ML20085F427

From kanterella
Revision as of 22:07, 16 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Telecopy AO AO-75-5:on 750401,unsampled Liquid Waste Tank of Laundry Waste Released.Caused by Two Tank Analyses on Same Tank.Tank Release Stopped & Analysis of Tank Contents Made. Tank Released on 750403
ML20085F427
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/07/1975
From: De Witt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20085F425 List:
References
AO-75-5, NUDOCS 8308220085
Download: ML20085F427 (3)


Text

__ _ _ _

,..(  ;

.g ..r , . . ,,-c7 .- .

I Telegram

. spe inn

. . .. .. w* .

9

-I VECP45(1755)(l-057151C097)PD 04/07/75 171EliFC -7 PHg:47 TLX CONSPOWER JKN ZCZC 005 JACKSON MICH 4-7-75 3-y PMS NRC h \, d'b (c C t %,

REGION III 9v5g 2 3 gl }

799 ROOSEVELT RD gg qng GLEN ELLYN, ILCrOlO SUFJECT: ABNORMAL OCCURRENCE 75-5 VERIFICATION OF PHONE CONVERSATION WITH MR K BAKER ON 4/2/75 AT 1540 REPORTED BY VERN SHOCKLEY.

RI? ORT 5 R.EPORT DATE - APRIL 2, 1975 0;CURRENCE DATE - APRIL 1, 1975 SF-1201 (R5 O FACILITY - PALISADES PLANT # 0 ,? f f

'DENTIFICATION OF OCCURRENCE - RELEASE OF UNSAMPLED LIQUID WASTE

'ANK - LAUNDRY WASTE -- 10 PERCENT OF T-65 SOUTH -

-S$ DESCRIPTION OF OCCURRENCE-G91 88 Ng ON APRIL 1,1975 AT 1726, AN OPERATOR STARTED THE RELEASE OF THE

$x SOUTH FILTERED WASTE MONITOR TANK WHICH WAS FULL OF LAUNDRY WASTE AS AUTHORIZED BY BATCH CARD ANALYSIS 75-015-L. AS HE WAS FILLING

@h <

OUT THE BATCH CARD HE NOTICED A SIX PERCENT DIFFERENCE BETWEEN THE -

h ACTUAL TANK LEVEL AND THE LEVEL INDICATED ON THE BATCH RELEASE. HE

' STOPPED THE BATCH RELEASE AFTER APPROXIMATELY 10 PERCENT HAD BEEN e n5-c') j sg _ , -

l l

sv

. gage ,

7.i.y.. .

L RELEASED. A REQUEST FOR A TANK ANALYSIS WAS MADE FOR FURTHER RELEASE.

{

l ANALYSIS OF GCCURRENCE-THIS RELEASE - 18 PERCENT FROM FILTEHED WASTE MohlTOR TANK SOUTH -

RESULATED FROM THE RADIOLOGICAL MATERIALIPANTROL - HMS- GROUP HAVING TWO TANK AN ALYSES ON THE SAME TANK. THE FIRST ANALYSIS WAS MADE ON 3/23/75 AT 1030. THE LAB REPORTED NOT HAVING RECEIVED THE REQUEST FOR A SAMPLE AND ASKED FOR A NEW SAMPLE ANALYSIS REQUEST. ON 3/26/75 AT 2327 A SECOND SAMPLE AND ANALYSIS WAS MADE. THE FIRST ANALYSIS WAS GIVEN TO RMC AND BATCH RELEASE 75-917-L MASA UT. THE TANK WAS RELEASED ON 3/27/75 AT 0050. ON 3/29/75 THE SEC8HD ANALYSIS SF-1201 (AH9)

WAS GIVEN TO RMS AND SINCE THE TANK WAS FULL A BATCH RELEASE 75-019-L WAS MADE OUT.

l A SAMPLE ANALYSIS WAS MADE ON THE 72 PERCENT REMAINING IN THE TANK.

THE ANALYSIS SHOWED THAT THE TANK COULD BE RELEASED AT A RATE OF 1919 GPM.

THE le PERCENT WAS RELEASED AT A RATE OF 32 GPM. THIS WAS A FACTOR OF APPRSXIMATELY 60 BELOW THE ALL8WED RELEASE RATE. THE RE-LEASE PROCESS MONITOR WAS ALSO SET CONSERVATIVELY. NO LIMITS OF TITLE 10 CODE OF FEDERAL REGULATIONS SECTION 20 LIMITS WERE VIOLATED.

CORRECTIVE ACTION-THE TANK RELEASE WAS STOPPED AND AN ANALYSIS OF TANK g CONTENTS MADE.

TH '

sr.km <nu >

E TANK WAS RELEASED ON APRIL 3, 1975 AS BATCH 75-019-L 2.

1 .. -- - - - - - - - - - - - -

I l

(-

WMY j w. }ueffeth union Tele ram l

PREVIOUS OCCURRENCE -

1 i

l ONE.

29443:589,- IN SECSND PARA l CSRRECTION- IN SECOND PARA SHSULD READ RMC NOT RMS i

R B DE WITT PALISABES PLANT CONSUMERS POWER COMPANY CBW '.

(

I l

srp201 (R5 69) 1 l

l l

I

. _ _ - - _ - _ _ _ _ - . _ _ _ _ _ - _ _ - . _ . - - . . . _ . _ , . . _ _ _ . . _ . - _ . _ . _ _ _ .