FOSAVEX-91 Scenario for 1991 Plant Exercise of Defueling Emergency Response Plan
ML20090M187
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/20/1991
From:
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML19337E664 List:
References
NUDOCS 9203240075
Download: ML20090M187 (38)


Text

g, ' . -

6 I l

ENCLO5URE TO P-91380 FOSAVEX-91 SCENARIO 9203240075 '911030 PDR ADOCK 05000267 F PDR

da . .

4 . .

f ,

4

- CnrT nFYT! A f SECTION 1.0 SCOPE Fort St.- Vrain (FSV) will conduct an annual exercise of the Defueling Emergency Response Plan (DERP) on November 20, 1991.

This exercise is entitled FOSAVEX-91. The purpose of the exercise is to meet the annual exercise requirements of 10CFR50-Appendix E' and the DERP, and is intended to test major elements of the Detueling Emergency Response Plan.

The DERP was initially implemented on March 29, 1991, and is a

- downgrade from the previous Radiological Emergency Response Plan (RERP). Of f si te Emergency Response Facilities (ERF) were shown to be no longer needed, as the maximum emergency classification level credibly attainable is:an ALERT. Two onsite ERF's remain - the Control Room and the Technical Support Center (TSC).

Issue 2 of the DERP became effective on October 11, 1991, and incorporated miscellaneous changes, most notable of which was the addition of emergency preparedness provisions for the recently constructed Independent Spent Fuel Storage Installation (ISFSI).

As previously agreed- upon by PSC and the NRC, FOSAVEX-91 will only involve Emergency Response Organization (ERO) responses to simulated emergencies that do not involve the ISFSI.

The DERP provides for notification of state / local agencies and the NRC during certain emergency conditions. Based on the maximum credible accidents during def ueling opera tions, no of f site f ederal or state response is anticipated for an emergency at FSV. While natifications will be made per-procedures and the drill scenario, any offsite response from local medical or law enforcement organizations will be simulated. Therefore, no offsite agencies will be involved with FOSAVEX-91.

1 COM Avn.,11 AL

1 .-

4. ,

CONFTnr*> tin

'Section 2,0_ OBJECTIVES 2.1 Demonstrate the ability of the organization to recognize and assess a simulated emergency at FSV, and of Control Room personnel to properly classif y an emergency event per established procedures.

2.2' Demonstrate ~ the ability to activate the Emergency Response Organization by manning the TSC within 90 minutes of declaring an ALERT.

2.3 Demonstrate -the ability to properly complete emergency event /of f site notification forms, and make notification phone calls within the required time frame per established procedures.

2.4 Demonstrate the ability to properly conduct initial site personnel accountability within 30 minutes of sounding the plant alarm.and directing personnel to their accountability stations.

2.5 Demonstrate the ability to properly perform search and rescue of missing personnel.

2.6 Demonstrate the ability to proper]y brief and deploy any team.

$ 2.7 Demonstrate the ability to properly handle a -contaminated

l. injured victim. Demonstrate the ability to properly assess the

! extent of; the injuries a rid .. compare to the threat of l . contamination / radiological hazards, 2.8 Demonstrate the ability to _. properly control a radiological-tz hazard 1nvolving a fire and take precautionary measures to protect

!.  : personnel, t c

!- s

a. Demonstrate proper wearing of protective equipment / clothing when responding to an emergency

, involving a radiological hazard.

b. Demonstrate proper radiation monitoring techniques and' personnel protection provisions (ALARA) .w hen fighting a fire involving a SFSC.

l C. Demonstrate control of-a contaminated area to prevent-

-the. spread:of contamination.

d. Demonstrate proper fire brigade organization and leadership.

Cc:d IDLNIML

e 4

4 v.,1 wi.;T: 7 m 2.9 Demonstrate proper field / survey team deployment, organization, and monitoring operations.

2.10 Demonst rate of f ective communications between the Control Room, TSC, Security, and deployed teams / fire brigade.

2.11 Demonstrate effective firat aid and decontamination procedures.

2.12 Demous tI at e abi li ty to conduct t imel y dose -

assessments / projections.

2.13 Demonstrate the ability to properly conduct an emergency preparedness e.Nercise and perform an effective self-assessment by {

the FSV Drill Controllers and observers.

e .

t CONrTnrNTIAL SECTION 3.0 CONTROLLER / OBSERVER PRECAUTIONS AND INSTRUCTIONS 3.1 Should, at any time during the course of this exercise, an actual emergency situation arises, all activities and communucations related to the exercise will be suspended. It will be the responsibility of any exercise Controller / Observer that becomes aware of an actual emergency to suspend exercise response in his/her 1mmediate area and to inform the Lead Exercise Controller of the situation. Upon notification of -

any actual emergency, the Lead Exercise Controller may notif y all other Controllers / Observers to suspend all exercise activities. The Lead Exercise Controller, together with the Emergency Coordinator , will make a determination at that point whether to continue, suspend, or terminate the exercise.

3.2 Should, at any tinie during the course of this exercise, an exercise Controller / Observer witness an exercise participant undertake any action which would, in the opinion of the Controller / Observer, pl ace either an individual or plant component in an unsaf e condi tion, the Controller / Observer must attempt to terminate the unsafe activity immediately, l'pon termination of the activity, the Controller / Observer is responsible for contacting the Lead Exercise Controller and informing him of the situation. The Lead Exercise Controller, together with the Emergency Coordinator, will make a determination at that point whether to continue, place on hold, or terminate the exercise. -

3.3 Manipulation of any plant operating systems, valves, breakers, or controls in response to this exercise are only to be simulated. No alteration of any plant operating equipment, systems, or circuits in response to this exercise should 5 occur.

