Monthly Operating Rept for Apr 1992 for Fort St Vrain.W/
ML20096E822
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/30/1992
From: Block M, Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
P-92189, NUDOCS 9205200026
Download: ML20096E822 (9)


Text

_

^

h Publ e Service- ML"A-16805 WCR 19 1/2, Platteville, Colorado 80651 May 15, 1992 Fort St. Vrain Unit No. 1 P-92189 U. 5. Nuclear Regulatory Commission t.TTN: Document Control Desk Washington, D.C. 20555 Occket No. 50-267

SUBJECT:

APRIL, 1992, MONTHLY-DEFUELING OPERATIONS REPOPT

REFERENCE:

Facility Operating License Number DPR-34

Dear Sirs:

Enclosed, pleare find the Monthly Defueling Operations report for the-month of April, 1992, submitted per the requirements ; of Fort .St' Vrain Technical Speelfication.AC 7.5.1.

If you have any questions, please contact ~Mr. lM. H.-Holmes at

., (303) 620-1701.

o

' Sincerely,

/ 0 NY W y u n /r w g D. W. Warembourg y

M wager, Nucleer Operations Fort St. Vrain Nuclear Generating Station-OW:MLB/as Enclosure cc: Regional _ Administrator, Region'IV' Mr. J B. Baird Senior P.esident inspector Fort St. Vrain-200.004 k

'9275200026-.920430 PDR

-R-ADOCK!05000267 YDR ^

_/pp\l \(- t 1

h Public Service' MOL.*

16805 WCR 19 1/2, Platteville, Colorado 80651 May 15, 1992 Fort St. Vrain Unit No. 1 P-92189 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 I

Docket No. 50-267

SUBJECT:

APRIL, 1992, MONTHLY DEFUELING OPERATIONS REPORT

REFERENCE:

Facility Operating License Number DPR-34

Dear Sirs:

Enclosed, please find the Monthly Defueling Operations report for the month of April, 1992, submitted per the requirements of Fort St.

Vrain Technical Specification AC 7.5.1.

If you have any questions, please contact Mr. M. H. Holmes at (303) 620-1701.

Sincerely,

\

/0 0' W.t tt wl!tW)-

D. W. Warembourg y Mi nager, Nuclear Operations Fort St. Vrain Nuclear Generating Station DWW:MLB/as Enclosure cc: Regional Administrator, Region IV i

Mr. J. B. Baird Senior Resident Inspector Fort St. Vrain

+

4 i

l l

l l

PUBLIC SERVICE COMPANY OF COLORADO FORT ST, VRAIN NUCLEAR GENERATING STATION

-r r

4 MONTHLY DEFUELING OPERATIONS REPORT NO. 219-April. 1992

  • k

~ s ~,y x y , m --+,.

s 9

-1 This report contains the highlights of the Fort St. Vrain, Unit t

No. 1, activities operated under the provisions of the Nuclear Regulatory Commission Operating License No. OPR-34. This report is for the month of April,1992, IO NARRATIVE

SUMMARY

OF CPERATING EXPERIENCE AND- MAJOR SAFETY RERTEb]AlIITENANCE ine reactor remained shutdown the entire month of April, 1992, following Public Service Company of Colorado's decision to end nuclear operation at Fott-St. Vrain.

During the month- of April,1992, thirty-seven loads (222 fuel elements) were deposited'in the Fort St. Vrain Independent Spant Fuel Storage Installation (ISFSI).

2.0 SINGLE RELEASES OF RADI0 ACTIVITY OR RADIATION EXPOSURE IN EXCESS DT 10% OF TIil ALLOWABLE ANiiUAL VALUE, None 3.0 INDICATION OF FAllq0_ FUEL RESULTING FROM IRRADIATED FUEL1 EXAi41 HAT 10NS g None 4.0 MONTHLY OPERATING DATA REPORT Attached d .

/

1 i

_______.___l1 ~.___1____i______f_1_________ i______.____i______ _ _ . _ _ _ _ _ _ _ _ ____._.l__x__.___j

i i

critATING DATA DEPORT DOCKET NO. 50-267 DATC May 15. 1992 COMPLtTID BY M. i., filock TCLIPHONE (303) 670-1313 ,

OPERAT MS $T1705 NOTE 5

1. Unit Name: Fort St. Vrnin. Unit No. 1
2. Reporting Pertoo: 92001 thrauch 920430
3. Licensed Therical Power (Mdt): 842 4 kameplate Rating (Gross MWe). 342
5. Cesign Electrical Rating (Net MWe): 330
6. Fattfnum Depencable Capacity (Gross MWe): 142 7 Faximum Oeoencable Capacity (Net MWe): 330
8.  ;' Onanges Occur in Capacity Ratings (ltefts Number 3 Througn 7) 5%Ce Last Eeoort. Give Reasonst ,

han

9. Fower Level to Which Restricteo, Jf Any (tiet MWe): -0.0
10. Seasons for Restrictions. If Anyt vnre gr. Vrnin ennend nucinnr nnerntfnn nn Ancusr '9. loRO This Month Year To Date Cumulative
11. Hours in Reporting Feriod 72n 2.903 112.512

