _ UNSAT STANDARD: Notes 1100E is OPEN. No action required.

COMMENTS:

STEP 12 (4.2.4.1.3.A RNO) CRITICAL STEP IF spray valve is still failed OPEN AND Pressurizer pressure approaches TM/LP setpoints, THEN PERFORM the following: _ _ SAT A. TRIP reactor.

_ _ UNSAT STANDARD: Applicant announces and trips the reactor.

COMMENTS:

STEP 13 (4.2.4.1.3.8 RNO) SAT B. IMPLEMENT 2-EOP-01, Standard Post Trip Actions.

_ _ UNSAT STANDARD: Transitions to EOP-01.

EXAMINERS NOTE: Applicant may elect to stop 282 RCP immediately afte tripping the Reactor. This is acceptable in that stopping the 282 RCP is the next step in this AOP.

COMMENTS:

JPM NRC S-2 RevO Simulator Page 8 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 2-EOP-01, Standard Post Trip Actions.

STEP 14 (4.1.A) SAT DETERMINE Reactivity Control acceptance criteria are met:

UNSAT A. VERIFY Reactor power is lowering.

STANDARD: Verifies reactor power indication is lowering on RTGB-204 and/or RPS cabinets.

COMMENTS:

STEP 15 (4.1.8) SAT B. VERIFY Startup Rate is negative.

_ _ UNSAT STANDARD: Verifies startup rate indication is negative on RTGB-204 and/or RPS cabinets.

COMMENTS:

STEP 16 (4.1.C) SAT C. VERIFY ALL CEAs are fully inserted.

UNSAT STANDARD: Verifies rod bottom lights lit on mimic and/or ADS.

EVALUATOR'S'S CUE: If the applicant attempts to perform step 2 of SPTAs, inform him that the BRCO will complete them.

EVALUATOR'S Note: Applicant should transition back to 2-AOP-01.1 0 at this point COMMENTS:

JPM NRC S-2 RevO Simulator Page 9 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Section 4.2.4, Pressurizer Spray or Auxiliary Spray Valves OPEN or Leaking STEP 17: (4.2.4.1.C) CRITICAL STEP C. IF PCV-1100E, SPRAY VALVE 262, is NOT CLOSED, THEN STOP 262 RCP.

- - SAT STANDARD: Applicant STOPs the 262 RCP EXAMINERS NOTE: Applicant must stop the 282 RCP before SIAS actuation setpoint - - UNSAT of 1736 psia to meet critical step.

COMMENTS:

END OF TASK STOP TIME: - - - -

JPM NRC S-2 RevO Simulator Page 10 of 12

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC #xx
2. UNFREEZE and RUN the simulator for a few minutes.
3. SELECT AND EXECUTE xx
4. UNFREEZE the Simulator when the student is ready.

JPM NRC S-2 RevO Simulator Page 11 of 12

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EVALUATOR'S UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 is operating at 100% power. No evolutions or surveillances are expected.

INITIATING CUES:

Respond to plant conditions.

JPM NRC S-2 RevO Page 12 of 12

Training Management Approval: - - - - - - -

Date NRC JPM S-3 Rev. 0 Page 1 of 12

JOB PERFORMANCE MEASURE Task: Align the 2A1 SIT to VCT for RCS makeup Faulted JPM? No Facility JPM #:

KIA Rating(s): KJA: 004-A4.13 Ability to manually operate and/or monitor in the control room: VCT level control and pressure control 3.3 I 2.9 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the 2A1 SIT is aligned to the VCT and VCT level rise is indicated.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • 2-AOP-02.01, 'Boron Concentration Control System (BCCS) Abnormal Operations'.

Validation Time: 10 minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • 2-AOP-02.01, 'Boron Concentration Control System (BCCS) Abnormal Operations'.

Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

  • None Radiological Protection and RWP Requirements:
  • None NRC JPM S-3 Rev. 0 Page 2 of 12

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Align the 2A 1 SIT to the VCT
  • The performance level to be used for this JPM is perform
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 has experienced severe weather that destroyed the RWT and the PWT. Both BAMT's inventory has been exhausted. The Unit is in Mode 3 with RCS pressure less than 1750 psia.

INITIATING CUES:

The US has directed you to makeup to the VCT using the 2A 1 SIT lAW 2-AOP-02.01, 'Boron Concentration Control System (BCCS) Abnormal Operations' Attachment 2.

NRC JPM S-3 Rev. 0 Page 3 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: _ _ __

2-AOP-02.01, 'Boron Concentration Control System (BCCS) Abnormal Operations' Attachment 2 NOTE

  • If other sources of makeup are NOT available, then one SIT at a time may be used to add makeup water to the VCT. (Section 6.1.3 Management Directive 3) - - SAT
  • Cooldown from normal operating temperature to below 200°F may require the volume of two BAMTs and one SIT OR one BAMT and two SITs. - - UNSAT
  • TS 3.5.1, Safety Injection Tanks (SIT), requires SITs to be OPERABLE in MODES 1, 2, and 3*1* pressurizer pressure 1750 psia or above).
  • STEP 1(1)

VERIFY RCS pressure is less than 1750 psia AND unit is in MODE 3 or lower. (Section 6.1.3 Management Directive 3)

STANDARD: Observes RCS pressure and temperature. Determines pressure less than 1750 psia. and temperature is Mode 3 conditions.

COMMENTS:

STEP 2:(2)

- - SAT IF CIAS or SIAS signal is present, THEN RESET signals for affected valves as needed.

- - UNSAT STANDARD: Determines CIAS and SIAS is NOT present.

COMMENTS:

NRC JPM S-3 Rev. 0 Page 4 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CRITICAL STEP 3:(3) STEP DISABLE V2501, VCT OUTLET VALVE, OPEN as follows:

A. OPEN V2501, VCT OUTLET VALVE. - - SAT B. OPEN Breaker 2-42118, CONTROL BREAKER FOR V2501.

(480V MCC-2B6, Cubicle DF3) - - UNSAT STANDARD: Opens VCT outlet valve V2501 and notifies SNPO to open Breaker 2-42118 COMMENTS:

CRITICAL STEP 4:(4) STEP DISABLE V2504, REFUELING WATER TO CHARGING PUMP, CLOSED as follows:

A. CLOSE V2504, REFUELING WATER TO CHARGING PUMP. - - SAT B. OPEN Breaker 2-42036, CONTROL BREAKER FOR V2504.

(480V MCC-2B5, Cubicle JF4) - - UNSAT STANDARD: Closes V2504, Refueling Water to Charging Pumps and notifies SNPO to open breaker 2-42036.

COMMENTS:

NRC JPM S-3 Rev. 0 Page 5 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CRITICAL STEP 5:(5} ALIGN SIT to RWTNCT line as follows: STEP I COMPONEN I COMPONENT I LOCATION I POSITION - - SAT T NUMBER DESCRIPTION REQUIRED I I V2621 I VCT Inlet From Pri I RAB/27/N-RA3NJ- I Closed - - UNSAT M/U Wtr & BAM lsol RAC I STANDARD: Notifies the SNPO to close V2621 COMMENTS:

CRITICAL STEP 6:(5} ALIGN SIT to RWTNCT line as follows: STEP I COMPONEN T NUMBER l COMPONENT DESCRIPTION I LOCATION I POSITION REQUIRED I - - SAT I V3597 I SIT OUTLET DRAIN I RAB/31/ I Closed TORWTISOL N-RA1/E-RAE I - - UNSAT STANDARD: Notifies the SNPO to close V3597 COMMENTS:

NRC JPM S-3 Rev. 0 Page 6 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7(5) ALIGN SIT to RWTNCT line as follows:

- - SAT I COMPONEN I COMPONENT I LOCATION I POSITION T NUMBER DESCRIPTION REQUIRED I

- - UNSAT I V3661 I TEST HDR DRAIN I RTGB 206 I Closed I STANDARD: Verifies V3661 is Closed COMMENTS:

CRITICAL STEP 8(5} ALIGN SIT to RWTNCT line as follows: STEP I COMPONEN I COMPONENT T NUMBER DESCRIPTION I LOCATION l POSITION REQUIRED J - - SAT I V3463 I SIT OUTLET DRAIN I RAB/25/ I OPEN TO RWT ISOL N-RA1/W-RAE I - - UNSAT STANDARD: Notifies SNPO to open V3463 COMMENTS:

