|
---|
Category:ABNORMAL OCCURRENCE REPORTS (SEE ALSO LER & RO)
MONTHYEARML20086B1731976-11-0909 November 1976 AO 50-267/74-20A:on 741116,during Low Power Physics Testing, Conflict Found Between Tech Specs 4.2.11 & 4.4.1 Re Moisture Limits.Caused by Last Minute Change in Tech Specs 4.2.11. Tech Specs Revised ML20086B1781976-11-0909 November 1976 AO 50-267/74-20A:on 741116,during Low Power Physics Testing, Conflict Found Between Tech Specs 4.2.11 & 4.4.1 Re Moisture Limits.Caused by Last Minute Change to Tech Specs 4.2.11. Tech Specs Revised ML20086B1001976-09-0303 September 1976 AO 50-267/74-21C:on 741121,high Pressure in Gas Waste Vacuum Tank Lifted Relief Valve Allowing Release of 700 Scf Uncontaminated Gas.Caused by Operator Error.Valves Will Be Replaced W/Kerotest Valves & Change Notice 91 Issued ML20086A0441976-05-28028 May 1976 Telecopy AO 76-012:on 760527,helium Circulator 1B Tripped Twice.Caused by Buffer Seal Malfunction.Sys Operating Procedure Will Be Revised ML20086A0691976-05-20020 May 1976 AO 76-011:on 760510,helium Circulator 1C Tripped Due to Negative buffer-midbuffer Differential Pressure.Cause Associated W/Test ML20086A0871976-05-0303 May 1976 Telecopy AO 76-010:on 760429 & 30,circulators 1A & 1B Tripped on Loss of Bearing Water.Caused by Operator Error ML20085M4351976-02-17017 February 1976 Telecopy AO 76/005:on 760227,loss of Essential 480-volt Bus 2 Caused Trip of Three Helium Circulators Due to Circulator Bearing Water Problems.Loss of 480-volt Bus Could Cause Temporary Loss of Forced Circulation ML20085M4731976-02-0606 February 1976 Telecopy AOs 76/03 & 76/04:on 760206,generator Set 1-B Load Breaker Would Not Close & Generator Set 1A Trouble Alarm Received,Indicating Partial Disconnection of Engine 1B from Generator.Causes Not Stated ML20085M5651975-12-22022 December 1975 AO 50-267/74/23A:on 741211,engine a of Standby Diesel Generator 1A Declutched During 2 H Surveillance Run & No Alarm Annunciated.Caused by Dirt Under Seat of Solenoid Valve.Plant Change Notice 12 Initiated ML20085M7181975-12-22022 December 1975 AO 50-267/75/15A:on 750709,during Repair of Minor Oil Leak on Gasoline Engine of Emergency Fire Pump,Inlet Manifold Piping Found Cracked.Caused by Component Failure.Manifold Repaired ML20086B1541975-12-18018 December 1975 AO 50-267/74-7A:on 740424,fuel Handling Machine Failed to Engage & Lift Reflector Element 09-06-R-01.Caused by Mfg Error.Reflectors de-burred & Ga Co Will Supply Two Column 1 Metal Clad Reflector Elements ML20085M5631975-11-18018 November 1975 AO 50-267/75/24:on 751108,static Seal on Helium Circulator B Inadvertently Released.Cause Presently Undetermined. Circulator B Brake & Seal Manually Set ML20085M6211975-10-21021 October 1975 AO 50-267/75/18A:on 750816,during Installation Preparation, Helium Circulation Damaged.Caused by Lack of Adherence to Approved Procedure.Personnel Counseled to Adhere to Approved Procedures & Supervision ML20085M5711975-09-26026 September 1975 AO 50-267/75/23:on 750916,essential Electrical Cable Discovered to Have Failed.Caused by Circumstances Associated W/Work in Progress.Damaged Cable Replaced ML20085M5771975-09-26026 September 1975 AO 50-267/75/22:on 750912,during Gas Waste Routine Release, Trouble W/Gas Vacuum Tank Observed by Reactor Operator.Cause of Malfunction Unknown.Failure Could Not Be Reproduced.No Further Action Planned ML20086B1151975-09-26026 September 1975 AO 50-267/74-21B:on 741121,high Pressure in Gas Waste Vacuum Tank Lifted Relief Valve Allowing Release of 700 Scf Uncontaminated Gas.Caused by