Requests Review & Concurrence to Proceed W/Phase III of HVAC Recovery Plan.Also Requests Concurrence to Remove Galvanox on All Accessible First Attachment,Hanger Structural & hanger-to-duct Welds
ML20080P312
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/28/1983
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20080P291 List:
References
4250-L, U-10073, NUDOCS 8310060409
Download: ML20080P312 (2)


Text

..

N

  • geppKJ gay 10 6

4250-L

/LLINDIS POWER COMPANY U-10073 CLINTON POWER STATION. P.O. BOX 678. CLINTON. ILLINOIS 61727 July 28, 1983 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Stop Work Action No. 014, 015, and 020 Heating, Ven tilation , and Airconditioning (HVAC)

Activities

Reference:

1. Ltr. D. P. Hall to J. G. Keppler, dated May 5, 1983
2. Ltr. J. G. Keppler to W. C. Gerstner, dated May 19, 1983

Dear Mr. Keppler:

On May 5,1983 Illinois Power submitted Revision 1 of the HVAC Recovery Plan (Reference 1 above) for Stop Work Actions 014, 015, and 020 for your review and concurrence. Additionally, Illinois Power requested your concurrence to proceed with Phase I and II of the Recovery Plan in parallel with your review.

On May 19, 1983 Illinois Power received NRC concurrence of the intent of the HVAC Recovery Plan (Reference 2 above).

Additionally it provided NRC's understanding of Illincis Power's plan to proceed with Phase I and II activities as prerequisites to the inspections outlined in Attachment 5 of the Recovery Plan and that Illinois Power will request an exception to the Stop Work Orders in order to perform the inspections outlined in Phase III of the Recovery Plan.

Illinois Power Company has completed the prerequisites for performing the Phase III Inspections.

It is requested that you review Illinois Power Company's actions associated with Phase I and II of the Recovery Plan and 8310060409 e310o3 '

PDR O ADOCK 05000461 PDR AUS 011993

. .e f~ .

Mr. James G. Keppler Page 2 July 28, 1983 provide concurrence to proceed with Phase III inspection activ-ities. Further, to allow adequate weld inspection, we request your further concurrence to remove galvanox on all accessible first attachment welds, hanger structural welds and hanger-to-duct welds.

Sincerely yours ,

D. P. Hall Vice President REC /jf cc: NRC Senior Resident Inspector Manager - Quality Assurance Director - Office of I&E, USNRC, Washington, DC 20555 Illinois Department of Nuclear Safety