NRC JPM S-3 Rev. 0 Page 7 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CRITICAL STEP 9(5} ALIGN SIT to RWTNCT line as follows: STEP I COMPONEN I COMPONENT I LOCATION I POSITION T NUMBER DESCRIPTION REQUIRED I - - SAT I V3201 I SIT OUTLET DRAIN I RAB/31/ I OPEN TOVCT ISOL N-RA1/W-RAE I - - UNSAT STANDARD: Notifies SNPO to Open V3201 COMMENTS:

CRITICAL STEP 10(5} ALIGN SIT to RWTNCT line as follows: STEP I COMPONEN T NUMBER I COMPONENT DESCRIPTION I LOCATION I POSITION REQUIRED I - - SAT

~1-SE-03-2A I TORWTNCT I RTGB-206 I OPEN RESET I - - UNSAT STANDARD: Opens 1-SE-03-2A COMMENTS:

NRC JPM S-3 Rev. 0 Page 8 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CRITICAL STEP 11 (5) ALIGN SIT to RWTNCT line as follows: STEP I COMPONEN I COMPONENT I LOCATION I POSITION - - SAT T NUMBER DESCRIPTION REQUIRED I

~1-SE-03-26 I TO RWTNCT I RTG6-206 I OPEN - - UNSAT RESET I STANDARD: Opens 1-SE-03-26 COMMENTS:

CRITICAL STEP 12(6) ADD borated water to VCT from selected SIT by opening its associated fill and STEP drain valve as needed.

J Component Number I Component Description I Required Position I

- - SAT I SE-03-1AN3621 I 2A1 FILUDRAIN I OPEN I - - UNSAT STANDARD: Opens SE-03-1AN3621 and monitors VCT level to observe a rise in level.

EXAMINERS NOTE: When VCT level has risen a couple%, notify Applicant the 2A1 SIT indicates 5% Wide Range Level.

COMMENTS:

NRC JPM S-3 Rev. 0 Page 9 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CRITICAL STEP 13(8) WHEN selected SIT reaches 5% wide range level, THEN STOP makeup from STEP selected SIT by closing its fill and drain valve: (Section 6.1.3 Management Directive 2)

SAT Component Component Required I Number I Description I Position I UNSAT I SE-03-1A/V3621 I 2A1 FILUDRAIN CLOSED STANDARD: Closes SE-03-1A/V3621 COMMENTS:

END OF TASK STOP TIME: - - - -

NRC JPM S-3 Rev. 0 Page 10 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST SIMULATOR SETUP SHEET

  • Restore 1/C-9
  • Initiate Lesson S-3. Ensure modification to IC set.
  • Stop BAM Pumps and close V2525
  • Divert VCT to 5% level, close VCT divert valve
  • Stop Charging and isolate Letdown
  • Freeze simulator NRC JPM S-3 Rev. 0 Page 11 of 12

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 has experienced severe weather that destroyed the RWT and the PWT. Both BAMT's inventory has been exhausted. The Unit is in Mode 3 with RCS pressure less than 1750 psia.

INITIATING CUES:

The US has directed you to makeup to the VCT using the 2A 1 SIT lAW 2-AOP-02.01, 'Boron Concentration Control System (BCCS) Abnormal Operations' Attachment 2.

NRC JPM S-3 Rev. 0

  • FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO HIGH RADIATION ALARM ON SPENT FUEL MONITORS - UNIT 2 NRC S-4 Simulator Applicant _ _ _ _ _ _ __

Examiner - - - - -

JOB PERFORMANCE MEASURE 07025090, Align SFP Ventilation Trains 07067430, Respond To Fuel Handling Accident (Dropped/Damaged Fuel)

Faulted JPM? Yes Facility JPM #: 0821117 A (modified) 072 A3.01 Ability to monitor automatic operation of the ARM system, including:

Changes in ventilation alignment. 2.9/ 3.1 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the US has been notified that the Fuel Handling Building ventilation line-up has been verified including contingency actions in accordance with 2-AOP-26.02.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

2-AOP-26.02, Area Radiation Monitors Validation Time: 10 minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • 2-AOP-26.02, "Area Radiation Monitors" Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None NRC HLC-21 S-4 Rev. 0 Simulator or U2 Control Room Page 2 of 10

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Respond to High Radiation Alarm on Spent Fuel Monitors- Unit 2
  • The performance level to be used for this JPM is Perform.
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 is at 100% power.

Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.

2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.

INITIATING CUES:

You are the Desk RCO.

The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-AOP-26.02, "Area Radiation Monitors", section 4.2.4, step 4.

NRC HLC-21 S-4 Rev. 0 Simulator or U2 Control Room Page 3 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME:----

4.2.4 Fuel Handling Building Radiation Monitor Alarm

4. IF more than one HIGH Alarm in a train actuated, THEN ENSURE FHB ventilation transfer to SBVS as follows:

STEP 1(4.2.4.4): A. ENSURE the following fans STOPPED: FAULTED

  • HVS-6, Fuel Pool Supply Fan. STEP
  • HVS-7, Fuel Handling Bldg Supply Fan.
  • HVE-15, Fuel Handling Bldg Exhaust Fan.
  • HVE-16A, Fuel Pool Exhaust Fan SAT
  • HVE-16B, Fuel Pool Exhaust Fan
  • HVE-17, Fuel BLDG H&V Room Exhaust Fan (FHB/52/FH6/E-RAC)

UNSAT STANDARD: ENSURES Fans are OFF.

EXAMINERS NOTE: Applicant must call SNPO to verify HVE-17 is OFF EXAMINERS NOTE: HVE-16A did not stop when high radiation signal received. As a result of HVE 16A not stopping, the supply fan HVS 6 also did not stop. (interlocked with HVE-16A)

EXAMINER'S CUE: SNPO reports HVE-17 is STOPPED COMMENTS:

CONTINGENCY ACTION CRITICAL STEP STEP 2 (4.2.4.4 ): A.1. STOP any running fan SAT STANDARD: STOP HVE-16A. VERIFY HVS 6 stopped when HVE-16A was stopped.

_ _ UNSAT EXAMINER'S CUE:

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC HLC-21 S-4 Rev. 0 Simulator Page 4 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (4.2.4.4}: B. VERIFY the following FHB dampers CLOSED:

  • D-33, Fuel Hdlg Bldg Inlet Damper
  • D-35, Fuel Hdlg Bldg Outlet Damper
  • D-34, Fuel Hdlg Bldg Inlet Damper
  • D-36, Fuel Hdlg Bldg Outlet Damper - - UNSAT
  • D-32, Fuel Pool Outlet Damper STANDARD: VERIFY Dampers D-29 through D-36 are CLOSED by observation of Red light off, Green light on.

EXAMINER'S CUE:

COMMENTS:

STEP 4 (4.2.4.4}: C. VERIFY FCV-25-30, Fuel Handling Emerg Vent Vlv, OPEN.

STANDARD: OBSERVE FCV-25-30 OPEN. - - SAT EXAMINER'S CUE: - - UNSAT COMMENTS:

STEP 5 (4.2.4.4}: D. VERIFY FCV-25-32, SBVS Isolation Valve, is CLOSED. FAULTED STEP STANDARD: OBSERVE FCV-25-32 OPEN.

EXAMINER'S CUE: - - SAT EVALUATOR'S NOTE: Faulted Step FCV-25-32 failed to auto CLOSE.

- - UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC HLC-21 S-4 Rev. 0 Simulator Page 5 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION: CRITICAL STEP STEP 6 (4.2.4.4): D.1 CLOSE FCV-25-32, SBVS Isolation Valve.

_ _ SAT STANDARD: POSITION FCV-25-32 control switch to CLOSE.

_ _ UNSAT EXAMINER'S CUE:

COMMENTS:

STEP 7 (4.2.4.4): E. VERIFY HVE-6A, SBVS Exhaust Fan, is ON. FAULTED STEP STANDARD: ENSURE HVE-6A is ON.

EXAMINER'S NOTE: HVE-6A did not start SAT COMMENTS:

UNSAT CONTINGENCY ACTION: CRITICAL STEP STEP 8 (4.2.4.4): E.1. START HVE-6A, SBVS Exhaust Fan

_ _ SAT STANDARD: STARTS HVE-6A EXAMINER'S NOTE: _ _ UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC HLC-21 S-4 Rev. 0 Simulator Page 6 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9 (4.2.4.4): F. VERIFY FCV-25-31, Fuel Handling Emerg Vent Vlv. OPEN

- - SAT STANDARD: OBSERVE FCV-25-31 OPEN.