Operator Error.Inlet Valve Seats Will Be Replaced W/Soft Seats ML20085M5821975-09-22022 September 1975 AO 50-267/75/21:on 750911,control Rod Drive Inserted Into Pcrv Rotated 180 Degrees from Required Orientation During Control Rod Drive Mod.Caused by Design & Procedure Error. Procedures Modified ML20085M6181975-09-0505 September 1975 AO 50-267/75/19:on 750825,engine a of Standby Generator a Automatically Shut Down & Declutched During Cooldown Portion of Weekly Surveillance Test.Caused by Difference in Fuel Rack Setting.Setting Changed ML20085M6231975-09-0505 September 1975 AO 50-267/75/18:on 750816,during Installation Preparation, Helium Circulator Damaged.Caused by Lack of Adherence to Approved Procedure.Personnel Counseled to Adhere to Approved Procedures & Supervision ML20085M6121975-09-0505 September 1975 AO 50-267/75/20:on 750826,12 Cord Sets Connecting Process Controllers at I-05 & I-06 Control Board to Cable Rack in Auxiliary Electric Equipment Room Switched.Caused by Malicious Mischief ML20085M6781975-08-15015 August 1975 AO 50-267/75/17:on 750808,instrument Air Compressor 1C Observed Running Continuously in Unloaded Condition.Caused by Component Failure.Failed Unloader Actuator Replaced W/New Unloader Actuator & Tested ML20085M7021975-07-21021 July 1975 AO 50-267/75/16:on 750610,when Engine B of Standby Generator a Dissassembled,Broken Rings,Scored Cylinders & Cracked Pistons Found.Caused by Water Engine.Engines Inspected.Pistons,Liners & Rings Replaced ML20085M7251975-07-18018 July 1975 AO 50-267/75/15:on 750709,during Repair of Minor Oil Leak on Gasoline Engine of Emergency Fire Pump Inlet Manifold, Piping Found Cracked.Caused by Component Failure.New Manifold Ordered & Defective Casting Replaced ML20085M7401975-06-11011 June 1975 AO 50-267/75/14:on 750530,engine B of a Diesel Generator Oversped to 1,900 Rpm While Electrical Overspeed Trip Being Set.Caused by Procedure Error.Test Procedure Changed ML20085L6331975-05-27027 May 1975 AO 75-267/75/13:on 750519,I-B Engine of I-A Standby Diesel Generator Failed to Start.Caused by Failure to Transmit Info That Engine Was Out of Svc to Adjust Overspeed Switches ML20085L6481975-05-12012 May 1975 AO 50-267/75/10:on 750501,exam Revealed Pin on Declutching Mechanism of Engine D of Standby Diesel Generator D Sheared Off.Caused by Inadequate Lubrication.Pin Replaced & Lubrication Frequency Increased ML20085L6301975-05-12012 May 1975 AO 50-267/75/9:on 750404,valve HV-2188-8 Did Not Open When Circulator Seal Release Permissive Circuit Directed Valve to Open.Cause Not Stated.Air Solenoids Inspected & Cleaned ML20085L7871975-05-0707 May 1975 AO 50-267/74-25:on 741018,diesel Engine B of Standby Generator a Tripped from High Water Jacket Temp on Routine Test.Caused by Improper Filling of Water Jackets.Personnel Counseled ML20085L6411975-05-0707 May 1975 AO 50-267/75/11:on 750424,preliminary Calculations Indicated That Helium Bottles Supplying Reserve Shutdown Sys Did Not Have Adequate Restraint for Dbe.Cause Not Stated.New Bottle Racks Designed & Installed ML20085L7881975-04-16016 April 1975 AO 50-267/74/24A:on 741222,static Seal on Helium Circulator a Released During Removal of Temporary Jumpers.Caused by Jumper Contact W/Station Ground ML20085L7671975-04-0808 April 1975 AO 50-267/75/3A:on 750123,dew Point Moisture Monitor Failed to Initiate Reactor Scram When Moisture Content Exceeded Trip Setpoint.Caused by Design & Procedure Inadequacies.New Procedure Developed ML20085L6491975-04-0707 April 1975 AO 50-267/75/9:on 750329,leak in Mechanical Seal