3.4 All repair activities associated with the exercise will be simulated. Extreme caution should be used when working near operating equipment.

3.s All telephone communications, radio transmissions, and public address announcements related to the exercise must begin and end with the statement, "This is a drill." Should a Controller / Observer witness an exercise participant not observing this practice, it is the Controller / Observer's responsibility to remind the individual to follow this practice.

"tt?II J DLx 115L

4 covrvnrw m t .m 3.6 Any motor vehicle responding in this exercise, whether for medical, rescue, fire f ighting, field moni toring, etc. , should I observe all normal traf fic laws including posted speed limits, stop lights / signs, . One way streets, etc, Controllers / Observers should ensure that exercise participants follow these requi,ements.

3.7 _ Care must be taken to prevent any individual not involved wi th the exercise from believing that an actual emergency exista.

Any Controller / Observer who believeo that thin situation exists, should approach that individual and explain the nature of the exercise and its intent.

3.8 If a Controller / Observer is aware of any of the above aituations, he .or_ she should immediately identify the situation to the Lead Exercise Controller.

3.9 Except as prescribed above and in the detailed exercice scenario, Controller /Observero - are not to prompt exercise participanto to_take actions. Controller /Observeru should avoid general conversations with the participants.

-3.10 controller / Observers are responsible'ior keeping the exercise on schedule. -Ihe Lead Controller is to be notified of any significant . delays or situationo that would cause the drill to be extended or to_ terminate prematurely.

3.11 Controller / Observers shall take - noten auf Iicient to allow

- adequat e _ ansessment of the- organization's response to _ the simulated emergency.

L .,

L i

~ -- .

o .

-4 CONFI DFNTT M _

~

SECTION 4.0 FOSAVEX-91 SCENARIO s

- 4l1 Scenario Overview The exercise will begin at approximately 0830 on November 20, 1991.

A' truck carrying a. simulated' Spent Fuel Shipping Cask (SFSC) full

- of- irradiated fuel will be staged complete with driver, and simulated to have just pulled out of the reactor building truck bay.. An individual located on top of the Security Administration Building, outside of the FSV protected-area, will-be simulated as firing - a. shoulder launched missile toward the SFSC. The missile will strike the truck and explode, causing _a subsequent nxplosion of . Lthe truck's diesel fuel tanks. These explosions result in

-destruction of the tractor, mangling of the trailer, and damage to the.SFSC. Secondary explosions of any flammable gases stored within reasonable distances will--also be simulated.

FSV Security- is expected to initiate actions per Securits

.' procedures to initially secure and protect the site . FSV personnel.

should.. take cover based on the immediate threat. The security force should assess the situation to determine if any further immediate threat exists, _ and contact local law enforcement agencies (local agency-r esponse will be simulated) . After it is determined tha t no addi tional' immediate' threat exists, emergency response l

actions should be taken per the Def ueling Emergency Respon: Plan, c

As a consequence of-_ the simulated explosions , the truck driver will

- be' killed instantly. A person that was walking nearby will be simulatedyto-bo_ injured and contaminated. Two other persons will l be" injured :' and loca t.ed. obscurely in or around-the helium storage

- building-and the chi-Iler building.

ll Af ter :the. security _ threE' is over, the fire brigade should respond to fight 1the fire, :planu clarms should be= sounded, and an Al;ERT u '

. should-be declared based on reports to the Control-Room.

Initial L personnel-accountability should be performed consequential to'the sounding _of; plant' alarms. The ERO should be activated, search'and ,

rescuet team (s) should be deployed to_ search for missing / injured L

personnel,- -field / survey team (s) should be deployed to monitor

!r >

- radiation / contamination levels and verify projected dose rates at

- the Emergency Planning Zone. boundary. The'SFSC condition should be

-~ assessed and stabilized.

. The exercise will' be terminated when all objectives have-been met, the'SFSC.is stabilized, radiation-levels have been-(or are being) tempered,-the extent of contamination'is known and controlled, and

. all. missing persons have been found.

t.uu2utsi T

_ .,.m...,  ;,,__, , . , . _ , - - , . . ~ , - ~ . .v .

,,m.. - , . - ,

.. .. . - - .- .. -- - - - - . . . ~ ----_-- ,

-p ,

MF-Htf*H AL _

4.2 Dotalled ScenarE 0830 Two Security Guards are staged- outside the truck bay-

  • doorn and simulated to have just locked the doors. One guard walks away and goen went through the helium atorage 4 building. The other guard incken his radio report that

' the door s are locked. (These actions will be controlled '

by a Drill Cont 1oller.]

0832 While the guardo are located an described above, an explosion is simulat ed involving a truck hauling the SPDC from- the reactor building truck bay. Secondary  ;

exploniana elso occur involving any nearby flammable gas I bottlen. Threa per sono are injured. The guard in the heli urn storage building is knocked unconscious. '1 h e

- guard standing - outside the trrch bay doors is knocked ,

unconscious and f alla out of r"9at between the chiller building and~the reactor Milt. wJ. Doth guards' radios are broken due-to their tal). One person that wan. ,

walking by the warehouse toward the t. ruck was knocked i

down frorn the blant and flying debris, lie han a broken '

arm and a sprained ankle, but in conocious. The truck drjver in killed inctantly.