EXAMINER'S CUE: - - UNSAT COMMENTS:

STEP 10 (4.2.4.4): G. VERIFY FCV-25-33, S8VS Isolation Valve, is CLOSED.

- - SAT STANDARD: OBSERVE FCV-25-33 OPEN.

EXAMINER'S CUE: - - UNSAT COMMENTS:

STEP 11 (4.2.4.4): H. VERIFY HVE-68, S8VS Exhaust Fan, is ON.

STANDARD: ENSURE HVE-68 is ON.

- - SAT EXAMINER'S CUE: Communicate to Applicant task is complete. Applicant should notify US task is complete and discrepancies found. - - UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC HLC-21 S-4 Rev. 0 Simulator Page 7 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (done): NOTIFY the US that the Fuel Handling Building ventilation line-up has been verified in accordance with 2-AOP-26.02, section 4.2.4, step 4. Appropriate contingency actions have been taken for failed equipment SAT STANDARD: NOTIFY the US that the Fuel Handling Building ventilation line-up has been VERIFIED. UNSAT EXAMINER'S CUE: US ACKNOWLEDGES.

COMMENTS:

END OF TASK STOP TIME: - - - -

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC HLC-21 S-4 Rev. 0 Simulator Page 8 of 10

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC-1.
2. UNFREEZE the Simulator.
3. SELECT the JPM Lesson File Folder.
4. OPEN and EXECUTE the lesson for S-4 SFP Rm.Lsn.
5. FREEZE the Simulator.
6. STORE a Temporary IC set if more than one student will be performing the JPM.
7. The lesson will NOT need to be stopped andre-executed for each student after restoring the IC.
8. UNFREEZE the Simulator when the student is ready to begin.

NRC HLC-21 S-4 Rev. 0 Simulator Page 9 of 10

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 is at 100% power.

Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.

2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.

INITIATING CUES:

You are the Desk RCO.

The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-AOP-26.02, "Area Radiation Monitors", section 4.2.4, step 4.

NRC HLC-21 S-4 Rev. 0

JOB PERFORMANCE MEASURE

-Unit 2 NRC S-5 Developed/Revised by: _ _ _ _ _ __

Date Training Management Approval: _ _ _ _ _ __

Date JPM NRC S-5, Rev 0 Simulator Page 1 of 7

JOB PERFORMANCE MEASURE Task: Perform Reactor Startup Pull CEAs to Criticality -Unit 2 Alternate Path JPM? Yes Facility JPM #: XXXXXXXA KIA: A2.11 Ability to (a) predict the impacts of situations requiring a reactor trip on the CRDS- and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations KIA Rating(s): 4.4/4.7 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the reactor is tripped.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • 2-GOP-302, "Reactor Plant Startup - Mode 3 to Mode 2"
  • 2-AOP-66.01, "Dropped or Misaligned CEA Abnormal Operations" Validation Time: xx minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • None Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC S-5, Rev 0 Simulator Page 2 of 7

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: respond to plant conditions - Unit 2
  • The performance level to be used for this JPM is Perform
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 is starting up after a 10 day maintenance outage following repairs to the main generator. 2-GOP-302, "Reactor Plant Startup-Mode 3 To Mode 2 is in progress. The shutdown banks have been withdrawn and Group X rods have been withdrawn to YY inches. While performing step 6.14.14 Rod withdrawal was stopped to allow I&C to evaluate an abnormal trace. The decision was to allow the oncoming crew to assume the shift during this delay.

INITIATING CUES:

I&C has completed their evaluation and the decision to continue the startup has been made. You are to complete the startup of the plant in accordance with 2-GOP-302, "Reactor Plant Startup-Mode 3 to Mode 2" continuing with step 6.14.14.

JPM NRC S-5, Rev 0 Simulator Page 3 of 7

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME:----

STEP 1 (6.14)

_ _ SAT

14. Continue to WITHDRAW Regulating Group 3 in Manual Sequential mode.

STANDARD: UNSAT

  • Ensures Group Selector switch is in Group 3.
  • Pushes the Manual Sequential button (illuminated).
  • Places joystick into the "Withdraw" position.
  • Ensures CEAs are stepping out.
  • Monitors Nls and CEA position COMMENTS:

FAULTED STEP 2: (6.14) STEP

15. When Regulating Group 3 reaches the Upper Group Stop, Then perform the following:

_ _ SAT A. Verify that Group 4 CEAs continue to withdraw.

STANDARD: When Group 3 stops moving, ensures that Group 4 continues to move, then _ _ UNSAT releases the joystick.

EVALUATOR'S'S NOTE: Group 4 CEAs will continue to withdraw after joystick is released.

EVALUATOR'S'S NOTE: Because the subsequent steps are Immediate Operator Actions from the CEA AOP, the Applicant should perform those steps without referring to the AOP.

COMMENTS:

JPM NRC S-5 RevO Simulator Page 4 of 7

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 2-AOP-66.01, "Dropped or Misaligned CEA Abnormal Operations" STEP 6: ( 4.1) Immediate Operator Action)

1. PLACE CEDMCS MODE SELECT switch in OFF. SAT STANDARD: Places CEDMCS MODE SELECT switch in OFF.

UNSAT EVALUATOR'S'S NOTE: CEAs continue to withdraw.

COMMENTS:

STEP 6: (4.1) Immediate Operator Action)

2. VERIFY all CEA motion has STOPPED. _ _ SAT STANDARD: Notes CEAs continue to withdraw.

_ _ UNSAT COMMENTS:

STEP 6: (4.1) Immediate Operator Action RNO) CRITICAL STEP 2.1 Trip reactor.

SAT STANDARD: Trips reactor, verifies rods insert, and verifies no further outward motion.

_ _ UNSAT COMMENTS:

END OF TASK STOP TIME: - - - -

JPM NRC S-5 RevO Simulator Page 5 of 7

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC-1
2. INITIATE LESSON 5-2
3. TRIGGER STEP
4. FREEZE SIMULATOR JPM NRC S-5 RevO Simulator Page 6 of 7

--**-------~----~-----------~----~----------

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EVALUATOR'S UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 is starting up after a 10 day maintenance outage following repairs to the main generator. 2-GOP-302, "Reactor Plant Startup-Mode 3 To Mode 2 is in progress. The shutdown banks have been withdrawn and Group X rods have been withdrawn to YY inches. While performing step 6.14.14 Rod withdrawal was stopped to allow I&C to evaluate an abnormal trace. The decision was to allow the oncoming crew to assume the shift during this delay.

INITIATING CUES:

I&C has completed their evaluation and the decision to continue the startup has been made. You are to complete the startup of the plant in accordance with 2-GOP-302, "Reactor Plant Startup-Mode 3 to Mode 2" continuing with step 6.14.14.

JPM NRC S-5 RevO Simulator

JOB PERFORMANCE MEASURE

  • FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE Perform a Containment Mini-purge on Unit 2 NRC S-6 Developed/Revised by: _ _ _ _ _ __

Date Training Management Approval: _ _ _ _ _ __

Date JPM NRC S-6, Rev 0 Simulator Page 1 of 11

JOB PERFORMANCE MEASURE Task: Perform a Containment Mini-purge on Unit 2 Alternate Path JPM? No Facility JPM #: xxxxxxx KIA: A4.01 Ability to manually operate and/or monitor in the control room containment purge flow rate; KIA Rating(s): 4.0 I 4.0 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the mini-purge is in progress.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

2-NOP-25.02, Continuous Containment I Hydrogen Purge System Operation Validation Time: xx minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • None Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC S-6, Rev 0 Simulator Page 2 of 11

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: respond to plant conditions- Unit 2
  • The performance level to be used for this JPM is Perform
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 is operating at 100% power.

INITIATING CUES:

Perform a containment mini-purge per 2-NOP-25.02, Section 4.1.

JPM NRC S-6, Rev 0 Simulator Page 3 of 11

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP START TIME:----

STEP 1 (4.1.1) REVIEW Section 2.0 PRECAUTIONS AND LIMITATIONS

- - SAT STANDARD: Reviews Section 2.0 PRECAUTIONS AND LIMITATIONS

- - UNSAT EVALUATOR'S NOTES: This may be done in the pre-brief.

COMMENTS:

STEP 2 (4.1.2) REVIEW Section 3.0 PREREQUISITES AND INITIAL CONDITIONS, COMPLETE. - - SAT STANDARD: Reviews Section 2.0 3.0 PREREQUISITES AND INITIAL CONDITIONS, - - UNSAT EVALUATOR'S NOTES: This may be done in the pre-brief.