of Helium Circulator B Discovered.Caused by Foreign Matl on Sealing Surfaces.No Corrective Actions Planned ML20085L6831975-04-0202 April 1975 AO 50-267/75/6A:on 750202,gas Waste Vacuum Tank Rupture Disc Ruptured,Releasing Small Quantity of Gas.Caused by Improper Closure of Air Operated Drain Valve Due to Foreign Matl on Valve Seat.Seat Repaired ML20086E1651975-03-21021 March 1975 AO 50-267/74/6A:on 750202,gas Waste Vacuum Tank Rupture Disc Ruptured,Releasing Small Quantity of Gas.Caused by Failure of Air Operated Drain Valve to Close Properly.Valve Repaired & Reinstalled ML20085L7071975-03-14014 March 1975 AO 50-267/75-4-A:on 750125,tritium Leaked from Secondary Closure of Refueling Region 1.Caused by Normal Presence of Tritium in Pressurizing Gas ML20085L6511975-03-0707 March 1975 AO 50-267/75/8:on 750224,diesel Engine B of Standby Generator a Failed to Function Properly During Weekly Test. Caused by Defective Temp Thermocouple.New Thermocouple Installed & Preventive Maint Program Instigated ML20085L6581975-03-0404 March 1975 AO 50-267/75/7:on 750121-23,reactivity Anamoly Occurred Due to Release of Hopper of Reserve Shutdown Mall Into Core. Cause Not Stated.Valve Seats Modified ML20086B0681975-02-26026 February 1975 AO 50-267/74-22A:on 741129,high Pressure in Gas Waste Vacuum Tank Blew Rupture Disc & Lifted Relief Valve Allowing Release of 750 Scf Uncontaminated Gas.Caused by Design Inadequacy.Pressure Indicator Installed ML20085L6851975-02-18018 February 1975 AO 50-267/75/6:on 750202,gas Waste Vacuum Tank Rupture Disc Ruptured,Releasing Small Quantity of Gas.Caused by Improper Closure of Air Operated Drain Valve.Valve Will Be Disassembled for Insp ML20085L7011975-02-17017 February 1975 AO 50-267/75/5:on 750127,gas Vacuum Tank Rupture Disc Ruptured,Releasing Small Quantity of Gas.Caused by Inadequate Procedures.Procedure Rewritten ML20085L7121975-02-14014 February 1975 AO 50-267/75/4:on 750125,tritium Leaked from Secondary Closure of Refueling Region 1.Cause Will Be Determined When Vessel Pressure Dropped to Atmospheric or Below ML20085L7721975-02-12012 February 1975 AO 50-267/75/3:on 750123,dew Point Moisture Monitors Failed to Initiate Reactor Scram When Moisture Content Exceeded Trip Setpoint.Caused by Failure of Sample of Primary Coolant to Reach Monitor.Tech Specs Revised ML20086B1231975-02-12012 February 1975 AO 50-267/74-21A:on 741121,high Pressure in Gas Waste Vacuum Tank Lifted Relief Valve Allowing Release of 700 Scf Uncontaminated Gas.Caused by Procedural Error.Inlet Valve Seats Will Be Replaced & Interim Procedure Modified ML20085L7401975-02-0707 February 1975 AO 50-267/75/1:on 750118,230-kV Breaker Tripped Due to High Winds,Causing Standby Diesel Generator a to Receive Start Signal.Generator B Did Not Receive Start Signal.Caused by Sensitive Relay Setting.Relay Recalibr ML20085L7271975-01-31031 January 1975 AO 50-267/75/2:on 750113,reactor Bldg Exhaust Charcoal Filters Failed to Meet Tech Spec Leak Rate Requirements. Caused by Use of oil-based Paint & Organic Solvents.Filters Changed Out ML20085L6501975-01-25025 January 1975 AO 50-267/75/24A:on 741222,static Seal on C-2101 (Helium Circulator C) Released During Removal of Temporary Jumpers. Caused by Blown Fuse & Seal Release Valve Leak.All Circulator Brake & Seal Vent Valves Checked ML20085L7341975-01-24024 January 1975 Telecopy Ao:Charcoal in Reactor Bldg Exhaust Filters Failed to Meet Tech Spec Requirements ML20085L7901975-01-14014 January 1975 AO 50-267/74/24:on 741222,static Seal on C-2101 (Helium Circulator C) Released During Removal of Temporary Jumpers.Caused by Jumper Across Logic Circulator a Coming in Contact W/Station Ground ML20086B0501974-12-23023 December 1974 AO 50-267/74-23:on 741211,engine a of Standby Diesel Generator 1-A Declutched & No Alarms Annunciated.Caused by Cylinder Air Pressure Decay Due to Dirt Under Solenoid Valve Seat.Change Notice 11 Re in-line Filters Approved ML20086B0641974-12-19019 December 1974 Telecopy AO 50-267/74-23:on 741211,diesel Engine a of Standby Generator 1-A Declutched 1976-09-03