0835 The ~ 1njured ' man by the warehouse is able to inform Security that he saw a minoile fired into the truck f rom ,

offnite. -A Security rmorgency should be- declared, i personnel uhould be instructed to take cover, and Weld Co. law enforcement should be -summoned (any offnite .

agency response'will be simulated).  !

0850 PSV Security is able to determine that no f urther thr eat existe and emergency response personnel may respond.

IDrill Contro11 era wi:11 provide information as necessary to assure this determination 10 made.)

08SS. An ALERT abould be - declared and announced ~ over the GAITRONICS system. A plant edarm should be sounded (moot likely the fire alarm depending on the information received in the CR) and the personnel accountability process Degins. (An ALERT may actually have already been

- declared by CR personnel. Ilowever, the ERO would not be respond untal no further security throat exista.)

I J.

. = =--e-,c.r---,---..,vrr-r-nr m,---. ..w-*-r.-i---..=.-=.,r,.rw-,my,~ w e,=-w .er .r v-y,.#m-.,,. as % ,w,w,w-w---,.v,--w,rr,-www,,,,,,-.rym-pg,,,,,,,-,e,,e-wy,w-,.,-y e ,r ww , wy,-t-gw-.,.--

. _ _ . _ . _ _ _ _ _ . . . = - -

, l MF4bHNTun

~

0900 The fire brigade _hould respond to begin fighting the firen (f rom t he exploolon, diesel f uel and flammable gan Sotties). The ERO should be summoned using the emergency pdger DyDlem. CR personnel Dhould begin off01te notificationn f or an ALERT (this may have already begun -

ace 0855 discucolon).

i 0925 'Initici personnel accountability is completed 30 mino.

L follcwing the counding of a plant alarm. At leaot 2 personnel are Inducing (the injured man located by the wa r ehou e r, snay or may not be logged as mioning at this stagvi.

. 0930 The ISr 40uld be activated by this time (90 mina. from the 7, ale ation of au l.LERT in allowed). All fires are out  ?

  • ins. aftet the fire brigade actually begina combatting the fire.

0935 A search and rescue team nhould be deploye1100 The exercise enda when all objectivoa have been met , the SFSC 10 stabilized, radiation IcVela from the breached cank have been (or are_being) tempered, the extent of contamination la known and controlled, and all missing personn have been found.

l L

l l -

M FTprs'TTAL l-

a N+NHMNft%tm 4.3 Ucenar io Menneigity 7

The attached suconagon will be used by tho Exercino Contro11ero an  :

opecifled to inf orin participant s of niinulated conditions during the ,

conduct of the exercine. 1:ection 4.4 contains ina pa and charts '

atipulatirig niinulated radiation and contamination levels.

i T

?

d 6

l .

(

L 1

f a b ) } ,*} ),

se.e- , - - -. .-w +r +,- h q -y wwge-,y.,r--r-p e w.. w h r,-e... e ,,,.e,yv.%- r-, mee.=-ve,,,mr.-. ,,we .,--%w,-,~ w--e.,, =*w.n,-y-,,, yy e v sw v-r - ev v m -w em---*,e r v e y v ~ e,-

I

p. F e t'tt7E:G ;. h MESSAGE #1 4

TIME / OCCASION: 0830 TO: TWO UECURITY GUARDS LOCKING Tile TRUCK DAY DOORS i i

A A A d e

  • A A A A A A A A d
  • A A A A A A A W A 9. A $ A A $ d A p 4 a p. e A p A
  • A A A , A A A A A A A A A A A A A n d, $ p A g a T!!10 IS A DRILL DO NOT TAKE ANY ACTIONS AFlECTING PLANT DEFUELING CONDITIONS

'AAAA,AAAAAAaA*,..**,.,,4.*,.AAA.A.*.,AA#A.A,*A.AAA..A,..,...A..A

. MCBSAGE:

One guard 'will stand near the doors and report over his radio t hat the doors have been simulated to be locked following truck bay '

operationn. The guard will une ntandard phraseology to make hia

- report. The other guard will go into the helium storage building and wait half-way-up the cantern side of the building. ,

Upcn hearing the nimulated exploulon, the outside guard will lay down out of sight between the chiller and reactor buildings. The other guard will lay down half way up the east side of the helium storage building. Both guards will be simulated -knocked *

- unconscious until an exercine participant touches the guard in an attempt to' arouse him. The guards will hereaf ter remain dazed.

- Both guardn' radios will be simulat ed broken f rom their f alls. The radion will actually be turned off to almulate they are broken."

t i

AAAAAAA$AAAAAAA$AdAsp+*****$$#9AA*AtA***AAARRAAn*AAAAAAAAAAAA*

Tills IG A DRILL f

- *A*ma***AA$A*AaeeAA*Ae**e**3******aAA**A*****************At*** -

^

COM J DENT J AL

.1

  • . - , ,_,. ~..~._,-- _ . _ _ , . . , _ _ . _ . . _ . ,_.-_-,,,-._-..,,,,..m.,,,, . . . . . _ , , . _ . . . . . . , . - . . . - - - _ ~~.,% , - - , =

. CONFIDENTIAL MLSHAP.E 42 TIME /DCCASION: 0832 TO: Al L l'ERSONNEL (VIA GAITRONICS)

,,,,. .,,,... ........,,...,,,,..** .,,,....***. i.,,,,.. ..,.,..*

Till S lu A DRlLL DO NOT TAKE ANY ACTIONS AITECTING PLANT DLFUELING CONDITIONS MESSAGE:

"'I h i n i n a drill . Thio in a dri)). All personnel have just heard a very loud explosive nojse i roin soinewher e north of the reactor building."

i

,, +,,,s ,n,,,.,,,s,,,sn, ,, , , ,,,,.,,,,,.,.,, .,, ,,,.,,,,,

THIS IS A DRILL

,, .+.**..*,,**,,,***,,#..**...