COMMENTS:

STEP 3 (4.1.3) Ensure a Gaseous Release Permit is issued and approved per 0-COP-01.06, Processing Gaseous Waste.

- - SAT RECORD Gas Release Permit Number

- - UNSAT STANDARD: Writes down Gas Release Permit Number EVALUATOR'S NOTES: Approved Gas Release Permit supplied at the pre-brief.

COMMENTS:

JPM NRC S-6 RevO Simulator Page 4 of 11

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP STEP 4 (Caution)

- - SAT CAUTION: Containment purging should NOT be performed concurrent with a Gas Decay Tank Release unless the mini-purge release has been in progress greater than 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> (CONTINOUS release). - - UNSAT STANDARD: Acknowledges Caution. No GOT release in progress.

COMMENTS:

STEP 5 (4.1.4)

- - SAT IF the Continuous Containment Purge (Mini-Purge) operation is a batch release, THEN ENSURE there are NO Gas Decay Tanks releases in progress.

- - UNSAT STANDARD: No GOT release in progress.

COMMENTS:

STEP 6 (4.1.5)

- - SAT Verify the following valves CLOSED (HVCB)

  • FCV-25-7, VACUUM RELIEF VALVE
  • FCV-25-8, VACUUM RELIEF VALVE - - UNSAT STANDARD: Verifies that FCV-25-7 and 8 indicate closed.

COMMENTS:

JPM NRC S-6 RevO Simulator Page 5 of 11

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP STEP 7 (4.1.6)

- - SAT PERFORM the following Continuous Containment Purge Valve Alignment (HVCB).

FCV-25-34, H2 PURGE DISCH to A SBVS, CLOSED - - UNSAT STANDARD: Verifies that FCV-25-34 indicates closed.

COMMENTS:

STEP 8 (4.1.6)

- - SAT PERFORM the following Continuous Containment Purge Valve Alignment (HVCB).

FCV-25-29, H2 PURGE DISCH to B SBVS, CLOSED - - UNSAT STANDARD: Verifies that FCV-25-29 indicates closed.

COMMENTS:

CRITICAL STEP 9 (4.1.6) STEP PERFORM the following Continuous Containment Purge Valve Alignment (HVCB). - - SAT FCV-25-20, CONTINUOUS CNTMT PURGE ISOL VLV, OPEN

- - UNSAT STANDARD: Opens FCV-25-20.

COMMENTS:

CRITICAL STEP 10 (4.1.6) STEP PERFORM the following Continuous Containment Purge Valve Alignment (HVCB). - - SAT FCV-25-21, CONTINUOUS CNTMT PURGE ISOL VLV, OPEN

- - UNSAT STANDARD: Opens FCV-25-21.

COMMENTS:

JPM NRC S-6 RevO Simulator Page 6 of 11

~-~----------------------------------------

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP STEP 11 (4.1.6)

- - SAT PERFORM the following Continuous Containment Purge Valve Alignment (HVCB).

FCV-25-9, CONTROL VALVE FILTER INLET, OPEN TO 5% - - UNSAT STANDARD: Opens FCV-25-9 to 5%.

COMMENTS:

STEP 12 (4.1.6)

- - SAT PERFORM the following Continuous Containment Purge Valve Alignment (HVCB).

FCV-25-28, CONTROL VALVE BYPASS, CLOSED - - UNSAT STANDARD: Verifies FCV-25-28 is Closed COMMENTS:

CRITICAL STEP 13 (4.1.6) STEP PERFORM the following Continuous Containment Purge Valve Alignment (HVCB). - - SAT FCV-25-35, Exhaust Valve (Key 192), OPEN

- - UNSAT STANDARD: Opens FCV-25-35.

COMMENTS:

STEP 14 (Note)

FCV-25-26 and FCV-25-36 will NOT OPEN until HVE-7A or &B starts and a negative differential pressure exists in Containment. - - SAT STANDARD: Acknowledges Note.

- - UNSAT COMMENTS:

JPM NRC S-6 RevO Simulator Page 7 of 11

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP CRITICAL STEP 15 (4.1.7) STEP PLACE the Control Switch for FCV-25-26, CONTINUOUS CNTMT PURGE MAKEUP VLV, in OPEN. (HVC8)

- - SAT STANDARD: Places FCV-25-26 control switch in OPEN.

NOTE - - UNSAT FCV-25-26 and FCV-25-36 will NOT OPEN until HVE-7A or 78 starts and a negative differential pressure exists in Containment.

COMMENTS:

CRITICAL STEP 16 (4.1.8) STEP PLACE the Control Switch for FCV-25-36, CONTINUOUS CNTMT PURGE MAKEUP VLV, in OPEN. (HVC8)

- - SAT STANDARD: Places FCV-25-36 control switch in OPEN.

NOTE - - UNSAT FCV-25-26 and FCV-25-36 will NOT OPEN until HVE-7A or 78 starts and a negative differential pressure exists in Containment.

COMMENTS:

STEP 17 (Note}

PDIS-25-1 A/1 8 reset setpoint is 4.5 INWD. If containment has NOT been pressurized to at least +4.5 INWD since the last time HVE-7A/78 were run, FCV-25-26 and FCV-25-36 may - - SAT open immediately upon fan start.

STANDARD: Acknowledges Note. - - UNSAT COMMENTS:

STEP 18 (Caution}

CIAS will close purge containment isolation (suction) valves, which will require HVE-7A and HVE-78 to be shut down manually. - - SAT STANDARD: Acknowledges Caution.

- - UNSAT COMMENTS:

JPM NRC S-6 RevO Simulator Page 8 of 11

~---~--------~

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP CRITICAL STEP 19 (4.1.9) STEP START one purge fan. (HVCB)

  • HVE-7A, CONTINUOUS CNTMT/H2 PURGE FAN
  • HVE-78, CONTINUOUS CNTMT/H2 PURGE FAN _ _ SAT STANDARD: Starts one of the fans. _ _ UNSAT COMMENTS:

STEP 20 (4.1.10) SAT RECORD time STARTED UNSAT STANDARD: Records start time COMMENTS:

CRITICAL STEP 19 (4.1.11) STEP THROTTLE FCV-25-9, CONTROL VALVE FILTER INLET, to obtain the flow rate prescribed on the Release Permit as indicated on either of the following: (HVCB)

  • Point 5 of UR-25-1, CONTINUOUS CNTMT I H2 PURGE FLOW/~P _ _ SAT
  • Fl-25-1-1, CONTINUOUS CNTMT PURGE FLOW

_ _ UNSAT STANDARD: Opens FCV-25-9 to get 100 SCFM COMMENTS:

END OF TASK STOP TIME: _ _ __

JPM NRC S-6 RevO Simulator Page 9 of 11

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC-1
2. UNFREEZE and RUN the simulator for a few minutes.
3. UNFREEZE the Simulator when the student is ready.

JPM NRC S-6 RevO Simulator Page 10 of 11

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EVALUATOR'S UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 is operating at 100% power.

INITIATING CUES:

Perform a containment mini-purge per 2-NOP-25.02, Section 4.1.

JPM NRC S-6 RevO Page 11 of 11

&FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE CCW AND CBO TO THE RCP'S AFTER INADVERTENT SIAS Unit 2 Simulator NRC S-7 Developed/Revised by: _ _ _ _ _ __

Training Management Approval: _ _ _ _ _ __

Date NRC JPM S-7 Rev. 0 Page 1 of 8

JOB PERFORMANCE MEASURE Restore CCW and CBO to the RCP's - Unit 2 Faulted JPM? Yes Facility JPM #:

KJA Rating(s): KJA: 008-A4.01 Ability to manually operate and/or monitor in the control room:

CCW indications and controls 3.3 I 3.1 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when CCW and CBO has been restored the Reactor Coolant Pumps.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • 2-EOP-99, Appendix J, Restoration of CCW and CBO to the RCP's Validation Time: 7 minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • 1-EOP-99, Appendix J Restoration of CCW and CBO to the RCP's Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None NRC JPM S-7 Rev. 0 Page 2 of 8

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Restoration of CCW and CBO to the RCP's
  • The performance level to be used for this JPM is perform
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 experienced an inadvertent SIAS. SIAS has NOT been reset.