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20196G6731997-07-0101 July 1997 Informs Commission That Decommissioning Process Has Been Completed at PSC of Colorado Fsvngs,Unit 1 Located in Town of Platteville in Weld County,Co ML20141K9961997-05-0505 May 1997 Safety Evaluation Supporting Amend 89 to License DPR-34 ML20140E1121997-04-10010 April 1997 Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20134D1661997-01-30030 January 1997 Rev 1,Vol 6 to Final Survey Rept,Final Survey of Group E (Book 2A of 2) ML20137S6111996-12-31031 December 1996 Annual Rept Pursuant to Section 13 or 15(d) of Securities Exchange Act 1934, for Fy Ended Dec 1996 ML20134G6401996-10-29029 October 1996 Rev 0,Volume 6,Books 1 & 2 of 2 to Final Survey of Group E ML20134G6171996-10-29029 October 1996 Rev 2,Volume 1,Books 1 & 2 of 2 to Final Survey Description & Results ML20134G7271996-10-29029 October 1996 Rev 0,Volume 11,Book 1 of 1 to Final Survey of Group J ML20134G6861996-10-29029 October 1996 Rev 0,Volume 8,Books 1 & 2 of 2 to, Final Survey of Group G ML20134G6321996-10-26026 October 1996 Rev 1,Volume 5,Books 2 & 3 of 3 to Final Survey of Group D ML20133D7831996-10-22022 October 1996 Preliminary Rept - Orise Support of NRC License Insp at Fsv on 960930-1003 ML20116A4661996-07-19019 July 1996 Fsv Final Survey Exposure Rate Measurements ML20112J6861996-05-31031 May 1996 June 1996 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning.Rept Covers Period of 960216-0531 ML20112C1531996-05-17017 May 1996 Fsv Final Survey Exposure Rate Measurements ML20101G5521996-03-21021 March 1996 Confirmatory Survey Activities for Fsv Nuclear Station PSC Platteville,Co, Final Rept ML20097E3201996-01-31031 January 1996 Nonproprietary Fort St Vrain Technical Basis Documents for Piping Survey Instrumentation ML20095K4131995-12-26026 December 1995 Rev 3 to Decommissioning Plan ML20095H7211995-12-20020 December 1995 Revs to Fort St Vrain Decommissioning Fire Protection Plan Update ML20095K9751995-12-15015 December 1995 Fort St Vrain Project Update Presentation to NRC, on 951207 & 15 ML20096C1671995-12-13013 December 1995 Rev 4 to Decommissioning Fire Protection Plan ML20094M1651995-11-30030 November 1995 Nonproprietary Fsv Technical Basis Documents for Piping Survey Implementation ML20092F3461995-09-14014 September 1995 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning, Covering Period of 950516-0815.W/ ML20137H3531994-12-31031 December 1994 Partially Withheld, Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, App D,Comments by Mkf & Westinghouse Team & Responses ML20137S2331994-12-31031 December 1994 Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, Dec 1994 ML20029C6031993-12-31031 December 1993 1993 Annual Rept Public Svc Co of Colorado. W/940405 Ltr ML20058Q3791993-12-21021 December 1993 Rev 1 to Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20045B3641993-06-30030 June 1993 June 1993 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning. ML20045A4291993-06-0303 June 1993 LER 93-003-00:on 