.. .......,4,.,,,,,,...,..,..,.

l O..i I UL hTitil ^

1 p3e tr i p tw o t g ],

MESSAGE #3 TIME /0CCADION: FROM 0830 UNTIL Tile FIRE IS OUT TO: ANY PERSON IN Tilt VIC]NITY OF Tile TRUCE FIRE P A *

  • A A A , A *
  • A d # A A A A , A ,
  • A A A A A A $ A A # A t t A 9 e R A A A * ,9 A
  • A A A A f
  • A A A A A A A A A A Tl!I S IS A DRILL DO NOT TAEE ANY ACTIONS ArrLCTING PLANT DEFUELING COND1TIONS ,

...*****t,.....A........,,...,**,**...**,a+,a*n,e,***,aa,.....

r MESSAGE:

"A huge fire 'in connuming the truck tractor. Smaller -fires- are ,

burning at ardous locations on the ground around the truck. Fires are burning and flameo are shooting f rom preasurized flammable gap bottles.- All ts uck/ trailer tires are on fire and giving of f black amoko."

CONTROLLER NOTES:

1. Dicael f uel' would have uprayed around the truck of t e f rom the ,

explondon. Small fires will be burning at these locations.

.2. Fires will burn ~ f rom -flammable gas bot t les f or as long as gan remains in them. .After the initial bottle explosions and preasure in the bottleo dissipaten, these fires will be self extinguishing. Allow approximately 30 mina, for the gas bottle fireo- to extinguish with no external influence. Flames will taper off accordingly over this period of time.

3. The truck tire lying on the injured man is not on fire.
  • a**e,.********.,*****************************.*****************

l TilIS IS A DRILL -

,,,,i,#** .

5,.,,,,*,,*,.. ,*, ,****,.*****>*,.**,****,,***a,***.**

M31 314 b $ ) ,$b

_ . . . _ . - _ , . . _ , _ . , . _ . _ . _ _ _ . . . _ . _ , . _ . _ . . . _ , _ . . . _ _ - _ . - . . - =- _ _,,.. _.._ _ _.

9 i

WTIENTI AL

. MESSAGE #4 4 TIME / OCCASION: PROM INITIAL EXPLOU10NS YllROUGl!OUT EXERCISC TO: ANY PERSON IN Tile VICINITY OF Tile TRUCN/DFSC ,

, , * * , , , , , , , , , , , , , , n * . n t , * * * * * * * * , , , , , , * , ,* * , , , m a n a * * * * * * *

  • n e , * * ,. ,

Tills 18 A DR1LL DO NOT TANC ANY ACTIONS AITECTING PLANT DEFUELING CONDITIOND

    • ,***. , 4*,$4,***,e,64, aver..,a.,,****,********,4.****,*,..**,

MESSAGE: ,

i 1

"The truck tractor has been dentroyed by the explonion and fire.

'Ibe trailer in mangled and on it s aide. The Sperit Fuel Shipping Cank in lying adjacent to the trailer. It has been physically separated / torn f rom ' the trailer. The helium storage building NE q corner and cautern o.ide have been partially torn away and blackened

- trom-the exploojono and flying debrio. The chiller building Nb corner- and- western ~ oide have been penetrated and damaged.

Miscellaneous metal and battle del >ris io strewn about the location."

(When askedl "The wind.in blowing.FROM the southwent. All other environmental conditions are as they exist."

CONTROLLER NOTE:

'1.- Any other buildingn/componenta within-thv same radius'as the chiller building at e nimilarly damaged.

  • AA*,**A*A,AA,***A***,,**A,A,,,*AAA**,*AAAA*AA 4A**A***,A$ ARA **A Til10 IS A DRILL l.

l- 4*4,*,,.**,*,. ,*,*,,, ..*3,2 .

.***.**,,,,**,**,.*,4.....*,*,4**

N TT W

=-: - . _ , _ . . . . _ . . . . , _ . , . - . . _ . = . - . . . _ - - - ~ , --.,--_..-w

. t tNCIDIAMAI  !

MESSAGE $5 TIME / OCCASION: FROM INITIAL EXPLOClONS TilROUGilOUT EXLRCISE

, f To: ANY PERSON INSPECTING INCIDE Ti!E IIELIUM DTORAGE IlUILDING I

      • Ae*A4AAAAA**A*AAA*eAAA**AAAAAAAAAAAaeae****AA4eaeeae*A$eAAeiaae TiiI S IS A DR1LL r

DO NOT TAKC

.ke*,4 ANY ACT10NU 4,***********

AITECTING**.,*,44

        • o ,*,

PLANT DEFULLING CCNDITIONS

  • ,*n.4...... n..... ..