INITIATING CUES:

You are the Desk RCO. The US has directed you to restore CCW and CBO to the RCP's lAW 2-EOP-99 Appendix J 'Restoration of CCW and CBO to the RCP's' NRC JPM S-7 Rev. 0 Page 3 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START T I M E : - - - -

2-EOP-99, Appendix J 'Restoration of CCW and CBO to the RCP's' CRITICAL STEP 1(1) STEP ENSURE Instrument Air to Containment is available by PLACING HCV 1 to CLOSE I OVERRIDE and then to OPEN.

- - SAT STANDARD: OPENS HCV-18-1 by taking handswitch from CLOSE I OVERRIDE to OPEN

- - UNSAT COMMENTS:

CAUTION FAULTED If a VALID SIAS occurs, the CCW 'N' header shall NOT be aligned to ANY essential STEP header. This will maintain train separation while safeguards signals are still present.

- - SAT NOTE

  • HCV-14-9 (HCV-14-10) will open 5 seconds after HCV-14-8A (HCV-14-88) starts to - - UNSAT open.
  • When SIAS is present, placing the control switches in CLOSE and then OVERRIDE will open the CCW 'N' header valves, until SIAS is reset.

STEP 2:(2) If an INADVERTENT SIAS has occurred, Then PERFORM the following:

A. RESTORE flow from EITHER 'A' or '8' CCW Header to the 'N' Header by PLACING the control switches for the desired train to CLOSE and then to OVERRIDE:

HCV-14-8A 'N' Hdr lsol Discharge HCV-14-9 'N' Hdr Jsol Suction OR HCV-14-88 'N' Hdr Jsol Discharge HCV-14-10 'N' Hdr Jsol Suction STANDARD: Recognizes one or the other HCV-14-9 OR HCV-14-10 did not open EXAMINERS NOTE: HCV-14-9 OR HCV-14-10, depending on which valve the applicant chooses first, will not open.

COMMENTS:

NRC JPM S-7 Rev. 0 Page 4 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CRITICAL STEP 3:(2) If an INADVERTENT SIAS has occurred, Then PERFORM the following: STEP A. RESTORE flow from EITHER 'A' or '8' CCW Header to the 'N' Header by PLACING the control switches for the desired train to CLOSE and then to OVERRIDE:

- - SAT HCV-14-8A 'N' Hdr lsol Discharge HCV-14-9 'N' Hdr lsol Suction - - UNSAT OR HCV-14-88 'N' Hdr lsol Discharge HCV-14-10 'N' Hdr lsol Suction STANDARD: Open HCV-14-9 OR HCV-14-10. If HCV-14-9 opened, Open HCV-14-8A, if 14-10 opened, Open HCV-14-88.

COMMENTS:

CRITICAL STEP 4:(2) If an INADVERTENT SIAS has occurred, Then PERFORM the following: STEP B. OPEN ALL of the following CCW to I from the RCP valves:

HCV-14-1, CCW To RC PUMP HCV-14-2, CCW From RC PUMP

- - SAT HCV-14-7, CCW To RC PUMP HCV-14-6, CCW From RC PUMP - - UNSAT STANDARD: OPENS ALL the above valves COMMENTS:

STEP 5:(2) If an INADVERTENT SIAS has occurred, Then PERFORM the following: CRITICAL STEP C. If CIAS has isolated controlled bleedoff flow to the VCT, Then OPEN V2507, RCP 81eedoff Relief Stop Vlv. - - SAT STANDARD: OPENS V2507 RCP 81eedoff Relief Stop Valve

- - UNSAT COMMENTS:

NRC JPM S-7 Rev. 0 Page 5 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CAUTION RCP Seal Cooler isolation valves automatically close on high Seal Cooler outlet temperature of 200°F. Maintaining the control switch in the OPEN position will override

- - SAT this function. CCW radiation monitors should be closely monitored for indication of RCS to CCW leakage should conditions warrant the valve(s) to be maintained in the open - - UNSAT position. Consideration should be given to returning the control switch(es) to the AUTO position once the valves have been opened.

STEP 6:(2) If an INADVERTENT SIAS has occurred, Then PERFORM the following:

D. ENSURE ALL RCP Seal Cooler Isolation valves are OPEN:

HCV-14-11-A1, CCW From 2A1 RCP Seal Cooler HCV-14-11-A2, CCW From 2A2 RCP Seal Cooler HCV-14-11-81, CCW From 281 RCP Seal Cooler HCV-14-11-82, CCW From 282 RCP Seal Cooler STANDARD: VERIFIES the above valves open COMMENTS:

STEP 7(2) If an INADVERTENT SIAS has occurred, Then PERFORM the following:

- - SAT E. VERIFY RCP CCW related alarms are CLEAR or have been evaluated and dispositioned. - - UNSAT STANDARD: VERIFIES CCW related alarms clear OR determines CCW flow is adequate.

COMMENTS:

END OF TASK STOP TIME: - - - -

NRC JPM S-7 Rev. 0 Page 6 of 8

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST SIMULATOR SETUP SHEET

  • Restore IC-4
  • Manually Initiate SIAS both trains
  • Freeze Simulator NRC JPM S-7 Rev. 0 Page 7 of 8

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 experienced an inadvertent SIAS. SIAS has NOT been reset.

INITIATING CUES:

You are the Desk RCO. The US has directed you to restore CCW and CBO to the RCP's lAW 2-EOP-99 Appendix J 'Restoration of CCW and CBO to the RCP's' NRC JPM S-7 Rev. 0

  • FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RELEASE 1A WASTE MONITOR TANK CONTENTS NRC P-1 Unit 1 RCA Developed/Revised by: _ _ _ _ _ __

Line Management Approval: _ _ _ _ _ __

Training Management Approval: _ _ _ _ _ __

Date NRC P-1 Rev. 0 Unit 1 RCA Page 1 of 12

JOB PERFORMANCE MEASURE 07006110, Release 1A Waste Monitor Tank Contents Faulted JPM? No Facility JPM #:

KIA Rating(s): 068-K4.01 Knowledge of design feature(s) and/or interlock(s) which provide for the following: Safety and environmental precautions for handling hot, acidic, and radioactive liquids 3.4 I 4.1 Duty Area(s): NA Task Information: NA Task Standard: This JPM is complete when 1A Waste Monitor Pump discharge to discharge canal is open and the placard has been placed on the LIS.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

NOP-1-0510020 'Oxygenated Waste System' 1-NOP-06.01, Controlled Liquid Release to the Circulating Water Discharge Validation Time: 20 minutes Time Critical:

Tools/Equipment/Procedures Needed:

NOP-1-0510020, 'Oxygenated Waste System' 1-NOP-06.01, 'Controlled Liquid Release to the Circulating Water Discharge' Personal Protective Equipment SNPO Shift Keys 2-Way Radio Flashlight Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

  • None Radiological Protection and RWP Requirements:
  • RWP Required NRC P-1 Rev. 0 Unit 1 RCA Page 2 of 12

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Release 1A Waste Monitor Tank Contents
  • The performance level to be used for this JPM is Simulate
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 1 is at 100% power with all systems operable. The Unit 1 Unit Supervisor has directed the 1A Waste Monitor Tank to be discharged. Section 6.1 of 1-NOP-06.01, Controlled Liquid Release to the Circulating Water Discharge, has been completed. Channel R-6627, Liquid Waste Monitor is in Service. Appendix E, Step 1.A of NOP 1-0510020, Oxygen Waste System, has been completed.

INITIATING CUES:

You are the Unit 1 SNPO. You have been directed by the Unit 1 Unit Supervisor to release the contents of 1A Waste Monitor Tank using the 1A Waste Monitor Pump, in accordance with section 6.3 of 1-NOP-06.01, Controlled Liquid Release to the Circulating Water Discharge. Begin with NOP-051 0020, Oxygenated Waste System, Appendix E, Step 2.8 NRC P-1 Rev. 0 Unit 1 RCA Page 3 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME:----

NOP-1-050020, Appendix E, Step 2.B STEP 1 :(2.B} At the Liquid Waste Control Panel (RAB/19.5 el) ENSURE Control Switch CRITICAL for HCV-06-6 is selected to FILLING TANK B. STEP STANDARD: POSITION the Control Switch for HCV-06-6 to FILLING TANK B. - - SAT EXAMINER'S CUE: Control Switch is in the FILLING TANK B position.

- - UNSAT COMMENTS:

STEP 2:(2.C} Ensure the following components are positioned as follows:

CLOSE V06221, 1A/1 B WMT Outlet Crossover lsol - - SAT STANDARD: VERIFY V06221 is CLOSED.

