|
---|
Category:License-Operator
MONTHYEARML22332A0562022-11-21021 November 2022 301 License Exam Corporate Notification Letter L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment L-2021-146, Change Requested to Schedule of Operator Licensing Examination2021-07-19019 July 2021 Change Requested to Schedule of Operator Licensing Examination ML21137A3652021-05-13013 May 2021 Plan, Unit 1 and 2, Operator Licensing Retake Written Examination Approval 05000335/2021301 and 05000389/2021301 ML21083A1332021-03-19019 March 2021 Notification of Licensed Operator Intake Initial Examination 05000335/2021301 and 05000389/2021301 ML21034A5192021-02-0303 February 2021 1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key ML21034A5312021-02-0303 February 2021 1B Psl 2020-301 NRC Exam Post Exam Comments and References_Redacted (PII Redacted) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21193A0872020-12-16016 December 2020 File 2A3 Exam Administrative Items ML21193A1052020-12-16016 December 2020 File 2A2 Exam Final Items ML21193A0522020-12-16016 December 2020 File 2B Normal Release Exam Administrative Items ML20351A2022020-12-15015 December 2020 301 Written Exam Approval Letter ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20115E3532020-04-24024 April 2020 Psl 2020 Exam Corporate Notification Letter Aka 210-day Letter NUREG Rev 111 L-2020-038, Preparation and Scheduling of Operator Licensing Examinations2020-03-0606 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19158A3312019-06-0707 June 2019 SL-2019-301 Exam Administrative Items (ADAMS 2D) ML19100A2442019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for St. Lucie Nuclear Power Plant ML19099A2902019-04-0909 April 2019 2019 Schedule Confirmation for St. Lucie ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18039A9282018-02-0808 February 2018 301 Exam Report Items RO as Given - Delay Release 2 Yrs ML18039A9332018-02-0808 February 2018 301 Exam Report Items SRO as Given - Delay Release 2 Yrs ML17164A0852017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 IR 05000335/20173012017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 L-2016-033, NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update2016-02-22022 February 2016 NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update ML15201A5382015-07-16016 July 2015 301 Draft Simulator Scenarios ML15201A5642015-07-16016 July 2015 301 Other Documents for Retention ML15201A5612015-07-16016 July 2015 301 Final Administrative JPMs ML15201A5602015-07-16016 July 2015 301 Final Simulator and in Plant JPMs ML15201A5582015-07-16016 July 2015 301 Final Simulator Scenarios ML15201A5572015-07-16016 July 2015 301 Final Administrative Documents ML15201A5532015-07-16016 July 2015 301 Draft Administrative JPMs ML15201A5452015-07-16016 July 2015 301 Draft Simulator and in Plant JPMs ML15201A5372015-07-16016 July 2015 301 Draft SRO Written Exam ML15201A4962015-07-13013 July 2015 301 Draft RO Written Exam ML15201A4942015-07-13013 July 2015 301 Draft Administrative Documents ML15142A4002015-05-21021 May 2015 Initial Exam 2009302 Final Admin Documents ML15142A4012015-05-21021 May 2015 Initial Exam 2009302 Draft Admin Documents ML15097A2692015-04-0707 April 2015 301 Post Exam Comments ML15097A2672015-04-0707 April 2015 301 Final SRO Written Exam ML15097A2642015-04-0707 April 2015 301 Final RO Written Exam ML14318A9192014-11-12012 November 2014 Notification of Licensed Operator Initial Examination 05000335/2015301 and 05000389/2015301 ML13225A1322013-08-0808 August 2013 Initial Exam 2012-301 Draft SRO Written Exam ML13225A1352013-08-0808 August 2013 Initial Exam 2012-301 Draft Simulator Scenarios ML13225A1382013-08-0808 August 2013 Initial Exam 2012-301 Draft Sim/In-plant JPMs ML13225A1402013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative JPMs ML13225A1662013-08-0808 August 2013 Initial Exam 2012-301 Final Administrative Documents 2022-04-20