MESSAGE:

t "The NE corner and cantern nido of the lielium atorage building han been acorched, ripped, and penetrated by the erplosions. Small  !

amounts of metal / bottle debria are lying about innido the building.

Some of the equipment located incide in acratched and dented, but in not damaged nignificantly tc af f ect its operation or preanure integr]ty."

5 s

6 i

$ k k h. $.Y k $ k k k kkhfNkkkk kkh khNN$N kkkkfkNk,kk$k$kMkhhk$ k8kkkhkkk Till S IS A DRILL

  • e, .**,a**k***********44...$, . .ie,xa**,**,,***, *********,,,,* ,

Tb SI 3 U$..dI5 l -

_....;,,_,,..__..,_..;_.-,..,__-._,-_....-. _ . , . . - , _ _ , ._~ . . _ . , _ _ . . . , _ . _ _ _ . - . . ~ . _ - . ~ . _ - . _ _ _ .

~

gNH-i+1 fetrna '

MESSAGE #6 TIME / OCCASION: FROM INITIAL EXPLOSIOND TilROUG110VT EXERCIDE To: 'ANY PERSON INSPECTING INSIDE Tile Cl! ILLER BUILDING

                                • n.**................,4.,***************aau,*,',*

TilI S IS A DRII.L I DO NOT TA14E ANY ACTIONS AFFECTING PLANT DEFULLING CONDITIONS l,

  • .,*A.A...., .******,..*****..Ana*..***.a**n*****.*****....* I MESSAGE:

"The NW corrier and went erti aide of the chiller building have been  !

penetrated and damaged, apparently by flying debris I rota the explosions. -Una)) amounto of metal /bott.lo debria are lying about inside the building. Some of the equipment located innido in acratched and dented, but jo not damaged signiticantly to affect its operation or pressure integrity."

I

)

6 i

    • t****A************$**************A*A**AA*nA*A A******A*Ain***

Tl!IS IS A DRILL

  • ,************ *=****,.#,. * ,.. ***** *,.,# 2.*, . *=**,.,**,,,

CUNi I Dijh

Q44RIDPG-M %

MESSAGI. #7 TIME / OCCASION: INJUkED MAN OUTSJDE BY WAREllOUSE To: ANY l'ERSON EXAMINING Tile INJURED MAN

..,x,, . ....................,##****,..........,,,,,,

Tills IS A DRTLL DO NO1 TAKE ANY ACTIONS Al'ITCT1hG PLANT DLEUELING CONDITIONS

. 4. ......,,,,. . ..........

MESSAUL:

"1 he nuut han been hit by debrio Irom the explosion. Ito han abrasionn on his head and atmo."

(Upon eeamination or quent ioning himi " lie has a broken arm (nimple fractor ' and a sprained ankle. Ihr is coher ent but in mild pain.

lie cantiot move by hin own powet."

(Upon nurveying him foi contam] nation) " lie is contamin at ed on all externol nurfaces." (See contamination charin.1 CONTROLLER NOTL:

1. A opare truck /t railer tire chould be used an a drill prop and gently laid on top of the man's arm ao he in staged for the eNorCiDe.
2. Refer to contamination charts /mapo for nimulated levels of personnel, ground, and equipment con t ami ria t i on .

,,,,*,.***x,......,*,,a........***,#.*****x....,*******.**,...i THIS IS A DRILL

...,.....*+,**,,a*

kNTILN I 1 tIb

MF1-DtNitAL MEUGAGE #8 TIME /OCCACION: I NJUl<l.D MAN ADJ ACENT 'IO' Cill LLER BLDG .

TO: ANY PERSON EXAMINING 'Illl' INJURED MAN

,,,,,4,,,.....,,,,,,,,,........,,,,,,,,,,,,...,,,,,,.. .

,s... .....

Till s I D A DRILL DO NOT T AKE ANY ACTIONS AITECTING PLANT DEFUELING CONDITIONS

,> ,,,+,,,,*,,,,,,,,,, .,,,..+,,,,,,,,,.,,,,,,,,,,,,,,,,,,,,,,,,,,

MEG 3AGl1:

llie taati in unconscioun when f ound. lie han auf f ered ininot abranionn (iticluding on his head) . Miscellaneous debris in lying around him.

Ihhen attemptedl lie can be arouced af t er a mornent 's at tempt , but remains dazed.

(Upon nurveying him foi cont aminationi lie in cor. t a tn i n a t ed on clothing from the kneen down. ICee contamination chatts.)

CONTROILER NOTE:

1. Refer to contamination charto/ maps for nimulated levels of personnel, ground, and equipment contamination.

,,,,,.,.......-...,.,..,..,,s..,,.,,,,,,,,s.,,,,,,,,,,,,,,;.

TilI S IS A DRILL

_ va t M 1 Al

trwryng m MESSAGE fl9 TIME / OCCASION: INJURED MAN INSIDE IlELIUM STORAGE BLDG.

To: ANY PERSON EXAMINING Tite INJURED MAN i

AAAAAAAAAAAAAAAAA*AAAAAA***AAAAAA*AAA,AAt**AAAAAAAAA,$A,**AAAAAAAA Tills 10 A DRILL DO NOT TAKE ANY ACTIONS AFFECTING PLANT DEFUELING CONDITIONS

  • ,.AAA,A*,AA,A*A....A.A4AAAA..A.,A,A,AA,AA,AAAAAAA.AAAAA.,AAA, M ES.9 AG E :

The man in unconscious when found. lie han suf f ered minor abracions (including'ori his head) . Miscellaneous debrin is lying around him.

