MONTHYEARML22332A0562022-11-21021 November 2022 301 License Exam Corporate Notification Letter L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment L-2021-146, Change Requested to Schedule of Operator Licensing Examination2021-07-19019 July 2021 Change Requested to Schedule of Operator Licensing Examination ML21137A3652021-05-13013 May 2021 Plan, Unit 1 and 2, Operator Licensing Retake Written Examination Approval 05000335/2021301 and 05000389/2021301 ML21083A1332021-03-19019 March 2021 Notification of Licensed Operator Intake Initial Examination 05000335/2021301 and 05000389/2021301 ML21034A5192021-02-0303 February 2021 1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key ML21034A5312021-02-0303 February 2021 1B Psl 2020-301 NRC Exam Post Exam Comments and References_Redacted (PII Redacted) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21193A0872020-12-16016 December 2020 File 2A3 Exam Administrative Items ML21193A1052020-12-16016 December 2020 File 2A2 Exam Final Items ML21193A0522020-12-16016 December 2020 File 2B Normal Release Exam Administrative Items ML20351A2022020-12-15015 December 2020 301 Written Exam Approval Letter ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20115E3532020-04-24024 April 2020 Psl 2020 Exam Corporate Notification Letter Aka 210-day Letter NUREG Rev 111 L-2020-038, Preparation and Scheduling of Operator Licensing Examinations2020-03-0606 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19158A3312019-06-0707 June 2019 SL-2019-301 Exam Administrative Items (ADAMS 2D) ML19100A2442019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for St. Lucie Nuclear Power Plant ML19099A2902019-04-0909 April 2019 2019 Schedule Confirmation for St. Lucie ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18039A9282018-02-0808 February 2018 301 Exam Report Items RO as Given - Delay Release 2 Yrs ML18039A9332018-02-0808 February 2018 301 Exam Report Items SRO as Given - Delay Release 2 Yrs ML17164A0852017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 IR 05000335/20173012017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 L-2016-033, NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update2016-02-22022 February 2016 NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update ML15201A5382015-07-16016 July 2015 301 Draft Simulator Scenarios ML15201A5642015-07-16016 July 2015 301 Other Documents for Retention ML15201A5612015-07-16016 July 2015 301 Final Administrative JPMs ML15201A5602015-07-16016 July 2015 301 Final Simulator and in Plant JPMs ML15201A5582015-07-16016 July 2015 301 Final Simulator Scenarios ML15201A5572015-07-16016 July 2015 301 Final Administrative Documents ML15201A5532015-07-16016 July 2015 301 Draft Administrative JPMs ML15201A5452015-07-16016 July 2015 301 Draft Simulator and in Plant JPMs ML15201A5372015-07-16016 July 2015 301 Draft SRO Written Exam ML15201A4962015-07-13013 July 2015 301 Draft RO Written Exam ML15201A4942015-07-13013 July 2015 301 Draft Administrative Documents ML15142A4002015-05-21021 May 2015 Initial Exam 2009302 Final Admin Documents ML15142A4012015-05-21021 May 2015 Initial Exam 2009302 Draft Admin Documents ML15097A2692015-04-0707 April 2015 301 Post Exam Comments ML15097A2672015-04-0707 April 2015 301 Final SRO Written Exam ML15097A2642015-04-0707 April 2015 301 Final RO Written Exam ML14318A9192014-11-12012 November 2014 Notification of Licensed Operator Initial Examination 05000335/2015301 and 05000389/2015301 ML13225A1322013-08-0808 August 2013 Initial Exam 2012-301 Draft SRO Written Exam ML13225A1352013-08-0808 August 2013 Initial Exam 2012-301 Draft Simulator Scenarios ML13225A1382013-08-0808 August 2013 Initial Exam 2012-301 Draft Sim/In-plant JPMs ML13225A1402013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative JPMs ML13225A1662013-08-0808 August 2013 Initial Exam 2012-301 Final Administrative Documents 2022-04-20