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22332A0562022-11-21021 November 2022 301 License Exam Corporate Notification Letter L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment L-2021-146, Change Requested to Schedule of Operator Licensing Examination2021-07-19019 July 2021 Change Requested to Schedule of Operator Licensing Examination ML21137A3652021-05-13013 May 2021 Plan, Unit 1 and 2, Operator Licensing Retake Written Examination Approval 05000335/2021301 and 05000389/2021301 ML21083A1332021-03-19019 March 2021 Notification of Licensed Operator Intake Initial Examination 05000335/2021301 and 05000389/2021301 ML21034A5312021-02-0303 February 2021 1B Psl 2020-301 NRC Exam Post Exam Comments and References_Redacted (PII Redacted) ML21034A5192021-02-0303 February 2021 1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21193A0522020-12-16016 December 2020 File 2B Normal Release Exam Administrative Items ML21193A1052020-12-16016 December 2020 File 2A2 Exam Final Items ML21193A0872020-12-16016 December 2020 File 2A3 Exam Administrative Items ML20351A2022020-12-15015 December 2020 301 Written Exam Approval Letter ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20115E3532020-04-24024 April 2020 Psl 2020 Exam Corporate Notification Letter Aka 210-day Letter NUREG Rev 111 L-2020-038, Preparation and Scheduling of Operator Licensing Examinations2020-03-0606 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML19158A3312019-06-0707 June 2019 SL-2019-301 Exam Administrative Items (ADAMS 2D) ML19100A2442019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for St. Lucie Nuclear Power Plant ML19099A2902019-04-0909 April 2019 2019 Schedule Confirmation for St. Lucie ML18039A9282018-02-0808 February 2018 301 Exam Report Items RO as Given - Delay Release 2 Yrs ML18039A9332018-02-0808 February 2018 301 Exam Report Items SRO as Given - Delay Release 2 Yrs ML17164A0852017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 IR 05000335/20173012017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 L-2016-033, NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update2016-02-22022 February 2016 NRC Regulatory Issue Summary 2015-05 Preparation and Scheduling of Operator Licensing Examinations - Update ML15201A5372015-07-16016 July 2015 301 Draft SRO Written Exam ML15201A5642015-07-16016 July 2015 301 Other Documents for Retention ML15201A5612015-07-16016 July 2015 301 Final Administrative JPMs ML15201A5602015-07-16016 July 2015 301 Final Simulator and in Plant JPMs ML15201A5582015-07-16016 July 2015 301 Final Simulator Scenarios ML15201A5572015-07-16016 July 2015 301 Final Administrative Documents ML15201A5532015-07-16016 July 2015 301 Draft Administrative JPMs ML15201A5452015-07-16016 July 2015 301 Draft Simulator and in Plant JPMs ML15201A5382015-07-16016 July 2015 301 Draft Simulator Scenarios ML15201A4962015-07-13013 July 2015 301 Draft RO Written Exam ML15201A4942015-07-13013 July 2015 301 Draft Administrative Documents ML15142A4002015-05-21021 May 2015 Initial Exam 2009302 Final Admin Documents ML15142A4012015-05-21021 May 2015 Initial Exam 2009302 Draft Admin Documents ML15097A2642015-04-0707 April 2015 301 Final RO Written Exam ML15097A2672015-04-0707 April 2015 301 Final SRO Written Exam ML15097A2692015-04-0707 April 2015 301 Post Exam Comments ML14318A9192014-11-12012 November 2014 Notification of Licensed Operator Initial Examination 05000335/2015301 and 05000389/2015301 ML13225A1382013-08-0808 August 2013 Initial Exam 2012-301 Draft Sim/In-plant JPMs ML13225A1282013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative Documents ML13225A1352013-08-0808 August 2013 Initial Exam 2012-301 Draft Simulator Scenarios ML13225A1322013-08-0808 August 2013 Initial Exam 2012-301 Draft SRO Written Exam ML13225A1302013-08-0808 August 2013 Initial Exam 2012-301 Draft RO Written Exam ML13225A1402013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative JPMs ML13225A1722013-08-0808 August 2013 Initial Exam 2012-301 Final Administrative JPMs ML13225A1712013-08-0808 August 2013 Initial Exam 2012-301 Final Sim/In-plant JPMs ML13225A1692013-08-0808 August 2013 Initial Exam 2012-301 Final Simulator Scenarios 2022-04-20
[Table view] |
Text
ML19158A331 ES-201 Examination Preparation Checklist Form ES-201-1 Facility: _St. Lucie____________________________ Date of Examination: _3/18/19____
Developed by: Written: Facility X NRC // Operating Facility X NRC Chief Target Task Description (Reference) Examiners Date*
Initials
- 1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, 5/10/18 arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Michael Attachment 3). Meeks Michael 5/10/18 2. NRC examiners and facility contact assigned (C.1.d; C.2.f).