[When attemptedl- lie can be aroused af ter a moment's at.Lempt. but retaaino ' dazed . '

IUpon surveying him for contaminationi lie in not contaminated.

(Unleco he becomes contaminated after he is' aroused and moved.)

c AAAAAAAAAAA'AAAAAAAAAA*AAAAAA*AA*Am**AAAAAAAAAAA'AAAAAAAAAAAAAAA#

~

Tlil S IS A DRILL AA,***AA****AAA,AAAA*,AAAA,*AA**A,,*AAAA,AA*AAAAAAAAAAAA*AA*A*$

    • T T A 1
g. carl DrN'Ti i L ,

MESSAGE #10

','I M E / OC C A S I ON :  !~ ROM INITIAL EXPLOSIONS TliROUGilOUT EXERCISE TO: CONTROL ROOM AND 'ISC PERSONNEL

....,*,**,,..,,,m.,,......,,..... ... n . .,2,4,,,***....e******,,

Till s I S A DIOLL DO NOT TAKE ANY ACTIONS AIT ECTI NG P1 ANT del'UELING CONDITIONS

    • , .. ..,aa**......,a.,,,,,**..#,*... .........,*,#***, .,*******,

MESSAGE:

IWhen they accefm ine t eor ol og i ca l d a t. a l "'Ihe wind 10 blowing FROM 230 degrees. All other environinent al pararnet ers are as read."

v A,AAAAA,,*A,*******fAA,,.,a*,*$ A *,t*A,,AA,,AAAA**,,A,,A. AAAAg*

71113 IS A DRILL s,,,**.+,,

s.,,s,<,a+,,,,

,,.+,..,,,,

. +,,,,n,,,n,,,s,,p,s,, a,,

MF 11/ L.= i 1 [IL

MEL4bhNMA4,-

4.4 Radi a t ion and cont atnina t iori Mrips /cha r t n The attached Iadiatiori atid corit arni riat iori t'ia pc and chartn wi11 be uoed by 1;Ne rci s e con t. r ol l e r s to ni rnul a t e r a di ra t i on levela corni ng irom the d a rn a g ed Spent l'uel Shipping Cank, arid to a i rnu l a t e con t aini tia t i ori levela ori pornonnel , the ground, and equiprnent .

i L

TtrrTiiiTrrxt--

m WO gC Z-Z

-  ! l oZ .-.

29

~~ .

l W

h

>==ue OO w H ^

- <- CD u

d'

~

'.a.3

. )

Ct; C ,

o m i e

' J L h e

^ ~

H (

n

- J m .

M i l' D

h m _

~ -

b%

N o

O{u 8 2

5 J_ . i- , .,

o e3 o 7-

% d S 9 t)

%sl %f f%

O'ga ,s' g 3x e b

eu s

e, 3 s ~

3e3l B g'yM \ \'

a / p ; g,----.dr l

e e4s u

., 7 4

k h' ~ .

I i

m y 9( -

4&

Cli' M An R "~.7 '

% L &t # w '

ju,f

.li, d43j

' t6 c u t b t _b, G

~

l l gO -

ZZ Z m o-h

~

W >=e 8

oo U_ -

He z- <-

MD 6'

  • J

- -  % C. ,

l

) ~ \

@ i 3

l t  ; e i e

danummma '

8 '

L

'M .m ,

N I n

f

- J -

i 6 : :, ~, - (-

y l

M WQ o

w4 g

$3 l.

A N m M g

!d*-

f

. /,,-,, / <l w\

j

  • \ Q MfMO j

j NN 's's 3 i -

'S 4

,/

x 'xs 3 & >z l

g '/ /

s m '1 ' ' q %

i-4.

/ /

'\ N,f g i k

2 p

, xXg ;7 g 4 ,

3, g g s

' '/,, \ ,

.s s

'7

>s x '

)

>== I 3 w g 60 g '

)x s - -

N y {

v) 'N x x,4 s .

i ,

~

r N/ , ' x N- '

l l

I a

r g Q g k'4 ,

-gg j t

G80 - . - . _ -. -- . - - . - . - . -

4 4

00SE knif*3 (dom /-hi i~ TA/ C.43K TNCitiJ A / Art .

I 3?o .

2" [8 3" 24 4 /y 5 9 l t .1 7 4. 7 8 36 9 2.s 10 "" 23

// /.9 fric _mA/bd

/ / 6 cc 3 9co 3 180 4 /oo 4 YY 8 35

/2 //

.20 of to /. o 80 25

/20 . to l

,m-- - 4 + - - J--- 4- + - -A--- 6- a----as +

G n

?

i

/

U 4

1 i !" *: '

N l

( ~N to

[

1 e

4

>,S. . ly {

y Ws # P ie l

-)

k s- TX N e

4

/^  %

5 h,

~ \

-' M y lu

" v a s 9

t v

G /.

f s

b ,

b V

U w

1

^

k s

  • I 1 e k L 2

\

w 0

~\ q O n \

' E h u ?a g w 3 q J k 4

CONFIDENTIAL

SECT 10fi5.0 E V ALU AT IDlLC.HE C Kl;l $15 Controller /Dbserver evaluation checklists are attached for use during FDSAVEX-91 to evaluate the response of the FSV organization to the simulated en'e r g e ncy situation. The checklists should be annotated regarding the actions taken by the participants / Emergency Response Organization in sufficient detail so that they can be used during the exercise debriefing and formal critique. All checklists should be given to the Lead Esercise Controller at the conclusion of the critique.

