ML20084K739
| ML20084K739 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/30/1995 |
| From: | Miller D NORTHEAST NUCLEAR ENERGY CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20084K743 | List: |
| References | |
| MP-95-178, NUDOCS 9506070001 | |
| Download: ML20084K739 (2) | |
Text
9
- \\ New R pe Ferry Rd. (Route 156), Daterford, CT 06385 f NuclearEnergy uin. tone Nudear Pmr Station Northeast Nudear Energy Company P.O. Box 128 Waterford, CT 06385-0128 (203) 444 4300 May 30, 1995 Fax (203) 440-2105 MP-95-178 The Northeast Utilities System Donald B. Miller Jr.
Senior Via President - Millstone Docket No. 50-423 Re: 10CFR50.36 U.S. Nuclear Regulatory Commission Document Control Desk Washington D.C. 20555 Millstone Nuclear Pov.er Station Unit No. 3 Transmittal of CORE OPERATING LIMITS REPORT (COLR)
In accordance with Millstone Unit No. 3 Technical Specification 6.9.1.6.d the Northeast Nuclear Energy Company hereby submits the CORE OPERATING LIMITS REPORT for cycle 6 of operation. This repon addresses both four loop and three loop operation. If you have any question please contact Jeffrey Camp at (203) 447-1791 ext 6076.
Very truly yours, NORTilEAST NUCLEAR ENERG COMPANY Donald B. Miller, Jr Senior Vice President-Millstone Station I)BM/DTM 9506070001 950530 ADOCK0500g3 PDR DN6189 REY.10-9*
P 11
\\
t DBM/DTM Attachment ec:
T.T. Martin, Region 1 Administrator P. Swetland, Senior Resident Inspector, Millstone Nos 1,2, and 3 V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 i
i 1
.