- - UNSAT EXAMINER'S CUE: V06221 is CLOSED.

COMMENTS:

STEP 3 (2.C} Ensure the following components are positioned as follows:

CLOSE V06222, 1A/1 B WMT Recirc Crossover lsol

- - SAT STANDARD: VERIFY V06222 is CLOSED.

- - UNSAT EXAMINER'S CUE: V06222 is CLOSED.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-1 Rev. 0 Unit 1 RCA Page 4 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4:(2.C} Ensure the following components are positioned as follows:

CLOSE V06215, 1A Waste Monitor Pump Disch lsol - - SAT STANDARD: VERIFY V06215 is CLOSED.

- - UNSAT EXAMINER'S CUE: V06215 is CLOSED.

COMMENTS:

STEP 5:(2.C} Ensure the following components are positioned as follows:

OPEN V06207, 1A Waste Monitor Tank Outlet lsol

- - SAT STANDARD: VERIFY V06207 is OPEN.

- - UNSAT EXAMINER'S CUE: V06207 is OPEN.

COMMENTS:

STEP 6:(2.C} Ensure the following components are positioned as follows:

OPEN V06208, 1A Waste Monitor Pump Suet lsol - - SAT STANDARD: VERIFY V06208 is OPEN.

- - UNSAT EXAMINER'S CUE: V06208 is OPEN.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-1 Rev. 0 Unit 1 RCA Page 5 of 12


~~~~~~--~~~~~--~~~~~-

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7:(2.C} Ensure the following components are positioned as follows:

OPEN V06220, 1A Waste Monitor Pump Disch Recirc lsol - - SAT STANDARD: VERIFY V06220 is OPEN.

- - UNSAT EXAMINER'S CUE: V06220 is OPEN.

COMMENTS:

STEP 8:(2.D} Record level in the 1A Waste Monitor Tank.

- - SAT STANDARD: RECORD the level of the 1A Waste Monitor Tank.

EXAMINER'S CUE: 1A Waste Monitor Tank level is 80%. - - UNSAT COMMENTS:

STEP 9:(2.E} Locally START the 1A Waste Monitor Pump, using the local pushbutton CRITICAL station located in B-141C (adjacent to the pump). STEP STANDARD: DEPRESS the local start pushbutton. - - SAT EXAMINER'S CUE: The button has been depressed, and the pump is running. - - UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-1 Rev. 0 Unit 1 RCA Page 6 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10:(2.F} If the Pump fails to start, Then refer to PRECAUTIONS/LIMITATIONS., Sec 5.6.

- - SAT STANDARD: Determines step is N/A.

- - UNSAT EXAMINER'S CUE: None.

COMMENTS:

STEP 11 :(2.G} THROTTLE valve V06220, 1A WMT Pump Disch Recirc, to obtain a CRITICAL pressure reading of 20-25 psig on PI-06-47A STEP STANDARD: POSITION V06220 to attain 20 to 25 psig on PI-06-47A. - - SAT EXAMINER'S CUE: V06220 is THROTTLED.

1A Waste Monitor Pump Pressure is 23 psig as - - UNSAT indicated on Pl-06-47 A.

COMMENTS:

STEP 12:(2.H} If unable to obtain a reading of 20-25 psig on PI-06-47A, stop the 1A Waste Monitor Pump and recheck lineup.

- - SAT STANDARD: Determine step is N/A.

- - UNSAT EXAMINER'S CUE: None.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-1 Rev. 0 Unit 1 RCA Page 7 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13:(2.1} Ensure level in the 1A Waste Monitor Tank is not decreasing.

- - SAT STANDARD: OBSERVE 1A Waste Monitor Tank level.

EXAMINER'S CUE: 1A Waste monitor Tank Level is 80%. - - UNSAT COMMENTS:

STEP 14:(2.J} Inform Chemistry and the Control Room that the 1A Waste Monitor Tank is on recirculation with the 1A Waste Monitor Pump .. - - SAT STANDARD: NOTIFY the Control Room & Chemistry via radio or telephone.

EXAMINER'S CUE: Chemistry acknowledges the communication.

- - UNSAT The Control Room acknowledges the communication, and directs continuing with the release of the 1A Waste Monitor Tank.

EVALUATOR'S NOTE: If asked, the Control Room will notify Chemistry.

COMMENTS:

STEP 15:(2.K} If the 1A Waste Monitor Tank is to be released, Then GO TO 1-NOP-06.01, Controlled Liquid Release to the Circulating Water Discharge. - - SAT STANDARD: GO TO 1-NOP-06.01

- - UNSAT EXAMINER'S CUE: None COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-1 Rev. 0 Unit 1 RCA Page 8 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 1-NOP-06.01, Section 6.3:

To Discharge the 1A Waste Monitor Tank, Using the 1A Waste Monitor Pump CAUTION STEP 16(6.3.1) If the Liquid Waste Monitor is Out of Service OR the affected Waste Monitor - - SAT Tank is to be drained completely The two independent valve alignments shall be performed to verify the discharge line valving.

- - UNSAT ENSURE appropriate section of NOP-1-0510020 Appendix E has been completed.

STANDARD: ENSURE appropriate section of NOP-1-0510020 Appendix E has been completed.

EXAMINER'S CUE: Appendix E has been completed.

COMMENTS:

STEP 16:(6.3.2)1f the Liquid Waste Monitor is Out of Service OR the affected Waste Monitor Tank is to be drained completely The two independent valve alignments - - SAT shall be performed to verify the discharge line valving.

STANDARD: From the initial conditions, determine step is N/A. - - UNSAT EXAMINER'S CUE: (If asked) The Liquid Waste Discharge Monitor is in service.

COMMENTS:

STEP 17:(6.3.3)0PEN V06215, 1A Waste Monitor Pump Discharge Isolation. CRITICAL STEP STANDARD: POSITION V06215 to OPEN

- - SAT EXAMINER'S CUE: V06215 is OPEN.

- - UNSAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-1 Rev. 0 Unit 1 RCA Page 9 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 18:(6.3.4)1f the Pump Discharge pressure does not return to approximately 20- 25 psig, Then PERFORM the following. - - SAT STANDARD: OBSERVE PI-06-47A, 1A Waste Monitor Pump Press indicates 20 to 25 psig. - - UNSAT EXAMINER'S CUE: PI-06-47A, 1A Waste Monitor Pump Press indicates 22 psig.

COMMENTS:

STEP (6.3.5): RECORD the following Liquid Release data in Section IV of the Liquid release permit. - - SAT STANDARD: N/A RCO step.

- - UNSAT EXAMINER'S CUE: RCO has recorded the required information COMMENTS:

CRITICAL STEP STEP (6.3.6): LOCK OPEN V21462, Waste Monitor Pump Discharge to Discharge Canal Isolation.

STANDARD: Opens and Locks V21462

- - SAT EXAMINER'S CUE: V21462 is opened and locked.

- - UN SAT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-1 Rev. 0 Unit 1 RCA Page 10 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CRITICAL STEP (6.3.7): At the Liquid Release Control Panel, PLACE a magnetic "LIQUID RELEASE" STEP placard beneath LIS-06-4 7-1 A SAT STANDARD: Places "LIQUID RELEASE" placard beneath LIS-06-47-1A UN SAT EXAMINER'S CUE: "LIQUID RELEASE" placard beneath LIS-06-47-1A has been placed.

EXAMINERS CUE: JPM is complete.

COMMENTS:

STOP TIME: - - - -

  • Cues are to be used only if JPM performance is being simulated in the plant.

NRC P-1 Rev. 0 Unit 1 RCA Page 11 of 12

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 1 is at 100% power with all systems operable. The Unit 1 Unit Supervisor has directed the 1A Waste Monitor Tank to be discharged. Section 6.1 of 1-NOP-06.01, Controlled Liquid Release to the Circulating Water Discharge, has been completed. Channel R-6627, Liquid Waste Monitor is in Service. Appendix E of NOP 1-0510020, Oxygen Waste System, has been completed.

INITIATING CUES:

You are the Unit 1 SNPO. You have been directed by the Unit 1 Unit Supervisor to release the contents of 1A Waste Monitor Tank using the 1A Waste Monitor Pump, in accordance with section 6.3 of 1-NOP-06.01, Controlled Liquid Release to the Circulating Water Discharge. Begin with NOP-051 0020, Oxygenated Waste System, Appendix E, Step 2.8.