M

.- w usnouaixe

- . -. - . - _.-.~. - -.. - .. .. - - . - - -

3 F

, l F05AVEX-91  !

CONTROLLER 76bil~kVE~k CHECKLIST i i

CONTROL ROOM Controller / Observer Name: _

~ ~

ICTI6 Tis EVELTKW0iT  ;

NOUE Declaration Time (if applicable): __

ALERT Declaration Time: ,

1. Communications with Security and ability to evaluate the implications of the scenario?

l

2. Ability to initially assess  !

facility conditions and determine the. emergency classification accuratelyi.

3. Knew when and how to activate the Emergency Response Organization properly?
4. Properly completed event notification forms, got them signed before making notif; cations, made netifications accurately and within specified time frames?
5. Initial- personnel accountability completed within minutes -of - -

notifying personnel to report to 1their 7,ccountability stations? >

6. Any teams deployed by the CR were

- properly briefed and deployed per DERP-TEAMS?

7. Effective communication link to the '

TSC (when manned)?

n@g w-  % =--- -me--e ,y -

a mp g a -gx. .+p,r.., s.ch ,- 69.i.p4, wi ,,e -yn. ,,p9ry,.y,-, a gWg..gg ,g -

9.y 9, y q p _a g y.- ++ywf_w..,,y9 ,,y,p-pe.y999,,,,, g+wp., qswww ry 9 9+- y-my m py y e- + 9,- y mryW.i

. I 2: FOSAVEX-91 -

3 CONTROLLER 7d($f4VffCHECKLIST l

, CONTROL ROOM (continued) i 1

XCfluiis EVAIJATT6N ,

i i i

1 1

8. Any additional-communications links  !

l- established were manned by I

, knowledgeable personnel and were ,

- effective? j
9. Initial EPZ dose rates assigned per DERP-DOSE?

l' 10. DERP-CR followed and checklists properly performed?  !

11. Habitability verified? l f

ADDITIONAL COMMENTS: i l

E b

l -

4 i

l' I

-i L

i r

u..,_..___.-- - _ _ _._.-. _ __ _ ..._._ _ . . _._- - _ . _ _ _ _ . _ _ _ - . _ . . .

F05AVEX-91 .

CONTROLLER 73 Bit'RVfR~ CHECKLIST ,

5 TECHNICAL SUPPORT CENTER Controller / Observer Name: _

AC71biW tVALUCIDN

]

1, Center manned and ready within 90 l minutes of ALERT declaration? - .

+

2. Center set up- and activated in .i accordance with Checklists /DERP- l TSC? l
3. Search and Rescue Teams, or other special teams properly briefed and ,

deployed per DERP-TEAMS & DERP-EXP?

Teams organized?

4. Field / Survey Teams = properly briefed

-and deployed perl DERP-FIELD /DERP-SURVEY 7 Teams organized?

S. Continuing accountability and personnel exposure maintained?

6. Follow up notification forms properly completed, signed before ,

notifications made, . notifications properly' made by knowledgeable individual?  ;

7. Effective commutHcations exist between the ISC, CR, Security and deployed teams?

8.. Dose assessment / projections '

effectively made and are appropriate for the given '

_ conditions?

,,e. ....,...;_m._4.- -p_., .,..-#,,,, , , ,._.-m_,_ , -,,,,,,.,,,-...,__..,,..L.,,.,_~.... ,,.-m em.._m_, , , _ ,_ _ . _ _,4,,.,,_.r,-%. . - . , , r_ ,_ ~ .'u.wm,M

1 FOSAVEX-91 CONTROLLER 70BifkVff' CHECKLIST l TECHNICAL SUPPORT CENTER (continued)

AlfT6NS CVAI.Tl4 TION

9. TSC is actively pursuing actual / accurate information and radiation / contamination levels from the SFSC site?
10. TSC i s actively pursuing location and status of any missing ,

personnel?

11. TSC is pursuing portable shielding / stabilizing the SFSC?

t

12. TSC i s pursuing containment of the contaminated area?
13. Habitability i s being periodically verified in the TSC? ,

ADDITIONAL COMMENTS:

1

+

i t

-- ,-.w. . ,,,.<e.. ..,,.,m,,y'..y . . . , . _ . . ..i,. ,y_.,y.._-.m, ..._m_ y .w__m, 7.,-,s ..,--m.,,,,,4,-- ,. -..yw.,,. , .,,..y,.my.w.,

~F05AVEX-91~

CONTROLLER /0B$ERVER CHECKLIST FIRE BRIGADE Controller / Observer Name: ____ _

Xtil0NS EVALUAll0M

1. Dresses out with protective clothing and equipment appropriate for the given scenario? Wears the equipment / clothing properly?
2. Fire Brigade is organized with a known fire brigade leader?
3. Establishes effective communications with the CR or 15C?

Keeps the Emergency Coordinator informed of the status of the fire?

