ML20073S358

From kanterella
Revision as of 03:57, 27 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised Overinsp & Record Verification Program Procedures Bqa 185,BQA 190-BQA 194 & Bqa 196,for Review. W/O Encl
ML20073S358
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/13/1983
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
0982-L, 982-L, U-10050, NUDOCS 8305060576
Download: ML20073S358 (1)


Text

P

/LLINDIS POWER COMPANY 0982*L lhfi U-10050 CLINTON POWER STATION, P.O. BOX 678, CLINTON. ILLINOIS 61727 April 13, 1983 Docket 50-461 Mr. J. G. Keppler Regional Administrator Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Overinspection and Record Verification Program

Dear Mr. Keppler:

On Wednesday, April 13, 1983, we provided your Mr. F.

Jablonski and Mr. H. Livermore a copy of the latest revision of the following procedures related to the Illinois Power Company Overinspection Program and Record Verification Program for your review and concurrence:

BQA 185, Revision 1 BQA 190, Revision 0, QPCR-83-031 BQA 191, Revision 1 BQA 193, Revision 2 BQA 194, Revision 1 BQA 196, Revision 1 If you have any questions or comments concerning the documents provided, please contact Illinois Power Company.

l S* erely yours,

/

. . Hall Vice President RLB/prh cc: Manager-Quality Assurance Director-Office of I&E, Washington, DC 20555 Illinois Department of Nuclear Safety US NRC Sr. Resident Inspector

/ f[0 /

8305060576 830413 DR ADOCK 0500 e APR151983