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22332A0562022-11-21021 November 2022 301 License Exam Corporate Notification Letter L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment L-2021-146, Change Requested to Schedule of Operator Licensing Examination2021-07-19019 July 2021 Change Requested to Schedule of Operator Licensing Examination ML21137A3652021-05-13013 May 2021 Plan, Unit 1 and 2, Operator Licensing Retake Written Examination Approval 05000335/2021301 and 05000389/2021301 ML21083A1332021-03-19019 March 2021 Notification of Licensed Operator Intake Initial Examination 05000335/2021301 and 05000389/2021301 ML21034A5312021-02-0303 February 2021 1B Psl 2020-301 NRC Exam Post Exam Comments and References_Redacted (PII Redacted) ML21034A5192021-02-0303 February 2021 1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21193A0522020-12-16016 December 2020 File 2B Normal Release Exam Administrative Items ML21193A1052020-12-16016 December 2020 File 2A2 Exam Final Items ML21193A0872020-12-16016 December 2020 File 2A3 Exam Administrative Items ML20351A2022020-12-15015 December 2020 301 Written Exam Approval Letter ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20115E3532020-04-24024 April 2020 Psl 2020 Exam Corporate Notification Letter Aka 210-day Letter NUREG Rev 111 L-2020-038, Preparation and Scheduling of Operator Licensing Examinations2020-03-0606 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML19158A3312019-06-0707 June 2019 SL-2019-301 Exam Administrative Items (ADAMS 2D) ML19100A2442019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for St. Lucie Nuclear Power Plant ML19099A2902019-04-0909 April 2019 2019 Schedule Confirmation for St. Lucie ML18039A9282018-02-0808 February 2018 301 Exam Report Items RO as Given - Delay Release 2 Yrs ML18039A9332018-02-0808 February 2018 301 Exam Report Items SRO as Given - Delay Release 2 Yrs ML17164A0852017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 IR 05000335/20173012017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 L-2016-033, NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update2016-02-22022 February 2016 NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update ML15201A5372015-07-16016 July 2015 301 Draft SRO Written Exam ML15201A5642015-07-16016 July 2015 301 Other Documents for Retention ML15201A5612015-07-16016 July 2015 301 Final Administrative JPMs ML15201A5602015-07-16016 July 2015 301 Final Simulator and in Plant JPMs ML15201A5582015-07-16016 July 2015 301 Final Simulator Scenarios ML15201A5572015-07-16016 July 2015 301 Final Administrative Documents ML15201A5532015-07-16016 July 2015 301 Draft Administrative JPMs ML15201A5452015-07-16016 July 2015 301 Draft Simulator and in Plant JPMs ML15201A5382015-07-16016 July 2015 301 Draft Simulator Scenarios ML15201A4962015-07-13013 July 2015 301 Draft RO Written Exam ML15201A4942015-07-13013 July 2015 301 Draft Administrative Documents ML15142A4002015-05-21021 May 2015 Initial Exam 2009302 Final Admin Documents ML15142A4012015-05-21021 May 2015 Initial Exam 2009302 Draft Admin Documents ML15097A2642015-04-0707 April 2015 301 Final RO Written Exam ML15097A2672015-04-0707 April 2015 301 Final SRO Written Exam ML15097A2692015-04-0707 April 2015 301 Post Exam Comments ML14318A9192014-11-12012 November 2014 Notification of Licensed Operator Initial Examination 05000335/2015301 and 05000389/2015301 ML13225A1382013-08-0808 August 2013 Initial Exam 2012-301 Draft Sim/In-plant JPMs ML13225A1282013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative Documents ML13225A1352013-08-0808 August 2013 Initial Exam 2012-301 Draft Simulator Scenarios ML13225A1322013-08-0808 August 2013 Initial Exam 2012-301 Draft SRO Written Exam ML13225A1302013-08-0808 August 2013 Initial Exam 2012-301 Draft RO Written Exam ML13225A1402013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative JPMs ML13225A1722013-08-0808 August 2013 Initial Exam 2012-301 Final Administrative JPMs ML13225A1712013-08-0808 August 2013 Initial Exam 2012-301 Final Sim/In-plant JPMs ML13225A1692013-08-0808 August 2013 Initial Exam 2012-301 Final Simulator Scenarios 2022-04-20
[Table view] |
Text
Attachment I - St. Lucie NRC Examination Facility Comments Question 32 Unit 2 is performing a cooldown per 2-GOP-305, Reactor Plant Cooldown Hot-Standby To Cold Shutdown, for a refueling outage with the following conditions:
Time: 11:30
- RCS pressure is 1750 psia
- 2A & 2B S/Cs are 740 psia Time: 11:32
- 2A Steam Line ruptures outside Containment and just upstream of the MSIV
- RCS pressure is 1630 psia and rapidly lowering
- SG pressures are 580 psia and rapidly lowering Which ONE of the following states:
- 1) What ESFAS actuation(s) must be MANUALLY actuated?