4. Health Physics Representative on the fire brigade properly monitors radiation levels, analyzes the scene from a radiological perspective, and establishes proper protect'.ve measures for the brigade while fighting the fire?
5. Health Physics Representative is cognizant of possible contamination and reasonably provides for its control?
6. Fire brigade attempts to minimi:e the spread of contamination as much as possible for the given scenario?

h I

4 FOSAVEX  !

CON _TR_OLLER70'EIN$~RCHECKLIS_T t

FIRE BRIGADE (continued)

KCTION tTALWfl0N

7. When finished fightilig the fire, properly removes protective  ;'

clothing and equiptrent? _

ADDITIONAL COMMENTS: i t

+

I f

k t

i a

s 9

l.

e l

- ..--:n...-a,.- ....,n,,--....____-,,,,..,,,.._,.-_,,,,i,,,,,,c,,-,...n.',,,.,-.A-,.m.,,_,,,.,,,v.,,-.,..,.me-,...-.~, van,, e.,w,,~.,S,,

- < s .

4 F05AVEX 91 CONTROLLER 7bs$lkVER~ CHECKLIST SEARCH AND RESCUE TEAMS Controller / Observer Name:

XtTTONS '

EVALUATION

1. Team properly briefed before deployment?
2. Team members understand their tasks? ,
3. Team leader is identified and known to members?

4 Radiological hazard / expected dose rates are known by all members?

Follows proper ALARA precautions?

5. Team .is properly dressed in protective clothing / equipment for the expected environmental / contamination conditions?

6 Appropriate dosimetry is worn?

SRPD's are periodically checked (as applicable)?

7. Effective communications are established between the team and TSC or CR?

l

f0SAVEX-91 CONTROLLER 70M GiW FCHECELIST .

9 l SEARCH AND RESCUE TEAMS (continued) r XCffDN WFLUATTBN

8. Properly handles and cares for an injured victim?
9. Takes adequate personal protection precautions when handling a potentially contaminated injured victim?

.10. Minimizes the spread of contamination?

11, Health Physics Technician is a member of any team going into areas where radiation / contamination levels are unknown?

- ADDITIONAL COMMENTS:

ll 4

. y u.my.-#, ....w,_, ,,.,,..s.,, , , ._y..,,.......y,., ,-g._. .,_,.v.w,

. . .. __ . _ - . . ._._.._ _ ._ .. _......_~.. _ ._ _ ._ _._.. _ _ _ ___ . . - . . _ . . _ _ . .

m FOSAVEX-91 CONTROLLER /0BSERVtTCHECKLIST FIELD / SURVEY TEAMS Controller / Observer Name: _ . _

~

AfYTDNS EVALVATl0N

1. Teams properly briefed be# ore deployment?
2. -Team members understand their
u. tasks?

>=,

Team leader is identified and known '

to members?

9. Emergency response vehicle is i - -

properly _ prepared for deployment per .DERP-FIELD -- instruments are properly source checked? (If z epplicable).

5. Radiological hazards are known by a'll ;membe rs? Expected -dose rates are known?

"r" l 6,. Team is properly dressed. in protec'ive t :lothing/ equipment for the excetted environmental /contaminatian conditio.i'

7. Appropr16ce dosimetry is vorn?

SRpD's are periodically t1ecked (as applicable).

l

.- 9 i;

l

!\ -,. , , ,- .. -- -

FOSAVEX-91 CONTROLLER 76CSERVER CHECKLIST FIELD / SURVEY TEAMS (continued)

)

RTl0N EVALUATION i

8. - Effective communications are established between .the team and ~ ~ ' ~~ ~

the TSC?

9. Minimizes the spread of contamination?
10. Properly completes checklists and gathers monitoring data per DERP-FIELD? :(Field Team).

- ADDITIONAL COMMENTS:

I i

l we w >- ,-.- , , , , e , . -m. . - . n-,-- .o.wr= ,g-- >>e, v , ,-- =~e-r-

F05AVEX-91 CONTROLLER 765SCRVER CHECKLIST FIRSTLAID/ DECONTAMINATION Controller / Observer-Name:

XTCTION ~~' EVALUAildk

1. Responder establishes communication with the victim and assesses an -

immediate medical threat? Vital

signs-(as appropriate for the time and location of victim)?
2. Victim's- proximity to radiological and environmental .. hazards (i.e.,

radiation, contamination, fires) are compared to his medical condition? Victim is removed from any . area / environmental condition that may pose a threat?

3. Any immobile victim is properly carried to safety without risking further injury?
4. . Vi c t'ims are kept wa~m and
  • reassured?

,I

5. Personal precautior.; are taken when ,

handling a potentially contaminated victim?-

'6 . Decentamination is- performed Jonsite, if possible, before transporting- a -victim via ambulance? (ThisL-depends on the l extent'of the injuries)'.

~

V l

l e

k e.em,,..w,~ .r., .,wo- . -, -- e +,, .w.-,-r,--y,, ,,-,-m-, , ---. c .~wr-, y,.-c.., , m -s

p-

-.- 4 ,

FOSAVEX CONTROLLER 7D55fkVfk CHECKLIST i FIRST AID / DECONTAMINATION (continued) i ECflDNS EVALUATION

7. Spread of contamination is minimized? .. .
8. Any routes taken with potentially contaminated personnel are made known to radiation / contamination survey personnel?
9. Decontamination procedures are ,

performed with care to not ,

aggravate injuries? Any water used does not exceed a lukewarm temperature?

10. Decontamination. procedures are effective and would actually result in lowering contamination levels?