930505,new Source of Natural Gas Introduced within 0.5 Miles of ISFSI & Reactor Bldg W/O Prior NRC Approval.Caused by Field Routing of Natural Gas Pipe.Well Isolated by Well operator.W/930603 Ltr ML20077D1631993-05-10010 May 1993 Enforcement Conference, in Arlington,Tx ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20128D7191992-12-0101 December 1992 Safety Evaluation Approving Exemption from Requirement of 10CFR50.54(q) to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise at Plant ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20127F5691992-11-0303 November 1992 Informs Commission of Intent to Issue Order Approving Plant Decommissioning Plan & Corresponding Amend to License DPR-34 ML20101E5761992-05-31031 May 1992 Monthly Defueling Operations Rept for May 1992 for Fort St Vrain ML20096E8221992-04-30030 April 1992 Monthly Operating Rept for Apr 1992 for Fort St Vrain.W/ ML20095E9601992-04-17017 April 1992 Rev to Fort St Vrain Proposed Decommissioning Plan ML20100R7431992-03-31031 March 1992 Monthly Operating Rept for Mar 1992 for Fort St Vrain.W/ ML20090L0621992-02-29029 February 1992 Monthly Operating Rept for Feb 1992 for Fort St Vrain Unit 1 ML20092D0081992-01-31031 January 1992 Monthly Operating Rept for Jan 1992 for Fort St Vrain Nuclear Generating Station ML20102B2241992-01-22022 January 1992 Fort St Vrain Station Annual Rept of Changes,Tests & Experiments Not Requiring Prior Commission Approval Per 10CFR50.59, for Period 910123-920122 ML20094N6701991-12-31031 December 1991 Public Svc Co Annual Financial Rept for 1991 ML20091J6251991-12-31031 December 1991 Monthly Operating Rept for Dec 1991 for Fort St Vrain.W/ ML20094D6711991-11-30030 November 1991 Monthly Operating Rept for Nov 1991 for Fort St Vrain Unit 1 ML20090M1871991-11-20020 November 1991 FOSAVEX-91 Scenario for 1991 Plant Exercise of Defueling Emergency Response Plan ML20086D6891991-11-15015 November 1991 Proposed Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20085N1451991-11-0505 November 1991 Revised Ro:Operability Date of 910830 for Electric Motor Driven Fire Water Pump P-4501 Not Met.Pump Not Actually Declared Operable Until 911025.Caused by Unforseen Matl & Testing Problems.Equivalent Pump Available ML20086C5451991-10-31031 October 1991 Monthly Operating Rept for Oct 1991 for Fort St Vrain.W/ ML20085H6611991-10-10010 October 1991 Assessment of Mgt Modes for Graphite from Reactor Decommissioning ML20091D7671991-10-0101 October 1991 Rev B to Engineering Evaluation of Prestressed Concrete Reactor Vessel & Core Support Floor Structures for Proposed Sys 46 Temp Change ML20085D9861991-09-30030 September 1991 Monthly Operating Rept for Sept 1991 for Fort St Vrain.W/ 1997-07-01
[Table view] |
Text
, ---- ----------
n o U V pubile service company ore celerade P. O. Box 361, Platteville, Colorado 80651
- . A ' ll .I '
- ' s. ,
l .. ' . . .l :'t s </\
l
,'f Q. l
- - Fort St. Vrain Nuclear' Generating Station j . .
6 9
e d
9
. g .
. \ ,
- 3 e
9 m.
e s
. u
j ,
~
?. .
I:EPORT DATE: March 4 u 1975,_ ABN0!U4AL OCCURRENCP.
OCCURKENCE DATE: Februa ry 24' 1975 ,
- y. - ~.;
FORT ST. VRAIN NUCLI%R GENERATING STATION - . .. ,
r
PUBLIC SI:RVICE COMPANY OF COLORADO ,
P. O. l'OX 361 d i L .! .' .-
"g-PLATTEVII.LE, COLORADO 80651 -
'-11-r,s. .
.--6.4% s REPORT No. 50-267/75/8 .
Final C l IDENTIFICATION OF . .
OCCURRENCE:
On February 24,1975, "B" diesel engine of "A" standby generator failed to function properly during a veckly surveillance test. The engine started, ran for approx-imately 20 seconds, then shut down.