- 2) Which procedure will be implemented to mitigate the event?
A. 1) BOTH MSIS, and SIAS.
- 2) 2-EOP-05, ESDE.
B. 1) ONLY SIAS.
- 2) 2-EOP-05, ESDE.
C. 1) BOTH MSIS, and SIAS.
- 2) 2-ONP-01 .01 Plant Condition 1 Steam Generator Heat Removal LTOP Not in Effect.
D. 1) ONLY SIAS.
- 2) 2-ONP-01 .01 Plant Condition 1 Steam Generator Heat Removal LTOP Not in Effect.
Answer Key: D
References:
2-GOP-305, Reactor Plant Cooldown, Hot Standby to Cold Shutdown ESFAS system description, 0711401 Main Steam system description, 0711304 Applicant question with proctor response for Q.#32 (copy)
Attachment I - St. Lucie NRC Examination Facility Comments Comment: The proper answer to question should be answer selection C.
The applicant should assume, from the given conditions that at time 11:30, based on plant conditions and the procedure in use, that SIAS has been blocked and MSIS is not blocked due to being above the block permissive setpoint (700 psia).
At time 11:32, given plant conditions are as follows:
- RCS pressure is 1630 psia and rapidly lowering
- SG pressures are 580 psia and rapidly lowering Based on this information, RCS pressure is below the SIAS actuation setpoint of 1736 psia decreasing and SC pressures are below the MSIS actuation setpoint of 600 psia decreasing.
Since SIAS is blocked at the time of the event, the operators must manually actuate SIAS.
Given that SC pressures (plural) are 580 psia and rapidly lowering, this means that MSIS did NOT automatically actuate as designed at 600 psia. If it had actuated, then only the faulted steam generator pressure (2A) would continue to lower and the intact SC pressure (2B) would stabilize since the main steam line break was upstream of the 2A SG MSIV (refer to attached drawing).
Since MSIS did not actuate automatically as designed at 600 psia, the operators must manually actuate MSIS in addition to SIAS.
FPL Utility Position: Based on the above discussion, change correct answer to C instead of D.
2
Q-Z REVISION NO.: PROCEDURE TITLE: PAGE:
49 REACTOR PLANT 000LDOWN HOT STANDBY TO COLD
},
SHUTDOWN 16 of 91 PROCEDURE NO.:
2-GOP-305 ST. LUCIE UNIT 2 .INinAL 4.3 RCS 1750-1800 PSIA; Temperature Greater Than 505°F (continued)
NOTE Administrative maximum cooldown rate for Pressurizer is 75°F I hr down to 120°F. (Section 7.1.3, Management Directive 12)
CAUTION With less than 4 RCPs in OPERATION, RCS depressurization to less than 1800 psia should be started as soon as possible to minimizes differential pressure across seal of idle RCP(s) while NO means of seal cooling exists.
(Section 7.1.3, Management Directive 9)
- 9. LOWER RCS pressure between 1750 and 1800 psia, while maintaining RCS temperature greater than 500°F.
(Section 7.1.3, Management Directive 7)
- 10. PLOT Pressurizer cooldown on Attachment 13, Reactor Coolant Cooldown System Curve.
- 11. RECORD Pressurizer cooldown on Attachment 11, Pressurizer Cool down.
NOTE
- Setpoint for SIAS Block permissive is 1836 psia S / G pressure.
- BLOCK keyswitchspnng returns to normal (left) position.
_4> 12. WHEN Annunciator R-8, SIAS CHANNEL A I B ACTUATION BLOCK PERMISSIVE alarms, THEN BLOCK SIAS as follows:
A. VERIFY Annunciator R-8, SIAS CHANNEL A I B ACTUATION BLOCK PERMISSIVE, is IN ALARM.
B. BLOCK CHANNEL A SIAS as follows:
(1) VERIFY amber light above SIAS BLOCK CHANNEL A keyswitch is ON.
(2) Momentarily PLACE SIAS BLOCK CHANNEL A keyswitch in BLOCK position. (Key 99)
REVISION NO.: PROCEDURE TITLE: PAGE:
49 REACTOR PLANT 000LDOWN HOT STANDBY TO COLD SHUTDOWN 21 of 91 PROCEDURE NO.:
2-GOP-305 ST. LUCIE UNIT 2 INI14AL 4.4 Preparation for RCS Cooldown (continued)
- 5. (continued)
F. ENSURE hose installed at V07166, routed to floor drain.
Person notified:___________________ Time:
4.5 Commencing RCS Cooldown NOTE Cooldown for refueling outage will typically require a Chemistry hold up to six hours prior to commencement of cooldown less than 500°F.
