L-2020-038, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Preparation and Scheduling of Operator Licensing Examinations
ML20066K589
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/06/2020
From: Godes W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2020-038
Download: ML20066K589 (2)


Text

U.S. Nuclear Regulatoi-y Commission Attn: Document Control Desk Washington, DC 20555 RE:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 MAR 0 6 2020 NRC Regulatoi-y Issue Summai-y 2020-01 Preparation and Scheduling of Operator Licensing Examinations L-2020-038 10 CFR 50.4 On Februai-y 19, 2020, NRC issued Regulatoi-y Issue Summai-y (RIS) 2020-01, Preparation and Sched11ling if Operator Licensing Examinations. RIS 2020-01 requests licensees to submit, on a volunta1y basis, information pertaining to their proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take operator licensing examinations, as well as whether the licensee or the NRC will prepare the examinations. The NRC stated that this info1mation would help the NRC to more effectively utilize its resources. A response was requested within 30 days of receipt of RIS 2020-01.

Attached please find the completed NRC Form 536, Operator Licensing Examination Data, for St.

Lucie Units 1and2.

Please contact Mr. Seth Duston at (772) 429-7831 or Mr. Brad Hinze at (772) 467-7350 if there are questions regarding this submittal.

V ei-y truly yours, wllT?~

itt~s Licensing Manager St. Lucie Plant WG/kp Attachment cc: Eugene Guthrie, DRS, OB2, RII Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

NRG FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~~.J>'°JIEO(l('f.I\\

Estimated burden per response to comply with this voluntal)' information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

+

o.,

OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.

Send

~

~

0 comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear

~~

EXAMINATION DATA Regulatol)' Commission, Washington, DC20555-000 I, or by e-mail to lnfocollects.Resource@nrc.gov,

~

"'/+.,

y.0-tt and to the Desk Officer, Office of Information and Regulatol)' Affairs, NEOB-10202, (3150-0131), Office of Management and Budget. Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMS control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRG REGION Jst. Lucie Plant I Irr I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 22 CY 23 CY 24 CY 25 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS

8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 22 CY 23 CY 24 CY 25 NUMBER OF REACTOR 4

4 OPERATORS NUMBER OF SENIOR REACTOR 6

6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 3/27/23 4/14/25 ALTERNATE DATE 4/24/23 5/12/25 NRC FORM 536 (11-201 7)