'12. humoer Of 4nurs Reactor Was Critical N/A N/A 60 A7K.7_

13. Reactor :eserve Shutdown Hours N/A N/A

__ N/A

14.
  • curs Generator On Line y / A'
15. Unit Reserve Shutdown Hours N/L 27.777.4 N/A N; L N/A
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)

N/A 'N L 14.450.651.2 M /L M /L 4.816.614.0

18. Net Electrical Energy Generated (MWH) -1.796 -6.990 4_??R 162
19. Unit Service factor N/A N /A M/A

- 20. Lnit Availability factor N/A N/A' N/A

21. Unit Cabacity Factor (Using MDC Net) N /A N / A,,, N/A
22. init Capacity Factor (Using DER het) M/A N /A - N/A-
23. 1;ntt Forced Outage Rate e/a y /a , y /A, 24.

Snutdowns Scheduled Over hext 6 Months (Type. Cate and Duration of Each): _ Fort ~ St.- Vrain ceased nurinar nnnenrinn nn Aucunt 29. 1099. ,

25.

' $ hut Dxn At fed Of Report Period. Estimated 06te Of Startuo: JUA

25. entts in Test Status (Prior To Commercial Coeration):- Forecast- Achievec

!NITIAL CRITICALITY N/A- N/A INITIAL ELECTRICliY N/A N/A COMMERCIAL OPERATION N/A' N/A

{

l l

u , _

, , AVERAGE DAILY UNIT P00ER LEVEL

' Docket No. 50-267 Unit FErt St. Vrain Unit No. 1 DateMy1h,_1992 3

Completed By M. _L. Block Telephone {303) 620-1313 Month APRIL OAY AVERAGE DAILY POWER LEVEL DAv AVERAGE DAILY POWER LEVEL (Mie-Net) (MWe-Net) 1 0.0 17 0.0 i

2 0.0 18 _

0.0 '

3 0.0 19 . 0.0 1

4 0 . 0,___ _ 20 , 0.0 j

. 5 0.0 21 0.0  ;

6 0.0 22 0.0 7 0.0 23. '0.0 S _ _,_ ___ 0 . 0 24 0.0 9 0.0 _ 25 0.0 10 0.0 26. 0.c 11 0.0 ~ 27 __ 0.0- -

12 0.0 28 0.0 13 _ _ - 0. 0 - 29 0.0 1

14 __

0.0 30 0.0 15 __

0.0 31 'N/A #

16 0.0 Nuclear Operationsist Fort St. Vrain were' terminated on August' 29, 1989.

(

e

I f: .

If UNIT SFIU1 DOWNS AND POWER REDUCTIONS 2 '

t DOCKET NO. 50-267 3:p UNIT NAME Fort St. Vra in Uni t No. 1 .

DATE May 15. 1922 COMPLETED BY M. L. Block e

REPORT mot 4TH april. 1992

-TELEPHONE f 303).620-1313 ,

1_ i 1'

di

' -I i l 1 1 IMElisOD Oft I i

.I 'l I I . 1 (SHUTTING-1 I i 1

-l

! NO . I DATE ITYPEl DURATION-l REASON lDOWN .I I CAUSE AND CORRECTIVE ACTION I I i j LER J. ISYSTEMICOMPONENTI TO FREVENT RECURRENCE '

l l _lREACTOR I ICODE l CODE I I

i; I 'l .. l .I al I I 1 I I I .

-189-091 ,I 920401'I F l- 720.0. I -F i 1 1 N/A' I N/A l N/A I - Nuclea r Opera t ions we re t e rmi na ted on l

.. I i- 1 I I i f

-l 1 l I  ;;ust 29, 1989, see LER 89--016.

I- .I l'- 'l i I I I 1-i '

l i I- 1 I- 't I l- 1 I- I

1. 1 I I I .I l- 1 I I l I 1 l' I I i i i I iL .I :l I- I

!- 1 I

l- 1 I I

..I' .I' I l- 1- 1 I I l-l' l'

I I

1 1 1 I I I- I

.1' 'l 1 1 tm I

1 i 'l .i

.I I I I I

.I

-I.

I l

I I I i i l i i I

! I I i- l -I i I I

f: l l- ~l 1 I I I l- i y-  ; 'l I .I I l t= 1 1 I

.I l-I l- 1 'l i 1 I I I I 1 l- :I 1 I I I I I I

( I- I ,

[- 'I i .: I I I I I I  :

% ;I l' :1 l< ..