- 1. IF an RCS cooldown has NOT yet been started, THEN START RCS cooldown per Section 4.3, Step 3.
- 2. REDUCE ROS temperature and pressure tising Attachment 13, Reactor Coolant Cooldown System Curve.
NOTE
- Setpoint for MSIS Block permissive is 685 psia S I G pressure which corresponds to an RCS temperature of 503°F.
- MSIS Block keyswitch spring returns to normal (left) position.
- 3. WHEN the fOllowing annunciators are IN ALARM, THEN BLOCK MSIS:
- P-18, MSIS CHANNEL A ACTUATION BLOCK PERMISSIVE
- P-20, MSIS CHANNEL B ACTUATION BLOCK PERMISSIVE A. BLOCK MSIS CHANNEL A as follows: (Key 21)
(1) VERIFY amber light above MSIS BLOCK CHANNEL A keyswitch is ON.
(2) Momentarily PLACE MSIS BLOCK CHANNEL A keyswitch to BLOCK position.
(3) VERIFY red light above MSIS BLOCK CHANNEL A keyswitch is ON.
IV
PSLOPS 0711401, Rev. 19 Page 34 of 58 FOR TRAINING USE ONLY SYSTEM DATA ESFAS DATA TABLE SIGNAL PARAMETER APPROXIMATE DESIGN BASES SETPOINT EVENT UNIT1 UNIT2 C SIAS LQ_Pzr-P.ressure-- _jOO psia 1736 psia LOCA HI Cntmt Pressure 5.0 psig 3.5psig CIS HI Cntmt Pressure 5.0 psig 3.5 psig LOCA
[CIAS] SIAS Actuation HI Cntmt Radiation 10 R/hr 10 R/hr (Refueling) 90 mr/hr 90 mr/hr MS,I L S/G Pressure 600 psia 600 psia Stm Line Break
[HI Cntrnt Pressure] NiA 3.5psig L- J CSAS HI Cntmt Pressure 10 psig 5.4 psig LOCA with SIAS Actuation w/SIAS w/SIAS Stm Line break RAS LO RWT Level 4 ft. 6 ft. LOCA DSS* HI Pzr Pressure 2450 psia 2450 psia ATWS total loss of FW with No RPS trip NOTE: The AFAS-1 and AFAS-2 signals are considered by the FSAR and Technical Specification to be part of the ESFAS. For instructional purposes, due to the difference in flowpath and operational design, they are taught in the AFAS/Auxiliary Feedwater Lesson Text.
Loss of power to safety related buses is addressed in the ESFAS Technical Specifications, but is addressed instructionally in Main Power Distribution text.
The DSS is not an ESFAS signal, but is functionally identical to other ESFAS signals.
Since the DSS equipment is located in the ESFAS cabinets, it is described in this text.
SIMPLIFIED DRAWING OF MAIN STEAM (UNIT 2) tXl CONDENSER PCV 2A SBCS 8804 VALVES ATMOSPHERIC SINCERS PCV 2B DUMP VALVES 8802 M MAIN STEAM SAFETY VALVES AIR )
MSIV FE-801 I M
T TCV T1 CROSS TCV1iID TCV I
ZIoN AUXILIARY STEAM REDUCERS & MSR2A MSR 28 AUXILIARY PRIMING EJECTORS fl HOGGING EJECTORS C STARTUP STEAM SUPPLY HP TURBINE m GLAND SEAL STEAM SILENCERS STARTUP MSR2D MSR2C SThAU SUPPLY I ATUOSPHERIC M
Li DUMP VALVES TCV TCV TCV FE8021 I Q Cl)
-10 MAIN STEAM SAFETY VALVES
- UXIUARY SBCS VALVES I
PCV 8805 PCV 8801 2B CONDENSER 28 z
0 Cl) c EED PUMP (STEAM DRIVEN) CONDENSER m
PCV 2A UM I 8803 Z-+.
(T/RCO/071 1304-F2-R9) -< . I..)
-D U)
C 4
(U E
Cu w c ZLC) 0 (j) a)
)
(
7
-j) z C
0 U
0 C
0 LI)
U)
C