NRC P-1 Rev. 0 Page 12 of 12

fj FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE DISCONNECT 1 B INSTRUMENT INVERTER FROM SERVICE FOR PREVENTIVE MAINTENANCE - UNIT 1 1 B Battery Charger Room NRC P-2 Developed/Revised by: _ _ _L_a_rry,._R_i_ch_ __

Date Technical Review: - - - - - - - -

Date Training Management Approval: _ _ _ _ _ _ __

Date NRC JPM P-2 Rev 0 1B Battery Charger Room Page 1 of9

JOB PERFORMANCE MEASURE Disconnect the 1B 120V Instrument Inverter from service on Unit 1.

Faulted JPM? No Facility JPM #: 0821067 KIA: Knowledge of the physical connections and/or cause effect relationships between the ac distribution system and the following systems: K1.03 DC distribution KIA Rating(s): 3.5 I 4.0 Duty Area(s): NA Task Information: NA Task Standard:

This JPM is complete when the Control Room has been notified that the 1B Instrument Inverter has been transferred to the Maintenance Bypass Bus and the 1B Instrument Inverter is out of service.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

1-NOP-49.05B, "120 VAC Instrument Bus 1MB (Class 1E) Normal Operations" Validation Time: 10 minutes Time Critical:

Tools/Equipment/Procedures Needed:

  • 1-NOP-49.05B, "120 VAC Instrument Bus 1MB (Class 1E) Normal Operations" Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • Normal PPE for in-plant Radiological Protection and RWP Requirements:
  • None NRC JPM P-2 Rev 0 1B Battery Charger Room Page 2 of 9

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Disconnect the 1B 120V Instrument Inverter from service.
  • The performance level to be used for this JPM is Simulate
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 1 is at 100% power and stable with each instrument bus aligned to receive power from its respective inverter. The 1B Instrument Inverter is to be removed from service for preventive maintenance.

INITIATING CUES:

You are the SNPO. The US has directed you to remove 1B 120V Instrument Inverter from service by placing it on the Maintenance Bypass Bus in accordance with 1-NOP-49.05B, "120 VAC Instrument Bus 1MB (Class 1E) Normal Operations". Consider all Concurrent Verifications complete. Step 1, Initiating an Equipment Out Of Service Log entry has been completed.

NRC JPM P-2 Rev 0 1B Battery Charger Room Page 3 of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: _ _ __

1-NOP-49.05B, "120 VAC Instrument Bus 1MB {Class 1E) Normal Operations" Step 4.1 Remove Instrument Inverter from Service (Shifting Loads to Maintenance Bypass Bus)

STEP 1 (4.1.2): At Instrument Bus Transfer Panel 1B, VERIFY switch 1010-2, TRANSFER SWITCH 1MD, is positioned to INVERTER 1D. _ _ SAT STANDARD: VERIFY switch 1010-2 is positioned to INVERTER 1D. _ _ UNSAT EXAMINER'S CUE: Switch 1010-2 is positioned to Inverter 10.

COMMENTS:

STEP 2 (4.1.3): At 1B Maint Bypass Bus, PLACE breaker CKT 13 (Feed to Instrument Bus CRITICAL 1MB) in ON. STEP

_ _ SAT STANDARD: POSITION 1B Maint Bypass Bus CKT 13 Breaker to ON.

EXAMINER'S CUE: CKT 13 Breaker is ON _ _ UNSAT EXAMINER'S NOTE: If CKT 13 breaker is already ON, then the standard for this step is VERIFY, and it no longer a critical step.

COMMENTS:

NRC JPM P-2 Rev 0 1 B Battery Charger Room Page 4 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (4.1.4}: At Instrument Bus Transfer Panei1B, VERIFY 1010-2, MAINT BYPASS BUS 1B FEED, power available light is ON.

- - SAT STANDARD: VERIFY light 1010-2 is ON at Bus Transfer Panel 1B.

EXAMINER'S CUE: Light 1010-2 is ON - - UNSAT COMMENTS:

STEP 4 (4.1.5}: At 1B Maint Bypass Bus, VERIFY breaker CKT 3 (Sync Signal to Inverter 1B) in ON.

STANDARD: VERIFY Inverter 1B Maint Bypass Bus 1B CKT 3 Breaker is ON. - - SAT EXAMINER'S CUE: CKT 3 Breaker is ON.

- - UNSAT COMMENTS:

STEP 5 (4.1.6}: At 1MB Instrument Inverter, VERIFY IN SYNC light is ON.

STANDARD: VERIFY IN at 1MB Instrument Inverter that the IN SYNC light is ON.

- - SAT EXAMINER'S CUE: IN SYNC light on Inverter 1MB is ON

- - UNSAT COMMENTS:

NRC JPM P-2 Rev 0 1B Battery Charger Room Page 5 of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (4.1.7}: IF the IN SYNC light is OFF, THEN STOP procedure and NOTIFY Electrical Maintenance. - - SAT STANDARD: DETERMINE step is N/A

- - UNSAT EXAMINER'S CUE: None COMMENTS:

STEP 7 (4.1.8}: At Instrument Bus Transfer Panei1B, PLACE 1010-1, TRANSFER CRITICAL SWITCH 1MB, in MAINT BYPASS BUS 1 B. STEP STANDARD: POSITION 1010-1 in MAINT BYPASS BUS 1B. - - SAT EXAMINER'S CUE: 1010-1 is in MAINT BYPASS BUS 1B.

- - UNSAT COMMENTS:

STEP 8 (4.1.9}: NOTIFY the Control Room That Instrument Bus 1MB is being powered from Maintenance Bypass Bus 1B STANDARD: NOTIFY Control Room that 1MB Instrument Bus is now being powered from - - SAT the Maintenance Bypass Bus.

EXAMINER'S CUE: CONTROL ROOM ACKNOWLEDGES - - UNSAT COMMENTS:

NRC JPM P-2 Rev 0 1 B Battery Charger Room Page 6 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9 (4.1.1 0): At 1MB Instrument Inverter, PLACE the following breakers in OFF: CRITICAL STEP A. 1MB-B4, BYPASS SOURCE A.C. INPUT B. 1MB-B2, INVERTER OUTPUT _ _ SAT C. 1MB-B1 DC INPUT I

STANDARD: POSITION Breakers, 1MB-B4, 1MB-B2, and 1MB-B1 on Inverter 1MB to _ _ UNSAT OFF in that order EXAMINER'S CUE: As Student positions these Breakers, cue that the respective breaker is OFF COMMENTS:

STEP 10 (4.1.11): At 125V DC Bus 1B, PLACE Bkr 1-60224, INVERTER 1B in OFF. CRITICAL STEP STANDARD: POSITION DC Bus 1B Breaker 1-60224 to OFF SAT EXAMINER'S CUE: Breaker 1-60224 is OFF

_ _ UNSAT COMMENTS:

STEP 11 (4.1.12): At 1B Maint Bypass Bus, PLACE breaker CKT 3 (Sync Signal to Inverter CRITICAL 1B) in OFF. STEP SAT STANDARD: POSITION Maintenance Bypass Bus 1B CKT 3 Breaker to OFF EXAMINER'S CUE: CKT 3 breaker is OFF _ _ UNSAT COMMENTS:

NRC JPM P-2 Rev 0 1B Battery Charger Room Page 7 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (4.1.13 done): Notify the Control Room the 1B inverter is removed from service.

STANDARD: NOTIFY the Control Room that 1MB Instrument Inverter is removed from service SAT EXAMINER'S CUE: CONTROL ROOM ACKNOWLEDGES UNSAT COMMENTS:

END OF TASK STOP TIME: _ _ __

NRC JPM P-2 Rev 0 1 B Battery Charger Room Page 8 of 9

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 1 is at 100% power and stable with each instrument bus aligned to receive power from its respective inverter. The 1B Instrument Inverter is to be removed from service for preventive maintenance.

INITIATING CUES:

You are the SNPO. The US has directed you to remove 1B 120V Instrument Inverter from service by placing it on the Maintenance Bypass Bus in accordance with 1-NOP-49.05B, "120 VAC Instrument Bus 1MB (Class 1E) Normal Operations". Consider all Concurrent Verifications complete. Step 1, initiating an Equipment Out Of Service Log entry has been completed.

Page 9 of9


Date Tech Review N/A


~---

Ops Review Required for Rev 0/Major Revisions Date Approval Terry Benton 02116/2010


~-------------