Meeks
- 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility Michael 4/18/18 contact submits to the NRC any prescreened K/As for elimination from the written examination Meeks outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
N/A 4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3). N/A Michael 6/19/18 5. Corporate notification letter sent (C.2.e).
Meeks
- 6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or Michael 4/18/18 ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; Meeks C.3.d-e).
- 7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1, Mike 10/19/18 ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e). Kennard
- 8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; Mike 11/2/18 C.3.d-e). Kennard
- 9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); Mike 1/7/19 supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, Kennard ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).
- 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for N/A N/A facility licensee review (C.1.i; C.2.h; C.3.f-g).
1/17/19 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202). Mike Kennard 1/28/19 12. Written exam and operating test reviews completed (C.3.f). Mike Kennard
- 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; Mike 2/4/19 C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week. Kennard
- 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) Mike 2/15/19 due (C.1.m; C.2.i; ES-202). Kennard
- 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Mike 3/4/19 Form ES-201-4 prepared (C.1.m; C.2.k; ES-202). Kennard 3/11/19 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h). Mike Kennard 3/11/19
- 17. Request facility licensee management feedback on the examination (C.2.l). Mike Kennard 3/11/19 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; Mike Attachment 5; ES-202, C.3.j; ES-204). Kennard ES-201
3/11/19
- 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k). Mike Kennard 3/11/19
- 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i). Mike Kennard
- Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter.
These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
ES-201
ML19158A331 ES-201 Examination Preparation Checklist Form ES-201-1 Facility: _St. Lucie____________________________ Date of Examination: _3/18/19____
Developed by: Written: Facility X NRC // Operating Facility X NRC Chief Target Task Description (Reference) Examiners Date*
Initials
- 1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, 5/10/18 arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Michael Attachment 3). Meeks Michael 5/10/18 2. NRC examiners and facility contact assigned (C.1.d; C.2.f).
Meeks
- 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility Michael 4/18/18 contact submits to the NRC any prescreened K/As for elimination from the written examination Meeks outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
N/A 4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3). N/A Michael 6/19/18 5. Corporate notification letter sent (C.2.e).
Meeks
- 6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or Michael 4/18/18 ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; Meeks C.3.d-e).
- 7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1, Mike 10/19/18 ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e). Kennard
- 8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; Mike 11/2/18 C.3.d-e). Kennard
- 9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); Mike 1/7/19 supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, Kennard ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).
- 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for N/A N/A facility licensee review (C.1.i; C.2.h; C.3.f-g).
1/17/19 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202). Mike Kennard 1/28/19 12. Written exam and operating test reviews completed (C.3.f). Mike Kennard
- 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; Mike 2/4/19 C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week. Kennard
- 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) Mike 2/15/19 due (C.1.m; C.2.i; ES-202). Kennard
- 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Mike 3/4/19 Form ES-201-4 prepared (C.1.m; C.2.k; ES-202). Kennard 3/11/19 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h). Mike Kennard 3/11/19
- 17. Request facility licensee management feedback on the examination (C.2.l). Mike Kennard 3/11/19 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; Mike Attachment 5; ES-202, C.3.j; ES-204). Kennard ES-201
3/11/19
- 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k). Mike Kennard 3/11/19
- 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i). Mike Kennard
- Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter.
These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
ES-201