ML20084K739

From kanterella
Revision as of 18:19, 17 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards COLR for Cycle 6 Operations
ML20084K739
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/30/1995
From: Miller D
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20084K743 List:
References
MP-95-178, NUDOCS 9506070001
Download: ML20084K739 (2)


Text

,- 9 .

\ New R pe Ferry Rd. (Route 156), Daterford, CT 06385 f NuclearEnergy uin. tone Nudear Pmr Station Northeast Nudear Energy Company P.O. Box 128 Waterford, CT 06385-0128 (203) 444 4300 May 30, 1995 Fax (203) 440-2105 MP-95-178 The Northeast Utilities System Donald B. Miller Jr.

Senior Via President - Millstone Docket No. 50-423 Re: 10CFR50.36 U.S. Nuclear Regulatory Commission Document Control Desk Washington D.C. 20555 Millstone Nuclear Pov.er Station Unit No. 3 Transmittal of CORE OPERATING LIMITS REPORT (COLR)

In accordance with Millstone Unit No. 3 Technical Specification 6.9.1.6.d the Northeast Nuclear Energy Company hereby submits the CORE OPERATING LIMITS REPORT for cycle 6 of operation. This repon addresses both four loop and three loop operation. If you have any question please contact Jeffrey Camp at (203) 447-1791 ext 6076.

Very truly yours, NORTilEAST NUCLEAR ENERG COMPANY Donald B. Miller, Jr Senior Vice President-Millstone Station I)BM/DTM 9506070001 950530 PDR ADOCK0500g3 DN6189 REY.10-9* P 11

\

. t .

I DBM/DTM Attachment ec: T.T. Martin, Region 1 Administrator P. Swetland, Senior Resident Inspector, Millstone Nos 1,2, and 3 V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 i

I i

I l

1

- - - .