Telecopy AO AO-75-5:on 750401,unsampled Liquid Waste Tank of Laundry Waste Released.Caused by Two Tank Analyses on Same Tank.Tank Release Stopped & Analysis of Tank Contents Made. Tank Released on 750403
ML20085F427
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/07/1975
From: De Witt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20085F425 List:
References
AO-75-5, NUDOCS 8308220085
Download: ML20085F427 (3)


Text

__

,..(

.g

..r

,,-c7.-.

I Telegram spe inn w*

9

-I VECP45(1755)(l-057151C097)PD 04/07/75 171EliFC -7 PHg:47 TLX CONSPOWER JKN ZCZC 005 JACKSON MICH 4-7-75 3-y PMS NRC h \\,

d'b (c C t %,

9v5g REGION III 3

gl }

2 799 ROOSEVELT RD gg qng GLEN ELLYN, ILCrOlO SUFJECT:

ABNORMAL OCCURRENCE 75-5 VERIFICATION OF PHONE CONVERSATION WITH MR K BAKER ON 4/2/75 AT 1540 REPORTED BY VERN SHOCKLEY.

RI? ORT 5 R.EPORT DATE - APRIL 2, 1975 0;CURRENCE DATE - APRIL 1, 1975 SF-1201 (R5 O FACILITY - PALISADES PLANT

  1. 0,? f f

'DENTIFICATION OF OCCURRENCE - RELEASE OF UNSAMPLED LIQUID WASTE

'ANK - LAUNDRY WASTE -- 10 PERCENT OF T-65 SOUTH -

-S$ DESCRIPTION OF OCCURRENCE-G91 88 Ng ON APRIL 1,1975 AT 1726, AN OPERATOR STARTED THE RELEASE OF THE

$x SOUTH FILTERED WASTE MONITOR TANK WHICH WAS FULL OF LAUNDRY WASTE

@h AS AUTHORIZED BY BATCH CARD ANALYSIS 75-015-L.

AS HE WAS FILLING OUT THE BATCH CARD HE NOTICED A SIX PERCENT DIFFERENCE BETWEEN THE h

ACTUAL TANK LEVEL AND THE LEVEL INDICATED ON THE BATCH RELEASE.

HE

' STOPPED THE BATCH RELEASE AFTER APPROXIMATELY 10 PERCENT HAD BEEN j sg e n5-c')

l l

sv 7.i.y... :

gage

  • L RELEASED.

A REQUEST FOR A TANK ANALYSIS WAS MADE FOR FURTHER RELEASE.

{

l ANALYSIS OF GCCURRENCE-THIS RELEASE - 18 PERCENT FROM FILTEHED WASTE MohlTOR TANK SOUTH -

RESULATED FROM THE RADIOLOGICAL MATERIALIPANTROL - HMS-GROUP HAVING TWO TANK AN ALYSES ON THE SAME TANK.

THE FIRST ANALYSIS WAS MADE ON 3/23/75 AT 1030.

THE LAB REPORTED NOT HAVING RECEIVED THE REQUEST FOR A SAMPLE AND ASKED FOR A NEW SAMPLE ANALYSIS REQUEST.

ON 3/26/75 AT 2327 A SECOND SAMPLE AND ANALYSIS WAS MADE.

THE FIRST ANALYSIS WAS GIVEN TO RMC AND BATCH RELEASE 75-917-L MASA UT.

THE TANK WAS RELEASED ON 3/27/75 AT 0050.

ON 3/29/75 THE SEC8HD ANALYSIS SF-1201 (AH9)

WAS GIVEN TO RMS AND SINCE THE TANK WAS FULL A BATCH RELEASE 75-019-L WAS MADE OUT.

l A SAMPLE ANALYSIS WAS MADE ON THE 72 PERCENT REMAINING IN THE TANK.

THE ANALYSIS SHOWED THAT THE TANK COULD BE RELEASED AT A RATE OF 1919 GPM.

THE le PERCENT WAS RELEASED AT A RATE OF 32 GPM.

THIS WAS A FACTOR OF APPRSXIMATELY 60 BELOW THE ALL8WED RELEASE RATE.

THE RE-LEASE PROCESS MONITOR WAS ALSO SET CONSERVATIVELY.

NO LIMITS OF TITLE 10 CODE OF FEDERAL REGULATIONS SECTION 20 LIMITS WERE VIOLATED.

CORRECTIVE ACTION-THE TANK RELEASE WAS STOPPED AND AN ANALYSIS OF TANK CONTENTS MADE.

g TH sr.km <nu E TANK WAS RELEASED ON APRIL 3, 1975 AS BATCH 75-019-L 2.

1

I

(-

WMY Tele ram j w.

}ueffeth union l

PREVIOUS OCCURRENCE -

1 i

l ONE.

29443:589,- IN SECSND PARA l

CSRRECTION-IN SECOND PARA SHSULD READ RMC NOT RMS i

R B DE WITT PALISABES PLANT CONSUMERS POWER COMPANY

(

CBW l

I srp201 (R5 69) 1 l