I I l- 1 l I 1; .

l-  ;'l l :f- I -l i I 1. I "I g

1 1 1: 1 I I I i i I 'l-. l' I l I- 1 I I 1

1 I I .I I l- I 4

I l-I-

I t i 1 l' l i I 1. 1 I 1

-l I. I ~f- I' l' I I I i I

~1 I i 1: -l> I I i .I  :  !

l I

'11 - .I I 1 1 i i i i l- I .1 -l I  ;

'l 1 -I I

I I 1 I I 'I l' 'l I . I -; I i f I t-

! ! ~. I l' I i i i i i f ,

.l.- I- -1

=l  ;

I l- 1 I I I i- "I I i  !  ! I l' I l-l l I ,1: 1-  !- I I l I I 1 I i l S I 1 I i i I I I I I

_!: I .. -l I 'l l- I -

.' .I -1 i l I.

l' .I 1. I I I 'l I .l. I

'l  ;

I '

1 I

1 4 e .. , ,.-m.. . , - .m - _ - - ,

_ - - - . . - __ - _ - - _ . _ . -~ - - . - . - - _ - . _ _- -

' Docket No. 50-267 Unit Fort St. Vrain Unit No. 1

' Date May 15, 1992 Completed By M. L. Block l Telephone (_303) dI20-1313 REFUELI_NG__ INFORMATION

~~'

l I Name of Facility i l 1. l Fort St. Vrain Unit No. 1 ,l 1 1 I l 2. Scheduled date for next l None, no further refueling t.t l l l refueling shutdown. I FSV_is expected. l l l I I 3. Scheduled date for restart l N/A l l feilowing refueling. I l

l l l l 4. Will refueling or resumption ofl N/A l l operation-thereafter require a l l l technical specification change l l l or other license amendment? l I

l I l l If answer is yes, what, in l'---------------- l l general, will these be? l l

l l l If answer is no, has the reload l l l fuel design and core configura-l l >

l tion 9een reviewed by your l l l Plant Lafety Review Committee N/A l to determine whether any unre- ll l l viewed safety questions are -l l l l

associated with the core reloadi l l (Reference 10 CFR Section l l 50.59J?_ _ _, _ l' 1

l {

l I I If no such review has taken l N/A l place, wnen is it scheduled? I l

[

l .

I l 5. Scheduled date's)_for submit- 1 I

l l ting proposed licensing action l -----------------

l and supporting information. 1 l

l l

-l 'l l 6. Important licensing considera .l l l --

l tions associated ing, e.g., with refuel- l new or different 1 j.

l fuel design or supplier, unre- ll ----------------

.I viewed design or performance 1

.I -l 1 analysis methods, significant - l- l l changes in fuel design,Jnew [ l operatint procedures.

l l 1 -l l 7. -The-number of fuel assemblies l l l

-l.

l (a) spentin the fuelcore andpool.

storage (b)'.in the l a)- 120 HTGR fuel elements. l I b) 396-HTGR fuel elements l r

.k

. REFUELING INFORMATION (CONTINUED) l l 8. The present licensed spent fuell Onsite capacity is limited in l l

l pool storage capacity and the l size to about one-third of core, l size of any increase in l l 504 HTGR elements. Construction -l l licensed storage capacity that l of an Independent Spent Fuel l l has been requested or is . l Storage Installation (ISFSI) l planned, in number of fuel l with a capacity of 1620 FSV HIGR l l

I assemblies. l elements has been completed and l l l and the facility has been l l l licensed by the NRC.* l 1

I l 9. The projected date of the last l No further' refueling is I

1 refueling that can be dis- .l l anticipated at Fort St. Vrain. ** l 1 charged to the spent fuel pool l l assuming the present licensed l

l. l l capacity. l 9 l The Independent Spent Fuel Storage Installation (ISFSI), which is presently undergoing fuel loading,"will be capable of storing the entire FSV core (1482 HTGR fuel elements) with storage space for an additional 138 HTGR fuel elements.

Under Agreements AT(04-3)-633 and DE-SC07-791001370 between Public Service Company of Colorado, General Atomic Cumpany, and DOE, spent fuel discharged curing the defueling process will be stored by 00E at the Idaho Chemical Processing Plant. The storage capacity-is presently limited to eight fuel segments. It is estimated that the ~

eighth fuel segment will-be discharged in 1992. 0tscussions concerning the disposition of ninth fuel segment are in progress with DOE.

1989.

Nuclear Operations at Fort St'. Vrain were terminated August 29,

' 2 I

  • s

_-_l

- _ - - - _ _ . . - - - . - - . - . - - - - - - - _ - - - . _ - _ _ . - - _ . _ - _ _ . . - _