ML19158A331

From kanterella
Jump to navigation Jump to search
SL-2019-301 Exam Administrative Items (ADAMS 2D)
ML19158A331
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/07/2019
From:
Division of Reactor Safety II
To:
References
Download: ML19158A331 (30)


Text

ES-201 ES-201 Examination Preparation Checklist Form ES-201-1 Facility: _St. Lucie____________________________

Date of Examination: _3/18/19____

Developed by: Written:

Facility X NRC

//

Operating Facility X

NRC Target Date*

Task Description (Reference)

Chief Examiners Initials 5/10/18 1.

Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; ).

Michael Meeks 5/10/18 2.

NRC examiners and facility contact assigned (C.1.d; C.2.f).

Michael Meeks 4/18/18 3.

Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b).

Michael Meeks N/A 4.

Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).

N/A 6/19/18 5.

Corporate notification letter sent (C.2.e).

Michael Meeks 4/18/18 6.

NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; C.3.d-e).

Michael Meeks 10/19/18 7.

Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).

Mike Kennard 11/2/18 8.

Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; C.3.d-e).

Mike Kennard 1/7/19 9.

Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3);

supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).

Mike Kennard N/A

10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f-g).

N/A 1/17/19

11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).

Mike Kennard 1/28/19

12. Written exam and operating test reviews completed (C.3.f).

Mike Kennard 2/4/19

13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week.

Mike Kennard 2/15/19

14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202).

Mike Kennard 3/4/19

15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).

Mike Kennard 3/11/19

16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).

Mike Kennard 3/11/19

17. Request facility licensee management feedback on the examination (C.2.l).

Mike Kennard 3/11/19

18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; ; ES-202, C.3.j; ES-204).

Mike Kennard ML19158A331

ES-201 3/11/19

19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).

Mike Kennard 3/11/19

20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).

Mike Kennard

  • Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter.

These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

ES-201 ES-201 Examination Preparation Checklist Form ES-201-1 Facility: _St. Lucie____________________________

Date of Examination: _3/18/19____

Developed by: Written:

Facility X NRC

//

Operating Facility X

NRC Target Date*

Task Description (Reference)

Chief Examiners Initials 5/10/18 1.

Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; ).

Michael Meeks 5/10/18 2.

NRC examiners and facility contact assigned (C.1.d; C.2.f).

Michael Meeks 4/18/18 3.

Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b).

Michael Meeks N/A 4.

Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).

N/A 6/19/18 5.

Corporate notification letter sent (C.2.e).

Michael Meeks 4/18/18 6.

NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; C.3.d-e).

Michael Meeks 10/19/18 7.

Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).

Mike Kennard 11/2/18 8.

Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; C.3.d-e).

Mike Kennard 1/7/19 9.

Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3);

supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).

Mike Kennard N/A

10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f-g).

N/A 1/17/19

11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).

Mike Kennard 1/28/19

12. Written exam and operating test reviews completed (C.3.f).

Mike Kennard 2/4/19

13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week.

Mike Kennard 2/15/19

14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202).

Mike Kennard 3/4/19

15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).

Mike Kennard 3/11/19

16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).

Mike Kennard 3/11/19

17. Request facility licensee management feedback on the examination (C.2.l).

Mike Kennard 3/11/19

18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; ; ES-202, C.3.j; ES-204).

Mike Kennard ML19158A331

ES-201 3/11/19

19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).

Mike Kennard 3/11/19

20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).

Mike Kennard

  • Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter.

These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.