Date NRC P-3 Rev 0 Page 1 of 10

Job Performance Measure Task Number:

Task

Title:

Align AFW System in Response to Component Malfunction/Failure Faulted JPM: DYes [8J No Facility JPM # N/A KIA Ratings: 061-K4.01 Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: Water sources and priority of use 4.1/ 4.2 Duty Areas: N/A Task Information: N/A Task Standard: N/A Evaluation Location Performance Level D Simulator C8J In Plant D Perform C8J Simulate D Discuss 0Lab 0 Other

References:

  • 1-AOP-09.02, "Auxiliary Feedwater" Validation Time: 15 Minutes Time Critical D Yes C8J No Tools/Equipment/Procedures Needed:
  • Standard Personal Protective Equipment
  • Flashlight
  • Radio
  • Watch Stander Key Ring for Locked Valves
  • None.

Radiological Protection and RWP Requirements:

  • None NRC P-3 Rev 0 Page 2 of 10

Job Performance Measure Specific Directions:

  • The Task you are to perform is: Align Unit 2 CST to Supply 1C AFW Pump
  • The performance level to be used for this JPM is Perform or Simulate.

(Circle the performance level being used for this implementation of the JPM.)

  • This Is Not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

Initial Conditions:

Unit 1 is experiencing a Total Loss ofFeedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.

Initiating Cues:

You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump lAW 1-AOP-09 .02, "Auxiliary Feedwater," Attachment 5, Steps l.A through l.D, and l.F .1 through l.F .4.

NRC P-3 RevO Page 3 of 10

Job Performance Measure PERFORMANCE CHECKLIST Start Time:

1-AOP-09.02, "Auxiliary Feedwater,"

Attachment 5 A. Notify Unit 2 Control Room.

STEP 1.{1}

NOTIFY Unit 2 Control Room that Unit 2 CST will be Standard:

ALIGNED to supply the 1C AFW Pump. - - Sat

- - Unsat Examiner's Unit 2 Control Room ACKNOWLEDGES Cue:

NOTE Comments:

In the event Unit 2 CST is utilized to supply condensate to Unit 1, a minimum of 182,000 gallons (19'6") must be maintained in the Unit 2 CST unless Unit 2 is in Modes 4, 5, or 6. This is to ensure that Unit 2 has the capability to cool the RCS to less than 350 degrees.

CAUTION

  • During the performance of this attachment, close communications with the Unit 2 Control Room must be maintained to ensure administrative requirements and safety issues are considered in regards to both units.
  • In the event the Unit 1 AFW Pump suction pressure decreases to 3 psig during the performance of this attachment, the AFW Pump discharge valves must be throttled to maintain suction pressure.
  • Performance of this attachment will require Unit 1 to enter action statement for Tech. Spec. 3.7.1.2 and 3.7.1.3. Unit 2 will be in action statement for Tech.

Spec. 3. 7 .1.3 and possibly 3. 7 .1.2 depending on valve selection in Attachment 5 Step 1.C.

NRC P-3 RevO Page 4 of 10

Job Performance Measure STEP 2.{1} B. ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF.

- - Sat Standard: ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF by calling the Unit 1 Control Room OR physically - - Unsat checking the AFW pumps.

All Unit 1 Auxiliary Feedwater pumps are OFF.

Examiner's Cue:

Comments:

C. At the Unit 2 CST, PERFORM one of the following to Critical Step STEP 3{1}.

establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps:

1. IF the Unit 2 CST level is greater than 40 feet, THEN - - Sat OPEN V12803, CST INLET TO I FROM UNIT 1 ISOL.

(CST/23/N-6/E-21) - - Unsat Standard: UNLOCK and POSITION V12803 to OPEN and then RELOCK.

Examiner's V12803 is OPEN and LOCKED.

Cue:

Initiating Cue gives Unit 2 CST level as 43 Feet. Valve Comments:

does not have to be re-locked to meet the Critical Step.

NRC P-3 Rev 0 Page 5 of 10

Job Performance Measure STEP 3(1). C. At the Unit 2 CST, PERFORM one of the following to establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps: - - Sat

2. IF the Unit 2 CST level is less than or equal to 40 feet, THEN PERFORM one of the following: - - Unsat
  • OPEN V12801, 2C AFW PUMP SUCT TO I FROM UNIT 1 ISOL. (CST/23/N-141E-20)
  • OPEN V12802, 2A/2B AFW PUMP SUCT TO I FROM UNIT 1 ISOL. (CSTI23/N-141E-20)

Determined to be NA, due to initiating cue.

Standard:

Examiner's Initiating Cue gives Unit 2 CST level as 43 Feet.

Cue:

Comments:

D. OPEN V12805, CST CROSSTIE TO UNIT 1 ISOL. Critical Step STEP 4 (1}.

(CSTI24/N-6851E-1191)

Standard: UNLOCK and POSITION V12805 to OPEN. - - Sat

- - Unsat V12805 is OPEN.

Examiner's Cue:

Comments: Valve does not have to be re-locked to meet the Critical Step.

NRC P-3 Rev 0 Page 6 of 10

Job Performance Measure F. To supply 1C AFW pump, PERFORM the following: Critical Step STEP 5{1}.

(1) CLOSE V12506, CST OUTLET TO 1C AFW PUMP SUCT ISOL at the Unit 1 CST. (CST/23/N-9/E-19)

- - Sat Standard: UNLOCK and POSITION V12506 to CLOSE. - - Unsat Examiner's V12506 is CLOSED.

Cue:

Comments: Valve does not have to be re-locked to meet the Critical Step.

F. To supply 1C AFW pump, PERFORM the following: Critical Step STEP 6{1}.

(2) OPEN V12175, TO/FROM UNIT 2 FROM 1C AFW PUMP SUCT LINE ISOL, at the Unit 1 CST. (CST/21/N-13/E-24)

- - Sat Standard: UNLOCK and POSITION V12175 to OPEN.

- - Unsat Examiner's V12175 is OPEN.

Cue:

Comments: Valve does not have to be re-locked to meet the Critical Step.

NRC P-3 Rev 0 Page 7 of 10

Job Performance Measure F. To supply 1C AFW pump, PERFORM the following:

STEP 7(1}.

  • (3) ENSURE PI-12-18C, 1C AFW PUMP SUCT PRESS, - - Sat instrument isolation valve is OPEN. (TRSL/27/N-T3/W-TA) - - Unsat Standard: POSITION Pl-12-18C instrument isolation to OPEN.

Examiner's PI-12-18C instrument isolation valve is OPEN.

Cue:

Comments:

F. To supply 1C AFW pump, PERFORM the following:

STEP 80}.

(4) VERIFY greater than 3 psig suction pressure on PI 18C, 1C AFW PUMP SUCTION PRESSURE. - - Sat

- - Unsat Standard: VERIFY GREATER THAN 3 psig on PI-12-18C.

Examiner's PI-12-18C INDICATES 15 psig.

Cue:

Comments:

NRC P-3 Rev 0 Page 8 of 10

Job Performance Measure F. To supply 1C AFW pump, PERFORM the following: Critical Step STEP 9{1}.

(5) IF feeding S/Gs with the 1C Auxiliary Feedwater Pump, THEN PERFORM the following:

- - Sat

a. CLOSE V09300, 1C AFW PUMP RECIRC ISOL.

(TRSL/23-N-T3/W-TA)

- - Unsat Standard: POSITION V09300, 1C AFW PUMP RECIRC ISOL. to CLOSE Examiner's The 1C AFW will be used to feed the SG's Cue: V09300, 1C AFW PUMP RECIRC ISOL. is closed Comments:

STEP 10{1} S.b. START 1C AUXILIARY FEEDWATER PUMP Standard: NOTIFY Unit 1 Unit Supervisor that 1C AFW Pump is - - Sat lined up to take a suction on the Unit 2 CST IAW 1-AOP-09.02, "Auxiliary Feedwater". - - Unsat Examiner's Unit 1 Unit Supervisor ACKNOWLEDGES.

Cue:

Comments: If candidate continues onward, then inform him "This JPM is complete."

END OF TASK Stop Time: _ _

NRC P-3 Rev 0 Page 9 of 10

Job Performance Measure CANDIDATE CUE SHEET Initial Conditions:

Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.

Initiating Cues:

You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump IAW 1-AOP-09 .02, "Auxiliary Feedwater," Attachment 5, Steps LA through l.D, and l.F.l through l.F.4.

NRC P-3 RevO Page 10 of 10