This is defined as an Abnormal occurrence as per definition 2.1.f) of the Technical Specifica<_fon.
CONDITIONS PRIOR tu uccusau.cr.: , steady State Poewr- , Routine Shutdown
, Hot Shutdown Routine Load Change X Cold Shutdown Other (specify)
Refueling Shutdown Routine Startup- .
The major plant parameters at the time of .the event were as fo))ows:
Power Rtr. O MWth Elect. O MWe Secondary Coolant Pressure 260 psig ,
Temperature 68 'F
. Flow 18,000 ~ #/hr. '
'p d Primary Coolant Pressure Atmospheric 'psig Temperature 100 ' 'F' Inlet. M i I- 100 #F Outlet _ i t
Flow 0 #/hr.
p.t257:
t- .
arrennammer 7r_ 1
~
O~ . 2 O
a i
l l
DESCRIPTION OF
.O..C_CURR_ ENC E :_ _ _ _
During SI; 5.6.1 a-w, weekly test ing of the it andby d iesel generating units, l engine B of A generator, started, ran for approximat ely 20 seconds, then shut down and declutched. A second, immediate attempt to start the engine was unsuccessful.
Exhaust temperature indication for li engine showed no increase during the 20 second run.
APPARENT CAUSE OF OCCURRENCE: Design ,
_ _ Unusual Service Cond.
Including Environ.
_ Manufacture _X _
_ Component Failure
_ Installation /Const. ,,_ _ __ Other (specify)
Operator _ __ _ _ , _ _ _ _ _ _ , , _
Procedure _ ____
The exhaust temperature thermocouple had failed, and therefore showed no tempera ture increase. The control system saw this as a failure of the engine to start, and therefore, shut the engine down and declutched it, en prouane A -nging re- g-7ggi g 2 : pperedly g2:2 inn , i ANALYSIS OF '
.O._C_ .CURRESC E :
At tempting to run S.R. 5.6.1-a-w, "B" engine on the "A" diesel-genera tor unit shut down after 20 seconds. Electrical inspection revealed that the exhaust temperature thercocouple was defective. ~
These exhaust temperature thereccouples cust show high temperature in the exhaust system for a "Go" in the process of starting the units. However, the thermocouple was not open but failed to produce the necessary millivolt output to drop out the tcaperature relay, which resulted in a declutch and trip of the "B" engine.
All alarms associated with the trip operated norrdilly.
CORRECTIVE ACTION:
PTR 2-350 issued. 'A new exhaust temperature thermocouple was installed, and a program initiated on the preventive maintenance program to change out all thermocouples on the diesel-generator units on an annual basis.
., ("S, (~N,
Fall.URE DATA /
SIMILIAR REPORTED OCCURI:ENCES:
None. Other thermocouples have becu changed in the pant, but because of suspected deterioration, not complete failure.
PROGRABIATIC I?1 PACT:
None CODE IMI'ACT:
I None Recommended: Approved:
Dh- ~'A'" Mw "
/
._ V ' ' M&. G . .St'J.1NWJQ Frederic E. Swart Frank M. 'fathic Superintendent-Maintenance Superintcudent Nuclear Produetion Fort St. Vrnin Nuclear Public Service Company of Colorado Cencrating Station e
I _ _ _ _ _ _ . _ . _ _ _ _ . _ _ _ _ _ . _ _ . _ _ _ _ _ _ _
.~
(, ,\ f
,m
).
q,' LJ G !xi c- flicn r A
/>
Thoned to 1,ois-Grico, Extension 7750, 2/24/75, at _y>, .
.- PM.
E. Morris Howard, Director U. S. Nucicar Regulatory Commission '
Office of Inspection & Enforecaent
-Region IV 611 Ryan Plaza Drive .
Suite 1000 Arlington, Texas 76012 -
On 2/24/75, while running the veckly. surveillance tests on the emergency diesel generators, "B" engine of the "A" diesel-generator set failed to operate normally due to.a faulty exhaust temperature thermocouple.
Frederic E. Swart Supt. Nucicar Product.icn 3
Fort St. Vrain Nuclear Gc.4 crating Station i -
e b
s g
. C e
j